{"schema_version":"1.0","country":"gb","country_name":"United Kingdom","topic":"grid-connection-queue","question":"Where can I get the list of grid connection requests in the United Kingdom, with project, technology, capacity (MW), connection node, status and date?","territory":"gb","territory_level":"country","parent_url":null,"published_on":"2026-11-27","research_reviewed_on":"2026-11-27","access_checked_on":"2026-11-27","answer":{"official_data":"partial","non_official_data":"not_tested","summary":"NESO publishes GB TEC contracts and a separate Scottish embedded register; SONI publishes Northern Ireland connection agreements and effective applications. Distribution operators publish their own registers. These datasets mix connected and future projects and do not provide a complete list of all UK applications.","main_caveats":["TEC is a contract register, not all requests; NESO reports no public demand connection register.","An empty Gate field is not Gate 1 or Gate 2: NESO populates it after an agreement is countersigned.","Effective capacity dates are not application dates; connected MW and cumulative stage MW are different.","NESO warns repeated capacity across stages or technologies can cause duplicates.","Distribution coverage varies: Northern Powergrid ECR omits unaccepted enquiries; SONI omits cluster agreements."],"confidence":"medium","confidence_reason":"Both NESO CSVs and SONI workbook were downloaded; a distribution CSV is blocked and full UK coverage remains unchecked.","attributes":[{"attribute":"project","covered":"partial","source_ids":["tec","embedded","soni","distribution"],"note":"Names and project IDs are available in tested NESO and SONI records.","gap":"not_checked","gap_note":"UK-wide coverage and missing distribution, request-date or history details remain to be checked."},{"attribute":"technology","covered":"partial","source_ids":["tec","embedded","soni","distribution"],"note":"NESO has Plant Type; SONI groups rows in technology sections.","gap":"not_checked","gap_note":"UK-wide coverage and missing distribution, request-date or history details remain to be checked."},{"attribute":"capacity_mw","covered":"partial","source_ids":["tec","embedded","soni","distribution"],"note":"NESO connected and cumulative TEC; SONI export/import differ.","gap":"not_checked","gap_note":"UK-wide coverage and missing distribution, request-date or history details remain to be checked."},{"attribute":"connection_node","covered":"partial","source_ids":["tec","embedded","soni","distribution"],"note":"NESO connection site and SONI point coordinates are available.","gap":"not_checked","gap_note":"UK-wide coverage and missing distribution, request-date or history details remain to be checked."},{"attribute":"status","covered":"partial","source_ids":["tec","embedded","soni","distribution"],"note":"Status and agreement stage exist; Gate blank is unspecified.","gap":"not_checked","gap_note":"UK-wide coverage and missing distribution, request-date or history details remain to be checked."},{"attribute":"event_date","covered":"partial","source_ids":["tec","embedded","soni","distribution"],"note":"NESO MW Effective From is not the request date; SONI has connection dates.","gap":"not_checked","gap_note":"The tested NESO files give capacity-effective dates, SONI reports connection dates or status, and Northern Powergrid reports offer acceptance. Application submission dates were not established across these registers."},{"attribute":"latest_data","covered":"partial","source_ids":["tec","embedded","soni"],"note":"NESO files dated 26 November 2026; SONI latest linked 17 August 2026.","gap":"not_checked","gap_note":"UK-wide coverage and missing distribution, request-date or history details remain to be checked."},{"attribute":"historical_series","covered":"partial","source_ids":["tec","embedded","soni"],"note":"NESO cites FOI archives for 2014–2025; SONI links previous editions.","gap":"not_checked","gap_note":"UK-wide coverage and missing distribution, request-date or history details remain to be checked."},{"attribute":"update_frequency","covered":"partial","source_ids":["tec","embedded","soni","distribution"],"note":"NESO states twice weekly, SSEN monthly; SONI schedule not established.","gap":"not_checked","gap_note":"UK-wide coverage and missing distribution, request-date or history details remain to be checked."}]},"sources":[{"source_id":"tec","name":"NESO Transmission Entry Capacity register","publisher":"National Energy System Operator","official":true,"landing_url":"https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register","data_url":"https://api.neso.energy/dataset/cbd45e54-e6e2-4a38-99f1-8de6fd96d7c1/resource/17becbab-e3e8-473f-b303-3806f43a6a10/download/tec-register-26-november-2026.csv","access":"direct_download","format":"CSV","license":"NESO Open Data Licence","language":"en","has_coordinates":false,"location_precision":"none","publisher_type":"operator","adds":"TEC agreements, including existing and future projects.","first_seen_pass":1,"rank":1,"summary":"TEC agreements, including existing and future projects.","coverage_note":"Great Britain; projects holding TEC agreements for existing or future connections, including embedded projects.","data_date":"26 November 2026","caveats":["Not a complete UK-wide list of all applications."],"coverage":{"geographic":"Great Britain; projects holding TEC agreements for existing or future connections, including embedded projects."},"fine_print":{"unit":{"value":"TEC in MW; connected, increment/decrement and cumulative totals are separate.","quote":null,"url":"https://api.neso.energy/dataset/cbd45e54-e6e2-4a38-99f1-8de6fd96d7c1/resource/17becbab-e3e8-473f-b303-3806f43a6a10/download/tec-register-26-november-2026.csv","attempts":[]},"inclusion_rule":{"value":"TEC agreements","quote":null,"url":"https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register","attempts":[]},"reference_date":{"value":"File dated 26 November 2026","quote":null,"url":"https://api.neso.energy/dataset/cbd45e54-e6e2-4a38-99f1-8de6fd96d7c1/resource/17becbab-e3e8-473f-b303-3806f43a6a10/download/tec-register-26-november-2026.csv","attempts":[]},"update_frequency":{"value":"Twice weekly, Tuesday and Friday","quote":"This file will be updated twice weekly on Tuesdays and Fridays.","url":"https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register","attempts":[]},"exclusions":{"value":"Not a full register of all applications before an agreement.","quote":null,"url":"https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register","attempts":[]}},"key_fields":[{"meaning":"project identifier; stages may have suffixes"},{"meaning":"case-sensitive identifier"},{"meaning":"contracted connection location"},{"meaning":"technology"},{"meaning":"connected capacity"},{"meaning":"staged capacity change"},{"meaning":"total after the stage, not additive across all rows"},{"meaning":"effective date for capacity, not application date"},{"meaning":"project status"},{"meaning":"agreement gate when countersigned; blank is unspecified"}],"how_to_use":{"example_request":"https://api.neso.energy/dataset/cbd45e54-e6e2-4a38-99f1-8de6fd96d7c1/resource/17becbab-e3e8-473f-b303-3806f43a6a10/download/tec-register-26-november-2026.csv","example_result":"012 NEP Coventry West | NEW ENERGY PARTNERSHIP LIMITED | Berkswell GSP | 92.4 MW | Scoping | 31/10/2034 | PRO-003804 | Gate blank","steps":["Download the CSV, read the headers and identify projects by Project Number and case-sensitive Project ID.","Read connected MW, increase/decrease, cumulative MW and effective date separately; distinguish built from scoping rows.","Do not sum cumulative MW across stages or repeated technology rows; inspect each project agreement."],"reading_traps":["Gate is populated after agreement countersignature; blank is not evidence of Gate 1 or rejection.","Aggregated capacity across stages and technologies may repeat in several rows.","MW Effective From is a capacity effective date, not date of application or proof of physical connection.","Corrections may lag while reform governance is in place.","Signed Gate 1 capacity is indicative and dependent on obtaining Gate 2, according to NESO: https://www.neso.energy/document/383501/download","NESO says it has no public demand connections register. https://www.neso.energy/document/390531/download","NESO has disclosed historic TEC versions via FOI-24-0040(a) (2014–2020) and FOI-24-0031 (2021–2025); the current portal is not a routine historical archive. Older versions may lack Project Number. https://www.neso.energy/document/363736/download"]},"test":{"tested_on":"2026-11-27","method":"download","http_status":200,"content_type":"application/octet-stream","size_bytes":419945,"records_total":2185,"records_for_country":2185,"problems":[]},"evidence":[],"members":[],"members_summary":null},{"source_id":"embedded","name":"NESO Embedded Register","publisher":"National Energy System Operator","official":true,"landing_url":"https://www.neso.energy/data-portal/embedded-register","data_url":"https://api.neso.energy/dataset/4b0e109c-aa23-45ac-86c1-0bda557d1aab/resource/68b6f3a1-e1bf-403b-9062-0269fc758d77/download/embedded-register-26-november-2026.csv","access":"direct_download","format":"CSV","license":"NESO Open Data Licence","language":"en","has_coordinates":false,"location_precision":"none","publisher_type":"operator","adds":"NESO Scottish embedded generation.","first_seen_pass":1,"rank":2,"summary":"NESO Scottish embedded generation.","coverage_note":"Scotland: embedded generation connected or contracted to connect.","data_date":"26 November 2026","caveats":["Not a complete UK-wide list of all applications."],"coverage":{"geographic":"Scotland: embedded generation connected or contracted to connect."},"fine_print":{"unit":{"value":"TEC in MW; connected, increment/decrement and cumulative totals are separate.","quote":null,"url":"https://api.neso.energy/dataset/4b0e109c-aa23-45ac-86c1-0bda557d1aab/resource/68b6f3a1-e1bf-403b-9062-0269fc758d77/download/embedded-register-26-november-2026.csv","attempts":[]},"inclusion_rule":{"value":"Scottish connected or contracted embedded generation","quote":null,"url":"https://www.neso.energy/data-portal/embedded-register","attempts":[]},"reference_date":{"value":"File dated 26 November 2026","quote":null,"url":"https://api.neso.energy/dataset/4b0e109c-aa23-45ac-86c1-0bda557d1aab/resource/68b6f3a1-e1bf-403b-9062-0269fc758d77/download/embedded-register-26-november-2026.csv","attempts":[]},"update_frequency":{"value":"Twice weekly, Tuesday and Friday","quote":"This file will be updated twice weekly on Tuesdays and Fridays.","url":"https://www.neso.energy/data-portal/embedded-register","attempts":[]},"exclusions":{"value":"Not a full register of all applications before an agreement.","quote":null,"url":"https://www.neso.energy/data-portal/embedded-register","attempts":[]}},"key_fields":[{"meaning":"project identifier; stages may have suffixes"},{"meaning":"case-sensitive identifier"},{"meaning":"contracted connection location"},{"meaning":"technology"},{"meaning":"connected capacity"},{"meaning":"staged capacity change"},{"meaning":"total after the stage, not additive across all rows"},{"meaning":"effective date for capacity, not application date"},{"meaning":"project status"},{"meaning":"agreement gate when countersigned; blank is unspecified"}],"how_to_use":{"example_request":"https://api.neso.energy/dataset/4b0e109c-aa23-45ac-86c1-0bda557d1aab/resource/68b6f3a1-e1bf-403b-9062-0269fc758d77/download/embedded-register-26-november-2026.csv","example_result":"180/181 Clynelish Muir BESS | Opdenergy UK 19 Limited | BRORA 132/33KV GRID SUPPLY POINT SUBSTATION | 50.00 MW | Scoping | 2030-10-31 | PRO-003597 | Gate 1","steps":["Download the CSV, read the headers and identify projects by Project Number and case-sensitive Project ID.","Read connected MW, increase/decrease, cumulative MW and effective date separately; distinguish built from scoping rows.","Do not sum cumulative MW across stages or repeated technology rows; inspect each project agreement."],"reading_traps":["Gate is populated after agreement countersignature; blank is not evidence of Gate 1 or rejection.","Aggregated capacity across stages and technologies may repeat in several rows.","MW Effective From is a capacity effective date, not date of application or proof of physical connection.","Corrections may lag while reform governance is in place."]},"test":{"tested_on":"2026-11-27","method":"download","http_status":200,"content_type":"application/octet-stream","size_bytes":91548,"records_total":555,"records_for_country":555,"problems":[]},"evidence":[],"members":[],"members_summary":null},{"source_id":"soni","name":"Connections Register","publisher":"SONI","official":true,"landing_url":"https://www.soni.ltd.uk/industry/connections-and-applications","data_url":"https://cms.soni.ltd.uk//sites/default/files/2026-08/20260817%20Connections%20Register%2017%20Aug%202026%20%28Excel%29.xlsx","access":"direct_download","format":"XLSX","license":"unknown","language":"en","has_coordinates":true,"location_precision":"exact","publisher_type":"operator","adds":"Northern Ireland applications and agreements.","first_seen_pass":1,"rank":3,"summary":"Northern Ireland applications and agreements.","coverage_note":"Northern Ireland transmission and selected distribution TUoS cases. SONI excludes connections below 5 MW and cluster substation agreements.","data_date":"17 August 2026","caveats":["Not a complete UK-wide list of all applications."],"coverage":{"geographic":"Northern Ireland transmission and selected distribution TUoS cases; excludes cluster substation agreements."},"fine_print":{"unit":null,"inclusion_rule":null,"reference_date":{"value":"17 August 2026","quote":"Last updated: 17 Aug 2026","url":"https://cms.soni.ltd.uk//sites/default/files/2026-08/20260817%20Connections%20Register%2017%20Aug%202026%20%28Excel%29.xlsx","attempts":[]},"update_frequency":null,"exclusions":{"value":"Cluster substation transmission works offers are excluded.","quote":"These are not covered in the SONI Connection Register.","url":"https://cms.soni.ltd.uk//sites/default/files/2026-08/20260817%20Connections%20Register%2017%20Aug%202026%20%28Excel%29.xlsx","attempts":[]}},"key_fields":[{"meaning":"project or unit"},{"meaning":"connected date or Not Connected Yet"},{"meaning":"agreement stage"},{"meaning":"easting and northing"},{"meaning":"export / import capacities for the storage section"}],"how_to_use":{"example_request":"https://cms.soni.ltd.uk//sites/default/files/2026-08/20260817%20Connections%20Register%2017%20Aug%202026%20%28Excel%29.xlsx — Connections Register sheet, row 174","example_result":"Sheet Connections Register, row 174: Magherafelt Battery Storage | Magherafelt BES Ltd | Transmission - 275 kV | 195 / 195 MW | In Progress | Awaiting Application | Not Connected Yet","steps":["Open Connections Register sheet; inspect the separate section headings and rows.","Row 174 belongs to Battery Storage - Applications Deemed Effective; read columns B–L, including both agreement statuses and export/import MW."],"reading_traps":["SONI lists separate application and agreement sections, not a single queue order.","The coordinates in the sample are connection-point coordinates; exact coordinate reference system remains to be confirmed.","Easting/northing sample Ballylumford transformed plausibly as Irish Grid but its CRS was not stated in the tested workbook.","NIE Networks’ 2018 consultation said disclosure of some individual distribution applicants required consent; that historic document is not evidence of the present law. https://www.nienetworks.co.uk/getattachment/Connections/Generation-connections/Generation-Consultation/NI-Gen-Connections-Consultation.pdf","The SONI register excludes connections below 5 MW."]},"test":{"tested_on":"2026-11-27","method":"download","http_status":200,"content_type":"application/vnd.openxmlformats-officedocument.spreadsheetml.sheet","size_bytes":54293,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Minimum size for inclusion in the SONI register.","url":"https://www.soni.ltd.uk/industry/connections-and-applications","quote":"Connections less than 5 MW are not included."}],"members":[],"members_summary":null},{"source_id":"distribution","name":"Distribution operators’ embedded capacity registers: sample","publisher":"Distribution network operators","official":true,"landing_url":null,"data_url":null,"access":"api","format":"JSON, CSV or web","license":"varies by operator","language":"en","has_coordinates":true,"location_precision":"exact","publisher_type":"operator","adds":"Distribution accepted or connected projects, including a tested Northern Powergrid API; some operators block access.","first_seen_pass":1,"rank":4,"summary":"Operator registers cover distribution-connected and accepted projects; Northern Powergrid data are queryable.","coverage_note":"Northern Powergrid tested in northeast England and Yorkshire; SSEN and NGED data downloads were blocked.","data_date":"13 November 2026 for Northern Powergrid","caveats":["Coverage and access differ by operator; ECRs omit many unaccepted enquiries."],"coverage":{"geographic":"Selected operators: Northern Powergrid, SSEN and NGED in Great Britain; not a complete UK distribution inventory."},"fine_print":{"unit":{"value":"Northern Powergrid registered, export and import capacity are separate MW fields.","quote":null,"url":"https://northernpowergrid.opendatasoft.com/explore/dataset/embedded-capacity-register/","attempts":[]},"inclusion_rule":{"value":"Northern Powergrid ECR includes generation, storage and flexible demand connected or accepted to connect; 50kW–<1MW and >=1MW parts.","quote":"either already connected, or accepted to connect","url":"https://northernpowergrid.opendatasoft.com/explore/dataset/embedded-capacity-register/","attempts":[]},"reference_date":{"value":"Northern Powergrid dataset processed 13 November 2026.","quote":null,"url":"https://northernpowergrid.opendatasoft.com/explore/dataset/embedded-capacity-register/","attempts":[]},"update_frequency":{"value":"Northern Powergrid: monthly by tenth working day.","quote":"updated by the 10th working day of each month","url":"https://northernpowergrid.opendatasoft.com/explore/dataset/embedded-capacity-register/","attempts":[]},"exclusions":{"value":"Enquiries before acceptance are not covered by Northern Powergrid ECR; NGED describes a broader generation register but its data were blocked.","quote":null,"url":"https://northernpowergrid.opendatasoft.com/explore/dataset/embedded-capacity-register/","attempts":[]}},"key_fields":[{"meaning":"operator record identifier"},{"meaning":"project/site"},{"meaning":"network points"},{"meaning":"technology"},{"meaning":"registered generation capacity"},{"meaning":"Connected or Accepted To Connect"},{"meaning":"date offer accepted"},{"meaning":"planned energisation; can be missing"}],"how_to_use":{"example_request":"https://northernpowergrid.opendatasoft.com/api/explore/v2.1/catalog/datasets/embedded-capacity-register/records?limit=2","example_result":"Northern Powergrid NPg15-000863 | Maiden Hill Farm BESS | Stella South | 99.4 MW | Accepted To Connect | date_accepted 2024-02-14 | target_energisation_date Data Not Available","steps":["For Northern Powergrid query the >=1 MW API; total_count returned 937 and two records were requested.","For 50 kW to <1 MW use the second member API, which returned total_count 1893.","Read accepted and connected MW, grid points, offer acceptance and target energisation dates separately."],"reading_traps":["Only accepted or connected assets are included in the tested Northern Powergrid data, not every enquiry.","Target energisation may be Data Not Available; the first tested row had no date.","Do not confuse registered MW with export/import limits or sum overlapping NESO and DNO records.","One sample point for Maiden Hill falls plausibly in the named Ryton/Gateshead area; coordinates are not a surveyed boundary.","Other distribution datasets may reject automated requests or require registration."]},"test":{"tested_on":"2026-11-27","method":"api_query","http_status":200,"content_type":"application/json","size_bytes":6148,"records_total":937,"records_for_country":937,"problems":[]},"evidence":[],"members":[{"name":"Northern Powergrid, >=1MW","landing_url":"https://northernpowergrid.opendatasoft.com/explore/dataset/embedded-capacity-register/","data_url":"https://northernpowergrid.opendatasoft.com/api/explore/v2.1/catalog/datasets/embedded-capacity-register/records?limit=2","access":"api","tested":true,"data_found":true,"note":"Northeast and Yorkshire; 937 records in API, monthly, 13 November 2026 release."},{"name":"Northern Powergrid, 50 kW to <1MW","landing_url":"https://northernpowergrid.opendatasoft.com/explore/dataset/embedded-capacity-register-part-2/","data_url":"https://northernpowergrid.opendatasoft.com/api/explore/v2.1/catalog/datasets/embedded-capacity-register-part-2/records?limit=2","access":"api","tested":true,"data_found":true,"note":"Northeast and Yorkshire; 1893 records in API; accepted or connected."},{"name":"SSEN Distribution","landing_url":"https://data.ssen.co.uk/dataset/655eb750-7b3f-4c55-93b6-9bc4c26a57ab","data_url":"https://data-api.ssen.co.uk/dataset/655eb750-7b3f-4c55-93b6-9bc4c26a57ab/resource/64e13718-ae36-4752-965c-eba466c6b622/download/ssen_ecr_part_1_1mw_november_2026_csv.csv","access":"direct_download","tested":true,"data_found":null,"note":"November 2026 catalog; CSV GET and CKAN metadata API rejected automated clients with 403."},{"name":"National Grid Electricity Distribution","landing_url":"https://commercial.nationalgrid.co.uk/our-network/generation-capacity-register","data_url":"https://connecteddata.westernpower.co.uk/dataset/generation-capacity-register","access":"direct_download","tested":true,"data_found":null,"note":"Generation register includes enquiries and offers; connected-data GET returned 403; HV <=11kV aggregated."}],"members_summary":{"total":null,"listed":4,"tested":4,"data_found":2,"scope_note":"Three DNO group examples reviewed, chosen for accessible dataset leads; not all GB operators are covered.","pattern":null},"member_scope":{"total":null,"note":"Three DNO group examples reviewed, chosen for accessible dataset leads; not all GB operators are covered."}}],"sector":{"regulator":{"name":"Ofgem (Great Britain); Utility Regulator (Northern Ireland)","url":"https://www.uregni.gov.uk/electricity"},"operators":{"structure":"many","note":"NESO coordinates GB transmission connections, multiple DNOs publish local registers; SONI and NIE Networks operate in NI.","census_url":null},"publication_obligation":{"exists":"yes","url":"https://www.ofgem.gov.uk/sites/default/files/2025-12/Enhancing%20asset%20visibility%20-%20Distribution%20Network%20Operator%20Options%20consultation.pdf"},"consolidated_republication":{"found":"partial","note":"NESO TEC and Scottish Embedded are partial, and SONI is separate.","checked_pages":[{"url":"https://www.neso.energy/document/390531/download"},{"url":"https://www.soni.ltd.uk/industry/connections-and-applications"},{"url":"https://www.uregni.gov.uk/electricity"}]}},"national_registry":{"exists":"partial","note":"NESO and SONI provide separate transmission and selected embedded records; no complete UK request register was established.","checked_pages":[{"url":"https://www.neso.energy/document/390531/download"},{"url":"https://www.soni.ltd.uk/industry/connections-and-applications"},{"url":"https://www.uregni.gov.uk/electricity"}]},"if_unstructured":{"summary":"Where published information is in workbooks or case documents, extract only their stated status; the example does not fill all missing requests.","recipe":["Open the SONI workbook and find the Battery Storage - Applications Deemed Effective section.","Read row 174 across unit, connection level, user, connection date, both agreement statuses and export/import capacity.","Do not treat a deemed-effective application as a signed or connected agreement."],"location_method":"SONI gives easting/northing for the electrical connection point. The reference system has not been established conclusively; do not claim exact latitude/longitude without confirming it.","cross_with":["NESO GB records do not replace the Northern Ireland SONI register."],"where_published":[{"name":"SONI Connections Register","url":"https://www.soni.ltd.uk/industry/connections-and-applications","example_document":{}}]},"related_not_answering":[{"name":"Northern Powergrid Connection Queue Information","url":"https://northernpowergrid.opendatasoft.com/explore/dataset/connection-queue-information/","why":"The sampled reform queue rows contain GSP, technology, MW, Gate and rank but no project name, so cannot supply the requested project list."}],"open_questions":[],"history":[{"pass":1,"date":"2026-11-27","role":"research","model":"GPT-6","rules_version":"6.15","note":"NESO and SONI files tested; distribution access and historical coverage remain incomplete.","headline":{"official_data":"partial","non_official_data":"not_tested","national_registry":"unknown"},"sources":{"total":4,"new":4,"dropped":0},"negatives":{},"effort":{"pages":null,"minutes":12}}],"local_terms":[{"term":"Transmission Entry Capacity","language":"en","meaning":"Contracted TEC, not all applications."},{"term":"Gate 2","language":"en","meaning":"Prioritised connection agreement after applicable assessment and countersignature."},{"term":"Embedded Capacity Register","language":"en","meaning":"Distribution operator register; distinct from NESO Scottish Embedded register."}],"provenance":{"pass_count":1,"models":["GPT-6"],"minutes_estimate":12,"pages_opened":null,"passes":[{"pass":1,"date":"2026-11-27","model":"GPT-6"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/gb/grid-connection-queue.json","detail_url":"https://georutter.org/v1/gb/grid-connection-queue/detail.json","html_url":"https://georutter.org/gb/grid-connection-queue/","country_url":"https://georutter.org/v1/countries/gb.json"}