{"schema_version":"1.0","country":"it","country_name":"Italy","topic":"data-centers-in-permitting","question":"Where can I get a list of data center projects currently in permitting in Italy, with location, power (MW), developer, permitting stage and date?","territory":"it","territory_level":"country","parent_url":null,"published_on":"2026-11-29","research_reviewed_on":"2026-11-29","access_checked_on":"2026-11-29","answer":{"official_data":"partial","non_official_data":"none_found","summary":"No single official list exists. Terna's Econnextion Download Center is the only national structured data: data-centre requests to connect to the transmission grid (581 requests, 108.2 GW, cut-off 31 Oct 2026) with requested MW and grid stage, summed by region, province or municipality, with no names, developers or per-request dates. Project records (developer, municipality, procedure status, dates) exist for large sites in MASE's environmental portal (backup generators over 50 MWt; 43 found, 42 in Lombardy) and in MIMIT's strategic-project list. Project MW appears only in documents.","main_caveats":["Terna's 108 GW is requested grid capacity, not permitted projects or IT load. Only 15 requests (1.9 GW) are at 'STMD/Contratti', which Terna issues after the permits are obtained.","Terna rows are sums by municipality and stage, not projects. Several requests can share a row, and no applicant names are given.","MASE only covers data centres whose backup generators exceed 50 MWt (screening 50-150 MWt, VIA over 150 MWt). Smaller sites go through municipal permits, which are not published as a list.","Three MW bases coexist: requested connection (Terna), facility or IT power (project PDFs, CdM resolutions) and generator MWt (VIA thresholds). They must not be summed or compared directly.","Coverage is uneven. Terna has requests in 18 regions, but 42 of 43 MASE files are in Lombardy. Piemonte (71 requests, 14.6 GW) has none at MASE or in its regional VIA list; only the MIMIT strategic Trino campus."],"confidence":"medium","confidence_reason":"Terna and MASE were tested end to end and cross-checked (Sedriano: Terna 70 MW STMG equals SNT 70 MW facility). Regions sampled: 5 of 21. No municipal permits were sampled and OSM could not be queried.","attributes":[{"attribute":"location","covered":"partial","source_ids":["terna-econnextion-consumption","mase-va-portal","mimit-strategic-programmes"],"note":"Municipality only: per aggregated row in Terna, per project in MASE, SILVIA and MIMIT. Street address only in PDFs (e.g. Via Luigi Galvani S/N, Sedriano).","gap":"not_published","gap_note":"No coordinates or site address as a field in Terna, MASE, MIMIT, SILVIA, the Lombardy single-procedure list or the Piemonte, ER, Lazio and Veneto VIA lists; only in project PDFs and drawings."},{"attribute":"power_mw","covered":"partial","source_ids":["terna-econnextion-consumption","mase-va-portal","mimit-strategic-programmes"],"note":"Terna: requested connection MW summed per municipality and stage. Project MW (facility, IT or generator MWt) only inside PDFs.","gap":"not_published","gap_note":"No per-project MW field at Terna (aggregated), MASE, SILVIA or MIMIT pages. Documents use different bases: Sedriano 70 MW facility vs 8 MW IT per hall; Cavour 300-400 MW IT."},{"attribute":"developer","covered":"partial","source_ids":["mase-va-portal","regional-va-portals","mimit-strategic-programmes"],"note":"Proponent per procedure on MASE (and SILVIA for Lombardy); company names on MIMIT pages. Terna data is anonymous.","gap":"not_published","gap_note":"Terna Econnextion has no applicant field. Sites below the 50 MWt VIA threshold need only municipal permits, which are not consolidated at Terna, MASE or MIMIT or on the regional pages checked."},{"attribute":"permitting_stage","covered":"partial","source_ids":["mase-va-portal","terna-econnextion-consumption","mimit-strategic-programmes","lombardy-single-procedure-list"],"note":"MASE 'Stato procedura' per procedure. Terna STMG/STMD stages are grid milestones, not permits. MIMIT shows the strategic-interest declaration.","gap":"not_published","gap_note":"No consolidated permit status below the MASE thresholds. The Lombardy single-procedure table was empty on 2026-11-29; the Piemonte, Emilia-Romagna, Lazio and Veneto lists have no current data-centre file."},{"attribute":"stage_date","covered":"partial","source_ids":["mase-va-portal","mimit-strategic-programmes"],"note":"MASE: dated milestones per procedure (application, consultation, requests for additional information). MIMIT: Cabinet (CdM) resolution date.","gap":"not_published","gap_note":"Terna gives only the dataset cut-off (LastDate 2026-10-31) and no date for each request or STMG. Municipal permit dates are not consolidated anywhere checked."}]},"sources":[{"source_id":"terna-econnextion-consumption","name":"Econnextion - connection requests of consumption users (Tipo Impianto 'Utenti di Consumo', Fonte 'Data center'), dashboard and Download Center","publisher":"Terna S.p.A. (transmission system operator)","official":true,"landing_url":"https://dati.terna.it/connessioni/econnextion","data_url":"https://dati.terna.it/api/sitecore/dati/downloadcenter/records?f=xlsx&filterDataset=Utenti+di+Consumo&filterViewBy=Municipality&orderByColumn=Potenza+%28MW%29&orderByDir=desc&db=enti&pageSize=697","access":"api","format":"XLSX export (GET) and JSON (POST recordsv2) from the Download Center; Power BI dashboard","license":"unknown","language":"it","has_coordinates":false,"location_precision":"municipality","publisher_type":"operator","adds":"Only national structured dataset on data-centre projects: requested connection MW and grid-connection stage for every data-centre request to the transmission grid, by region, province and municipality, refreshed monthly.","first_seen_pass":1,"rank":1,"summary":"Monthly national table of data-centre requests to connect to the transmission grid: region, province, municipality, grid stage and requested MW. Rows are sums, not projects.","coverage_note":"581 data-centre requests, 108,177 MW, cut-off 2026-10-31; Lombardia 304 requests. No applicant names or per-request dates; distribution-level requests not included.","data_date":"2026-10-31","caveats":["Grid-connection stage, not permit status.","Requested connection MW, not IT power."],"coverage":{"geographic":"Italy (all regions with requests: 18 for data centres); only requests to connect to Terna's national transmission grid (RTN)"},"fine_print":{"unit":{"value":"MW of requested connection power, summed per row (column 'Potenza (MW)'); 'Numero Pratiche' counts requests in region and province views. The dashboard shows GW.","quote":"Potenza (MW)","url":"https://dati.terna.it/api/sitecore/dati/downloadcenter/records?f=xlsx&filterDataset=Utenti+di+Consumo&filterViewBy=Municipality&orderByColumn=Potenza+%28MW%29&orderByDir=desc&db=enti&pageSize=697","attempts":[]},"inclusion_rule":{"value":"Connection requests to the RTN filed by consumption users, split into 'Data center', 'Cold ironing' and 'Altri utenti di consumo'; each row aggregates all requests with the same territory and connection stage.","quote":"degli utenti di consumo (data center, iniziative di cold ironing e altri utenti)","url":"https://dati.terna.it/connessioni/econnextion","attempts":[]},"reference_date":{"value":"2026-10-31 (API field LastDate on 2026-11-29; LastEntryDate 2026-11-13 is the load date).","quote":"\"LastDate\":\"/Date(1793401200000+0100)/\"","url":"https://dati.terna.it/api/sitecore/dati/downloadcenter/recordsv2","attempts":[]},"update_frequency":{"value":"Monthly.","quote":"La dashboard è aggiornata con cadenza mensile.","url":"https://dati.terna.it/connessioni/econnextion","attempts":[]},"exclusions":{"value":"No project identity, applicant or per-request date. Requests to distribution networks (medium voltage) are outside Terna's queue. Data are as declared by applicants.","quote":"Terna non è responsabile della veridicità dei dati riportati, che sono stati elaborati sulla base delle informazioni fornite dagli utenti nel corso del procedimento di connessione alla rete di trasmissione nazionale.","url":"https://dati.terna.it/connessioni/econnextion","attempts":[{"url":"https://www.e-distribuzione.it/connessione-alla-rete.html","note":"e-distribuzione connection pages opened: no publication of consumption or data-centre connection requests."}]}},"key_fields":[{"field":"Regione / Provincia / Comune","meaning":"Territory of the request (upper case); the Municipality view has no request count."},{"field":"Tipo Impianto","meaning":"'Utenti di Consumo' for consumption users (filterDataset)."},{"field":"Fonte","meaning":"'Data center', 'Cold ironing' or 'Altri utenti di consumo'."},{"field":"Stato Connessione","meaning":"Grid stage: 'STMG da accettare' (offer issued, not accepted), 'STMG accettate' (offer accepted), 'Progetti in valutazione', 'STMD/Contratti' (detailed solution or contract; requested after permits are obtained); 'Progetti con nulla osta' appears for other users."},{"field":"Potenza (MW)","meaning":"Sum of requested connection power of the requests in the row."},{"field":"Numero Pratiche","meaning":"Number of requests in the row (Region and Province views only)."}],"how_to_use":{"example_request":"curl -s -X POST -H 'Content-Type: application/json' -d '{\"filterDataset\":\"Utenti di Consumo\",\"filterViewBy\":\"Municipality\",\"orderByColumn\":\"Potenza (MW)\",\"orderByDir\":\"desc\",\"pageSize\":\"5000\",\"pageIndex\":\"0\",\"db\":\"enti\"}' https://dati.terna.it/api/sitecore/dati/downloadcenter/recordsv2","example_result":"Count 697 rows; [\"LOMBARDIA\",\"MILANO\",\"SEDRIANO\",\"Utenti di Consumo\",\"Data center\",\"STMG accettate\",70.0]; [\"PIEMONTE\",\"VERCELLI\",\"TRINO\",\"Utenti di Consumo\",\"Data center\",\"STMG da accettare\",750.0]; LastDate /Date(1793401200000+0100)/","steps":["Same data as an Excel file: GET the data_url (XLSX, one sheet, header in row 1: Regione, Provincia, Comune, Tipo Impianto, Fonte, Stato Connessione, Potenza (MW)); set pageSize to the row count returned by the JSON call.","Change filterViewBy to 'Region' or 'Province' to get the 'Numero Pratiche' column; the Municipality view has no count.","Keep rows with Fonte = 'Data center'; on 2026-11-29: 397 municipality rows, 581 requests, 108,177.4 MW (STMG accettate 376 / 67,942.5 MW; STMG da accettare 179 / 34,339.9 MW; Progetti in valutazione 11 / 4,000 MW; STMD/Contratti 15 / 1,895 MW).","Lombardia holds 304 of 581 requests (52.3%) and 47,247.5 MW; then Piemonte 71, Lazio 47, Emilia-Romagna 40, Veneto 32, Puglia 29.","Convert LastDate (milliseconds since 1970, +0100) to the cut-off date; the response is JSON served as text/html.","To attach a project, match the municipality and MW against MASE or MIMIT records: Sedriano 70 MW 'STMG accettate' equals the 70 MW facility power in the Sedriano VIA non-technical summary."],"reading_traps":["A row is not a project: it sums all requests of one municipality in one stage (Milano province: 121 requests in 'STMG accettate').","STMG stages are grid offers, not permits. Requests are known to include speculative or duplicate applications: 108 GW against an IDA estimate of about 760 MW of IT capacity installed at the end of 2025.","'Potenza (MW)' is requested connection power, not IT power: Trino (VC) shows 750 MW 'STMG da accettare' while the CdM resolution for the Cavour Hyperscale Campus in Trino states 300-400 MW IT.","Terna publishes no definition of 'Progetti in valutazione' on the pages checked; STMD is requested only after permits ('Una volta ottenuti i titoli autorizzativi').","The old address /it/sistema-elettrico/rete/econnextion now redirects (302) to a Terna planning page; the data live on dati.terna.it."]},"test":{"tested_on":"2026-11-29","method":"api_query","http_status":200,"content_type":"text/html; charset=utf-8 (JSON body); XLSX export served as text/html","size_bytes":28759,"records_total":697,"records_for_country":397,"problems":["The JSON and XLSX endpoints are undocumented (found in the Download Center script); the XLSX is served with content type text/html."]},"evidence":[{"claim":"The dashboard covers data-centre connection requests and their permitting progress.","url":"https://dati.terna.it/connessioni/econnextion","quote":"Terna condivide le informazioni sulla distribuzione regionale e locale e sullo stato di avanzamento autorizzativo delle richieste di connessione rinnovabile suddivise per fonti (solare, eolico on-shore, eolico off-shore, idroelettrico, geotermico, biomasse), dei sistemi di accumulo (pompaggio puro, pompaggio misto, accumulo stand-alone, accumulo integrato su impianto solare, accumulo integrato su impianto eolico) e degli utenti di consumo (data center, iniziative di cold ironing e altri utenti)."},{"claim":"STMG is part of the connection offer that the applicant accepts within 120 days.","url":"https://www.terna.it/it/sistema-elettrico/programmazione-territoriale-efficiente/connessione-rete/procedura-connessione","quote":"Terna mette a disposizione il preventivo di connessione, che comprende: STMG (Soluzione Tecnica Minima Generale); corrispettivo di connessione; elenco degli adempimenti necessari per l'autorizzazione dell'impianto di rete."},{"claim":"STMD is requested after the permits have been obtained.","url":"https://www.terna.it/it/sistema-elettrico/programmazione-territoriale-efficiente/connessione-rete/procedura-connessione","quote":"Una volta ottenuti i titoli autorizzativi sia per le opere di cui al Piano Tecnico delle Opere di connessione sia per le opere di utenza, il soggetto richiedente, previo pagamento del corrispettivo, ha la facoltà di richiedere la STMD (Soluzione Tecnica Minima di Dettaglio)"}],"members":[],"members_summary":null},{"source_id":"mase-va-portal","name":"Portale Valutazioni e Autorizzazioni Ambientali - project search (VIA, verifica di assoggettabilità, 'Procedimento Unico per il rilascio delle autorizzazioni ai progetti di centri dati')","publisher":"Ministero dell'Ambiente e della Sicurezza Energetica (MASE), Direzione Generale Valutazioni Ambientali","official":true,"landing_url":"https://va.mite.gov.it/it-IT/Ricerca/Via","data_url":null,"access":"web_viewer_only","format":"HTML search results and project pages; per-procedure document list export (XLSX, ?mode=export); PDF documents","license":"unknown","language":"it","has_coordinates":false,"location_precision":"municipality","publisher_type":"national_government","adds":"Per-project records for large data centres: proponent, municipalities, procedure type, status and dated milestones, plus all project documents (power, address, generators).","first_seen_pass":1,"rank":2,"summary":"Per-project environmental files for large data centres (generators over 50 MWt): proponent, municipalities, procedure, status and dated milestones; documents carry MW and address.","coverage_note":"43 data-centre projects found (42 Lombardia, 1 Lazio); 19 with an open procedure on 2026-11-29; one 'Procedimento Unico centri dati' (Data4, Settimo Milanese/Cornaredo).","data_date":"2026-11-29","caveats":["No MW field: power only in PDFs.","Smaller data centres are absent."],"coverage":{"geographic":"Italy, projects of state environmental competence: on 2026-11-29, 43 data-centre projects (42 Lombardia, 1 Lazio), one of them (D4 Data Center MIL1) also in the new single procedure (proceduraID 151)"},"fine_print":{"unit":{"value":"No power field on project pages. In documents, generators are given in thermal MW (MWt) and facility or IT power in MW.","quote":"La potenza elettrica complessiva prevista per l'edificio è pari a 70 MW","url":"https://va.mite.gov.it/File/Documento/1320888","attempts":[]},"inclusion_rule":{"value":"Data centres whose emergency generators exceed 50 MWt in aggregate: verifica di assoggettabilità 50-150 MWt, VIA above 150 MWt. Since DL 21/2026, also single procedures where MASE is the AIA authority (300 MWt or more).","quote":"Data Center assistiti da gruppi elettrogeni di emergenza con potenza superiore complessivamente a 50 MWt","url":"https://va.mite.gov.it/it-IT/Comunicazione/DettaglioDirezione/4755","attempts":[]},"reference_date":{"value":"Live portal (checked 2026-11-29); each procedure lists its own milestone dates.","quote":"Data presentazione istanza: 16/09/2025","url":"https://va.mite.gov.it/it-IT/Oggetti/Documentazione/11868/18279","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://va.mite.gov.it/it-IT/Ricerca/Via","note":"No update statement on the search page."},{"url":"https://va.mite.gov.it/it-IT/Oggetti/Info/11868","note":"Project page shows milestone dates but no update frequency."}]},"exclusions":{"value":"Data centres without generators over 50 MWt, and single procedures of regional competence (50-300 MWt in Lombardy), are not here.","quote":"Nei casi in cui nel centro dati non siano presenti attività soggette ad AIA (in particolare la presenza di gruppi elettrogeni di potenza complessiva pari o superiore a 50 MW) al relativo iter autorizzativo NON si applica il Procedimento Unico di cui all’art. 8 del D.L. 21/2026","url":"https://www.regione.lombardia.it/ambiente-e-territorio/autorizzazione-ambientali/autorizzazione-integrata-ambientale-aia/procedimento-unico-centri-dati","attempts":[]}},"key_fields":[{"field":"Progetto / Proponente / Procedura","meaning":"Columns of the search result list (title, applicant company, procedure type)."},{"field":"Regioni / Province / Comuni","meaning":"Territory block of the 'Info' page (municipality level)."},{"field":"Tipologia di opera","meaning":"Always 'Centrali' for data centres (classified by their generators)."},{"field":"Codice procedura (ID_VIP/ID_MATTM)","meaning":"Procedure identifier; one project can have several procedures (screening, VIA, compliance checks, single procedure)."},{"field":"Data presentazione istanza / Data avvio consultazione pubblica / Data richiesta Integrazioni","meaning":"Dated milestones of each procedure."},{"field":"Stato procedura","meaning":"Status, e.g. 'Verifica amministrativa', 'Istruttoria tecnica CTVIA', 'In predisposizione provvedimento', 'Sospeso su richiesta del Proponente', 'Conclusa', 'Archiviata'."}],"how_to_use":{"example_request":"https://va.mite.gov.it/it-IT/Ricerca/ViaLibera?t=o&Testo=data%20center&pagina=1 (7 pages; then https://va.mite.gov.it/it-IT/Oggetti/Info/11868)","example_result":"List row: 'Progetto per un nuovo data center nel comune di Sedriano (MI). | MINERVA ITALY DC SPV S.R.L. | Valutazione Impatto Ambientale'. Info/Documentazione: 'Codice procedura (ID_VIP/ID_MATTM): 14299 ... Data presentazione istanza: 16/09/2025 ... Stato procedura: Istruttoria tecnica CTVIA'","steps":["Run the free-text search with t=o for 'data center' (7 pages) and 'datacenter' (2 pages); page with &pagina=N. Discard false positives (hydrocarbon permits, ports, Terna line 'Cella Dati').","For the new single procedure, use Ricerca per procedura with proceduraID=151 ('Procedimento Unico per il rilascio delle autorizzazioni ai progetti di centri dati'): one project on 2026-11-29 (DATA 4 MILAN S.P.A., ID_VIP 15208 and 15209, 'Verifica amministrativa').","Open https://va.mite.gov.it/it-IT/Oggetti/Info/<id> for proponent, region, municipalities and every procedure with its dates and 'Stato procedura'. Treat 'Conclusa' and 'Archiviata' as out of scope.","For power and address, open Documentazione/<id>/<procedure>, find the 'Sintesi non Tecnica' or 'Quadro progettuale' (the ?mode=export XLSX lists titles without links; page with ?pagina=N to get the File/Documento link).","In the 43 data-centre project pages read on 2026-11-29, 19 projects had at least one open procedure (27 procedures not 'Conclusa' or 'Archiviata', including compliance checks 'Verifica di Ottemperanza')."],"reading_traps":["Searching by 'Tipologia di opera' does not isolate data centres: they are filed as 'Centrali'.","Proponent names differ between sources: Siziano (ID_VIP 14473) is 'Infrastructure Italia Land 2 S.r.l.' at MASE but 'INFRASTRUCTURE ITALIA LAND 9 S.R.L.' in SILVIA.","Dates differ by meaning: Siziano application filed 24/11/2025 (avviso), 'Data presentazione istanza' 25/11/2025 (MASE), 'dataAvvio' 13/01/2026 (SILVIA).","One project (Equinix ML10, Info/11899) shows 'Nessuna regione' and 'Nessun comune': take the municipality from the title.","VIA thresholds use generator thermal MWt (e.g. '133 generatori per una potenza termica complessiva di circa 1.000 MWt' in Vimercate), which is not grid or IT power."]},"test":{"tested_on":"2026-11-29","method":"page_only","http_status":200,"content_type":"text/html; charset=utf-8","size_bytes":25938,"records_total":77,"records_for_country":43,"problems":["Banner on project pages: 'Il servizio è temporaneamente stato disabilitato in quanto è in corso una attività di analisi dei requisiti di sicurezza informatica.'"]},"evidence":[{"claim":"MASE has a dedicated procedure type for the data-centre single authorisation.","url":"https://va.mite.gov.it/it-IT/Ricerca/Via","quote":"Procedimento Unico per il rilascio delle autorizzazioni ai progetti di centri dati"},{"claim":"Example project with proponent and municipality.","url":"https://va.mite.gov.it/it-IT/Oggetti/Info/11512","quote":"Proponente : DATA 4 MILAN S.P.A. Tipologia di opera : Centrali Territori ed aree marine Regioni: Lombardia Province: Milano Comuni: Settimo Milanese, Cornaredo"},{"claim":"Project power in the Sedriano non-technical summary (facility vs IT).","url":"https://va.mite.gov.it/File/Documento/1320888","quote":"La potenza elettrica complessiva prevista per l’edificio è pari a 70 MW"}],"members":[],"members_summary":null},{"source_id":"mimit-strategic-programmes","name":"Grandi programmi di investimento riconosciuti di interesse strategico nazionale (art. 13 DL 104/2023)","publisher":"Ministero delle Imprese e del Made in Italy (MIMIT), Unità di missione attrazione e sblocco degli investimenti (UMASI)","official":true,"landing_url":"https://www.mimit.gov.it/it/caie/unita-di-missione/grandi-programmi-di-investimento","data_url":null,"access":"web_viewer_only","format":"HTML pages per programme; scanned PDF resolutions","license":"unknown","language":"it","has_coordinates":false,"location_precision":"municipality","publisher_type":"national_government","adds":"Official list of data-centre programmes (outside Lombardy as well) declared of national strategic interest, with the Cabinet (CdM) resolution date. Resolution PDFs give developer, site and IT power.","first_seen_pass":1,"rank":3,"summary":"MIMIT list of data-centre programmes declared of national strategic interest, each with CdM resolution date; resolution PDFs give developer, site and IT MW.","coverage_note":"7 data-centre programmes (AWS Milan, Vantage, EdgeConneX, Equinix, Cavour-Techbau in Trino, K2, Digital Vault Sulcis); declarations 29/11/2024 to 04/08/2026.","data_date":"2026-11-29","caveats":["Declaration of strategic interest, not authorisation."],"coverage":{"geographic":"Italy; only programmes declared strategic (investment of at least EUR 1 billion): 10 programmes listed, 7 data-centre related on 2026-11-29"},"fine_print":{"unit":{"value":"No power field on the pages; resolutions state IT power in MW.","quote":"potenza IT complessiva compresa tra 300 MW e 400 MW","url":"https://www.mimit.gov.it/images/stories/documenti/allegati/Delibera_Cavour_Hyperscale_Campus_Techbau.pdf","attempts":[]},"inclusion_rule":{"value":"Programmes declared of 'preminente interesse strategico nazionale' by CdM resolution under art. 13 DL 104/2023.","quote":"Grandi programmi di investimento riconosciuti di interesse strategico nazionale.","url":"https://www.mimit.gov.it/it/caie/unita-di-missione/grandi-programmi-di-investimento","attempts":[]},"reference_date":{"value":"Per programme: CdM resolution date (29/11/2024 to 04/08/2026); AWS page last modified 06/03/2026.","quote":"Con delibera del Consiglio dei ministri del 23 luglio 2026, il programma è stato dichiarato di preminente interesse strategico nazionale ai sensi dell’art. 13 del D.L. 104/2023.","url":"https://www.mimit.gov.it/it/caie/unita-di-missione/grandi-programmi-di-investimento/cavour-hyperscale-campus-techbau","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.mimit.gov.it/it/caie/unita-di-missione/grandi-programmi-di-investimento","note":"No update statement on the list."},{"url":"https://www.mimit.gov.it/it/caie/unita-di-missione","note":"UMASI page describes tasks, no update frequency."}]},"exclusions":{"value":"Only strategic-interest programmes; later permit steps appear only for AWS (conferenza di servizi documents).","quote":null,"url":null,"attempts":[{"url":"https://www.mimit.gov.it/it/caie/unita-di-missione/grandi-programmi-di-investimento/regione-aws-europe-milan-espansione","note":"Only the AWS page lists conferenza di servizi documents; the other six show only the resolution."}]}},"key_fields":[{"field":"Programme title","meaning":"e.g. 'Regione AWS Europe (Milan) - Espansione', 'Vantage Data Centers', 'EdgeConneX Campus Italia', 'Equinix per l’Italia', 'Cavour Hyperscale Campus – Techbau', 'Progetto K2 - K2 Strategic Infrastructure Italy', 'Digital Vault Sulcis - Energy Vault Sulcis'."},{"field":"Delibera (pdf)","meaning":"CdM resolution: developer, site, investment, IT power, schedule."},{"field":"Commissario Straordinario","meaning":"Named extraordinary commissioner where appointed (AWS, Vantage: Giorgio Zanzi)."}],"how_to_use":{"example_request":"https://www.mimit.gov.it/images/stories/documenti/allegati/Delibera_Cavour_Hyperscale_Campus_Techbau.pdf (scanned, pages 2-3; pdftoppm -png -r 70)","example_result":"'presentato da Techbau S.p.A.'; 'potenza IT complessiva compresa tra 300 MW e 400 MW'; 'ex centrale termoelettrica \"Galileo Ferraris\" di Trino (VC)'; 'avvio dei lavori nel 2027 e l'apertura del primo lotto del Campus entro la fine del 2028'","steps":["Open the list page and keep the data-centre programmes (7 of 10 on 2026-11-29).","Open each programme page for the CdM resolution date and the links to 'Delibera (pdf)'.","The resolutions are scanned: render pages to PNG (pdftoppm) and read developer, site, IT MW and schedule from the recitals."],"reading_traps":["The strategic declaration is not a permit: the single authorisation is then issued under art. 13 c. 5-6 DL 104/2023.","Resolution PDFs have no text layer.","Programme names can cover several sites ('Equinix per l’Italia', Vantage extended to a further project on 4 June 2026)."]},"test":{"tested_on":"2026-11-29","method":"page_only","http_status":200,"content_type":"text/html; charset=utf-8","size_bytes":139799,"records_total":10,"records_for_country":7,"problems":["Resolution PDFs are scanned images without text."]},"evidence":[{"claim":"The Cavour campus (Techbau) is in Trino (VC) with 300-400 MW IT.","url":"https://www.mimit.gov.it/images/stories/documenti/allegati/Delibera_Cavour_Hyperscale_Campus_Techbau.pdf","quote":"progettato per accogliere una potenza IT complessiva compresa tra 300 MW e 400 MW dedicato all'intelligenza artificiale"}],"members":[],"members_summary":null},{"source_id":"lombardy-single-procedure-list","name":"Procedimento Unico Centri Dati: riferimenti normativi e procedimenti in corso","publisher":"Regione Lombardia, Direzione Generale Ambiente e Clima (Sportello regionale per i centri dati)","official":true,"landing_url":"https://www.regione.lombardia.it/ambiente-e-territorio/autorizzazione-ambientali/autorizzazione-integrata-ambientale-aia/procedimento-unico-centri-dati","data_url":null,"access":"web_viewer_only","format":"HTML table","license":"unknown","language":"it","has_coordinates":false,"location_precision":"municipality","publisher_type":"regional_government","adds":"The only list found that the law requires to publish for data-centre single procedures of regional competence: proponent, municipality, procedure type, environmental assessment type, object and start date.","first_seen_pass":1,"rank":4,"summary":"Lombardy's legally required list of data-centre single procedures of regional competence: proponent, municipality, procedure, object and start date.","coverage_note":"Empty on 2026-11-29 (page updated 24/11/2026). Covers only regional-AIA data centres (generators 50 to under 300 MWt).","data_date":"2026-11-24","caveats":["Empty table at test date."],"coverage":{"geographic":"Lombardia; single procedures where the Region is the AIA authority (generators 50 to under 300 MWt)"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.regione.lombardia.it/ambiente-e-territorio/autorizzazione-ambientali/autorizzazione-integrata-ambientale-aia/procedimento-unico-centri-dati","note":"Table has no power column."},{"url":"https://www.regione.lombardia.it/content/dam/rl/canali-tematici-servizi/06-ambiente-e-territorio/03-autorizzazione-ambientali/01-autorizzazione-integrata-ambientale-aia/red-procedimento-unico-centri-dati/allegati/Legge%20regionale%203%20giugno%202026%20-%20n.%2011.pdf","note":"LR 11/2026 requires the application to state the requested connection power, but the list does not show it."}]},"inclusion_rule":{"value":"Data centres subject to regional AIA (combustion units 50 to under 300 MWt); state AIA (300 MWt or more) and strategic projects go to MASE/MIMIT.","quote":"AIA di competenza regionale : per impianti di combustione con potenza termica nominale totale pari o superiore a 50 MW e inferiore a 300 MWt","url":"https://www.regione.lombardia.it/ambiente-e-territorio/autorizzazione-ambientali/autorizzazione-integrata-ambientale-aia/procedimento-unico-centri-dati","attempts":[]},"reference_date":{"value":"Page last updated 24 November 2026; table empty on 2026-11-29.","quote":"Ultimo aggiornamento: 24 Novembre 2026","url":"https://www.regione.lombardia.it/ambiente-e-territorio/autorizzazione-ambientali/autorizzazione-integrata-ambientale-aia/procedimento-unico-centri-dati","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.regione.lombardia.it/ambiente-e-territorio/autorizzazione-ambientali/autorizzazione-integrata-ambientale-aia/procedimento-unico-centri-dati","note":"No frequency stated; list published under art. 29-quater D.Lgs. 152/2006 and art. 4 c. 9 LR 11/2026."},{"url":"https://www.regione.lombardia.it/content/dam/rl/canali-tematici-servizi/06-ambiente-e-territorio/03-autorizzazione-ambientali/01-autorizzazione-integrata-ambientale-aia/red-procedimento-unico-centri-dati/allegati/Legge%20regionale%203%20giugno%202026%20-%20n.%2011.pdf","note":"Art. 4 c. 9 requires transparency and publication of acts, no frequency."}]},"exclusions":{"value":"Data centres without AIA activities (generators under 50 MWt) are excluded from the single procedure.","quote":"al relativo iter autorizzativo NON si applica il Procedimento Unico di cui all’art. 8 del D.L. 21/2026","url":"https://www.regione.lombardia.it/ambiente-e-territorio/autorizzazione-ambientali/autorizzazione-integrata-ambientale-aia/procedimento-unico-centri-dati","attempts":[]}},"key_fields":[{"field":"Proponente","meaning":"Applicant."},{"field":"Comune (Provincia)","meaning":"Municipality and province."},{"field":"Tipologia di procedimento / Tipologia di Valutazione ambientale","meaning":"Procedure and VIA/screening type."},{"field":"Oggetto istanza","meaning":"Project object."},{"field":"Data di avvio del procedimento","meaning":"Start date of the procedure."}],"how_to_use":{"example_request":"https://www.regione.lombardia.it/ambiente-e-territorio/autorizzazione-ambientali/autorizzazione-integrata-ambientale-aia/procedimento-unico-centri-dati (section 'Procedimenti in corso')","example_result":"Header: Proponente | Comune (Provincia) | Tipologia di procedimento | Tipologia di Valutazione ambientale | Oggetto istanza | Data di avvio del procedimento; one empty row (2026-11-29)","steps":["Open the page and read the table under 'Procedimenti in corso'.","For VIA documents of these projects the page points to the MASE portal; AIA documents can be viewed at the Sportello within 30 days of the start notice."],"reading_traps":["An empty table does not mean no data-centre projects in Lombardy: the large ones are at MASE (42 Lombardy projects) and the small ones go through municipal permits."]},"test":{"tested_on":"2026-11-29","method":"page_only","http_status":200,"content_type":"text/html;charset=utf-8","size_bytes":447481,"records_total":0,"records_for_country":0,"problems":[]},"evidence":[{"claim":"The page publishes the list of ongoing data-centre procedures by law.","url":"https://www.regione.lombardia.it/ambiente-e-territorio/autorizzazione-ambientali/autorizzazione-integrata-ambientale-aia/procedimento-unico-centri-dati","quote":"Nella presente sezione si riporta, ai sensi dell’art. 29 quater commi 2 e 3 del D.lgs. 152/2006 e dell’art. 4 comma 9 della LR 11/2026, l’elenco degli impianti per i quali sono in corso procedimenti"}],"members":[],"members_summary":null},{"source_id":"regional-va-portals","name":"Regional environmental assessment (VIA/screening) portals and project lists","publisher":"Regional governments (Regioni and Province autonome)","official":true,"landing_url":null,"data_url":null,"access":"web_viewer_only","format":"HTML lists and search applications; JSON (SILVIA)","license":"unknown","language":"it","has_coordinates":false,"location_precision":"municipality","publisher_type":"regional_government","adds":"Regional mirror and regional-competence files: SILVIA gives a queryable JSON for Lombardy (proponent, start date, MASE link); other regions show whether any data-centre VIA of regional competence exists.","first_seen_pass":1,"rank":5,"summary":"Regional VIA portals: SILVIA mirrors Lombardy's (state) data-centre VIA files as JSON with proponent and start date; Piemonte, Emilia-Romagna, Lazio and Veneto show no current data-centre file.","coverage_note":"5 of 21 sampled. Lombardia SILVIA: 25 procedures (8 open). Piemonte (937 files), ER, Lazio, Veneto: no current data-centre file. Use SILVIA for Lombardy; elsewhere search the regional list for 'data center'.","data_date":"2026-11-29","caveats":["Regional lists hold almost no data-centre projects; most sites need only municipal permits."],"coverage":{"geographic":"Sample of 5 of 21 regions/autonomous provinces, chosen by Terna data-centre request count: Lombardia, Piemonte, Lazio, Emilia-Romagna, Veneto"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.silvia.servizirl.it/silviaweb/getSchedaSintesiByIdProgetto.html?idProgetto=20346","note":"SILVIA summary sheet has no power field (only the VIA category, e.g. Allegato II p.2)."},{"url":"https://www.regione.veneto.it/web/vas-via-vinca-nuvv/progetti-2026","note":"Veneto list gives MW only inside project titles."}]},"inclusion_rule":{"value":"Projects subject to regional VIA/screening, plus (SILVIA) state procedures in which Lombardy takes part.","quote":"Documentazione disponibile alla pagina https://va.mite.gov.it/it-IT/Oggetti/Documentazione/11703/18478","url":"https://www.silvia.servizirl.it/silviaweb/getSchedaSintesiByIdProgetto.html?idProgetto=20346","attempts":[]},"reference_date":{"value":"Live portals (checked 2026-11-29).","quote":null,"url":null,"attempts":[{"url":"https://www.regione.veneto.it/web/vas-via-vinca-nuvv/progetti-2026","note":"Annual pages 'Progetti presentati nel 2026'."}]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.silvia.servizirl.it/silviaweb/","note":"No statement."},{"url":"https://serviziambiente.regione.emilia-romagna.it/viavasweb/","note":"No statement."}]},"exclusions":{"value":"Municipal building permits and AIA of provinces are not in VIA portals.","quote":null,"url":null,"attempts":[{"url":"https://www.regione.lombardia.it/ambiente-e-territorio/red-procedimenti-autorizzatori-progetti-data-center","note":"Lombardy notes building permits are issued by municipalities."}]}},"key_fields":[{"field":"codProcedura / descrProgetto / proponenti / dataAvvio / macroStato (SILVIA)","meaning":"Code (VIA0262-MA = state VIA), title, applicant, start date, state ('In Attivazione', 'In Corso', 'Chiuso', 'Termini sospesi')."},{"field":"descrSito (SILVIA scheda)","meaning":"Link to the MASE documentation page for state procedures."}],"how_to_use":{"example_request":"https://www.silvia.servizirl.it/silviaweb/avviaRicercaProcedura.html?tipoProcedura=1,2,3,14,15&rgroupAutorita=&descrProcedura=data%20center&strFiltroEnte=&checkedAutorita=&checkedTipologiaProg=","example_result":"18 JSON records; e.g. {\"codProcedura\":\"VIA0262-MA\",\"descrProgetto\":\"[ID_VIP: 14473]-Progetto “Data Center Stack Campus Siziano (PV)”.\",\"macroStato\":{\"descrMacroStato\":\"In Corso\"},\"dataAvvio\":\"13/01/2026\",\"proponenti\":\" (Azienda: INFRASTRUCTURE ITALIA LAND 9 S.R.L.); \"}","steps":["SILVIA: call avviaRicercaProcedura.html with tipoProcedura=1,2,3,14,15, descrProcedura='data center' (18) or 'datacenter' (7) and the empty parameters shown (without them the server returns 500); all 25 are MASE procedures ('V.I.A. Ministero', 'V.E.R. Ministero'), 8 open.","SILVIA: getSchedaSintesiByIdProgetto.html?idProgetto=<idProgetto> gives proponent, municipalities and the MASE link.","Emilia-Romagna: GET /viavasweb/ricerca?TITOLODESC=data%20center&STATO_AGGREGATO_COD=T (POST returns 500).","Lazio: ?keyword=data%20center on the project list; Veneto: read the yearly pages progetti-2026 and progetti-2025.","Piemonte: POST to the SCRIVA search (data_url of the member) returns all published files; filter des_oggetto locally (the text filter in the body is ignored)."],"reading_traps":["SILVIA proponent names can differ from MASE (Siziano: LAND 9 vs LAND 2).","Old or unrelated hits: ER returns only ECMWF geothermal wells (2018, 2020); Lazio only 2019 and 2021 files."]},"test":{"tested_on":"2026-11-29","method":"api_query","http_status":200,"content_type":"text/html;charset=UTF-8 (JSON body, SILVIA)","size_bytes":26545,"records_total":25,"records_for_country":25,"problems":["Piemonte: the address without www (servizi.piemonte.it) timed out; the www address and the SCRIVA API answer.","Emilia-Romagna search answers GET but returns 500 to POST."]},"evidence":[{"claim":"SILVIA lists the Siziano data centre as an open state VIA with proponent and start date.","url":"https://www.silvia.servizirl.it/silviaweb/getSchedaSintesiByIdProgetto.html?idProgetto=20346","quote":"[ID_VIP: 14473]-Progetto “Data Center Stack Campus Siziano (PV)”."}],"members":[{"name":"Lombardia - SILVIA (Sistema Informativo Lombardo Valutazione Impatto Ambientale)","landing_url":"https://www.silvia.servizirl.it/silviaweb/","data_url":"https://www.silvia.servizirl.it/silviaweb/avviaRicercaProcedura.html?tipoProcedura=1,2,3,14,15&rgroupAutorita=&descrProcedura=data%20center&strFiltroEnte=&checkedAutorita=&checkedTipologiaProg=","access":"api","tested":true,"data_found":true,"note":"25 data-centre procedures, all of MASE competence mirrored by the Region; 8 open (Rozzano, Vimercate, Sedriano, Melzo, Siziano, Settimo Milanese, Magenta, Treviglio). Proponent and start date per procedure."},{"name":"Lombardia - Procedimenti autorizzatori per i progetti di Data Center (guidance page)","landing_url":"https://www.regione.lombardia.it/ambiente-e-territorio/red-procedimenti-autorizzatori-progetti-data-center","data_url":null,"access":"web_viewer_only","tested":true,"data_found":false,"note":"DGR XII/2629 of 24/06/2024 guidelines and VIA thresholds; no project list."},{"name":"Emilia-Romagna - Banca dati delle Valutazioni ambientali regionali (viavasweb)","landing_url":"https://serviziambiente.regione.emilia-romagna.it/viavasweb/","data_url":"https://serviziambiente.regione.emilia-romagna.it/viavasweb/ricerca?TITOLODESC=data%20center&STATO_AGGREGATO_COD=T","access":"web_viewer_only","tested":true,"data_found":false,"note":"'data center' 1 hit and 'data centre' 1 hit, both ECMWF geothermal water files (2018, 2020); 'datacenter', 'centro dati', 'centri dati' 0. Terna ER: 40 requests."},{"name":"Lazio - Valutazione Impatto Ambientale - Progetti","landing_url":"https://regione.lazio.it/imprese/tutela-ambientale-difesa-suolo/valutazione-impatto-ambientale-progetti","data_url":"https://regione.lazio.it/imprese/tutela-ambientale-difesa-suolo/valutazione-impatto-ambientale-progetti?keyword=data%20center","access":"web_viewer_only","tested":true,"data_found":false,"note":"'data center' 2 hits, both closed (Aruba Roma 2019; ex ACEA La Torretta 2021); 'datacenter', 'centro dati' 0. Terna Lazio: 47 requests."},{"name":"Veneto - Progetti presentati nel 2026 / 2025 (VIA, PAUR, screening, scoping)","landing_url":"https://www.regione.veneto.it/web/vas-via-vinca-nuvv/progetti-2026","data_url":null,"access":"web_viewer_only","tested":true,"data_found":false,"note":"No data-centre entry in 2026 or 2025 lists (proponent, municipalities, status per file). Terna Veneto: 32 requests."},{"name":"Piemonte - SCRIVA Pubblicazione e Osservazioni (VIA, screening, opinions on national projects)","landing_url":"https://www.servizi.piemonte.it/srv/valutazioni-ambientali/","data_url":"https://scriva-servizi.regione.piemonte.it/scrivaconsweb/api/v1/istanze-pubblicate/_search?offset=1&limit=1000","access":"api","tested":true,"data_found":false,"note":"POST body {\"id_ambito\":1,\"id_tipo_adempimento\":1,\"fase_pubblicazione\":\"TUTTI\"}: 937 published procedures (2006-2026; 32 in progress, 6 in consultation); none mentions data center, centro dati or hyperscale. Terna Piemonte: 71 requests, 14,593 MW; MASE: none."}],"members_summary":{"total":21,"listed":6,"tested":6,"data_found":1,"scope_note":"19 regions and 2 autonomous provinces each run their own VIA portal; 5 sampled (the five with most Terna data-centre requests). Only SILVIA (Lombardia) returned current data-centre procedures, all of state competence; Piemonte, Emilia-Romagna, Lazio and Veneto returned none open.","pattern":"Regional page 'Valutazione di impatto ambientale' with a project list or 'banca dati' searchable by title; search 'data center' and 'datacenter'."},"member_scope":{"total":21,"note":"19 regions and 2 autonomous provinces each run their own VIA portal; 5 sampled (the five with most Terna data-centre requests). Only SILVIA (Lombardia) returned current data-centre procedures, all of state competence; Piemonte, Emilia-Romagna, Lazio and Veneto returned none open.","pattern":"Regional page 'Valutazione di impatto ambientale' with a project list or 'banca dati' searchable by title; search 'data center' and 'datacenter'."}}],"sector":{"regulator":{"name":"MASE (environmental assessment, AIA and the data-centre single procedure under art. 8 DL 21/2026); ARERA regulates grid connection; MIMIT handles projects of national strategic interest","url":"https://va.mite.gov.it/it-IT/Ricerca/Via"},"operators":{"structure":"many","note":"Many private developers (Microsoft, Equinix, Amazon, Data4, Stack/Infrastructure Italia Land SPVs, Vantage, EdgeConneX, Aruba, etc.). Transmission connection is handled by one operator, Terna, which is the only body receiving all large requests. No developer census was found.","census_url":null},"publication_obligation":{"exists":"yes","norm":"D.Lgs. 152/2006 arts. 19, 23-24 and 29-quater (VIA/screening/AIA public notices and documents); DL 21/2026 art. 8 c. 3 (single procedure, with the art. 24 public notice when VIA applies); Lombardy LR 11/2026 art. 4 c. 9","url":"https://www.gazzettaufficiale.it/atto/serie_generale/caricaArticolo?art.versione=1&art.idGruppo=1&art.flagTipoArticolo=0&art.codiceRedazionale=26G00041&art.idArticolo=8&art.idSottoArticolo=1&art.idSottoArticolo1=10&art.dataPubblicazioneGazzetta=2026-02-20&art.progressivo=0","what_must_be_published":"Per procedure: public notice and project documentation on the competent authority's website (proponent, location, project description), when VIA, screening or AIA applies. No obligation found to publish a register of data-centre projects. MASE decree 291/2026 obliges Terna to publish per-request data (holder, MW, permit status) only for renewable and storage plants.","frequency":"Per procedure (at filing and at each consultation); no periodic list."},"consolidated_republication":{"found":"partial","note":"MASE's portal gathers all state-level files (one dedicated procedure type for data centres). SILVIA mirrors them for Lombardy. Terna publishes the grid queue only as sums by territory. Nothing consolidates municipal permits or regional files.","checked_pages":[{"organization":"Terna","url":"https://dati.terna.it/connessioni/econnextion","saw":"Dashboard of consumption-user requests including data centres; monthly; only aggregate rows in the Download Center."},{"organization":"Terna","url":"https://dati.terna.it/connessioni/terra","saw":"TE.R.R.A. portal for institutions (MASE, MIC, ARERA, Regions); public page shows grid microzones, no project list."},{"organization":"MASE","url":"https://va.mite.gov.it/it-IT/Ricerca/ViaProcedura?proceduraID=151&testo=","saw":"Procedure type 'Procedimento Unico ... centri dati': one project (Data4 MIL1), 2 procedures in 'Verifica amministrativa'."},{"organization":"Regione Lombardia","url":"https://www.regione.lombardia.it/ambiente-e-territorio/autorizzazione-ambientali/autorizzazione-integrata-ambientale-aia/procedimento-unico-centri-dati","saw":"Legally required list of ongoing data-centre single procedures; empty table on 2026-11-29."},{"organization":"MIMIT","url":"https://www.mimit.gov.it/it/caie/unita-di-missione/grandi-programmi-di-investimento","saw":"List of programmes of national strategic interest; 7 of 10 are data-centre programmes."},{"organization":"ARERA","url":"https://www.arera.it/fileadmin/allegati/docs/26/300-2026-I-eel.pdf","saw":"Opinion of 6 Aug 2026 on the MASE decree under art. 7 DL 21/2026: per-request publication by Terna, in the context of renewables and storage."}]}},"national_registry":{"exists":"partial","note":"No national register of data-centre projects. Two national partial sets: Terna's Econnextion (every grid request, but aggregated and anonymous) and MASE's environmental portal (named projects, only those with generators over 50 MWt or where MASE is the single-procedure authority). The EU data-centre database covers operating sites only and is published in aggregate form.","checked_pages":[{"organization":"Terna","url":"https://dati.terna.it/download-center","saw":"Download Center, Connessioni > Econnextion > 'Utenti di Consumo': aggregate rows only (region/province/municipality x stage)."},{"organization":"MASE","url":"https://va.mite.gov.it/it-IT/Ricerca/Via","saw":"Project search with free text, procedure type (incl. id 151 for data centres), work type and territory."},{"organization":"MIMIT","url":"https://www.mimit.gov.it/it/caie/unita-di-missione/grandi-programmi-di-investimento","saw":"Strategic-interest programmes only (7 data-centre programmes)."},{"organization":"Regione Lombardia","url":"https://www.regione.lombardia.it/ambiente-e-territorio/autorizzazione-ambientali/autorizzazione-integrata-ambientale-aia/procedimento-unico-centri-dati","saw":"Regional list of ongoing data-centre single procedures, empty."},{"organization":"ARERA","url":"https://www.arera.it/fileadmin/allegati/docs/26/300-2026-I-eel.pdf","saw":"No data-centre register; per-request publication foreseen for renewable and storage connection requests."},{"organization":"European Commission (DG ENER)","url":"https://energy.ec.europa.eu/topics/energy-efficiency/energy-efficiency-targets-directive-and-rules/energy-efficiency-directive/energy-performance-data-centres_en","saw":"European database of operating data centres (500 kW IT and above); public only as aggregated data and dashboard."},{"organization":"AgID / dati.gov.it","url":"https://www.dati.gov.it/opendata/api/3/action/package_search?q=%22data%20center%22&rows=20","saw":"1 unrelated dataset (Basilicata municipal disaster recovery); 'datacenter' and 'centri dati' 0."},{"organization":"AgID / RNDT","url":"https://geodati.gov.it/RNDT/rest/metadata/search?q=datacenter&start=1&num=20&f=json","saw":"0 records; '(\"data center\")' 1 unrelated (ISPRA GNSS network)."}]},"if_unstructured":{"summary":"Project-level MW, address and IT power are only in documents: MASE project PDFs (non-technical summary, project description) and MIMIT CdM resolutions. Below the MASE threshold, data centres need municipal building permits that are not listed anywhere checked.","recipe":["Download Terna's 'Utenti di Consumo' table (Municipality view) and keep Fonte = 'Data center' as the universe of grid requests by municipality, stage and MW.","Collect named projects from MASE (free text 'data center'/'datacenter' + procedure id 151), keep projects with a procedure not 'Conclusa'/'Archiviata', and read proponent, municipalities, procedure dates and 'Stato procedura' from Oggetti/Info/<id>.","Add MIMIT strategic programmes (resolution date; developer, site and IT MW from the scanned resolution).","For each named project, open the non-technical summary or public notice for address and MW, and note the power basis (facility, IT or generator MWt).","Match named projects to Terna rows by municipality and MW (tested: Sedriano, 70 MW in both); leave unmatched Terna rows as anonymous requests.","For Lombardy check the regional single-procedure list; for other regions search the regional VIA list for 'data center'; below 50 MWt, permits are municipal and must be sought per municipality."],"location_method":"Project PDFs give the street address (e.g. Via Luigi Galvani S/N, Sedriano; Via Marche 8, Siziano), and SIA drawings show the site on orthophoto or CTR (e.g. 'Planimetria percorso cavi AT con DPA su CTR'). Terna gives the municipality only.","cross_with":["Terna Econnextion municipality rows (requested MW and grid stage) against MASE and MIMIT projects in the same municipality.","SILVIA (Lombardy) for proponent and start date of the same MASE procedure.","MIMIT strategic list for projects outside Lombardy (e.g. Trino, Piombino, Sulcis)."],"where_published":[{"name":"MASE environmental portal - project documentation","url":"https://va.mite.gov.it/it-IT/Ricerca/Via","what":"Public notice, non-technical summary (Sintesi non Tecnica), project description and drawings for each state VIA/screening/single procedure.","how_to_search_inside":"Free text 'data center' or 'datacenter' (ViaLibera t=o), or procedure id 151; then Documentazione/<project>/<procedure>, paged with ?pagina=N; ?mode=export gives an XLSX of document titles (no links).","example_document":{"url":"https://va.mite.gov.it/File/Documento/1320888","what_it_gives":"Sedriano SNT (Sept 2025), §5.2 pp. 32-33: 'La potenza elettrica complessiva prevista per l’edificio è pari a 70 MW'; '69 MW destinati ai carichi critici'; 'sala dati da 8MW IT'; cover: 'INDIRIZZO: Via Luigi Galvani S/N, Sedriano, MI, Italy'."}},{"name":"MASE environmental portal - public notices (Avviso al pubblico)","url":"https://va.mite.gov.it/it-IT/Procedure/AvvisiAlPubblico/","what":"Two-page notice per procedure: applicant, filing date, site address, VIA category, competent authority for the building permit.","how_to_search_inside":"Section 'Avviso al Pubblico' of each project's documentation.","example_document":{"url":"https://va.mite.gov.it/File/Documento/1342614","what_it_gives":"'Infrastructure Italia Land 2 S.r.l'; 'di aver presentato in data 24/11/2025'; 'DATA CENTER STACK CAMPUS SIZIANO Via Marche 8, Siziano (PV)'; 'l’Autorità competente al rilascio è il Comune di Siziano'."}},{"name":"MIMIT - CdM resolutions on strategic programmes","url":"https://www.mimit.gov.it/it/caie/unita-di-missione/grandi-programmi-di-investimento","what":"Scanned resolution per programme: developer, site, investment, IT power, schedule.","how_to_search_inside":"Open each programme page and its 'Delibera (pdf)'; render to images (no text layer).","example_document":{"url":"https://www.mimit.gov.it/images/stories/documenti/allegati/Delibera_Cavour_Hyperscale_Campus_Techbau.pdf","what_it_gives":"p. 2: 'presentato da Techbau S.p.A.'; 'potenza IT complessiva compresa tra 300 MW e 400 MW'; 'dell'ex centrale termoelettrica \"Galileo Ferraris\" di Trino (VC)'; p. 3: 'l'avvio dei lavori nel 2027'."}},{"name":"Regional decrees on municipal plan variants (example: Regione Lazio, VAS screening)","url":"https://regione.lazio.it/imprese/tutela-ambientale-difesa-suolo/valutazione-impatto-ambientale-progetti","what":"Regional decisions on urban-plan variants for data-centre sites; give municipality and project name, not developer or MW.","how_to_search_inside":"Keyword search on the regional site; decrees are PDFs under /sites/default/files/documentazione/<year>/.","example_document":{"url":"https://regione.lazio.it/sites/default/files/documentazione/2026/DD-G03708-19-03-2026.pdf","what_it_gives":"'VER-2025_20. Comune di Colleferro (RM). Procedura di Verifica di assoggettabilità a VAS ... relativa alla \"Variante al PRG denominata Data Center Cobra Green Hyperscale\". Esclusione dalla procedura di VAS'; 'Autorità Procedente: Comune di Colleferro (RM)'."}}]},"related_not_answering":[{"name":"EU database on data centres (Delegated Regulation 2024/1364)","url":"https://energy.ec.europa.eu/topics/energy-efficiency/energy-efficiency-targets-directive-and-rules/energy-efficiency-directive/energy-performance-data-centres_en","why":"Operating data centres of 500 kW IT and above; published only as aggregated data, no projects."},{"name":"IDA - Italian Datacenter Association, Ricerca di mercato 2026 (press report)","url":"https://www.teleborsa.it/DettaglioNews/143_2026-10-08_TLB/Data-Center-in-Italia-investimenti-potenziali-per-37-miliardi-in-10-anni.html","why":"Aggregate pipeline only ('230 MW in costruzione, 673 in sviluppo e 936 in fase preliminare'), no project list."},{"name":"Politecnico di Milano ProdAction - data-centre mapping of the Città metropolitana di Milano","url":"https://www.polimi.it/fileadmin/user_upload/comunicati_stampa/Comst_Mappatura_data_center_Milano.pdf","why":"Counts only (10 under construction, 23 under evaluation in the Milan area); no published list or dataset found."},{"name":"MASE decree 291 of 8 Sept 2026 (copy hosted by Certifico)","url":"https://certifico.com/component/attachments/download/64046","why":"Art. 5 c. 4 obliges Terna to publish per-request holder, MW and permit status, but only for renewable and storage plants (art. 1)."},{"name":"Terna TE.R.R.A. portal","url":"https://dati.terna.it/connessioni/terra","why":"Per-request monitoring is accessible only to MASE, MIC, ARERA and the Regions; the public page shows grid microzones."},{"name":"Lombardy DGR XII/2629/2024 guidelines and MASE guidelines D.D. 257/2024","url":"https://va.mite.gov.it/it-IT/Comunicazione/DettaglioDirezione/4755","why":"Procedural guidance on assessing data centres; no project list."}],"open_questions":["Terna does not define 'Progetti in valutazione' (11 data-centre requests, 4,000 MW) on the pages checked; whether it means the network-project review before 'benestare' needs confirmation from Terna.","MASE and SILVIA name different applicants for the Siziano project (ID_VIP 14473): 'Infrastructure Italia Land 2 S.r.l.' (MASE notice and Info page) vs 'INFRASTRUCTURE ITALIA LAND 9 S.R.L.' (SILVIA).","Whether any regional-competence data-centre single procedure (generators 50 to under 300 MWt) has been filed in Lombardy: the required list is empty, which only the Sportello regionale per i centri dati can confirm."],"history":[{"pass":1,"date":"2026-11-29","role":"research","model":"Claude Sonnet 5.5 (claude-sonnet-5-5)","rules_version":"6.15","note":"First pass: Terna Econnextion consumption data (aggregate MW by stage) plus MASE, MIMIT and Lombardy per-project records; cross-check Sedriano 70 MW; no single list.","headline":{"official_data":"partial","non_official_data":"none_found","national_registry":"partial"},"sources":{"total":5,"new":5,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":60,"minutes":41}}],"local_terms":[{"term":"centro dati / data center","language":"it","meaning":"Data centre; legal texts use 'centri dati', MASE titles and Terna use 'data center'/'datacenter'."},{"term":"Procedimento Unico per il rilascio delle autorizzazioni ai progetti di centri dati","language":"it","meaning":"Single authorisation procedure (art. 8 DL 21/2026); MASE search procedure id 151."},{"term":"Utenti di Consumo","language":"it","meaning":"Terna Econnextion dataset value for consumption users (Fonte 'Data center')."},{"term":"STMG (Soluzione Tecnica Minima Generale)","language":"it","meaning":"Terna's general connection solution in the connection offer; 'accettata' when the applicant accepts it."},{"term":"STMD (Soluzione Tecnica Minima di Dettaglio)","language":"it","meaning":"Detailed connection solution, requested after permits are obtained."},{"term":"gruppi elettrogeni di emergenza","language":"it","meaning":"Backup generators; their thermal MW (MWt) decide VIA, screening and AIA competence."},{"term":"verifica di assoggettabilità a VIA","language":"it","meaning":"VIA screening (generators 50-150 MWt, at MASE)."},{"term":"interesse strategico nazionale","language":"it","meaning":"National strategic-interest declaration (art. 13 DL 104/2023), listed by MIMIT."}],"provenance":{"pass_count":1,"models":["Claude Sonnet 5.5 (claude-sonnet-5-5)"],"minutes_estimate":41,"pages_opened":60,"passes":[{"pass":1,"date":"2026-11-29","model":"Claude Sonnet 5.5 (claude-sonnet-5-5)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/it/data-centers-in-permitting.json","detail_url":"https://georutter.org/v1/it/data-centers-in-permitting/detail.json","html_url":"https://georutter.org/it/data-centers-in-permitting/","country_url":"https://georutter.org/v1/countries/it.json"}