{"schema_version":"1.0","country":"it","country_name":"Italy","topic":"energy-auctions","question":"Where can I get the results of renewable and storage auctions in Italy, with awarded projects, capacity (MW), price, technology and location?","territory":"it","territory_level":"country","parent_url":null,"published_on":"2026-11-27","research_reviewed_on":"2026-11-27","access_checked_on":"2026-11-27","answer":{"official_data":"partial","non_official_data":"not_tested","summary":"Terna's final MACSE 2029 results list 16 awarded storage systems and 16 GWh of selected capacity, with municipalities, charging and discharging MW and area-level premiums. GSE's FER X rankings provide renewable awardees, locations, kW and bid reductions. The MACSE report gives area premiums and omits individual bid prices.","main_caveats":["The 2029 MACSE final report adds municipalities missing from the provisional report.","MACSE marginal and average premiums by area are not project-specific prices.","GSE bid reduction and the award-price calculation are not evidence of actual payments.","MWh of storage capacity and MW of charging or discharging power are different."],"confidence":"medium","confidence_reason":"The final MACSE report and a renewable award and call were downloaded; other rounds remain to be checked.","attributes":[{"attribute":"awarded_project","covered":"partial","source_ids":["terna_macse","gse_ferx"],"note":"MACSE names awardees and systems; GSE Table A names admitted applicants.","gap":"not_checked","gap_note":"Other procedures, complete history and project-specific storage prices need further checks."},{"attribute":"capacity_mw","covered":"partial","source_ids":["terna_macse","gse_ferx"],"note":"MACSE distinguishes MWh capacity and MW power; GSE provides kW.","gap":"not_checked","gap_note":"Other procedures, complete history and project-specific storage prices need further checks."},{"attribute":"price","covered":"partial","source_ids":["terna_macse","gse_ferx"],"note":"MACSE provides area premiums; GSE provides bid reduction and call base price.","gap":"not_checked","gap_note":"Other procedures, complete history and project-specific storage prices need further checks."},{"attribute":"technology","covered":"partial","source_ids":["terna_macse","gse_ferx"],"note":"MACSE 2029 lithium-ion; GSE has separate wind and photovoltaic tables.","gap":"not_checked","gap_note":"Other procedures, complete history and project-specific storage prices need further checks."},{"attribute":"location","covered":"partial","source_ids":["terna_macse","gse_ferx"],"note":"Final MACSE report and GSE ranking show municipality and province.","gap":"not_checked","gap_note":"Other procedures, complete history and project-specific storage prices need further checks."},{"attribute":"latest_data","covered":"partial","source_ids":["terna_macse","gse_ferx"],"note":"MACSE 2029 final dated 26 November 2026; other rounds not checked.","gap":"not_checked","gap_note":"Other procedures, complete history and project-specific storage prices need further checks."},{"attribute":"historical_series","covered":"partial","source_ids":["terna_macse","gse_ferx"],"note":"Terna publishes MACSE 2028 and 2029 results and revisions. GSE 2025 transitional rankings are available; other rounds remain unchecked.","gap":"not_checked","gap_note":"Other procedures, complete history and project-specific storage prices need further checks."},{"attribute":"update_frequency","covered":"partial","source_ids":["terna_macse","gse_ferx"],"note":"Results published by auction; a general publication schedule is not yet checked.","gap":"not_checked","gap_note":"Other procedures, complete history and project-specific storage prices need further checks."}]},"sources":[{"source_id":"terna_macse","name":"MACSE 2029 auction results, final report","publisher":"Terna","official":true,"landing_url":"https://www.terna.it/it/sistema-elettrico/mercato-termine-stoccaggi/esiti-aste","data_url":"https://download.terna.it/terna/Rendiconto_EsitiMacse2029_definitivi_8df4bab78e49957.pdf","access":"pdf","format":"PDF","license":"unknown","language":"it","has_coordinates":false,"location_precision":"municipality","summary":"Final selected storage systems and separate area-level premiums for MACSE 2029.","coverage_note":"Individual awardees with municipality, province, MWh and MW; price is reported by area.","data_date":"Auction 24 November 2026; final 26 November 2026","caveats":["Area premium is not a project-specific price."],"test":{"tested_on":"2026-11-27","method":"download","http_status":200,"problems":[]},"example":null,"members_summary":null},{"source_id":"gse_ferx","name":"FER X Transitorio photovoltaic and wind award rankings","publisher":"Gestore dei Servizi Energetici (GSE)","official":true,"landing_url":"https://www.gse.it/servizi-per-te/fonti-rinnovabili/ferx/graduatorie","data_url":"https://www.gse.it/documenti_site/Documenti%20GSE/Servizi%20per%20te/FERX/Graduatorie%20bando%201/Graduatoria_DM_FERXtransitorio_PC_FTV_2025_TabA.pdf","access":"pdf","format":"PDF","license":"unknown","language":"it","has_coordinates":false,"location_precision":"municipality","summary":"Published renewable auction rankings identify admitted PV and wind projects.","coverage_note":"FER X Transitorio rankings; Table A is admitted, other tables cover exclusions, non-admission and withdrawals.","data_date":"2025 competitive round","caveats":["Bid percentage is not the payment actually received."],"test":{"tested_on":"2026-11-27","method":"download","http_status":200,"problems":["Browser extraction initially returned 403 for the landing page, but an ordinary GET succeeded."]},"example":null,"members_summary":null}],"other_sources_count":0,"if_unstructured":{"summary":"Auction results are released in PDF tables; the following examples were extracted."},"local_terms":[{"term":"graduatoria","language":"it","meaning":"Ranking of applicants in a competitive procedure."},{"term":"assegnatario","language":"it","meaning":"Selected storage awardee."},{"term":"premio marginale","language":"it","meaning":"Area marginal premium, not necessarily each project’s premium."},{"term":"potenza in immissione","language":"it","meaning":"Selected injection power in MW."}],"provenance":{"pass_count":1,"models":["GPT-6"],"minutes_estimate":10,"pages_opened":null,"passes":[{"pass":1,"date":"2026-11-27","model":"GPT-6"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/it/energy-auctions.json","detail_url":"https://georutter.org/v1/it/energy-auctions/detail.json","html_url":"https://georutter.org/it/energy-auctions/","country_url":"https://georutter.org/v1/countries/it.json"}
