{"schema_version":"1.0","country":"it","country_name":"Italy","topic":"energy-auctions","question":"Where can I get the results of renewable and storage auctions in Italy, with awarded projects, capacity (MW), price, technology and location?","territory":"it","territory_level":"country","parent_url":null,"published_on":"2026-11-27","research_reviewed_on":"2026-11-27","access_checked_on":"2026-11-27","answer":{"official_data":"partial","non_official_data":"not_tested","summary":"Terna's final MACSE 2029 results list 16 awarded storage systems and 16 GWh of selected capacity, with municipalities, charging and discharging MW and area-level premiums. GSE's FER X rankings provide renewable awardees, locations, kW and bid reductions. The MACSE report gives area premiums and omits individual bid prices.","main_caveats":["The 2029 MACSE final report adds municipalities missing from the provisional report.","MACSE marginal and average premiums by area are not project-specific prices.","GSE bid reduction and the award-price calculation are not evidence of actual payments.","MWh of storage capacity and MW of charging or discharging power are different."],"confidence":"medium","confidence_reason":"The final MACSE report and a renewable award and call were downloaded; other rounds remain to be checked.","attributes":[{"attribute":"awarded_project","covered":"partial","source_ids":["terna_macse","gse_ferx"],"note":"MACSE names awardees and systems; GSE Table A names admitted applicants.","gap":"not_checked","gap_note":"Other procedures, complete history and project-specific storage prices need further checks."},{"attribute":"capacity_mw","covered":"partial","source_ids":["terna_macse","gse_ferx"],"note":"MACSE distinguishes MWh capacity and MW power; GSE provides kW.","gap":"not_checked","gap_note":"Other procedures, complete history and project-specific storage prices need further checks."},{"attribute":"price","covered":"partial","source_ids":["terna_macse","gse_ferx"],"note":"MACSE provides area premiums; GSE provides bid reduction and call base price.","gap":"not_checked","gap_note":"Other procedures, complete history and project-specific storage prices need further checks."},{"attribute":"technology","covered":"partial","source_ids":["terna_macse","gse_ferx"],"note":"MACSE 2029 lithium-ion; GSE has separate wind and photovoltaic tables.","gap":"not_checked","gap_note":"Other procedures, complete history and project-specific storage prices need further checks."},{"attribute":"location","covered":"partial","source_ids":["terna_macse","gse_ferx"],"note":"Final MACSE report and GSE ranking show municipality and province.","gap":"not_checked","gap_note":"Other procedures, complete history and project-specific storage prices need further checks."},{"attribute":"latest_data","covered":"partial","source_ids":["terna_macse","gse_ferx"],"note":"MACSE 2029 final dated 26 November 2026; other rounds not checked.","gap":"not_checked","gap_note":"Other procedures, complete history and project-specific storage prices need further checks."},{"attribute":"historical_series","covered":"partial","source_ids":["terna_macse","gse_ferx"],"note":"Terna publishes MACSE 2028 and 2029 results and revisions. GSE 2025 transitional rankings are available; other rounds remain unchecked.","gap":"not_checked","gap_note":"Other procedures, complete history and project-specific storage prices need further checks."},{"attribute":"update_frequency","covered":"partial","source_ids":["terna_macse","gse_ferx"],"note":"Results published by auction; a general publication schedule is not yet checked.","gap":"not_checked","gap_note":"Other procedures, complete history and project-specific storage prices need further checks."}]},"sources":[{"source_id":"terna_macse","name":"MACSE 2029 auction results, final report","publisher":"Terna","official":true,"landing_url":"https://www.terna.it/it/sistema-elettrico/mercato-termine-stoccaggi/esiti-aste","data_url":"https://download.terna.it/terna/Rendiconto_EsitiMacse2029_definitivi_8df4bab78e49957.pdf","access":"pdf","format":"PDF","license":"unknown","language":"it","has_coordinates":false,"location_precision":"municipality","publisher_type":"operator","adds":"Final selected storage systems, municipality, province, MWh, MW and area-level premiums.","first_seen_pass":1,"rank":1,"summary":"Final selected storage systems and separate area-level premiums for MACSE 2029.","coverage_note":"Individual awardees with municipality, province, MWh and MW; price is reported by area.","data_date":"Auction 24 November 2026; final 26 November 2026","caveats":["Area premium is not a project-specific price."],"coverage":{"geographic":"Italy; winning storage systems in the areas Centro Sud, Sardegna, Sicilia, Sud e Calabria, 2029 delivery."},"fine_print":{"unit":{"value":"Capacity and energy in MWh; withdrawal and injection in MW; area premiums in €/MWh per year.","quote":"PREMIO MARGINALE [€/MWh per anno]","url":"https://download.terna.it/terna/Rendiconto_EsitiMacse2029_definitivi_8df4bab78e49957.pdf","attempts":[]},"inclusion_rule":{"value":"Selected storage systems in the 24 November 2026 MACSE auction for 2029.","quote":"Sistemi di Stoccaggio selezionati","url":"https://download.terna.it/terna/Rendiconto_EsitiMacse2029_definitivi_8df4bab78e49957.pdf","attempts":[]},"reference_date":{"value":"Auction 24 November 2026, delivery year 2029; final results confirmed 26 November 2026.","quote":null,"url":"https://www.terna.it/it/sistema-elettrico/pubblicazioni/news-operatori/dettaglio/pubblicazione-esiti-definitivi-asta-macse-anno-consegna-2029","attempts":[]},"update_frequency":{"value":"By auction and follow-up final publication, not a regular statistical series.","quote":null,"url":"https://www.terna.it/it/sistema-elettrico/mercato-termine-stoccaggi/esiti-aste","attempts":[]},"exclusions":{"value":"Area premium statistics are not an individual award price; report does not give a named project-specific premium.","quote":null,"url":"https://download.terna.it/terna/Rendiconto_EsitiMacse2029_definitivi_8df4bab78e49957.pdf","attempts":[]}},"key_fields":[{"meaning":"awardee"},{"meaning":"market area"},{"meaning":"municipality and province, final report"},{"meaning":"contracted storage capacity"},{"meaning":"selected energy, including other obligations"},{"meaning":"withdrawal power"},{"meaning":"injection power"},{"meaning":"area marginal and weighted-average premium"}],"how_to_use":{"example_request":"https://download.terna.it/terna/Rendiconto_EsitiMacse2029_definitivi_8df4bab78e49957.pdf pages 3–4","example_result":"Table 3 row 1: ACL SPV 2 S.R.L. | SUD E CALABRIA | PALO DEL COLLE (BA) | 888 MWh | 903,467 MWh | -143,754 MW | 143,754 MW.","steps":["Extract table 3 on page 4 preserving its separate MWh and MW columns and the municipality and province.","Link each row to table 1 by area for the area marginal and weighted premiums only.","Check the definitive announcement and current auction results page for later versions."],"reading_traps":["Do not assign an area average or marginal premium as the individual winning bid.","The initial 24 November provisional report omitted municipality; the 26 November final report includes it.","Selected capacity (MWh), energy (MWh), withdrawal MW and injection MW are different values.","MW and energy figures include both realisation and other obligations, as the table footnote states.","For 2028 use the updated report: the original reported 10.000 MWh, the later report 9.968 MWh after a partial award was declined. https://download.terna.it/terna/Rendiconto_EsitiMacse2028_aggiornati_8de05c1e38635fd.pdf"]},"test":{"tested_on":"2026-11-27","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":391221,"records_total":16,"records_for_country":16,"problems":[]},"evidence":[{"claim":"Selected storage technology","url":"https://download.terna.it/terna/Rendiconto_EsitiMacse2029_definitivi_8df4bab78e49957.pdf","quote":"Batterie agli Ioni di Litio"}],"members":[],"members_summary":null},{"source_id":"gse_ferx","name":"FER X Transitorio photovoltaic and wind award rankings","publisher":"Gestore dei Servizi Energetici (GSE)","official":true,"landing_url":"https://www.gse.it/servizi-per-te/fonti-rinnovabili/ferx/graduatorie","data_url":"https://www.gse.it/documenti_site/Documenti%20GSE/Servizi%20per%20te/FERX/Graduatorie%20bando%201/Graduatoria_DM_FERXtransitorio_PC_FTV_2025_TabA.pdf","access":"pdf","format":"PDF","license":"unknown","language":"it","has_coordinates":false,"location_precision":"municipality","publisher_type":"national_government","adds":"Renewable competitive rankings with admitted projects and bid reductions.","first_seen_pass":1,"rank":2,"summary":"Published renewable auction rankings identify admitted PV and wind projects.","coverage_note":"FER X Transitorio rankings; Table A is admitted, other tables cover exclusions, non-admission and withdrawals.","data_date":"2025 competitive round","caveats":["Bid percentage is not the payment actually received."],"coverage":{"geographic":"Italy; FER X Transitorio 2025 auction rankings, by technology."},"fine_print":{"unit":{"value":"Nominal and admitted power in kW; percentage bid reduction. Call states upper exercise price in €/MWh.","quote":"Offerta di riduzione percentuale sul prezzo di esercizio superiore","url":"https://www.gse.it/documenti_site/Documenti%20GSE/Servizi%20per%20te/FERX/Graduatorie%20bando%201/Graduatoria_DM_FERXtransitorio_PC_FTV_2025_TabA.pdf","attempts":[]},"inclusion_rule":{"value":"Table A is admitted in the PV auction quota, based on submitted and checked information.","quote":"Tabella A - AMMESSI IN POSIZIONE UTILE","url":"https://www.gse.it/documenti_site/Documenti%20GSE/Servizi%20per%20te/FERX/Graduatorie%20bando%201/Graduatoria_DM_FERXtransitorio_PC_FTV_2025_TabA.pdf","attempts":[]},"reference_date":{"value":"Call 9 July 2025; summary of ranking dated 1 December 2025.","quote":null,"url":"https://www.gse.it/documenti_site/Documenti%20GSE/Servizi%20per%20te/FERX/Graduatorie%20bando%201/Graduatoria_DM_FERXtransitorio_PC_FTV_2025_TabA.pdf","attempts":[]},"update_frequency":{"value":"Published by competitive procedure; not a fixed calendar frequency established here.","quote":null,"url":"https://www.gse.it/servizi-per-te/fonti-rinnovabili/ferx/graduatorie","attempts":[]},"exclusions":{"value":"Tables B, C and D cover excluded, eligible but not admitted, and withdrawals respectively.","quote":null,"url":"https://www.gse.it/servizi-per-te/fonti-rinnovabili/ferx/graduatorie","attempts":[]}},"key_fields":[{"meaning":"request identifier"},{"meaning":"applicant"},{"meaning":"location"},{"meaning":"bid reduction"},{"meaning":"nominal plant power"},{"meaning":"admitted capacity in kW"}],"how_to_use":{"example_request":"https://www.gse.it/documenti_site/Documenti%20GSE/Servizi%20per%20te/FERX/Graduatorie%20bando%201/Graduatoria_DM_FERXtransitorio_PC_FTV_2025_TabA.pdf page 1, row 1; https://www.gse.it/documenti_site/Documenti%20GSE/Servizi%20per%20te/FERX/Bandi/Bando-PC-Procedura_%20PC_FTV_2025_01.pdf page 2","example_result":"FER500301 | ENERGIA PULITA ITALIANA 2 S.R.L | SICILIA | CATANIA | RAMACCA | 49,829% | 42.000,000 kW admitted.","steps":["Select Table A for admitted projects and the correct procedure and technology; preserve the row’s region, province and municipality.","For FER500301, 42.000,000 kW corresponds to 42 MW; the call gives 90,689 €/MWh as the upper exercise price.","For the example row, 90.689 × (1 − 0.49829) gives approximately 45.50 €/MWh before any applicable corrections. Check the rules and contract before using it as a payable rate."],"reading_traps":["The table gives a bid reduction, not an explicit project payment or paid market price.","Italian notation uses dots as thousands separators and commas for decimals.","Table A admission does not establish that a project is built or paid.","This example is the 2025 transitional procedure, not the later FER X definitivo.","As of 27 November 2026, GSE’s first FER X Definitivo round is at expressions-of-interest evaluation; it is not the 2025 transitional ranking. https://www.gse.it/servizi-per-te/news/fer-x-definitivo-pubblicati-i-bandi-per-le-manifestazioni-di-interesse-della-prima-procedura-competitiva"]},"test":{"tested_on":"2026-11-27","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":214755,"records_total":null,"records_for_country":null,"problems":["Browser extraction initially returned 403 for the landing page, but an ordinary GET succeeded."]},"evidence":[{"claim":"The bid reduction applies to the upper price","url":"https://www.gse.it/documenti_site/Documenti%20GSE/Servizi%20per%20te/FERX/Bandi/Bando-PC-Procedura_%20PC_FTV_2025_01.pdf","quote":"l’offerta di riduzione percentuale si applica al Prezzo di Esercizio Superiore"}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"ARERA","url":"https://www.arera.it/atti-e-provvedimenti/dettaglio/26/283-26"},"operators":{"structure":"few","note":"Terna administers MACSE; GSE administers FER X renewable support.","census_url":null},"publication_obligation":{"exists":"yes","url":"https://download.terna.it/terna/Rendiconto_EsitiMacse2029_definitivi_8df4bab78e49957.pdf"},"consolidated_republication":{"found":"partial","note":"Terna and GSE each publish their own results.","checked_pages":[{"url":"https://www.terna.it/it/sistema-elettrico/mercato-termine-stoccaggi/esiti-aste"},{"url":"https://www.gse.it/servizi-per-te/fonti-rinnovabili/ferx/graduatorie"},{"url":"https://www.arera.it/atti-e-provvedimenti/dettaglio/26/283-26"}]}},"national_registry":{"exists":"partial","note":"Separate GSE renewable and Terna storage auction publications; no single consolidated register was established.","checked_pages":[{"url":"https://www.terna.it/it/sistema-elettrico/mercato-termine-stoccaggi/esiti-aste"},{"url":"https://www.gse.it/servizi-per-te/fonti-rinnovabili/ferx/graduatorie"},{"url":"https://www.arera.it/atti-e-provvedimenti/dettaglio/26/283-26"}]},"if_unstructured":{"summary":"Auction results are released in PDF tables; the following examples were extracted.","recipe":["Extract the selected PDF tables using a layout-preserving PDF text extractor.","Join MACSE table 3 to table 1 on area without assigning its average to individual bidders.","For the GSE example pair the same procedure’s call and ranking; apply the bid reduction to the upper exercise price and preserve any separate adjustments."],"location_method":"Use the Comune and Provincia fields in these tables; they do not locate a facility precisely.","cross_with":["GSE auction call for the applicable price basis.","Terna final notice for the status of the report."],"where_published":[{"name":"Terna MACSE 2029 final results","url":"https://download.terna.it/terna/Rendiconto_EsitiMacse2029_definitivi_8df4bab78e49957.pdf","example_document":{}},{"name":"GSE FER X Transitorio ranking","url":"https://www.gse.it/servizi-per-te/fonti-rinnovabili/ferx/graduatorie","example_document":{}}]},"related_not_answering":[{"name":"GSE Atlaimpianti","url":"https://www.gse.it/dati-e-scenari/atlaimpianti","why":"A facilities map is not an auction award and price register."}],"open_questions":[],"history":[{"pass":1,"date":"2026-11-27","role":"research","model":"GPT-6","rules_version":"6.15","note":"Final MACSE 2029 and a FER X 2025 award and call tested; other rounds remain unchecked.","headline":{"official_data":"partial","non_official_data":"not_tested","national_registry":"unknown"},"sources":{"total":2,"new":2,"dropped":0},"negatives":{},"effort":{"pages":null,"minutes":10}}],"local_terms":[{"term":"graduatoria","language":"it","meaning":"Ranking of applicants in a competitive procedure."},{"term":"assegnatario","language":"it","meaning":"Selected storage awardee."},{"term":"premio marginale","language":"it","meaning":"Area marginal premium, not necessarily each project’s premium."},{"term":"potenza in immissione","language":"it","meaning":"Selected injection power in MW."}],"provenance":{"pass_count":1,"models":["GPT-6"],"minutes_estimate":10,"pages_opened":null,"passes":[{"pass":1,"date":"2026-11-27","model":"GPT-6"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/it/energy-auctions.json","detail_url":"https://georutter.org/v1/it/energy-auctions/detail.json","html_url":"https://georutter.org/it/energy-auctions/","country_url":"https://georutter.org/v1/countries/it.json"}
