{"schema_version":"1.0","country":"it","country_name":"Italy","topic":"grid-connection-queue","question":"Where can I get the list of grid connection requests in Italy, with project, technology, capacity (MW), connection node, status and date?","territory":"it","territory_level":"country","parent_url":null,"published_on":"2026-11-29","research_reviewed_on":"2026-11-29","access_checked_on":"2026-11-29","answer":{"official_data":"partial","non_official_data":"none_found","summary":"No public per-project list of Italian connection requests exists. Terna's Econnextion (dati.terna.it) publishes all active transmission-grid (RTN) renewable and storage requests monthly, as anonymised MW sums by technology and status down to municipality (cut-off 2026-10-31). Puglia republishes a Terna per-request extract with request date but no name or node. Named projects with their RTN station appear only in Terna's Development Plan annexes (late stages) and in STMG letters filed in environmental-assessment dossiers. The full register sits in Terna's login-only TE.R.R.A. portal; DM 291/2026 obliges Terna to publish per-request data before each open season.","main_caveats":["Econnextion rows are anonymous sums: a municipality cell can merge several projects (e.g. two 60 MW wind cells in Acquaviva Collecroce), so it cannot be turned into a project list.","Requests are largely speculative: at 2026-10-31 RTN requests were 304.89 GW renewables and 282.89 GW storage, against about 65 GW of new renewables needed by 2030 per Terna's PNIEC note; DM 291/2026 open seasons may void many.","Only the RTN (high/extra-high voltage, Terna, plants >=10 MW) is covered. MV/LV requests go to 114 distributors; e-distribuzione, areti and unareti publish saturation atlases or nothing, not request lists.","Econnextion has no 'STMG da elaborare' status although PdS 2025 reports 22.3 GW in it; whether requests awaiting a quote are excluded is not stated.","The company named in an STMG can differ from the current proponent (transfer): the Finale Emilia STMG is addressed to Mare Rinnovabili, the EIA project to ENGIE Finale Emilia."],"confidence":"high","confidence_reason":"Terna service queried and reconciled with its hub totals; Puglia file, PdS annexes, DM 291 and Grid Code read in full text; restricted access confirmed at the TE.R.R.A. login. Only some regional portals were sampled.","attributes":[{"attribute":"project","covered":"partial","source_ids":["regional-terna-extracts","terna-pds-connections","terna-terra-portal"],"note":"Puglia: one anonymous row per request. PdS 2025 annex names applicant companies for STMD/contract-stage plants and consumers. Full register only in TE.R.R.A. (login).","gap":"restricted","gap_note":"Grid Code 1A.5.3.2 (ARERA 183/2023) lets Terna publish single initiatives only after quote acceptance, and it publishes aggregates only; identity is in TE.R.R.A. DM 291/2026 art. 5.4 list not seen on 2026-11-29."},{"attribute":"technology","covered":"partial","source_ids":["terna-econnextion","regional-terna-extracts"],"note":"Econnextion 'Fonte': 6 renewable and 5 storage types per aggregate cell; Puglia gives it per request, incl. Data center, Cold ironing, Altri utenti di consumo.","gap":"restricted","gap_note":"Nationally technology is attached to municipal aggregates, not to requests; per-request rows only for Puglia. Consumer requests (data centres) are only in the Power BI tab, not in the Download Center."},{"attribute":"capacity_mw","covered":"partial","source_ids":["terna-econnextion","regional-terna-extracts","terna-terra-microzones"],"note":"'Potenza (MW)' summed per region/province/municipality x source x status; Puglia gives MW per request. Whether it is injection or nominal power is not stated.","gap":"restricted","gap_note":"Per-request MW is public only for Puglia (2025-10-31) and in individual STMG letters; national per-request power stays in TE.R.R.A."},{"attribute":"connection_node","covered":"partial","source_ids":["terna-pds-connections"],"note":"PdS 2025 Appendix 2 names the RTN station (SE) for STMD/contract-stage plants and consumers; earlier stages only via STMG letters in EIA dossiers (recipe).","gap":"restricted","gap_note":"Econnextion and the Puglia extract carry no node. STMG node per request is in TE.R.R.A.; DM 291 art. 5.1 adds per-connection-point capacity, not yet published (checked dati.terna.it 2026-11-29)."},{"attribute":"status","covered":"partial","source_ids":["terna-econnextion","regional-terna-extracts","terna-terra-microzones"],"note":"Five 'Stato Connessione' values from STMG da accettare to STMD/Contratti; Puglia adds 41 'Stato Pratica' values per request. No queue position is published.","gap":"restricted","gap_note":"Status is per aggregate cell nationally; per-request status only for Puglia. No queue rank exists in any source opened (allocation is by open season under DM 291/2026)."},{"attribute":"event_date","covered":"partial","source_ids":["regional-terna-extracts"],"note":"Puglia: 'Data Richiesta Connessione' per request (2005-09-12 to 2025-09-10). Econnextion gives only the cut-off date; STMG letters carry their own dates.","gap":"restricted","gap_note":"No national request, STMG-acceptance or contract dates are public; they are in TE.R.R.A. Checked Econnextion fields, Download Center config and PdS 2025 tables."},{"attribute":"latest_data","covered":"yes","source_ids":["terna-econnextion","terna-terra-microzones","regional-terna-extracts"],"note":"Econnextion and microzones: cut-off 2026-10-31 (loaded 2026-11-13). Puglia extract: 2025-10-31, issued 2025-12-17.","gap":null,"gap_note":null},{"attribute":"historical_series","covered":"partial","source_ids":["terna-pds-connections","regional-terna-extracts","terna-econnextion"],"note":"Econnextion (online since 2023-02-27) serves only the current snapshot. Dated snapshots: PdS 2021 (STMG accepted ~69.5 GW), PdS 2025 tables at 2024-12-31; Puglia replaced yearly.","gap":"not_published","gap_note":"Download Center returns 'Years': [] for Connections; no monthly archive found; Wayback has no captures of dati.terna.it/connessioni; PdS 2023 annex link on arera.it returns 'File non disponibile'."},{"attribute":"update_frequency","covered":"yes","source_ids":["terna-econnextion","regional-terna-extracts","terna-terra-portal"],"note":"Econnextion: monthly ('aggiornata con cadenza mensile'). Puglia: ANNUAL in catalogue metadata. DM 291/2026: open-season data at least quarterly.","gap":null,"gap_note":null}]},"sources":[{"source_id":"terna-econnextion","name":"Econnextion: requests for connection to the national transmission grid (RTN) – Download Center datasets Connessioni/FER and Connessioni/Accumuli","publisher":"Terna S.p.A.","official":true,"landing_url":"https://dati.terna.it/connessioni/econnextion","data_url":"https://dati.terna.it/api/sitecore/dati/downloadcenter/recordsv2","access":"api","format":"JSON from a POST service behind the Download Center; XLSX export by GET; Power BI dashboard","license":"unknown","language":"it","has_coordinates":false,"location_precision":"municipality","publisher_type":"operator","adds":"Only national, monthly, machine-readable view of all active RTN renewable and storage connection requests by technology and processing status, down to municipality.","first_seen_pass":1,"rank":1,"summary":"Monthly national view of all active RTN renewable and storage requests: MW (and request count at regional level) by technology and status, by region, province or municipality.","coverage_note":"RTN only (Terna, >=10 MW); consumer requests only in the Power BI tab; anonymous sums, no project, node or request date.","data_date":"2026-10-31","caveats":["A municipal cell can merge several projects.","POST service without published documentation; parameters taken from the Download Center page."],"coverage":{"geographic":"Italy, requests to Terna's RTN (high and extra-high voltage); region, province or municipality; offshore wind attributed to a reference municipality"},"fine_print":{"unit":{"value":"MW in the Download Center column 'Potenza (MW)'; the dashboard shows GW. Power basis (injection, nominal or withdrawal) not stated.","quote":"il numero complessivo e lo stato delle pratiche, nonché la potenza (espressa in GW), delle richieste di connessione","url":"https://dati.terna.it/connessioni/econnextion","attempts":[{"url":"https://dati.terna.it/connessioni/econnextion","note":"No definition of the power basis in the 'Info sui dati' text."},{"url":"https://dati.terna.it/download-center","note":"Column only labelled 'Potenza (MW)'."}]},"inclusion_rule":{"value":"Connection requests handled by Terna (high and extra-high voltage, plants of 10 MW or more) for renewables, storage and consumers; published only aggregated and anonymised.","quote":"Terna è competente per la connessione in alta e altissima tensione degli impianti con una potenza uguale o superiore a 10 MW.","url":"https://dati.terna.it/connessioni","attempts":[]},"reference_date":{"value":"2026-10-31 (service LastDate; hub 'Richieste di connessione al 31/10/2026'; LastEntryDate 2026-11-13)","quote":"Richieste di connessione al 31/10/2026","url":"https://dati.terna.it/connessioni","attempts":[]},"update_frequency":{"value":"Monthly","quote":"La dashboard è aggiornata con cadenza mensile.","url":"https://dati.terna.it/connessioni/econnextion","attempts":[]},"exclusions":{"value":"Distribution-grid (MV/LV) requests are not included; consumer requests (data centres, cold ironing) are in the dashboard but not in the Download Center; no 'STMG da elaborare' status appears.","quote":null,"url":null,"attempts":[{"url":"https://dati.terna.it/connessioni/econnextion","note":"Page lists the categories but no exclusion statement."},{"url":"https://dati.terna.it/download-center","note":"Connections cluster offers only datasets FER and Accumuli; no consumer dataset."}]}},"key_fields":[{"field":"Regione / Provincia / Comune","meaning":"Territorial unit of the aggregate (Comune and Provincia only with filterViewBy Municipality or Province)."},{"field":"Tipo Impianto","meaning":"'FER' or 'Accumuli' (dataset family)."},{"field":"Fonte","meaning":"Technology: Solare, Eolico on-shore, Eolico off-shore, Idroelettrico, Geotermico, Biomasse; or Accumulo stand-alone, Integrato a solare, Integrato a eolico, Pompaggio puro, Pompaggio Misto."},{"field":"Stato Connessione","meaning":"STMG da accettare, STMG accettate, Progetti in valutazione, Progetti con nulla osta, STMD/Contratti."},{"field":"Potenza (MW)","meaning":"Sum of requested power in the cell."},{"field":"Numero Pratiche","meaning":"Number of requests in the cell; present only in the Region view."},{"field":"LastDate / LastEntryDate","meaning":"Data cut-off and load timestamp, in /Date(ms+0100)/ format."}],"how_to_use":{"example_request":"curl -s -X POST -H \"Content-Type: application/json\" -d '{\"filterDataset\":\"Accumuli\",\"filterViewBy\":\"Region\",\"pageIndex\":\"0\",\"pageSize\":\"500\",\"db\":\"enti\"}' https://dati.terna.it/api/sitecore/dati/downloadcenter/recordsv2","example_result":"{\"Columns\":{\"Regione\":\"String\",\"Tipo Impianto\":\"String\",\"Fonte\":\"String\",\"Stato Connessione\":\"String\",\"Potenza (MW)\":\"Number\",\"Numero Pratiche\":\"Number\"},\"Count\":221,\"Data\":[...[\"PUGLIA\",\"Accumuli\",\"Accumulo stand-alone\",\"STMG accettate\",19031.85364,146]...],\"LastDate\":\"/Date(1793401200000+0100)/\"}","steps":["POST JSON to the recordsv2 URL with filterDataset 'FER' or 'Accumuli', filterViewBy 'Region', 'Province' or 'Municipality', db 'enti', pageIndex '0' and a pageSize above Count (Region 198/221 rows, Municipality 2,739/1,840 rows on 2026-11-29).","Alternatively GET https://dati.terna.it/api/sitecore/dati/downloadcenter/records?f=xlsx&filterDataset=FER&filterViewBy=Municipality&db=enti&pageIndex=0&pageSize=5000 for an XLSX with the same columns.","Decode LastDate: milliseconds since 1970 plus a +0100 offset; 1793401200000 is 2026-10-31 00:00 CET.","Use the Region view to get request counts ('Numero Pratiche'); the Province and Municipality views give MW only.","Consumer requests (data centres, cold ironing, other users) are only in the 'Utenti di consumo' tab of the Power BI dashboard, whose per-chart 'Export data' needs a browser; headline on 2026-10-31: 120,50 GW and 915 pratiche."],"reading_traps":["Each row is a sum, not a request: in the municipal view one cell can hold several projects (Acquaviva Collecroce shows two 60.0 MW onshore-wind cells under different statuses).","Numbers use a dot as decimal separator in the JSON; the dashboard text says English formatting (comma for thousands).","Storage 'Fonte' labels differ in case between the filter list ('Pompaggio misto') and the data ('Pompaggio Misto').","The 2023 Econnextion page warned that offshore-wind requests are located at the province of a reference municipality, so their municipal cell is not the plant site.","Totals reconcile with the hub: FER 304,887.11 MW / 5,565 requests and Accumuli 282,886.67 MW / 3,424 requests on 2026-10-31; press figures with other cut-offs (e.g. 144 GW PV at 2026-03-31) are older snapshots, not contradictions.","Direct GET of the records endpoint without the xlsx flag returns HTTP 500; the JSON service only answers POST."]},"test":{"tested_on":"2026-11-29","method":"api_query","http_status":200,"content_type":"text/html; charset=utf-8 (body is JSON)","size_bytes":91654,"records_total":198,"records_for_country":198,"problems":["The service declares Content-Type text/html although the body is JSON.","No documented public API: parameters are those used by the Download Center page script."]},"evidence":[{"claim":"Hub totals at the cut-off date","url":"https://dati.terna.it/connessioni","quote":"ECONNEXTION Richieste di connessione al 31/10/2026 Fonti rinnovabili 304,89 GW Pratiche 5.565"},{"claim":"Dashboard covers renewables, storage and consumer users including data centres","url":"https://dati.terna.it/connessioni/econnextion","quote":"degli utenti di consumo (data center, iniziative di cold ironing e altri utenti)"},{"claim":"Navigation down to municipality","url":"https://dati.terna.it/connessioni/econnextion","quote":"Attraverso la mappa interattiva è possibile navigare i dati a livello regionale, provinciale o comunale."},{"claim":"Terna may publish requests only aggregated and anonymous (Grid Code chapter 1, PDF dated 2023-05-08)","url":"https://download.terna.it/terna/Capitolo_1_A_8db53072fd1ed41.pdf","quote":"in forma aggregata (fino al livello comunale) e anonima, le informazioni relative alle richieste di connessione pervenute al Gestore medesimo"},{"claim":"Size of the queue versus the 2030 need","url":"https://dati.terna.it/connessioni/econnextion","quote":"secondo il Piano Nazionale Integrato Energia e Clima (PNIEC) entro il 2030 sarà necessario installare in Italia circa 65 GW di nuova capacità rinnovabile"},{"claim":"Econnextion online since 2023-02-27; Grid Code amended in 2023 to allow publishing single initiatives with accepted quotes, which Terna has not done publicly","url":"https://arera.it/allegati/docs/23/183-23.pdf","quote":"il 27 febbraio 2023, Terna ha reso disponibile sul proprio sito internet la piattaforma Econnextion che consente di visualizzare, in forma aggregata, la distribuzione geografica delle richieste di connessione alla RTN"}],"members":[],"members_summary":null},{"source_id":"regional-terna-extracts","name":"Regional open-data republications of Terna per-request connection extracts","publisher":"Italian regions (Regione Puglia found), data from Terna","official":true,"landing_url":null,"data_url":null,"access":"direct_download","format":"CSV (cp1252, ';' separator) and XLSX","license":"CC BY 4.0 (Puglia)","language":"it","has_coordinates":false,"location_precision":"municipality","publisher_type":"regional_government","adds":"Only public per-request rows: technology, MW, request date, municipality, connection status and detailed practice status for every RTN request in a region (found for Puglia only).","first_seen_pass":1,"rank":2,"summary":"Per-request rows republished by a region from Terna data: technology, MW, request date, municipality, status and detailed practice state. Found only for Puglia.","coverage_note":"Puglia only (2,085 requests, cut-off 2025-10-31, annual). Searched the national catalogue plus Sicilia and Lombardia directly; no other region publishes it.","data_date":"2025-10-31","caveats":["No project name, applicant or node.","Windows-1252 CSV; includes storage and data centres despite its title."],"coverage":{"geographic":"Regione Puglia (2,085 requests at 2025-10-31); no equivalent found for other regions"},"fine_print":{"unit":{"value":"MW with comma decimals in column 'Potenza (MW)'","quote":"Potenza (MW)","url":"https://dati.puglia.it/ckan/dataset/87b75375-4a86-425d-9455-f43221e42cc9/resource/6d0a10ca-3cdf-4ff4-ac48-be0a5da339e6/download/dataset_richieste-di-connessione-alla-rete-per-impianti-da-fonti-rinnovabili_20251205.csv","attempts":[]},"inclusion_rule":{"value":"RTN connection requests located in Puglia; source Terna. The file contains only four statuses (no 'STMG da accettare').","quote":"Il dataset contiene le richieste di connessione alla rete elettrica di trasmissione nazionale (RTN) per gli impianti di produzione di energia elettrica da fonti rinnovabil ricadenti nel territorio della Regione Puglia.","url":"https://dati.puglia.it/ckan/api/3/action/package_show?id=87b75375-4a86-425d-9455-f43221e42cc9","attempts":[]},"reference_date":{"value":"2025-10-31","quote":"I dati sono aggiornati al 31 ottobre 2025. Fonte dei dati: TERNA.","url":"https://dati.puglia.it/ckan/api/3/action/package_show?id=87b75375-4a86-425d-9455-f43221e42cc9","attempts":[]},"update_frequency":{"value":"Annual (catalogue metadata); dataset created 2024-12-11, current file issued 2025-12-17","quote":"frequency : ANNUAL","url":"https://dati.puglia.it/ckan/api/3/action/package_show?id=87b75375-4a86-425d-9455-f43221e42cc9","attempts":[]},"exclusions":{"value":"No project name, applicant, node or coordinates; despite the title, storage and consumer requests (data centres) are included.","quote":null,"url":null,"attempts":[{"url":"https://dati.puglia.it/ckan/api/3/action/package_show?id=87b75375-4a86-425d-9455-f43221e42cc9","note":"Metadata do not state exclusions or anonymisation."},{"url":"https://dati.puglia.it/ckan/dataset/87b75375-4a86-425d-9455-f43221e42cc9/resource/6d0a10ca-3cdf-4ff4-ac48-be0a5da339e6/download/dataset_richieste-di-connessione-alla-rete-per-impianti-da-fonti-rinnovabili_20251205.csv","note":"Eight columns only; no identifier column."}]}},"key_fields":[{"field":"Classificazione Impianto","meaning":"Technology, incl. Accumulo stand-alone, Integrato a solare/eolico, Data center, Altri utenti di consumo, Cold ironing (header contains a line break)."},{"field":"Potenza (MW)","meaning":"Requested power per request, comma decimals."},{"field":"Data Richiesta Connessione","meaning":"Request date, dd/mm/yyyy."},{"field":"Provincia / Comune","meaning":"Location of the request."},{"field":"Stato Connessione","meaning":"Same five-value scale as Econnextion (four present)."},{"field":"Stato Pratica","meaning":"41 detailed workflow states, e.g. 'Tavolo tecnico in  corso', 'Progetto benestariato', 'Contratto sottoscritto - Corrispettivo pagato', 'Sospesa per decadenza'."}],"how_to_use":{"example_request":"curl -sL -o richieste.csv \"https://dati.puglia.it/ckan/dataset/87b75375-4a86-425d-9455-f43221e42cc9/resource/6d0a10ca-3cdf-4ff4-ac48-be0a5da339e6/download/dataset_richieste-di-connessione-alla-rete-per-impianti-da-fonti-rinnovabili_20251205.csv\"","example_result":"Accumulo stand-alone;100,00;04/10/2024;PUGLIA;BARI;ACQUAVIVA DELLE FONTI;Progetti con nulla osta;Progetto benestariato\nData center;500,00;08/08/2024;PUGLIA;BRINDISI;BRINDISI;STMG accettate;Offerta economica fornita","steps":["Member used as example: Regione Puglia (dati.puglia.it).","Read the CSV as cp1252 with ';' separator; the first header cell spans two lines ('Classificazione\\nImpianto'). 2,085 data rows, 149,294.7 MW in total.","Convert 'Potenza (MW)' from comma decimals and parse 'Data Richiesta Connessione' as dd/mm/yyyy (range 2005-09-12 to 2025-09-10).","Group by 'Stato Connessione' for the Econnextion scale (STMG accettate 851, Progetti con nulla osta 822, Progetti in valutazione 334, STMD/Contratti 78) or keep 'Stato Pratica' for the detailed step.","To find a newer edition, check the package_show metadata (modified/issued) before reuse."],"reading_traps":["UTF-8 decoding fails (byte 0xe0); the file is Windows-1252.","Title and description say renewables, but 533 rows are stand-alone storage and 27 are consumers (Data center 7, Altri utenti di consumo 18, Cold ironing 2).","No 'STMG da accettare' rows, unlike Econnextion: the extract covers requests with an accepted STMG or later.","40 groups of fully identical rows (93 rows) exist, e.g. two 'Accumulo stand-alone;100,00;24/02/2025;...;ACQUAVIVA DELLE FONTI' rows; with no request ID they cannot be told apart from duplicates, so do not deduplicate blindly.","Solar and its integrated storage appear as separate rows with the same date and municipality (Solare and Integrato a solare, 45,00 MW, 01/12/2021, Acquaviva delle Fonti); summing all rows mixes generation and storage power.","Some 'Stato Pratica' values contain double spaces ('Tavolo tecnico in  corso')."]},"test":{"tested_on":"2026-11-29","method":"download","http_status":200,"content_type":"text/csv","size_bytes":213365,"records_total":2085,"records_for_country":2085,"problems":["File encoded in Windows-1252 although served as text/csv without charset."]},"evidence":[{"claim":"Regional dataset sourced from Terna, cut-off date","url":"https://dati.puglia.it/ckan/api/3/action/package_show?id=87b75375-4a86-425d-9455-f43221e42cc9","quote":"I dati sono aggiornati al 31 ottobre 2025. Fonte dei dati: TERNA."},{"claim":"Regions have institutional access to Terna's detailed request data","url":"https://www.terna.it/it/sistema-elettrico/programmazione-territoriale-efficiente/econnextion","quote":"e alle Regioni e alle Province autonome di Trento e Bolzano, l’accesso tempestivo e dettagliato a tutti i dati"}],"members":[{"name":"Regione Puglia – dati.puglia.it","landing_url":"https://dati.puglia.it/ckan/dataset/87b75375-4a86-425d-9455-f43221e42cc9","data_url":"https://dati.puglia.it/ckan/dataset/87b75375-4a86-425d-9455-f43221e42cc9/resource/6d0a10ca-3cdf-4ff4-ac48-be0a5da339e6/download/dataset_richieste-di-connessione-alla-rete-per-impianti-da-fonti-rinnovabili_20251205.csv","access":"direct_download","tested":true,"data_found":true,"note":"2,085 per-request rows, cut-off 2025-10-31; CSV and XLSX; CC BY 4.0; annual. Landing URL redirects to dati.puglia.it/v2/dataset/87b75375-4a86-425d-9455-f43221e42cc9."},{"name":"Regione Siciliana – dati.regione.sicilia.it","landing_url":"https://dati.regione.sicilia.it/api/3/action/package_search?q=connessione%20terna&rows=5","data_url":null,"access":"api","tested":true,"data_found":false,"note":"CKAN search 'connessione terna' returned 0 datasets on 2026-11-29."},{"name":"Regione Lombardia – dati.lombardia.it","landing_url":"https://www.dati.lombardia.it/api/catalog/v1?q=connessione%20terna&limit=5","data_url":null,"access":"api","tested":true,"data_found":false,"note":"Catalogue search 'connessione terna' returned 0 results on 2026-11-29."}],"members_summary":{"total":21,"listed":3,"tested":3,"data_found":1,"scope_note":"19 regions plus the autonomous provinces of Trento and Bolzano. The national catalogue dati.gov.it (harvests regional catalogues) returns only Puglia for title/notes searches 'richieste di connessione', 'TERNA', 'STMG' and 'Econnextion'. Direct catalogue queries on Sicilia and Lombardia returned 0; Sardegna, Lazio and Basilicata catalogue APIs not reachable at the tried paths.","pattern":"dati.gov.it search 'richieste di connessione' (title or notes) and 'TERNA'; the Puglia dataset is titled 'Richieste di connessione alla rete per impianti da fonti rinnovabili'."},"member_scope":{"total":21,"note":"19 regions plus the autonomous provinces of Trento and Bolzano. The national catalogue dati.gov.it (harvests regional catalogues) returns only Puglia for title/notes searches 'richieste di connessione', 'TERNA', 'STMG' and 'Econnextion'. Direct catalogue queries on Sicilia and Lombardia returned 0; Sardegna, Lazio and Basilicata catalogue APIs not reachable at the tried paths.","pattern":"dati.gov.it search 'richieste di connessione' (title or notes) and 'TERNA'; the Puglia dataset is titled 'Richieste di connessione alla rete per impianti da fonti rinnovabili'."}},{"source_id":"terna-pds-connections","name":"Terna Development Plan (Piano di Sviluppo) connections volume: 'Programmazione territoriale efficiente e interventi di connessione' (2025) and earlier connection annexes","publisher":"Terna S.p.A. (copy hosted by ARERA)","official":true,"landing_url":null,"data_url":"https://arera.it/fileadmin/allegati/operatori/pds/25/Programmazione_territoriale_efficiente_e_interventi_di_connessione.pdf","access":"pdf","format":"PDF (108 pages, 2025 edition)","license":"unknown","language":"it","has_coordinates":false,"location_precision":"municipality","publisher_type":"operator","adds":"Status definitions, dated national snapshots by status and market zone, MV/LV request totals reported by distributors, and named applicant companies with their RTN station for contract-stage plants and consumers.","first_seen_pass":1,"rank":3,"summary":"Planning volume with dated snapshots by status and zone, status definitions, MV/LV totals, and lists naming applicant companies and their RTN station for late-stage plants and accepted consumer connections.","coverage_note":"National; 2025 edition at 2024-12-31. Named lists only for plants with STMD/contract and consumers with accepted solution; no MW or dates per row.","data_date":"2024-12-31","caveats":["PDF tables with wrapped cells.","Status labels differ from Econnextion."],"coverage":{"geographic":"Italy; tables by market zone and region; Appendix 2 lists per connection with region and province or municipality"},"fine_print":{"unit":{"value":"GW in status and zone tables; Appendix 2 lists carry no power","quote":"Tabella 2 Distribuzione delle richieste di connessione FER suddivise per stato di avanzamento dell’iter (aggiornamento al 31/12/2024)","url":"https://arera.it/fileadmin/allegati/operatori/pds/25/Programmazione_territoriale_efficiente_e_interventi_di_connessione.pdf","attempts":[]},"inclusion_rule":{"value":"Appendix 2 Table 1 lists power plants with accepted STMD and connection contract; Table 5 lists consumers whose connection solution was accepted.","quote":"per tali centrali è stata accettata la soluzione tecnica minima di dettaglio (STMD) ed è stato definito il contratto di connessione (Tabella 1 e 2)","url":"https://arera.it/fileadmin/allegati/operatori/pds/25/Programmazione_territoriale_efficiente_e_interventi_di_connessione.pdf","attempts":[]},"reference_date":{"value":"2024-12-31 for RTN tables; 2024-11-30 for distributor (MV/LV) data","quote":"sulla base degli ultimi dati disponibili comunicati dalle imprese distributrici aggiornati al 30 novembre 2024","url":"https://arera.it/fileadmin/allegati/operatori/pds/25/Programmazione_territoriale_efficiente_e_interventi_di_connessione.pdf","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.arera.it/fileadmin/allegati/operatori/pds/21/04_PdS_CONN%20RTN_2021.pdf","note":"2021 edition exists (PDF dated 2021-05-04); no stated periodicity."},{"url":"https://arera.it/allegati/operatori/pds/23/0_Terna_Pds23_Evoluzione_Connessione.pdf","note":"2023 file returns 'File non disponibile'; the cadence could not be confirmed from the documents."}]},"exclusions":{"value":"Named lists exclude requests before STMD/contract (plants) or before accepted solution (consumers); no MW or dates per listed connection.","quote":"connessioni di utenti di consumo: comprende l’elenco degli impianti RTN necessari per la connessione delle utenze passive. Per tali utenze la soluzione di connessione rilasciata da Terna è stata accettata dal richiedente (Tabella 5).","url":"https://arera.it/fileadmin/allegati/operatori/pds/25/Programmazione_territoriale_efficiente_e_interventi_di_connessione.pdf","attempts":[]}},"key_fields":[{"field":"IMPIANTI RTN DA REALIZZARE","meaning":"RTN works and station (SE) where the connection is made, e.g. 'Nuovo stallo 132 kV nella SE RTN 380/132 kV “Adria Sud”'."},{"field":"SOCIETÀ RICHIEDENTE","meaning":"Applicant company (one or more per station)."},{"field":"FONTE","meaning":"Technology (Fotovoltaico, BESS, Biomasse, Idroelettrico...)."},{"field":"REGIONE / PROVINCIA (or COMUNE)","meaning":"Location of the works."},{"field":"STMG DA ELABORARE ... STMD/CONTRATTO (GW)","meaning":"Status columns of the national snapshot tables."}],"how_to_use":{"example_request":"https://arera.it/fileadmin/allegati/operatori/pds/25/Programmazione_territoriale_efficiente_e_interventi_di_connessione.pdf – Tabella 2 on PDF page 15 (printed 13); Appendice 2 Tabella 1 from PDF page 68; Tabella 5 'Connessioni di Utenti di consumo' from PDF page 93","example_result":"Tabella 2 Totale: STMG da elaborare 22,3 GW; fornito 29,8; accettata 162,4; progettazione in corso 73,0; nulla osta 53,1; STMD/contratto 8,5. Appendix row: 'Nuovo stallo 132 kV nella SE RTN 380/132 kV “Adria Sud”' | Marco Polo Solar 2 S.r.l. | Fotovoltaico | Veneto | Loreo (RO)","steps":["Extract text with pdftotext -layout; tables are laid out in columns with wrapped cells, so a row spans several text lines.","Use Tabella 2 (status) and Tabella 3 (market zones) for the 2024-12-31 snapshot; §1.1.2 for MV/LV totals reported by distributors.","For named connections, read Appendix 2 Tabella 1 (plants) and Tabella 5 (consumers, includes data-centre developers); join wrapped lines by station name.","For the history, repeat on older annexes hosted by ARERA (e.g. 04_PdS_CONN RTN_2021: 'oltre 1.500 pratiche di connessione con STMG accettata su RTN per una potenza di circa 69,5 GW')."],"reading_traps":["The PdS status scale has six steps ('STMG da elaborare', 'STMG fornito'...), Econnextion five with different labels ('STMG da accettare', 'Progetti in valutazione'); map them by definition, not by name.","Appendix lists are works for connection, not requests: one station row can carry several applicant companies and no MW.","Hosted on arera.it as the plan submitted to the regulator; the file name does not carry the year in every edition."]},"test":{"tested_on":"2026-11-29","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":9821716,"records_total":null,"records_for_country":null,"problems":["The 2023 edition link on arera.it returns 'File non disponibile'."]},"evidence":[{"claim":"Definition of the nulla-osta status","url":"https://arera.it/fileadmin/allegati/operatori/pds/25/Programmazione_territoriale_efficiente_e_interventi_di_connessione.pdf","quote":"la potenza che fa riferimento alle iniziative che hanno ottenuto un parere positivo in merito al progetto delle opere di rete e quindi il nulla osta da parte di Terna all’avvio del procedimento autorizzativo è pari a 53,1 GW"},{"claim":"STMG sets the connection point at a station bay","url":"https://arera.it/fileadmin/allegati/operatori/pds/25/Programmazione_territoriale_efficiente_e_interventi_di_connessione.pdf","quote":"La Soluzione Tecnica Minima Generale (STMG) prevede, quale punto di connessione, tipicamente uno stallo dedicato su una nuova stazione elettrica o sull’ampliamento di una stazione esistente"},{"claim":"Distributors report MV/LV requests to Terna aggregated by primary substation","url":"https://arera.it/fileadmin/allegati/operatori/pds/25/Programmazione_territoriale_efficiente_e_interventi_di_connessione.pdf","quote":"Le informazioni trasmesse dai distributori e ricevute da Terna presentano richieste di connessione aggregate per impianto di distribuzione (es. per cabina primaria)."},{"claim":"Consumer requests including data centres at end-2024","url":"https://arera.it/fileadmin/allegati/operatori/pds/25/Programmazione_territoriale_efficiente_e_interventi_di_connessione.pdf","quote":"DATA CENTER ~ 30 GW circa +24 GW rispetto al 2023"}],"members":[],"members_summary":null},{"source_id":"terna-terra-portal","name":"TE.R.R.A. (Territorio Reti Rinnovabili Accumuli) portal – detailed connection-request data for institutions and open-season platform","publisher":"Terna S.p.A.","official":true,"landing_url":"https://www.terna.it/it/sistema-elettrico/programmazione-territoriale-efficiente/econnextion","data_url":"https://terra.terna.it","access":"registration_required","format":"Web platform (login)","license":"unknown","language":"it","has_coordinates":null,"location_precision":null,"publisher_type":"operator","adds":"Holds the per-request register (detailed data on every connection procedure) and is the platform where DM 291/2026 requires per-request data, connection points and the open-season offer to be published.","first_seen_pass":1,"rank":4,"summary":"Terna's institutional portal with the detailed request register; DM 291/2026 requires per-request data (company, type, MW, location, solution, permit status) to be published there before each open season.","coverage_note":"Login only (MASE, MiC, ARERA, Regions). Per-request publication under DM 291 not yet visible on 2026-11-29.","data_date":null,"caveats":["Not publicly accessible.","Future public scope of the 'domanda' list not stated."],"coverage":{"geographic":"Italy, RTN connection requests for renewables, storage and consumers"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://terra.terna.it","note":"Login wall; content not visible."},{"url":"https://www.terna.it/it/sistema-elettrico/programmazione-territoriale-efficiente/econnextion","note":"Describes access, not fields."}]},"inclusion_rule":{"value":"Access for MASE, Ministry of Culture, ARERA, Regions and autonomous provinces to all data on connection procedures.","quote":"questo portale consente al Ministero dell’Ambiente e della Sicurezza Energetica (MASE), al Ministero della Cultura (MIC), all’Autorità di Regolazione per Energia Reti e Ambiente (ARERA) e alle Regioni e alle Province autonome di Trento e Bolzano, l’accesso tempestivo e dettagliato a tutti i dati e ai contenuti delle relazioni di monitoraggio sullo stato di avanzamento dei procedimenti di connessione degli impianti","url":"https://www.terna.it/it/sistema-elettrico/programmazione-territoriale-efficiente/econnextion","attempts":[]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://terra.terna.it","note":"Not visible behind login."},{"url":"https://dati.terna.it/connessioni/terra","note":"Public TE.R.R.A. page dated 31/10/2026 covers only microzone aggregates."}]},"update_frequency":{"value":"Per-request data and offer at least quarterly, at least 30 days before each open season (DM 291/2026 art. 5-6).","quote":"Con cadenza trimestrale e almeno 30 giorni solari prima di ogni sessione di Open Season, Terna pubblica sulla Piattaforma l'offerta e la domanda.","url":"https://www.terna.it/it/sistema-elettrico/programmazione-territoriale-efficiente/connessione-rete/procedura-connessione","attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://terra.terna.it","note":"Login wall."},{"url":"https://www.mase.gov.it/portale/documents/20119/0/m_amte.MASE.UDCM_DECRETI_MINISTRO_R_.0000291.08-09-2026+DM+Saturazione.pdf/cbf8660d-8953-3012-0d1e-39af0ecbc49c?t=1788884782477","note":"Decree lists minimum fields, not exclusions."}]}},"key_fields":[{"field":"società titolare; tipologia di impianto; potenza in immissione/prelievo; localizzazione; soluzione o attestazione; stato iter autorizzativo","meaning":"Minimum per-request fields Terna must publish under DM 291/2026 art. 5 c. 4 (publication not yet seen)."}],"how_to_use":{"example_request":"","example_result":"","steps":["Public users cannot query it; regions can, and Puglia republished an extract (source regional-terna-extracts).","Watch dati.terna.it/connessioni/terra and the Terna open-season page for the 'domanda' (requests) publication required before the first open season."],"reading_traps":["The public page dati.terna.it/connessioni/terra shares the TE.R.R.A. name but only shows microzone totals.","The procedure page says publication is 'sulla Piattaforma'; whether the request list will be public or login-only is not stated."]},"test":{"tested_on":"2026-11-29","method":"blocked","http_status":302,"content_type":null,"size_bytes":null,"records_total":null,"records_for_country":null,"problems":["Redirects to an Azure AD B2C sign-in page (B2C_1A_SIGNUP_SIGNIN); access reserved to institutions."]},"evidence":[{"claim":"DM 291/2026 per-request publication duty","url":"https://www.mase.gov.it/portale/documents/20119/0/m_amte.MASE.UDCM_DECRETI_MINISTRO_R_.0000291.08-09-2026+DM+Saturazione.pdf/cbf8660d-8953-3012-0d1e-39af0ecbc49c?t=1788884782477","quote":"Terna, entro il termine di cui al comma 1, pubblica i dati relativi alle richieste di connessione alla RTN, fornendo, per ciascuna richiesta, almeno le seguenti informazioni: a) società titolare della richiesta di connessione; b) tipologia di impianto; c) potenza in immissione richiesta;"},{"claim":"Connection points with capacity to be shown per point","url":"https://www.mase.gov.it/portale/documents/20119/0/m_amte.MASE.UDCM_DECRETI_MINISTRO_R_.0000291.08-09-2026+DM+Saturazione.pdf/cbf8660d-8953-3012-0d1e-39af0ecbc49c?t=1788884782477","quote":"Terna, almeno trenta giorni prima dell’apertura dell’Open season, pubblica la Capacità massima addizionale microzonale e l’Offerta, dando evidenza, per ciascun punto di connessione:"}],"members":[],"members_summary":null},{"source_id":"terna-terra-microzones","name":"TE.R.R.A. public page – microzone dataset (Download Center OpenSeason/Microzones and Municipalities-Microzones)","publisher":"Terna S.p.A.","official":true,"landing_url":"https://dati.terna.it/connessioni/terra","data_url":"https://dati.terna.it/api/sitecore/dati/downloadcenter/recordsv2","access":"api","format":"JSON (POST service behind the Download Center)","license":"unknown","language":"it","has_coordinates":false,"location_precision":"municipality","publisher_type":"operator","adds":"Splits active RTN renewable and storage requests into authorised vs not-yet-authorised MW for each of 77 microzones, the geography used by DM 291/2026 open seasons, with a municipality-to-microzone key.","first_seen_pass":1,"rank":5,"summary":"Microzone totals of operating MW and of authorised vs not-yet-authorised request MW.","coverage_note":"77 microzones, cut-off 2026-10-31.","data_date":"2026-10-31","caveats":[],"coverage":{"geographic":"Italy, 77 microzones; 7,895 municipality-microzone rows"},"fine_print":{"unit":{"value":"MW","quote":"I dati di potenza, espressi in megawatt (MW), relativi agli impianti da fonti energetiche rinnovabili (FER) e ai sistemi di accumulo in esercizio, e le richieste di connessione attive (con la distinzione tra quelle già autorizzate e tutte le altre)","url":"https://dati.terna.it/connessioni/terra","attempts":[]},"inclusion_rule":{"value":"Active RTN connection requests for renewables and storage, split into authorised and all others; offshore not mentioned.","quote":"richieste di connessione attive (con la distinzione tra quelle già autorizzate e tutte le altre), consultabili a livello nazionale, regionale e per microzona","url":"https://dati.terna.it/connessioni/terra","attempts":[]},"reference_date":{"value":"2026-10-31","quote":"Ultimo aggiornamento: 31/10/2026","url":"https://dati.terna.it/connessioni/terra","attempts":[]},"update_frequency":{"value":"Capacity at least quarterly under DM 291/2026; page cadence not stated","quote":"dispone che Terna s.p.a. pubblichi e aggiorni trimestralmente la capacità massima addizionale","url":"https://www.mase.gov.it/portale/documents/20119/0/m_amte.MASE.UDCM_DECRETI_MINISTRO_R_.0000291.08-09-2026+DM+Saturazione.pdf/cbf8660d-8953-3012-0d1e-39af0ecbc49c?t=1788884782477","attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://dati.terna.it/connessioni/terra","note":"No exclusion statement."},{"url":"https://dati.terna.it/download-center","note":"Dataset has only microzone, operating MW and two request columns."}]}},"key_fields":[{"field":"Descrizione","meaning":"Microzone code, e.g. 'PUGLIA 06'."},{"field":"Impianti FER e accumuli in Esercizio (MW)","meaning":"Operating capacity."},{"field":"Richieste FER e accumuli Autorizzate (MW)","meaning":"Active requests already authorised."},{"field":"Richieste FER e accumuli Da Autorizzare (MW)","meaning":"All other active requests."}],"how_to_use":{"example_request":"curl -s -X POST -H \"Content-Type: application/json\" -d '{\"filterDataset\":\"Microzones\",\"orderByColumn\":\"DataRiferimento\",\"orderByDir\":\"desc\",\"pageIndex\":\"0\",\"pageSize\":\"100\",\"db\":\"enti\"}' https://dati.terna.it/api/sitecore/dati/downloadcenter/recordsv2","example_result":"{\"Columns\":{\"Descrizione\":\"String\",\"Impianti FER e accumuli in Esercizio (MW)\":\"Number\",\"Richieste FER e accumuli Autorizzate (MW)\":\"Number\",\"Richieste FER e accumuli Da Autorizzare (MW)\":\"Number\"},\"Count\":77,\"Data\":[[\"PUGLIA 06\",1253.455930,1806.571800,17948.272610],...]}","steps":["The Microzones query needs orderByColumn 'DataRiferimento'; without it the service returns HTTP 500.","Use filterDataset 'Municipalities-Microzones' (7,895 rows: Microzona, Regione, Provincia, Comune) to join Econnextion municipal cells to microzones."],"reading_traps":["'Autorizzate' means permitted plants, not connection contracts; it is a different split from Econnextion's status scale.","Rows are sorted by the request backlog when ordered desc, not alphabetically."]},"test":{"tested_on":"2026-11-29","method":"api_query","http_status":200,"content_type":"text/html; charset=utf-8 (body is JSON)","size_bytes":721,"records_total":77,"records_for_country":77,"problems":["Undocumented parameters; a request without orderByColumn returns HTTP 500."]},"evidence":[{"claim":"Microzone split introduced under the MASE decree","url":"https://dati.terna.it/connessioni/terra","quote":"Il primo passo verso questo nuovo paradigma, secondo quanto previsto all'articolo 3 comma 2 del citato Decreto MASE, è la suddivisione della Rete di Trasmissione Nazionale (RTN) in microzone"}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"ARERA – Autorità di Regolazione per Energia Reti e Ambiente (TICA, Allegato A to ARG/elt 99/08)","url":"https://www.arera.it/atti-e-provvedimenti/dettaglio/08/099-08arg"},"operators":{"structure":"many","note":"Terna is the single TSO handling all RTN requests (high/extra-high voltage, plants >=10 MW). MV/LV requests go to distributors: 114 registered at 2024-12-31, of which 10 serve over 100,000 customers (e-distribuzione, Unareti, Areti, Ireti largest).","census_url":"https://www.arera.it/area-operatori/ricerca-operatori"},"publication_obligation":{"exists":"yes","norm":"DM MASE n. 291 of 2026-09-08 art. 5 (per-request data before each open season); TICA art. 4.2 (qualitative saturation atlases), art. 37 (distributors report to Terna quarterly) and art. 38 (reports to ARERA); Grid Code 1A.5.3.2 as approved by ARERA 183/2023/R/eel (option, not duty, to publish aggregated anonymous data and single initiatives with accepted quotes).","url":"https://www.mase.gov.it/portale/documents/20119/0/m_amte.MASE.UDCM_DECRETI_MINISTRO_R_.0000291.08-09-2026+DM+Saturazione.pdf/cbf8660d-8953-3012-0d1e-39af0ecbc49c?t=1788884782477","what_must_be_published":"DM 291: per request at least holder company, plant type, injection and withdrawal power, location, connection solution or attestation, permitting status; per connection point the available capacity. TICA 4.2: atlases of critical areas/lines and MV/LV saturation colours per primary substation, not request lists.","frequency":"DM 291: at least quarterly, 30 days before each open season. TICA 4.4: every 8 months (HV/EHV) and every 3 months (MV/LV)."},"consolidated_republication":{"found":"partial","note":"Terna receives distributors' quarterly reports (TICA art. 37) and republishes MV/LV totals by region and status only in the PdS (54.5 GW at 2024-11-30). ARERA receives semi-annual status reports (TICA art. 38.2); no public dataset of them was found.","checked_pages":[{"organization":"Terna","url":"https://arera.it/fileadmin/allegati/operatori/pds/25/Programmazione_territoriale_efficiente_e_interventi_di_connessione.pdf","saw":"§1.1.2 MV/LV requests from distributors aggregated by region and status, 54.5 GW at 30 Nov 2024; no per-request list."},{"organization":"Terna","url":"https://dati.terna.it/download-center","saw":"Connections datasets FER and Accumuli (RTN) only; no distributor dataset."},{"organization":"ARERA","url":"https://www.arera.it/fileadmin/allegati/docs/08/099-08argallnew.pdf","saw":"TICA art. 37-38 reporting duties to Terna and ARERA; no publication duty for request lists."},{"organization":"e-distribuzione","url":"https://www.e-distribuzione.it/a-chi-ci-rivolgiamo/produttori/aree-critiche.html","saw":"Monthly saturation degree per HV/MV section that counts valid requests; no request list."}]}},"national_registry":{"exists":"restricted","note":"Terna keeps the complete register of RTN connection requests (MyTerna procedures, Codice Pratica) and gives detailed access through TE.R.R.A. only to MASE, MiC, ARERA and the Regions. The public gets aggregated anonymous totals (Econnextion). DM 291/2026 requires per-request publication before open seasons; not visible on 2026-11-29.","checked_pages":[{"organization":"Terna","url":"https://www.terna.it/it/sistema-elettrico/programmazione-territoriale-efficiente/econnextion","saw":"TE.R.R.A. described as giving institutions 'accesso tempestivo e dettagliato a tutti i dati' on connection procedures."},{"organization":"Terna","url":"https://terra.terna.it","saw":"Redirect to Azure AD B2C sign-in; no public content."},{"organization":"Terna","url":"https://dati.terna.it/connessioni/terra","saw":"Public TE.R.R.A. page with microzone aggregates only, last update 31/10/2026."},{"organization":"Terna","url":"https://download.terna.it/terna/Capitolo_1_A_8db53072fd1ed41.pdf","saw":"Grid Code 1A.5.3.2: Terna may publish requests only aggregated to municipality and anonymous; single initiatives only once quotes are accepted or authorised."},{"organization":"ARERA","url":"https://www.arera.it/fileadmin/allegati/docs/08/099-08argallnew.pdf","saw":"TICA: transparency via qualitative atlases (art. 4) and reports to Terna/ARERA (art. 37-38); no public request register."},{"organization":"MASE","url":"https://www.mase.gov.it/portale/documents/20119/0/m_amte.MASE.UDCM_DECRETI_MINISTRO_R_.0000291.08-09-2026+DM+Saturazione.pdf/cbf8660d-8953-3012-0d1e-39af0ecbc49c?t=1788884782477","saw":"DM 291/2026 art. 5 c. 4: future per-request publication by Terna with minimum fields."},{"organization":"ARERA","url":"https://arera.it/allegati/docs/23/183-23.pdf","saw":"Deliberation 183/2023/R/eel approving Grid Code 1A: Terna may (not must) publish single initiatives with accepted quotes, including geolocation; public output so far is aggregated."}]},"if_unstructured":{"summary":"Named projects with their node and request code are found in Terna STMG letters attached to environmental-assessment dossiers (MASE and regional portals); MASE project titles cite the Terna code and can be exported.","recipe":["Download the MASE export for 'MYTERNA' (Export.xlsx) and extract the 9-digit code, MW and municipalities from the 'Progetto' text with a regular expression such as 'MYTERNA[^0-9]{0,15}(\\d{9})'.","For each project, open its 'Documentazione' page and the grid-connection report; the Terna letter (often an annex) gives Codice Pratica, technology, MW, applicant and the STMG connection scheme with the station name.","Read the station from the STMG paragraph ('collegata in antenna ... SE RTN ... denominata ...'); the letter date is in the Terna protocol line when present (e.g. P20210012806-15/02/2021), otherwise not in the text layer.","Take the connection status only as of the dossier: the STMG may since have lapsed or advanced; check the municipality cell in Econnextion for consistency (Acquaviva Collecroce shows two 60.0 MW onshore-wind cells).","Regional-competence projects (smaller plants) are in regional EIA portals; the same document type is found there."],"location_method":"STMG letters name the RTN station and the municipality; Econnextion and the Puglia extract only give the municipality of the request.","cross_with":["Econnextion municipal cells (same municipality, technology and MW) to check consistency, not identity.","PdS Appendix 2 lists to confirm the station and applicant for contract-stage projects.","DM 291/2026 per-request publication on TE.R.R.A. once released."],"where_published":[{"name":"MASE Valutazioni e Autorizzazioni Ambientali (state-level EIA)","url":"https://va.mite.gov.it/it-IT/Ricerca/ViaLibera?Testo=MYTERNA&t=o","what":"Project dossiers; many titles cite the Terna request code ('cod. MYTERNA n. ...'). On 2026-11-29 the free-text search 'MYTERNA' returned 313 projects (302 with a 9-digit code); '&mode=export' downloads Export.xlsx with Progetto, Proponente, Ultima procedura.","how_to_search_inside":"Free-text 'Testo' search over titles (e.g. MYTERNA, a municipality); open 'Documentazione' > 'Elaborati di Progetto' and look for the grid-connection report or an 'Allegato' with the Terna preventivo/STMG.","example_document":{"url":"https://va.mite.gov.it/File/Documento/829769","what_it_gives":"Connection report of the 'Acquaviva Collecroce' wind project (ID_VIP 9663, application 03/04/2023), Allegato I Terna letter P20210012806-15/02/2021, PDF p. 13: 'Codice Pratica: 202002009' and 'Richiesta di connessione per un impianto di generazione da fonte rinnovabile (eolica) da 60 MW'; p. 17: 'collegata in antenna a 150 kV con la sezione 150 kV di una nuova stazione di trasformazione 380/150 kV della RTN da inserire in entra - esce sulla linea RTN a 380 kV “Larino - Gissi”'."}},{"name":"Regional EIA portals (example: Emilia-Romagna VIA/VAS web)","url":"https://serviziambiente.regione.emilia-romagna.it/viavasweb/","what":"Regional-competence project dossiers whose attachments include the Terna STMG.","how_to_search_inside":"Not tested inside the portal; the example attachment was reached through a web search of the portal domain for STMG documents.","example_document":{"url":"https://serviziambiente.regione.emilia-romagna.it/viavasweb/progettoIniziale/scaricaAllegato/648469/6871","what_it_gives":"'D10_STMG_signed.pdf' for the 'Energia del Panaro' PV project (proponent ENGIE FINALE EMILIA S.r.l.), PDF p. 2: 'Codice Pratica: 202402209' and 'potenza nominale ed in immissione pari a 80,96 MW'; p. 6: 'collegato in antenna a 132 kV su un ampliamento/adeguamento della Stazione Elettrica (SE) della RTN a 132 kV denominata “Massa Finalese”'."}}]},"related_not_answering":[{"name":"e-distribuzione – Aree critiche: mappa e informazioni","url":"https://www.e-distribuzione.it/a-chi-ci-rivolgiamo/produttori/aree-critiche.html","why":"Monthly saturation class per HV/MV section of primary substations; it counts valid requests but lists none."},{"name":"areti – Livelli criticità per la capacità della rete (Rome and Formello)","url":"https://www.areti.it/content/dam/acea-areti/documenti/area-servizi/connessione-impianti-produzione/livelli-criticita-capacita-rete.pdf","why":"Quarterly criticality colour per urban zone under TICA art. 4.2 c (valid 01/12/2026–28/02/2027); no requests."},{"name":"e-distribuzione Piano di Sviluppo 2025 – Allegato 1.4 'Impianti primari con richiesta di connessione formalizzata alla RTN'","url":"https://www.e-distribuzione.it/content/dam/e-distribuzione/documenti/Piano%20di%20Sviluppo%202025%20E-Distribuzione_Appendice_%20Post%20Consultazione.pdf","why":"About 595 primary substations (name, municipality, province, region) for which the DSO itself requested RTN connection at 2024-12-31; no MW, technology or producer requests."},{"name":"Terna Econnextion hub headline figures and press reports","url":"https://www.pv-magazine.com/2026/04/16/italy-has-now-a-9-34-gw-pipeline-of-ready-to-build-pv-projects/","why":"Headline totals at earlier cut-offs (e.g. 144 GW PV at 2026-03-31); summaries, not request records."}],"open_questions":["Econnextion lacks the PdS status 'STMG da elaborare' (22.3 GW of FER at 2024-12-31): only Terna can say whether requests awaiting a quote are excluded or merged into 'STMG da accettare'.","Whether 'Potenza (MW)' is injection power for generation and withdrawal power for storage and consumers is not stated by Terna.","Whether the per-request list required by DM 291/2026 art. 5 c. 4 will be public on dati.terna.it or visible only on the TE.R.R.A. platform; the first open-season calendar was due by 30 November 2026."],"history":[{"pass":1,"date":"2026-11-29","role":"research","model":"Claude Sonnet 5.5 (claude-sonnet-5-5)","rules_version":"6.15","note":"First pass: Econnextion service decoded and reconciled; Puglia per-request extract found; named nodes only via PdS annexes and STMG letters; full register restricted (TE.R.R.A.).","headline":{"official_data":"partial","non_official_data":"none_found","national_registry":"restricted"},"sources":{"total":5,"new":5,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":53,"minutes":27}}],"local_terms":[{"term":"richiesta di connessione / pratica di connessione","language":"it","meaning":"Connection request; Terna's records are 'pratiche' counted in 'Numero Pratiche'."},{"term":"Codice Pratica (MyTerna)","language":"it","meaning":"Terna request code (e.g. 202002009); EIA project titles cite it as 'cod. MYTERNA n.'."},{"term":"STMG – Soluzione Tecnica Minima Generale","language":"it","meaning":"Connection quote with the general connection scheme and node; 'STMG da accettare' / 'STMG accettate' are statuses."},{"term":"Stato Connessione / Stato Pratica","language":"it","meaning":"Status scale in Econnextion and detailed workflow step in the Puglia extract."},{"term":"STMD – Soluzione Tecnica Minima di Dettaglio","language":"it","meaning":"Detailed solution after authorisation; status 'STMD/Contratti' precedes the connection contract."},{"term":"stazione elettrica (SE) RTN / stallo","language":"it","meaning":"Transmission substation and bay named as connection point in STMG letters and PdS lists."},{"term":"Open Season / attestazione della soluzione di connessione","language":"it","meaning":"Quarterly capacity-allocation sessions under DM 291/2026 replacing first-come queueing."},{"term":"saturazione virtuale / aree critiche","language":"it","meaning":"Grid capacity booked by unbuilt requests; DSO atlases classify saturation, not requests."}],"provenance":{"pass_count":1,"models":["Claude Sonnet 5.5 (claude-sonnet-5-5)"],"minutes_estimate":27,"pages_opened":53,"passes":[{"pass":1,"date":"2026-11-29","model":"Claude Sonnet 5.5 (claude-sonnet-5-5)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/it/grid-connection-queue.json","detail_url":"https://georutter.org/v1/it/grid-connection-queue/detail.json","html_url":"https://georutter.org/it/grid-connection-queue/","country_url":"https://georutter.org/v1/countries/it.json"}