{"schema_version":"1.0","country":"us","country_name":"United States","topic":"battery-storage-in-permitting","question":"Where can I get a list of stand-alone battery storage (BESS) projects currently in permitting in the United States, with location, power (MW), developer, permitting stage and date?","territory":"us","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-15","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"partial","summary":"US stand-alone BESS permitting is split across state and local authorities; no complete national list was found in the inherited research. EIA-860M September 2026 (released October) gives a planned-generator proxy with 34 filtered stand-alone cases >=1 MW, coordinates and Entity Name, but lacks permit stages/dates and misses early or local applications. Sampled state portals provide actual stages and dates in CA, WA and MA; linked dockets and PDFs supply further details. Paid trackers have different coverage.","main_caveats":["Cross-checking Sep 2026 EIA-860M (L) proves it misses active state siting cases: 4/5 CA CEC Opt-In BESS under review, WA Goldeneye (200 MW), and MA EFSB 26-01/26-02 do not appear in EIA-860M (L).","EIA-860 annual 3_4_Energy_Storage 'Independent' column is blank in 89/90 Status='L' rows and labels hybrid Plant 65043 ('Dulles Solar and Storage') as 'Y'; stand-alone BESS must be derived across Plant IDs.","Grid interconnection queues (NYISO, ERCOT GIS, CAISO, LBNL Queued Up, Interconnection.fyi) track transmission study status and target COD, NOT siting or environmental permitting.","Texas leads EIA-860M stand-alone (L) with 16 of 34 plants nationwide despite having no state BESS siting board, underscoring that most BESS permit locally at county/municipal level.","Open non-official portals freeze in Jan 2022 (Sandia GESDB), lack a BESS tracker (GEM), have ~0 proposed BESS (OSM Taginfo), or mirror EIA-860M (US Energy Map); PUC+EIA trackers (Halcyon) are paid."],"confidence":"high","confidence_reason":"Verified directly against Sep 2026 EIA-860M/2025 EIA-860 spreadsheets, federal NEPA/FAST-41 portals, 9 state siting portals, NYISO queue workbook, OSM Taginfo, Sandia GESDB, GEM, and commercial trackers.","attributes":[{"attribute":"location","covered":"partial","source_ids":["s001","s002"],"note":"EIA and CA have coordinates; WA/MA use towns, counties or docket maps. Early local projects and a consolidated national permitting inventory are missing.","gap":"not_published","gap_note":"Inherited location and stand-alone-project-list rows document gaps in early county/municipal cases and variable site precision."},{"attribute":"power_mw","covered":"partial","source_ids":["s001","s002"],"note":"MW is available in EIA, CA and some state pages; small or early projects outside reporting thresholds lack consolidated coverage.","gap":"not_published","gap_note":"The original power and project-list rows document projects below 1 MW and early/local cases outside the EIA proxy."},{"attribute":"developer","covered":"partial","source_ids":["s001","s002"],"note":"EIA Entity Name and state applicant LLCs give partial developer information; CA REST requires linked project pages for the applicant.","gap":"not_published","gap_note":"The original developer row distinguishes project SPVs, parent developers and fields omitted from the CA REST attributes."},{"attribute":"permitting_stage","covered":"partial","source_ids":["s002","s001"],"note":"State dockets give review stages; EIA Status (L) is a coarse approvals-pending proxy. Interconnection study status is not a siting permit stage.","gap":"not_published","gap_note":"The original stage and project-list rows document absent national tracking of local zoning, environmental and other siting sub-stages."},{"attribute":"stage_date","covered":"partial","source_ids":["s002"],"note":"State dockets give some filing/completeness/scoping dates. EIA planned-operation dates do not satisfy a permitting-stage date.","gap":"not_published","gap_note":"EIA does not publish permit application/hearing/approval dates. The inherited evidence locates real stage dates in scattered state/county dockets."}]},"sources":[{"source_id":"s001","name":"Preliminary Monthly Electric Generator Inventory (Form EIA-860M) — supplemented by Form EIA-860","publisher":"U.S. Energy Information Administration (EIA)","official":true,"landing_url":"https://www.eia.gov/electricity/data/eia860m/","data_url":"https://www.eia.gov/electricity/data/eia860m/xls/september_generator2026.xlsx","access":"direct_download","format":"xlsx (plus annual zip of xlsx files for EIA-860)","license":"Public domain (U.S. Federal Government publication; attribution requested)","language":"en","has_coordinates":true,"location_precision":"exact","summary":"A nationwide planned-generator proxy with MW and coordinates; it is not a complete permitting register.","coverage_note":"Reported batteries at least 1 MW; the inherited stand-alone Status (L) filter yields 34 cases and misses early/local applications.","data_date":"September 2026 inventory, released October 2026.","caveats":["Planned or interconnection status is not the same as siting/environmental permit stage. EIA lacks permit filing and decision dates.","The annual Independent field is unreliable for this purpose; the detail gives the tested cross-Plant-ID filter.","The inherited shell example only lists workbook sheets; the 34-project result also requires the filtering steps in the detail."],"test":{"tested_on":"2026-11-15","method":"download","http_status":200,"problems":["Lacks permitting sub-stages and permitting/filing dates; misses early state-permitting BESS (4/5 CA CEC Opt-In, WA Goldeneye, MA EFSB 26-01/26-02)."]},"example":null,"members_summary":null},{"source_id":"s002","name":"U.S. State Energy Facility Siting Boards & State BESS Permitting Portals (sampled across 9 states)","publisher":"State Energy Commissions & Utility Siting Councils (CA CEC, WA EFSEC, MA EFSB, OR EFSC, NY ORES, CT CSC, VA DEQ, MN PUC, MI MPSC)","official":true,"landing_url":"https://www.energy.ca.gov/programs-and-topics/topics/power-plants/opt-certification-program","data_url":"https://services3.arcgis.com/bWPjFyq029ChCGur/arcgis/rest/services/OptIn_Dashboard_Data/FeatureServer/0","access":"api","format":"ArcGIS REST GeoJSON/JSON (CA CEC Opt-In) + HTML docket tables & PDFs (WA, MA, OR, NY, CT)","license":"Public state government records (varies by state)","language":"en","has_coordinates":true,"location_precision":"exact","summary":"Start here for actual state permitting stages and dates; follow linked dockets and PDFs for missing fields.","coverage_note":"Nine state portals sampled. Matching stand-alone cases are documented in CA, WA and MA; local approvals remain fragmented.","data_date":"Rolling dockets; inherited tests dated 2026-11-15.","caveats":["CA REST field Projec_Name is misspelled and omits the developer; use the linked project page.","OR/NY mainly show hybrids and CT had no pending matching cases. VA/MN/MI access failures do not establish absence.","County/municipal permits are not comprehensively covered. WA/MA location and document access vary."],"test":{"tested_on":"2026-11-15","method":"api_query","http_status":200,"problems":["Patchwork coverage across only selected states/thresholds; Developer omitted in CA REST attributes; VA/MN/MI blocked to curl."]},"example":{"example_request":"curl -sS \"https://services3.arcgis.com/bWPjFyq029ChCGur/arcgis/rest/services/OptIn_Dashboard_Data/FeatureServer/0/query?where=Technology%3D%27Energy%20Storage%20System%27%20AND%20Status%3D%27Under%20Review%27&outFields=Projec_Name,Docket_Number,Technology,Status,BatteryPower,County,Latitude_DD,Longitude_DD,Application_Review_Status,Application_Completeness,Scoping_Date,Webpage&outSR=4326&f=json\"","example_result":"5 features returned: Corby (24-OPT-05, 300 MW, Solano, Application Approved, completeness 2025-10-17), Prairie Song (25-OPT-02, 1150 MW, LA, completeness 2026-01-30), Viracocha Hill (25-OPT-01, 90.7 MW, Alameda, Incomplete), Vaca Dixon (26-OPT-01, 157 MW, Solano, Incomplete), Seahawk (26-OPT-02, 200 MW, Santa Cruz, Under completeness review, 36.951874, -121.758846)."},"members_summary":{"total":50,"listed":9,"tested":9,"data_found":3,"scope_note":"50 state-level jurisdictions, with nine portals sampled. This group does not enumerate DC, territories or county/municipal authorities.","pattern":null}}],"other_sources_count":2,"if_unstructured":{"summary":"Use state siting docket logs to locate applications, completeness worksheets and assessments. The inherited CA and WA PDF examples supply dates, project context and location references; broader coordinate/ortho joins remain unverified."},"local_terms":[{"term":"Stand-alone BESS / Front-of-the-Meter (FTM) Energy Storage System","language":"en","meaning":"Battery facility not co-located with generation; isolated in EIA-860M by checking that all units sharing Plant ID across Operating + Planned have Technology='Batteries'."},{"term":"Status (L) — Regulatory approvals pending. Not under construction","language":"en","meaning":"Form EIA-860/860M planned generator status code indicating approvals/permits are pending prior to construction."},{"term":"Opt-In Certification (CA AB 205 / Pub. Resources Code § 25545)","language":"en","meaning":"California Energy Commission optional statewide CEQA/siting certification pathway for >=200 MWh energy storage systems, alternative to county conditional use permits."},{"term":"Site Certification / CPCN / Certificate of Environmental Impact and Public Interest","language":"en","meaning":"State siting permit terms used by WA EFSEC, CT CSC, and MA EFSB for state-jurisdiction projects."},{"term":"Conditional Use Permit (CUP) / Special Use Permit (SUP)","language":"en","meaning":"County or municipal land-use zoning permit required in states without a state BESS siting board (e.g. Texas) or below state capacity thresholds."},{"term":"NFPA 855 / IFC Chapter 1207","language":"en","meaning":"Model U.S. fire safety codes governing stationary BESS fire permitting, hazard mitigation analysis, and UL 9540A testing."}],"provenance":{"pass_count":1,"models":["Gemini 4 Hydrogen"],"minutes_estimate":23,"pages_opened":73,"passes":[{"pass":1,"date":"2026-11-15","model":"Gemini 4 Hydrogen"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/us/battery-storage-in-permitting.json","detail_url":"https://georutter.org/v1/us/battery-storage-in-permitting/detail.json","html_url":"https://georutter.org/us/battery-storage-in-permitting/","country_url":"https://georutter.org/v1/countries/us.json"}
