{"schema_version":"1.0","country":"us","country_name":"United States","topic":"battery-storage-in-permitting","question":"Where can I get a list of stand-alone battery storage (BESS) projects currently in permitting in the United States, with location, power (MW), developer, permitting stage and date?","territory":"us","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-15","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"partial","summary":"US stand-alone BESS permitting is split across state and local authorities; no complete national list was found in the inherited research. EIA-860M September 2026 (released October) gives a planned-generator proxy with 34 filtered stand-alone cases >=1 MW, coordinates and Entity Name, but lacks permit stages/dates and misses early or local applications. Sampled state portals provide actual stages and dates in CA, WA and MA; linked dockets and PDFs supply further details. Paid trackers have different coverage.","main_caveats":["Cross-checking Sep 2026 EIA-860M (L) proves it misses active state siting cases: 4/5 CA CEC Opt-In BESS under review, WA Goldeneye (200 MW), and MA EFSB 26-01/26-02 do not appear in EIA-860M (L).","EIA-860 annual 3_4_Energy_Storage 'Independent' column is blank in 89/90 Status='L' rows and labels hybrid Plant 65043 ('Dulles Solar and Storage') as 'Y'; stand-alone BESS must be derived across Plant IDs.","Grid interconnection queues (NYISO, ERCOT GIS, CAISO, LBNL Queued Up, Interconnection.fyi) track transmission study status and target COD, NOT siting or environmental permitting.","Texas leads EIA-860M stand-alone (L) with 16 of 34 plants nationwide despite having no state BESS siting board, underscoring that most BESS permit locally at county/municipal level.","Open non-official portals freeze in Jan 2022 (Sandia GESDB), lack a BESS tracker (GEM), have ~0 proposed BESS (OSM Taginfo), or mirror EIA-860M (US Energy Map); PUC+EIA trackers (Halcyon) are paid."],"confidence":"high","confidence_reason":"Verified directly against Sep 2026 EIA-860M/2025 EIA-860 spreadsheets, federal NEPA/FAST-41 portals, 9 state siting portals, NYISO queue workbook, OSM Taginfo, Sandia GESDB, GEM, and commercial trackers.","attributes":[{"attribute":"location","covered":"partial","source_ids":["s001","s002"],"note":"EIA and CA have coordinates; WA/MA use towns, counties or docket maps. Early local projects and a consolidated national permitting inventory are missing.","gap":"not_published","gap_note":"Inherited location and stand-alone-project-list rows document gaps in early county/municipal cases and variable site precision."},{"attribute":"power_mw","covered":"partial","source_ids":["s001","s002"],"note":"MW is available in EIA, CA and some state pages; small or early projects outside reporting thresholds lack consolidated coverage.","gap":"not_published","gap_note":"The original power and project-list rows document projects below 1 MW and early/local cases outside the EIA proxy."},{"attribute":"developer","covered":"partial","source_ids":["s001","s002"],"note":"EIA Entity Name and state applicant LLCs give partial developer information; CA REST requires linked project pages for the applicant.","gap":"not_published","gap_note":"The original developer row distinguishes project SPVs, parent developers and fields omitted from the CA REST attributes."},{"attribute":"permitting_stage","covered":"partial","source_ids":["s002","s001"],"note":"State dockets give review stages; EIA Status (L) is a coarse approvals-pending proxy. Interconnection study status is not a siting permit stage.","gap":"not_published","gap_note":"The original stage and project-list rows document absent national tracking of local zoning, environmental and other siting sub-stages."},{"attribute":"stage_date","covered":"partial","source_ids":["s002"],"note":"State dockets give some filing/completeness/scoping dates. EIA planned-operation dates do not satisfy a permitting-stage date.","gap":"not_published","gap_note":"EIA does not publish permit application/hearing/approval dates. The inherited evidence locates real stage dates in scattered state/county dockets."}]},"sources":[{"source_id":"s001","name":"Preliminary Monthly Electric Generator Inventory (Form EIA-860M) — supplemented by Form EIA-860","publisher":"U.S. Energy Information Administration (EIA)","official":true,"landing_url":"https://www.eia.gov/electricity/data/eia860m/","data_url":"https://www.eia.gov/electricity/data/eia860m/xls/september_generator2026.xlsx","access":"direct_download","format":"xlsx (plus annual zip of xlsx files for EIA-860)","license":"Public domain (U.S. Federal Government publication; attribution requested)","language":"en","has_coordinates":true,"location_precision":"exact","publisher_type":"national_government","adds":null,"first_seen_pass":1,"rank":1,"summary":"A nationwide planned-generator proxy with MW and coordinates; it is not a complete permitting register.","coverage_note":"Reported batteries at least 1 MW; the inherited stand-alone Status (L) filter yields 34 cases and misses early/local applications.","data_date":"September 2026 inventory, released October 2026.","caveats":["Planned or interconnection status is not the same as siting/environmental permit stage. EIA lacks permit filing and decision dates.","The annual Independent field is unreliable for this purpose; the detail gives the tested cross-Plant-ID filter.","The inherited shell example only lists workbook sheets; the 34-project result also requires the filtering steps in the detail."],"coverage":{"geographic":"United States (50 states + DC in Planned sheet; Puerto Rico on separate Planned_PR sheet with 0 Status (L) batteries)"},"fine_print":{"unit":{"value":"Individual electric generating or storage unit row (`Planned` tab); aggregate/filter across `Operating` and `Planned` by `Plant ID` to separate stand-alone BESS (`Batteries` only) from co-located hybrids.","quote":"monitors the current status of existing and proposed generating units at electric power plants with 1 megawatt or greater of combined nameplate capacity.","url":"https://www.eia.gov/electricity/data/eia860m/","attempts":[]},"inclusion_rule":{"value":"Electric power plants >=1 MW combined nameplate capacity expected in commercial operation within 5 years (for non-coal/non-nuclear generators), mandatory under FEAA Section 13(b). Status '(L) Regulatory approvals pending. Not under construction' flags units awaiting regulatory approvals.","quote":"Complete this Schedule for all generators at this plant that are: ... Expected to be in commercial operation within 5 years for all generators other than coal and nuclear generators.","url":"https://www.eia.gov/electricity/data/eia860/","attempts":[]},"reference_date":{"value":"September 2026 inventory edition (released October 23, 2026; HTTP Last-Modified: Fri, 23 Oct 2026 15:32:18 GMT).","quote":"Release Date: October 23, 2026 Next Release Date: November 24, 2026","url":"https://www.eia.gov/electricity/data/eia860m/","attempts":[]},"update_frequency":{"value":"Monthly for EIA-860M (monthly changing `<month>_generator<year>.xlsx` URL); annual for EIA-860 (`Final 2025 data` released Sep 10, 2026).","quote":"The monthly survey Form EIA-860M, Monthly Update to Annual Electric Generator Report supplements the annual survey form EIA-860 data with monthly information","url":"https://www.eia.gov/electricity/data/eia860m/","attempts":[]},"exclusions":{"value":"Excludes installations <1 MW, behind-the-meter/unreported sites, projects >5 years out, permitting stage details, permit filing/approval dates, `Planned` MWh energy capacity, and early state/local permitting projects not yet reported to EIA (verified missing: 4/5 CA CEC Opt-In BESS, WA Goldeneye, MA EFSB 26-01/26-02).","quote":"L | Regulatory approvals pending. Not under construction but site preparation could be underway","url":"https://www.eia.gov/electricity/data/eia860/","attempts":[]}},"key_fields":[{"field":"Plant ID","meaning":"Unique EIA plant identifier used to check whether non-battery technologies share the site across Operating and Planned sheets"},{"field":"Entity Name","meaning":"Project entity / SPV LLC / utility name"},{"field":"Plant Name","meaning":"Proposed BESS facility name"},{"field":"Technology","meaning":"'Batteries' (coupled with Energy Source Code='MWH', Prime Mover Code='BA')"},{"field":"Status","meaning":"'(L) Regulatory approvals pending. Not under construction' (coarse permitting-phase status)"},{"field":"Nameplate Capacity (MW)","meaning":"Planned power capacity in MW"},{"field":"Plant State / County / Latitude / Longitude","meaning":"State, county, and site WGS84 coordinates (0 missing in Sep 2026 Status (L) rows)"},{"field":"Planned Operation Month / Year","meaning":"Target commercial operation date (NOT permit application or approval date)"}],"how_to_use":{"example_request":"curl -sS -L -o /tmp/eia860m.xlsx \"https://www.eia.gov/electricity/data/eia860m/xls/september_generator2026.xlsx\" && python3 -c \"import zipfile, xml.etree.ElementTree as ET; print([s.attrib['name'] for s in ET.fromstring(zipfile.ZipFile('/tmp/eia860m.xlsx').read('xl/workbook.xml')).iter('{http://schemas.openxmlformats.org/spreadsheetml/2006/main}sheet')])\"","example_result":"sheets: ['Operating', 'Planned', 'Retired', 'Canceled or Postponed', ...]; Planned valid=2358 -> Batteries=483 -> Status '(L)'=85 -> Stand-alone=34 (Sample: Entity 65764 'Lighthouse Pier S, LLC', Plant 66787 'Elevate Pier S', CA, Los Angeles, 70 MW, 12/2026, 33.764993, -118.223700).","steps":["Fetch https://www.eia.gov/electricity/data/eia860m/ to locate the latest <month>_generator<year>.xlsx file URL.","Parse header row 3 (`Plant ID` on 0-indexed row 2) of `Operating` and `Planned` tabs, dropping trailing `NOTES` rows without numeric `Plant ID`.","Build set of `Plant ID`s with any generator `Technology != 'Batteries'` in `Operating` or `Planned`, then filter `Planned` for `Technology == 'Batteries'`, `Status` starting with `'(L)'`, and `Plant ID` not in non-battery set."],"reading_traps":["Annual EIA-860 `3_4_Energy_Storage_Y2025.xlsx` (`Proposed`) contains an `Independent` column that is blank in 89/90 Status='L' rows and set to `'Y'` only on hybrid Plant `65043` ('Dulles Solar and Storage'), which also has Solar PV — do NOT rely on `Independent` to identify stand-alone BESS.","Header row is on Excel row 3 (rows 1-2 are titles) and footer `NOTES` lines appear at the bottom of each sheet.","EIA Open Data API v2 (`https://api.eia.gov/v2/electricity/`) requires API key registration (`API_KEY_MISSING` HTTP 403) and exposes operating capability/generation rather than planned `(L)` filings.","`Planned` tab reports MW power capacity only, not MWh energy capacity."]},"test":{"tested_on":"2026-11-15","method":"download","http_status":200,"content_type":"application/vnd.openxmlformats-officedocument.spreadsheetml.sheet","size_bytes":14013970,"records_total":2358,"records_for_country":34,"problems":["Lacks permitting sub-stages and permitting/filing dates; misses early state-permitting BESS (4/5 CA CEC Opt-In, WA Goldeneye, MA EFSB 26-01/26-02)."]},"evidence":[{"claim":"Monthly release schedule and >=1 MW unit scope of Form EIA-860M","url":"https://www.eia.gov/electricity/data/eia860m/","quote":"Release Date: October 23, 2026 Next Release Date: November 24, 2026 ... monitors the current status of existing and proposed generating units at electric power plants with 1 megawatt or greater of combined nameplate capacity."},{"claim":"Mandatory FEAA legal reporting basis and 5-year planned inclusion rule","url":"https://www.eia.gov/electricity/data/eia860/","quote":"The timely submission of Form EIA 860 by those required to report is mandatory under Section 13(b) of the Federal Energy Administration Act of 1974 (FEAA) (Public Law 93 275), as amended."},{"claim":"Public domain reuse terms","url":"https://www.eia.gov/about/copyrights_reuse.php","quote":"U.S. government publications are in the public domain and are not subject to copyright protection."}],"members":[],"members_summary":null},{"source_id":"s002","name":"U.S. State Energy Facility Siting Boards & State BESS Permitting Portals (sampled across 9 states)","publisher":"State Energy Commissions & Utility Siting Councils (CA CEC, WA EFSEC, MA EFSB, OR EFSC, NY ORES, CT CSC, VA DEQ, MN PUC, MI MPSC)","official":true,"landing_url":"https://www.energy.ca.gov/programs-and-topics/topics/power-plants/opt-certification-program","data_url":"https://services3.arcgis.com/bWPjFyq029ChCGur/arcgis/rest/services/OptIn_Dashboard_Data/FeatureServer/0","access":"api","format":"ArcGIS REST GeoJSON/JSON (CA CEC Opt-In) + HTML docket tables & PDFs (WA, MA, OR, NY, CT)","license":"Public state government records (varies by state)","language":"en","has_coordinates":true,"location_precision":"exact","publisher_type":"regional_government","adds":"True permitting sub-stages (completeness review, scoping, staff assessment), permit filing/milestone dates, docket logs, and early-stage BESS absent from EIA-860M (L) in covered states.","first_seen_pass":1,"rank":2,"summary":"Start here for actual state permitting stages and dates; follow linked dockets and PDFs for missing fields.","coverage_note":"Nine state portals sampled. Matching stand-alone cases are documented in CA, WA and MA; local approvals remain fragmented.","data_date":"Rolling dockets; inherited tests dated 2026-11-15.","caveats":["CA REST field Projec_Name is misspelled and omits the developer; use the linked project page.","OR/NY mainly show hybrids and CT had no pending matching cases. VA/MN/MI access failures do not establish absence.","County/municipal permits are not comprehensively covered. WA/MA location and document access vary."],"coverage":{"geographic":"Selected US states with state-level siting preemption or opt-in pathways (sampled 9 state portals; non-exhaustive across 50 states)"},"fine_print":{"unit":{"value":"Individual state siting docket / certification application (e.g., 26-OPT-02 in CA, EFSEC facility docket in WA, EFSB 26-02 in MA).","quote":"Energy storage systems capable of storing 200 megawatt-hours (MWh) or more","url":"https://www.energy.ca.gov/programs-and-topics/topics/power-plants/opt-certification-program","attempts":[]},"inclusion_rule":{"value":"Varies by state statute: voluntary/opt-in >=200 MWh BESS in California (AB 205); voluntary/statutory large energy facility siting in WA EFSEC; EFSB certificate/zoning preemption petitions in MA; excluding local county-only BESS and states without state BESS siting boards (such as TX).","quote":"Goldeneye is a proposed stand-alone 200-megawatt (MW)/800-megawatt hour (MWh) Battery Energy Storage System (BESS) ... Facility status Application review","url":"https://efsec.wa.gov/facilities/goldeneye-battery-storage","attempts":[]},"reference_date":{"value":"Live rolling docket records verified 2026-11-15 (e.g., WA Goldeneye Application received Jun 2024; CA CEC Corby completeness 2025-10-17, Prairie Song scoping 2026-02-24, Seahawk docketed 5/14/2026).","quote":"Timeline Application received Jun, 2024","url":"https://efsec.wa.gov/facilities/goldeneye-battery-storage","attempts":[]},"update_frequency":{"value":"Event-driven / continuous upon applicant filings, staff completeness determinations, and public notices.","quote":"The Office of Renewable Energy Siting and Electric Transmission permit applications at various stages.","url":"https://dps.ny.gov/ores-permit-applications","attempts":[]},"exclusions":{"value":"Excludes county/municipal-permitted BESS below state thresholds or in states without state siting (including TX), hybrid-only portfolios (NY ORES, OR EFSC current listings), and geo/WAF-blocked portals (VA DEQ, MN PUC, MI MPSC, MA CloudFront PDFs from non-US IPs).","quote":"EFSB 26-02 On behalf of Hillman Energy Center, attached please find its Initial Petition and Application for a Certificate of Environmental Impact and Public Interest.","url":"https://www.mass.gov/info-details/efsb-and-dpu-siting-open-dockets","attempts":[]}},"key_fields":[{"field":"Docket_Number / Docket ID","meaning":"State proceeding identifier (e.g. 26-OPT-02 in CA, EFSB 26-02 in MA)"},{"field":"Projec_Name / Facility","meaning":"Project name in state docket"},{"field":"BatteryPower / Capacity","meaning":"Power capacity in MW (and MWh on project webpages)"},{"field":"Status / Application_Review_Status","meaning":"True permitting status and current staff review sub-stage"},{"field":"Application_Completeness / Scoping_Date / Timeline","meaning":"Permitting milestone dates (missing in EIA-860M)"},{"field":"Latitude_DD / Longitude_DD / County","meaning":"Exact WGS84 coordinates in CA CEC REST API; county/town + PDF site maps on WA/MA pages"}],"how_to_use":{"example_request":"curl -sS \"https://services3.arcgis.com/bWPjFyq029ChCGur/arcgis/rest/services/OptIn_Dashboard_Data/FeatureServer/0/query?where=Technology%3D%27Energy%20Storage%20System%27%20AND%20Status%3D%27Under%20Review%27&outFields=Projec_Name,Docket_Number,Technology,Status,BatteryPower,County,Latitude_DD,Longitude_DD,Application_Review_Status,Application_Completeness,Scoping_Date,Webpage&outSR=4326&f=json\"","example_result":"5 features returned: Corby (24-OPT-05, 300 MW, Solano, Application Approved, completeness 2025-10-17), Prairie Song (25-OPT-02, 1150 MW, LA, completeness 2026-01-30), Viracocha Hill (25-OPT-01, 90.7 MW, Alameda, Incomplete), Vaca Dixon (26-OPT-01, 157 MW, Solano, Incomplete), Seahawk (26-OPT-02, 200 MW, Santa Cruz, Under completeness review, 36.951874, -121.758846).","steps":["Query CA CEC Opt-In ArcGIS REST FeatureServer 0 filtering `Technology='Energy Storage System' AND Status='Under Review'`.","Fetch each feature's `Webpage` URL (or CA eFiling DocketLog) to extract `Project Owner` / Developer, since the REST service omits applicant owner.","Parse HTML docket tables on `efsec.wa.gov/facilities` and `mass.gov/info-details/efsb-and-dpu-siting-open-dockets` for WA and MA stand-alone BESS dockets."],"reading_traps":["CA CEC REST field is misspelled `Projec_Name` (missing 't') and lacks Developer/Owner — must join `Webpage` HTML.","NY ORES (`dps.ny.gov/ores-permit-applications`) and OR EFSC currently show solar/wind+storage hybrids rather than stand-alone BESS.","VA DEQ (`403` + `EDMA/MapServer/280` `404`), MI MPSC (`403`), MN PUC (Radware CAPTCHA), and MA EFSB CloudFront PDFs (`403` country block) reject automated non-US requests."]},"test":{"tested_on":"2026-11-15","method":"api_query","http_status":200,"content_type":"application/json","size_bytes":6136,"records_total":11,"records_for_country":5,"problems":["Patchwork coverage across only selected states/thresholds; Developer omitted in CA REST attributes; VA/MN/MI blocked to curl."]},"evidence":[{"claim":"CA CEC Opt-In scope includes stand-alone BESS >=200 MWh","url":"https://www.energy.ca.gov/programs-and-topics/topics/power-plants/opt-certification-program","quote":"Energy storage systems capable of storing 200 megawatt-hours (MWh) or more"},{"claim":"WA EFSEC tracks stand-alone BESS with MW, applicant, stage, and application received date","url":"https://efsec.wa.gov/facilities/goldeneye-battery-storage","quote":"Goldeneye is a proposed stand-alone 200-megawatt (MW)/800-megawatt hour (MWh) Battery Energy Storage System (BESS) ... Facility status Application review ... Applicant or Certificate Holder Goldeneye Battery Storage, LLC Timeline Application received Jun, 2024"},{"claim":"MA EFSB lists active stand-alone BESS certificate dockets with applicant names","url":"https://www.mass.gov/info-details/efsb-and-dpu-siting-open-dockets","quote":"EFSB 26-02 On behalf of Hillman Energy Center, attached please find its Initial Petition and Application for a Certificate of Environmental Impact and Public Interest. Donna Sharkey Town of Tewksbury, MA EFSB 26-01 On behalf of Moraga Storage LLC, attached please find its Initial Petition"}],"members":[{"name":"California Energy Commission (CEC) Opt-In Certification Program (AB 205)","landing_url":"https://www.energy.ca.gov/programs-and-topics/topics/power-plants/opt-certification-program","data_url":"https://services3.arcgis.com/bWPjFyq029ChCGur/arcgis/rest/services/OptIn_Dashboard_Data/FeatureServer/0","access":"api","tested":true,"data_found":true,"note":"HTTP 200 ArcGIS FeatureServer; returns 5 stand-alone 'Energy Storage System' 'Under Review' >=200 MWh projects (Corby 300 MW, Prairie Song 1150 MW, Viracocha Hill 90.7 MW, Vaca Dixon 157 MW, Seahawk 200 MW) with exact coords, Application_Review_Status, Application_Completeness and Scoping_Date. Developer omitted in REST attributes; present on linked Webpage (e.g. Seahawk -> Sequoia Energy Storage 1, LLC / New Leaf Energy)."},{"name":"Washington Energy Facility Site Evaluation Council (EFSEC)","landing_url":"https://efsec.wa.gov/facilities","data_url":null,"access":"web_viewer_only","tested":true,"data_found":true,"note":"HTTP 200; lists 19 facilities including stand-alone 'Goldeneye Battery Storage' (200 MW / 800 MWh, Skagit County near Sedro-Woolley, Goldeneye Battery Storage, LLC, status 'Application review', Application received Jun 2024, 5-stage progress tracker + downloadable PDF exhibits)."},{"name":"Massachusetts Energy Facilities Siting Board (EFSB) Open Dockets","landing_url":"https://www.mass.gov/info-details/efsb-and-dpu-siting-open-dockets","data_url":null,"access":"pdf","tested":true,"data_found":true,"note":"HTTP 200 HTML docket table listing active stand-alone BESS certificates 'EFSB 26-02' Tewksbury BESS (Hillman Energy Center) and 'EFSB 26-01' Oakham BESS (Moraga Storage LLC); linked CloudFront petition PDFs returned 403 country geo-block from non-US IP."},{"name":"Oregon Energy Facility Siting Council (EFSC)","landing_url":"https://www.oregon.gov/energy/facilities/Pages/Facilities-Under-EFSC.aspx","data_url":null,"access":"web_viewer_only","tested":true,"data_found":false,"note":"HTTP 200; tracks EFSC siting reviews, though currently listed storage facilities (Deschutes Solar and Battery, Speedway Energy Facility, Sunrise Solar and Storage) are solar/wind hybrids rather than stand-alone BESS."},{"name":"New York Office of Renewable Energy Siting and Electric Transmission (ORES)","landing_url":"https://dps.ny.gov/ores-permit-applications","data_url":null,"access":"web_viewer_only","tested":true,"data_found":false,"note":"HTTP 200; covers Article VIII / 94-c applications >=25 MW renewable generation + co-located storage (7 hybrid applications listed; 0 stand-alone BESS)."},{"name":"Connecticut Siting Council (CSC) Pending Matters","landing_url":"https://portal.ct.gov/csc/1_applications-and-other-pending-matters/pending-matters","data_url":null,"access":"web_viewer_only","tested":true,"data_found":false,"note":"HTTP 200; active state siting dockets index; currently 0 pending battery storage matters listed."},{"name":"Virginia DEQ Renewable Energy PBR / GIS Portal","landing_url":"https://www.deq.virginia.gov/permits/regulations-guidance/renewable-energy","data_url":null,"access":"web_viewer_only","tested":true,"data_found":null,"note":"HTTP 403 Access Denied to curl; gisdata.deq.virginia.gov/EDM/ returned web shell (200) while ArcGIS MapServer/280 returned 404 Service not found and /Hosted returned 499 Token Required."},{"name":"Minnesota Public Utilities Commission (MN PUC) Energy Storage","landing_url":"https://mn.gov/puc/activities/eip/energy-storage/index.jsp","data_url":null,"access":"web_viewer_only","tested":true,"data_found":null,"note":"Blocked to automated curl by Radware Bot Manager CAPTCHA challenge (validate.perfdrive.com)."},{"name":"Michigan Public Service Commission (MPSC) PA 233 Siting","landing_url":"https://www.michigan.gov/mpsc/regulatory/electricity/renewable-energy-and-storage-facility-siting","data_url":null,"access":"web_viewer_only","tested":true,"data_found":null,"note":"HTTP 403 Access Denied to automated curl."}],"members_summary":{"total":50,"listed":9,"tested":9,"data_found":3,"scope_note":"50 state-level jurisdictions, with nine portals sampled. This group does not enumerate DC, territories or county/municipal authorities.","pattern":null},"member_scope":{"total":50,"note":"50 state-level jurisdictions, with nine portals sampled. This group does not enumerate DC, territories or county/municipal authorities.","pattern":null}},{"source_id":"s003","name":"Halcyon Battery Energy Storage Systems (BESS) Tracker","publisher":"Halcyon","official":false,"landing_url":"https://halcyon.io/bess-tracker","data_url":null,"access":"paid","format":"Subscription dataset / API (gated)","license":"Proprietary commercial subscription","language":"en","has_coordinates":false,"location_precision":null,"publisher_type":"commercial","adds":"Commercial structured compilation combining state PUC dockets and EIA filings with developer, docket numbers, MW/MWh, and regulatory status across 1,048 US BESS projects (requires paid subscription).","first_seen_pass":1,"rank":3,"coverage":{"geographic":"United States"},"fine_print":{"unit":{"value":"Individual US BESS project entries (1,048 tracked as of Nov 2, 2026).","quote":"UPDATED November 2nd, 2026 RECENT UPDATES +86 Projects , 1048 BESS projects tracked TOTALS 163 GW // 408 GWh","url":"https://halcyon.io/bess-tracker","attempts":[]},"inclusion_rule":{"value":"Newly proposed, in development, and under construction BESS across the US (>100 MW from Dec 2025, adding <100 MW since Jan 2026), compiled from state PUC dockets and EIA datasets.","quote":"Halcyon's BESS Tracker compiles information on newly proposed, in development, and under construction battery energy storage systems across the United States. The tracker was released in December 2025 with projects over 100 MW of capacity and began adding projects under 100 MW in January 2026.","url":"https://halcyon.io/bess-tracker","attempts":[]},"reference_date":{"value":"Updated November 2, 2026.","quote":"UPDATED November 2nd, 2026","url":"https://halcyon.io/bess-tracker","attempts":[]},"update_frequency":{"value":"Updated monthly.","quote":"*Updated monthly","url":"https://halcyon.io/bess-tracker","attempts":[]},"exclusions":{"value":"Full records, exact coordinate resolution, and coverage of county/municipal-only BESS outside PUC dockets cannot be verified without paid commercial access.","quote":"Reach out to access the full dataset","url":"https://halcyon.io/bess-tracker","attempts":[]}},"key_fields":[{"field":"docket numbers / regulatory status","meaning":"State PUC docket references and regulatory status documented in methodology"},{"field":"capacity, duration, developers","meaning":"MW, MWh, duration, POI substation, and parent company/developer (behind paywall)"}],"how_to_use":{"example_request":null,"example_result":null,"steps":["Public methodology and preview summary are readable at https://halcyon.io/bess-tracker; dataset access requires contacting sales for a Data Subscription."],"reading_traps":["Drawn from state PUC dockets and EIA datasets — county/municipal permits outside PUC dockets may still have gaps."]},"test":{"tested_on":"2026-11-15","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":111829,"records_total":1048,"records_for_country":1048,"problems":["Commercial subscription required; raw rows and coordinates not publicly downloadable."]},"evidence":[{"claim":"Project count and update date on Halcyon BESS Tracker","url":"https://halcyon.io/bess-tracker","quote":"UPDATED November 2nd, 2026 RECENT UPDATES +86 Projects , 1048 BESS projects tracked TOTALS 163 GW // 408 GWh"},{"claim":"Combines state PUC dockets and EIA datasets","url":"https://halcyon.io/bess-tracker","quote":"The Tracker consolidates key project details into a structured, research-ready dataset, drawing from state public utility commission (PUC) dockets and the U.S. Energy Information Administration (EIA) datasets."}],"members":[],"members_summary":null},{"source_id":"s004","name":"Cleanview Power Projects & Free Battery Storage Project Tracker","publisher":"Cleanview","official":false,"landing_url":"https://www.cleanview.co/power-projects/battery-storage-projects","data_url":null,"access":"paid","format":"Subscription web export / API (gated)","license":"Proprietary commercial subscription","language":"en","has_coordinates":false,"location_precision":null,"publisher_type":"commercial","adds":"Commercial subscription ($4,900 one-time / $9,000/yr + $5,000/yr API) aggregating ISO/RTO interconnection queues and EIA power projects; public pages expose state totals only.","first_seen_pass":1,"rank":4,"coverage":{"geographic":"United States (all 50 states claimed)"},"fine_print":{"unit":{"value":"Planned and operating grid-connected power/storage projects aggregated from interconnection queues and EIA.","quote":"Every planned and operating power project connected to the grid: solar, wind, storage, and gas.","url":"https://www.cleanview.co/pricing","attempts":[]},"inclusion_rule":{"value":"Grid-connected solar, wind, and battery projects across US ISO/RTO interconnection queues and EIA filings (interconnection-queue driven, not permitting dockets).","quote":"Solar, wind and storage projects from every major queue.","url":"https://www.cleanview.co/power-projects/battery-storage-projects","attempts":[]},"reference_date":{"value":"Page verified live 2026-11-15 (no explicit release timestamp in public snippet).","quote":"Operating battery storage projects 1,095 Operating capacity 56,142 MW","url":"https://www.cleanview.co/power-projects/battery-storage-projects","attempts":[]},"update_frequency":{"value":"Continuous updates advertised for annual subscription.","quote":"Every subscription includes up to five users, unlimited downloads and updates all year.","url":"https://www.cleanview.co/pricing","attempts":[]},"exclusions":{"value":"Public pages display aggregate counts only; full project downloads cost $4,900 one-time or $9,000/yr (+$5,000/yr API) and rely primarily on queues/EIA rather than local permitting.","quote":"One-time downloads $4,900 A one-time download of the data center or power projects dataset.","url":"https://www.cleanview.co/pricing","attempts":[]}},"key_fields":[{"field":"capacity / status / developer","meaning":"Project-level queue/EIA fields documented in paid product description"}],"how_to_use":{"example_request":null,"example_result":null,"steps":["Public summary counts are at https://www.cleanview.co/power-projects/battery-storage-projects; downloads/API require paid purchase at https://www.cleanview.co/pricing."],"reading_traps":["Primary planned pipeline comes from interconnection queues and EIA rather than municipal/county siting permits."]},"test":{"tested_on":"2026-11-15","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":268144,"records_total":1095,"records_for_country":1095,"problems":["Full dataset is paywalled ($4,900-$14,000); interconnection queue status does not equal siting permitting status."]},"evidence":[{"claim":"Cleanview commercial pricing and API terms","url":"https://www.cleanview.co/pricing","quote":"Grid power projects subscription $9,000 a year Every planned and operating power project connected to the grid: solar, wind, storage, and gas. ... API access +$5,000 a year ... One-time downloads $4,900"},{"claim":"Public US BESS summary view and queue basis","url":"https://www.cleanview.co/power-projects/battery-storage-projects","quote":"Solar, wind and storage projects from every major queue. ... Track operating and planned battery storage projects across all 50 states in the US. Operating battery storage projects 1,095 Operating capacity 56,142 MW"}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"Decentralized: U.S. EIA collects mandatory generator statistics (not a permitting authority); no federal BESS siting regulator except federal-land/NEPA nexus; state siting boards (CA CEC, WA EFSEC, MA EFSB, OR EFSC, NY ORES, CT CSC, VA DEQ, MN PUC, MI MPSC) and county/municipal zoning authorities handle permitting.","url":"https://www.eia.gov/electricity/data/eia860m/"},"operators":{"structure":"many","note":"Hundreds of independent power producers, project-specific SPV LLCs, and utilities operate or develop BESS across 50 states and report planned units >=1 MW to EIA.","census_url":"https://www.eia.gov/electricity/data/eia860/"},"publication_obligation":{"exists":"yes","norm":"Section 13(b) of the Federal Energy Administration Act of 1974 (FEAA, Public Law 93-275) mandates Form EIA-860/860M reporting for power plants >=1 MW within 5 years of commercial operation; state siting dockets are public under state siting laws.","url":"https://www.eia.gov/electricity/data/eia860/xls/eia8602025.zip","what_must_be_published":"Monthly/annual generator attributes (Entity ID/Name, Plant ID/Name, State, County, Lat/Lon, Technology, Nameplate Capacity MW, planned Status code including (L), Planned Operation Month/Year); plus state siting docket logs and applications where state jurisdiction applies.","frequency":"Monthly (EIA-860M) and Annual (EIA-860); continuous state docket filings"},"consolidated_republication":{"found":"partial","note":"No public federal or non-profit aggregator republishes cross-state/county BESS permitting dockets with permitting stages and dates; only EIA-860M aggregates >=1 MW planned units nationwide.","checked_pages":[{"organization":"U.S. Energy Information Administration (EIA)","url":"https://www.eia.gov/electricity/data/eia860m/","saw":"Publishes consolidated national monthly Excel workbook of operating and planned >=1 MW units, but tracks generator status rather than permitting dockets."},{"organization":"Federal Permitting Improvement Steering Council (Permitting Dashboard)","url":"https://www.permitting.gov/projects/current-fast-41-portfolio","saw":"Tracks federal-nexus FAST-41 NEPA reviews across agencies; lists 2 pumped storage projects and solar+BESS hybrids, 0 stand-alone BESS."},{"organization":"Federal Energy Regulatory Commission (FERC)","url":"https://data.ferc.gov/nepa-schedule-for-pending-infrastructure-projects/nepa-schedule-for-pending-infrastructure-projects/","saw":"Tracks hydropower and natural gas NEPA schedules only, not stand-alone BESS."},{"organization":"Halcyon","url":"https://halcyon.io/bess-tracker","saw":"Commercial paid subscription compiling state PUC dockets and EIA datasets (1,048 BESS projects reported Nov 2, 2026); full dataset gated."},{"organization":"Cleanview","url":"https://www.cleanview.co/power-projects/battery-storage-projects","saw":"Commercial paid platform ($4,900 one-time / $9,000/yr) aggregating EIA and ISO/RTO interconnection queues; public page shows aggregate totals only."}]}},"national_registry":{"exists":"partial","note":"No unified national BESS permitting registry exists. Form EIA-860M provides the only nationwide structured official inventory of proposed >=1 MW BESS with coarse Status (L) 'Regulatory approvals pending', while federal NEPA portals (FAST-41, EPA EIS, BLM ePlanning, FERC) cover only federal-nexus projects (currently 0 stand-alone BESS on FAST-41/FERC).","checked_pages":[{"organization":"U.S. Energy Information Administration (EIA)","url":"https://www.eia.gov/electricity/data/eia860m/","saw":"HTTP 200; monthly Form EIA-860M planned generator workbook contains 85 Status (L) Planned Batteries (34 stand-alone after filtering non-battery units at same Plant ID), without permitting stages or permit dates."},{"organization":"Federal Permitting Improvement Steering Council (FPISC)","url":"https://www.permitting.gov/projects/current-fast-41-portfolio","saw":"HTTP 200 (also checked /current-transparency-projects 200; legacy permits.performance.gov returned 403 Akamai). Current FAST-41 portfolio contains pumped storage and federal-land solar+BESS hybrids, 0 stand-alone BESS."},{"organization":"Federal Energy Regulatory Commission (FERC)","url":"https://data.ferc.gov/nepa-schedule-for-pending-infrastructure-projects/nepa-schedule-for-pending-infrastructure-projects/","saw":"HTTP 200; Industry metadata restricted to 'Hydropower, Natural Gas'; FERC does not permit stand-alone BESS."},{"organization":"U.S. Bureau of Land Management (BLM)","url":"https://eplanning.blm.gov/","saw":"HTTP 200 Power Apps NEPA Register (replaces 404 eplanning-ui/home; blm.gov/programs/intermittent-energy 403); tracks federal BLM NEPA projects only."},{"organization":"U.S. Environmental Protection Agency (EPA)","url":"https://cdxapps.epa.gov/cdx-enepa-II/public/action/eis/search","saw":"HTTP 200; federal EIS database since 1987; tracks federal Environmental Impact Statements only, not state or local BESS permits."}]},"if_unstructured":{"summary":"Use state siting docket logs to locate applications, completeness worksheets and assessments. The inherited CA and WA PDF examples supply dates, project context and location references; broader coordinate/ortho joins remain unverified.","recipe":["Pull state siting docket logs (e.g. CA eFiling DocketLog.aspx?docketnumber=26-OPT-02 or WA EFSEC facility pages) to enumerate filing PDFs and dates.","Download PDF filings with curl (verified HTTP 200 on tn=269966, tn=270293, and WA Figure1_RegionalVicinity.pdf) and extract text via `pdftotext`.","Parse Docket Number, Project Title, Applicant LLC/Developer, MW/MWh, County/Town/PLSS Township-Range-Section, Submission/Docketed Date, and permitting stage.","Cross-check project titles, LLC names, counties, and MW against EIA-860M `Planned` and query Federal Register API / EPA EIS Database for federal-land projects."],"location_method":"Extract PLSS Township/Range/Section (e.g. Township 35N Range 5E Section 20 in WA Figure 1), county/road intersections (e.g. Minto Rd & Green Valley Rd on CA Seahawk webpage), or site boundary maps from docket PDFs, then verify coordinates against USGS NAIP Plus orthoimagery.","cross_with":["Form EIA-860M Planned Generator Inventory (match by Plant Name, Entity Name, County, State, MW)","CA CEC Opt-In FeatureServer (join Docket_Number to Latitude_DD/Longitude_DD)","USGS NAIP Plus ImageServer (2025) & county parcel/zoning GIS"],"where_published":[{"name":"California CEC Opt-In eFiling Docket PDFs","url":"https://efiling.energy.ca.gov/Lists/DocketLog.aspx?docketnumber=26-OPT-02","what":"Application parts, Data Completeness Worksheets, Memoranda to Open Docket, Staff Assessments, and CEQA notices in PDF.","how_to_search_inside":"Filter docket log by docket number (e.g., 26-OPT-02 from OptIn_Dashboard_Data FeatureServer) and retrieve GetDocument.aspx?tn=<TN>&DocumentContentId=<ID>.","example_document":{"url":"https://efiling.energy.ca.gov/GetDocument.aspx?tn=269966&DocumentContentId=107121","what_it_gives":"Tested HTTP 200 PDF ('Memo to Open Docket', Seahawk BESS, 26-OPT-02, Docketed Date 5/14/2026); plus tn=270293 ('Data Completeness Worksheet', Docketed 5/27/2026, Dudek)."}},{"name":"Washington EFSEC Facility Siting Docket PDFs","url":"https://efsec.wa.gov/facilities/goldeneye-battery-storage","what":"Facility application PDFs, critical areas maps, public comments, and SEPA EIS review files.","how_to_search_inside":"Open facility page on efsec.wa.gov/facilities/<slug> and extract /sites/default/files/*.pdf links.","example_document":{"url":"https://efsec.wa.gov/sites/default/files/2026-05/Figure1_RegionalVicinity.pdf","what_it_gives":"Tested HTTP 200 PDF extracted via pdftotext: 'Goldeneye Energy Storage Project', 'Skagit County', 'Sedro-Woolley North', and PLSS 'Township 35N; Range 5E; Section 20'."}},{"name":"Federal EPA EIS Database, Federal Register & BLM National NEPA Register","url":"https://cdxapps.epa.gov/cdx-enepa-II/public/action/eis/search","what":"Federal-nexus Draft/Final Environmental Impact Statements and weekly Notices of Availability.","how_to_search_inside":"Search by project title or keyword on cdxapps.epa.gov, https://eplanning.blm.gov/, or query https://www.federalregister.gov/api/v1/documents.json.","example_document":{"url":"https://www.federalregister.gov/documents/2026/07/20/2026-14605/generator-interconnection-programmatic-environmental-impact-statement","what_it_gives":"Tested Federal Register API JSON document record with publication_date 2026-07-20 and federal NEPA notice metadata."}}]},"related_not_answering":[{"name":"NYISO Interconnection Queue","url":"https://www.nyiso.com/interconnections","why":"Downloaded NYISO-Interconnection-Queue-10312026.xlsx (483,664 bytes; 335 queue rows, 20 Type/Fuel='ES'); tracks grid interconnection study phases ('Project Status #' 4..12) and Proposed COD, NOT siting or environmental permitting."},{"name":"Interconnection.fyi / ERCOT GIS / CAISO / LBNL Queued Up","url":"https://www.interconnection.fyi/projects","why":"Aggregates ISO/RTO grid interconnection queues rather than land-use, zoning, or environmental permits (LBNL emp.lbl.gov/queues and ERCOT GIS returned 403; CAISO old URL 404)."},{"name":"DOE / Sandia Global Energy Storage Database (GESDB)","url":"https://www.sandia.gov/ess-ssl/gesdb/public/","why":"Downloaded New_GESDB_1-12-2022.json (7,436,775 bytes; HTTP Last-Modified Jan 13, 2022; 1,693 rows, 739 US); frozen 2022 legacy snapshot with no permitting stages or permit dates."},{"name":"Global Energy Monitor (GEM) Trackers","url":"https://globalenergymonitor.org/download-data/","why":"Download catalog covers Solar, Wind, Hydropower (including pumped storage), Geothermal, Bioenergy, Nuclear, and Integrated Power; publishes no stand-alone Battery Energy Storage Tracker."},{"name":"OpenStreetMap (Taginfo / Overpass)","url":"https://taginfo.openstreetmap.org/","why":"Taginfo API (data_until 2026-11-15) shows 0 'proposed:generator:source=battery', 0 'construction:generator:source=battery', 6 'proposed:plant:source=battery', and 2 'construction:plant:source=battery' globally, with no permitting fields."},{"name":"US Energy Map (BESS layer)","url":"https://usenergymap.com/methodology","why":"Automated monthly ingestion of EIA-860M battery rows (`eia-` prefix); inherits all EIA-860M omissions (no permitting stage details, no permit dates, misses early state/county projects)."},{"name":"Permitting Dashboard / FAST-41 Covered & Transparency Projects","url":"https://www.permitting.gov/projects/current-fast-41-portfolio","why":"Covers large federal-nexus NEPA reviews; currently lists 2 pumped storage projects, federal-land solar+BESS hybrids, and critical-mineral mines, with 0 stand-alone BESS."},{"name":"FERC NEPA Schedule for Pending Infrastructure Projects","url":"https://data.ferc.gov/nepa-schedule-for-pending-infrastructure-projects/nepa-schedule-for-pending-infrastructure-projects/","why":"Metadata lists Industry as 'Hydropower, Natural Gas' only; FERC does not site or permit stand-alone BESS."},{"name":"Spark Battery Storage Site Screening & Permitting","url":"https://www.sparkhq.ai/developers/battery-storage","why":"Commercial B2B zoning-ordinance, fire-code (NFPA 855/IFC 1207), and moratorium screening tool for developers, not a registry of proposed BESS projects currently in permitting."}],"open_questions":["Audit the remaining ~40 US states (notably TX county/fire-marshal processes, plus AZ, NV, IL, IN, CO, NM, ME, VT) and a sample of county planning portals to quantify local-only BESS visibility outside EIA-860M.","Re-test WAF/geo-blocked state siting portals from a US IP or browser session: VA DEQ Renewable Energy PBR (403 + MapServer/280 404), MI MPSC PA 233 (403), MN PUC Energy Storage (Radware Captcha), TX PUC (403), and MA EFSB CloudFront petition PDFs (403 country block).","Evaluate Halcyon BESS Tracker under a trial/subscription to quantify how completely PUC dockets capture stand-alone BESS vs county-only projects."],"history":[{"pass":1,"date":"2026-11-15","role":"research","model":"Gemini 4 Hydrogen","rules_version":"6.8","note":"No national BESS permitting registry exists; EIA-860M Status (L) lists 34 stand-alone projects without permit stages/dates, while sampled state siting portals cover subsets with real stages/dates.","headline":{"official_data":"partial","non_official_data":"partial","national_registry":"partial"},"sources":{"total":4,"new":4,"dropped":0},"negatives":{"overturned":0,"confirmed":1},"effort":{"pages":73,"minutes":23}}],"local_terms":[{"term":"Stand-alone BESS / Front-of-the-Meter (FTM) Energy Storage System","language":"en","meaning":"Battery facility not co-located with generation; isolated in EIA-860M by checking that all units sharing Plant ID across Operating + Planned have Technology='Batteries'."},{"term":"Status (L) — Regulatory approvals pending. Not under construction","language":"en","meaning":"Form EIA-860/860M planned generator status code indicating approvals/permits are pending prior to construction."},{"term":"Opt-In Certification (CA AB 205 / Pub. Resources Code § 25545)","language":"en","meaning":"California Energy Commission optional statewide CEQA/siting certification pathway for >=200 MWh energy storage systems, alternative to county conditional use permits."},{"term":"Site Certification / CPCN / Certificate of Environmental Impact and Public Interest","language":"en","meaning":"State siting permit terms used by WA EFSEC, CT CSC, and MA EFSB for state-jurisdiction projects."},{"term":"Conditional Use Permit (CUP) / Special Use Permit (SUP)","language":"en","meaning":"County or municipal land-use zoning permit required in states without a state BESS siting board (e.g. Texas) or below state capacity thresholds."},{"term":"NFPA 855 / IFC Chapter 1207","language":"en","meaning":"Model U.S. fire safety codes governing stationary BESS fire permitting, hazard mitigation analysis, and UL 9540A testing."}],"provenance":{"pass_count":1,"models":["Gemini 4 Hydrogen"],"minutes_estimate":23,"pages_opened":73,"passes":[{"pass":1,"date":"2026-11-15","model":"Gemini 4 Hydrogen"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/us/battery-storage-in-permitting.json","detail_url":"https://georutter.org/v1/us/battery-storage-in-permitting/detail.json","html_url":"https://georutter.org/us/battery-storage-in-permitting/","country_url":"https://georutter.org/v1/countries/us.json"}