{"schema_version":"1.0","country":"us","country_name":"United States","topic":"biomethane-plants-in-permitting","question":"Where can I get a list of biogas and biomethane projects currently in permitting in the United States, with location, capacity, developer, permitting stage and date?","territory":"us","territory_level":"country","parent_url":null,"published_on":"2026-11-24","research_reviewed_on":"2026-11-24","access_checked_on":"2026-11-24","answer":{"official_data":"partial","non_official_data":"none_found","summary":"No national list of biogas/RNG projects in permitting was found. Stage and date are documented only in local records: CEQAnet (California) follows projects through dated filings, e.g. Orland Power Solutions, Manteca (MND 2026-06-02, county approval 2026-07-16, air district 2026-09-09) and Couco Creek, Turlock (approval 2025-08-21). EPA LMOP (102 landfill RNG projects) and AgSTAR (73 farm digesters) give construction status without permit dates; CDFA lists California grants. Capacity is not published.","main_caveats":["Approval is not construction: CEQA notices of determination show decisions (Manteca 2026-07-16 and 2026-09-09); no start-of-construction or operation document was found.","LMOP (September 2024) and AgSTAR (June 2024) status fields are stale: 8 planned LMOP rows and 49 of 73 AgSTAR construction rows have expected years already past.","LMOP 'Planned', AgSTAR 'Construction' and CDFA funding data are not permitting stages; their dates are anticipated starts or grant dates.","No project capacity is published in the records opened; LMOP and AgSTAR give landfill-gas or raw-biogas volumes, not RNG output.","Wisconsin WARP documents are behind page postbacks and were not read; Oregon and county portals outside California were not checked."],"confidence":"medium","confidence_reason":"Two projects were followed to dated approval documents and counts come from downloaded files; coverage outside California and Wisconsin, and permit texts with capacity, were not checked.","attributes":[{"attribute":"location","covered":"partial","source_ids":["ceqanet","epa-lmop-planned","epa-agstar-construction","cdfa-ddrdp"],"note":"CEQAnet gives address, parcel and some coordinates (California); LMOP gives landfill coordinates via a join; AgSTAR and CDFA give city and county.","gap":"not_checked","gap_note":"County and state permit records outside California and Wisconsin, and Oregon, were not checked."},{"attribute":"capacity","covered":"partial","source_ids":["epa-lmop-planned","epa-agstar-construction"],"note":"No project RNG capacity found. LMOP gives landfill-gas input (19 of 102 rows); AgSTAR raw biogas cu ft/day (16 of 73); CEQA records give truck trips and buildings only.","gap":"not_checked","gap_note":"Full mitigated negative declarations, air-district evaluations and Wisconsin permit documents, which may state capacity, were not read."},{"attribute":"developer","covered":"partial","source_ids":["ceqanet","epa-lmop-planned","epa-agstar-construction","cdfa-ddrdp"],"note":"CEQAnet names the applicant (Orland Power Solutions, Couco Creek Dairy Biogas); LMOP developer on 79 of 102 RNG rows; AgSTAR and CDFA name developer companies.","gap":"not_checked","gap_note":"Projects outside California and landfills in other states' permit portals were not matched to developers."},{"attribute":"permitting_stage","covered":"partial","source_ids":["ceqanet","wi-dnr-warp"],"note":"CEQAnet document types give stage (consultation, negative declaration, approval); Wisconsin WARP gives permit milestones. LMOP, AgSTAR, CDFA: construction or funding status only.","gap":"not_checked","gap_note":"No national stage field exists; only two California projects and one Wisconsin facility were followed to stage documents."},{"attribute":"stage_date","covered":"partial","source_ids":["ceqanet","wi-dnr-warp"],"note":"CEQAnet Received and Approved On dates and WARP milestone dates; LMOP anticipated start and CDFA grant dates are not stage dates.","gap":"not_checked","gap_note":"Dates exist only for records opened; there is no national list of stage dates."}]},"sources":[{"source_id":"ceqanet","name":"CEQAnet: California CEQA database of project records and filed documents","publisher":"California Governor's Office of Land Use and Climate Innovation (LCI), State Clearinghouse","official":true,"landing_url":"https://ceqanet.lci.ca.gov/","data_url":"https://ceqanet.lci.ca.gov/Search?Sch=2026060079&DocumentId=3&OutputFormat=CSV","access":"direct_download","format":"HTML record pages, per-document CSV export and PDF attachments","license":"Unknown","language":"en","has_coordinates":true,"location_precision":"address","adds":"Only source found that follows a named project through dated documents: early consultation, negative declaration, county notice of determination and air-district notice, with applicant, parcel and sometimes coordinates.","first_seen_pass":1,"rank":1,"summary":"Dated CEQA documents with applicant and site: for example Orland Power Solutions (Manteca) MND 2026-06-02, county approval 2026-07-16, air-district approval 2026-09-09.","coverage_note":"California only; approval stages, no capacity; keyword search not scriptable.","data_date":"2026-11-23","caveats":["Notice of determination = approved, not built.","No capacity field."],"coverage":{"geographic":"California projects whose lead agencies file CEQA documents with the State Clearinghouse; the 2026 filter alone returned 18,765 documents of every project type."},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://ceqanet.lci.ca.gov/2026060079/3","note":"No capacity field exists; two records checked describe equipment and truck trips only."}]},"inclusion_rule":{"value":"Documents filed by lead or responsible agencies: notices of preparation, early consultation, negative declarations, notices of determination and exemption.","quote":null,"url":"https://ceqanet.lci.ca.gov/","attempts":[]},"reference_date":{"value":"Search results on 2026-11-24 listed documents received on 2026-11-23.","quote":"18,765 document(s) found - latest 100 shown.","url":"https://ceqanet.lci.ca.gov/Search?q=digester&StartRange=2026-01-01&EndRange=2026-12-31","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://ceqanet.lci.ca.gov/","note":"Continuous postings; no schedule stated."}]},"exclusions":{"value":"Projects outside California; projects not subject to CEQA or not filed with the State Clearinghouse; a notice of determination is posted only after approval.","quote":null,"url":"https://ceqanet.lci.ca.gov/","attempts":[]}},"key_fields":[{"field":"SCH Number","meaning":"Project key; the record URL is https://ceqanet.lci.ca.gov/<SCH>/<document number>."},{"field":"Document Type","meaning":"CON early consultation, NEG or MND negative declaration, NOD notice of determination (approval made), NOE exemption."},{"field":"Received / Posted / Approved On","meaning":"Filing date and, on a notice of determination, the date the agency approved the project."},{"field":"Lead Agency; Approving Agency (+ role)","meaning":"County or district that decides; an air district can file its own notice as responsible agency."},{"field":"Document Description","meaning":"Free text with applicant, equipment and sometimes gas destination."},{"field":"Project Applicant contact; Location (cities, counties, parcel, cross streets, coordinates)","meaning":"Developer and site; coordinates only on some records."}],"how_to_use":{"example_request":"curl -sL https://ceqanet.lci.ca.gov/2026060079/1 (and /2, /3) ; per-document CSV: curl -sL -o doc3.csv 'https://ceqanet.lci.ca.gov/Search?Sch=2026060079&DocumentId=3&OutputFormat=CSV' ; attachment link pattern /2026060079/3/Attachment/<id> is on each record page.","example_result":"SCH 2026060079, Lead Agency San Joaquin County: document 1 MND received 6/2/2026; document 2 NOD received 7/22/2026, approved 7/16/2026 by the County Planning Commission; document 3 NOD received 9/11/2026, approved 9/9/2026 by the San Joaquin Valley APCD; applicant Orland Power Solutions, LLC; 8350 E Brady Road, Manteca; APN 257-220-04, -05; 37°43'44\"N 121°11'52\"W.","steps":["Find the project: the keyword box is a Google Custom Search (not reproducible with curl); use Advanced Search facets (county, document type, dates) or links from county and air-district pages.","Open each document number of the SCH (1, 2, 3...) to get stage and date; the CSV export of a document gives the same fields.","Read the attachment PDF (notice of determination) for project location and approving agency.","Search other keys (permit number such as PA-2500075 or APCD project N-1261215) in the record text to link county and district records."],"reading_traps":["The title is usually a permit number (PA-2500075, PLN2025-0011), not a project name; the same project appears with several titles.","A notice of determination means the approval has happened; 'Received' is the filing date, 'Approved On' the decision date. The county and the air district file separate notices for one SCH.","No capacity: Orland gives only 'two 7,200 square foot digester buildings' and 12 truck trips a month; Couco Creek gives 3-6 truck trips a day.","The advanced-search page ignores a free-text 'q' parameter in /Search (it returned unrelated recent notices), so a keyword list of all biogas projects could not be produced by script.","Approval is not construction or operation: no building permit or start-of-construction document was found for either case."]},"test":{"tested_on":"2026-11-24","method":"download","http_status":200,"content_type":"text/csv","size_bytes":2064,"records_total":null,"records_for_country":null,"problems":["Free-text search is a Google Custom Search widget; the /Search 'q' parameter returned unrelated documents (18,765 for 2026)."]},"evidence":[{"claim":"County approval of the Manteca digester (CUP PA-2500075).","url":"https://ceqanet.lci.ca.gov/2026060079/2","quote":"Approved On 7/16/2026 ... The biogas from the bladders will be converted into biomethane gas (RNG) and compressed then loaded onto gas trucks for final distribution."},{"claim":"Air district approval of the same project.","url":"https://ceqanet.lci.ca.gov/2026060079/3","quote":"Orland Power Solutions, LLC, the applicant, proposed to install a dairy digester system which consists of two identical, above-ground, in-vessel anaerobic digesters ... a biogas upgrading/cleaning system ... Approved On 9/9/2026"},{"claim":"Mitigated negative declaration filed with a state review period.","url":"https://ceqanet.lci.ca.gov/2026060079/1","quote":"Document Type MND - Mitigated Negative Declaration Received 6/2/2026 ... State Review Period Start 6/2/2026 State Review Period End 7/1/2026"},{"claim":"Turlock injection site: early consultation, negative declaration and approval.","url":"https://ceqanet.lci.ca.gov/2025030780/3","quote":"Request to establish a biogas pipeline injection site on a 307± acre parcel ... Approved On 8/21/2025"}],"members":[],"members_summary":null},{"source_id":"epa-lmop-planned","name":"LMOP under-construction or planned landfill gas energy projects (September 2024)","publisher":"U.S. EPA, Landfill Methane Outreach Program (LMOP)","official":true,"landing_url":"https://www.epa.gov/lmop/landfill-gas-energy-project-data","data_url":"https://www.epa.gov/system/files/documents/2024-09/underconsplannedlmopdata.xlsx","access":"direct_download","format":"XLSX (sheets Summary, LMOP Database, Field Descriptions)","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"municipality","adds":"National list of landfill-gas projects not yet operating with status, developer, delivery method and anticipated start; locations come from joining the landfill-level file.","first_seen_pass":1,"rank":2,"summary":"102 landfill RNG projects not yet operating (26 under construction, 76 planned) with developer, delivery method and anticipated start; September 2024.","coverage_note":"Landfills only; LMOP status, not permit stage; coordinates via landfill file join.","data_date":"2024-09","caveats":["Planned is not a permitting stage; 8 planned rows have start dates already past in 2024.","No RNG capacity."],"coverage":{"geographic":"United States MSW landfills: 124 rows, 123 landfills, 121 projects (Summary sheet)."},"fine_print":{"unit":{"value":"LFG flow to project in million standard cubic feet per day (landfill gas input).","quote":"LFG Flow to Project (mmscfd)","url":"https://www.epa.gov/system/files/documents/2024-09/underconsplannedlmopdata.xlsx (sheet LMOP Database, header)","attempts":[]},"inclusion_rule":{"value":"Projects with status Construction or Planned.","quote":"Planned: Planning is underway on project or expansion (between Candidate and Construction).","url":"https://www.epa.gov/system/files/documents/2024-09/underconsplannedlmopdata.xlsx (sheet Summary)","attempts":[]},"reference_date":{"value":"September 2024.","quote":"Under-construction or planned projects (September 2024) (xlsx) (48.78 KB)","url":"https://www.epa.gov/lmop/landfill-gas-energy-project-data","attempts":[]},"update_frequency":{"value":"Generally two to three times a year.","quote":"LMOP publishes updated data on this website periodically (generally, two to three times a year)","url":"https://www.epa.gov/lmop/lmop-landfill-and-project-database","attempts":[]},"exclusions":{"value":"Not every landfill; planned status is LMOP's own and is not a permit stage.","quote":"the database is not exhaustive","url":"https://www.epa.gov/lmop/lmop-landfill-and-project-database","attempts":[]}},"key_fields":[{"field":"Landfill ID / Landfill Name / State / City / County","meaning":"Landfill; join Landfill ID to lmopdata.xlsx for latitude and longitude (102 of 102 RNG rows joined)."},{"field":"Current Project Status","meaning":"Construction or Planned."},{"field":"Project Start Date","meaning":"Anticipated start as Excel date serial; not the date of a permit stage."},{"field":"Project Type Category = Renewable Natural Gas; RNG Delivery Method","meaning":"102 RNG rows: Pipeline Injection 78, Unknown 14, Local Use 7, blank 3."},{"field":"Project Developer(s); Potential End Users; LFG Flow to Project (mmscfd)","meaning":"Developer on 79 of 102 RNG rows; flow on 19."}],"how_to_use":{"example_request":"curl -sL -o underconsplannedlmopdata.xlsx https://www.epa.gov/system/files/documents/2024-09/underconsplannedlmopdata.xlsx ; sheet 'LMOP Database' header row 1; keep 'Project Type Category' == 'Renewable Natural Gas'.","example_result":"102 rows (26 Construction, 76 Planned; 99 parent projects). Example: Magnolia Subtitle D MSW LF, Summerdale AL, Construction, anticipated start 2024-09-30, developer Viridi Energy, LLC, Pipeline Injection.","steps":["Download the xlsx and filter RNG rows.","Convert Project Start Date serials (day zero 1899-12-30).","Join Landfill ID with https://www.epa.gov/system/files/documents/2024-09/lmopdata.xlsx for coordinates.","Confirm each project in a state or local permit record before treating it as in permitting."],"reading_traps":["Planned and Construction are LMOP statuses, not permitting stages; no permit document or date is given.","11 of 102 RNG rows have an anticipated start before September 2024 (8 of them still Planned), so dates can already be stale; the file is two years old.","Flow is landfill gas input, present on 19 of 102 rows; RNG capacity is not published."]},"test":{"tested_on":"2026-11-24","method":"download","http_status":200,"content_type":"application/vnd.openxmlformats-officedocument.spreadsheetml.sheet","size_bytes":49946,"records_total":124,"records_for_country":124,"problems":[]},"evidence":[{"claim":"The file lists under-construction or planned projects.","url":"https://www.epa.gov/lmop/landfill-gas-energy-project-data","quote":"Under-construction or planned projects (September 2024) (xlsx) (48.78 KB)"},{"claim":"Planned is a status between candidate and construction.","url":"https://www.epa.gov/system/files/documents/2024-09/underconsplannedlmopdata.xlsx","quote":"Planned: Planning is underway on project or expansion (between Candidate and Construction)."}],"members":[],"members_summary":null},{"source_id":"epa-agstar-construction","name":"AgSTAR Livestock Anaerobic Digester Database: rows with Status = Construction","publisher":"U.S. EPA, AgSTAR","official":true,"landing_url":"https://www.epa.gov/agstar/livestock-anaerobic-digester-database","data_url":"https://www.epa.gov/sites/default/files/2020-10/agstar-livestock-ad-database.xlsx","access":"direct_download","format":"XLSX (sheet 'Operational and Construction')","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"municipality","adds":"Livestock-farm digesters under construction (73 rows) with developer, expected year, biogas end use and, for 35, pipeline gas.","first_seen_pass":1,"rank":3,"summary":"73 livestock digesters listed under construction (35 with pipeline gas), with developer and expected year; labelled June 2024.","coverage_note":"Farm digesters only; expected years often already past; no permit stage.","data_date":"2024-06","caveats":["49 of 73 expected years are 2024 or earlier.","No permit information."],"coverage":{"geographic":"United States livestock-farm digesters; construction rows: CA 25, KS 9, NY 6, TX 6, WI 6."},"fine_print":{"unit":{"value":"Biogas estimate in cubic feet per day (raw biogas); only 16 of 73 construction rows have it.","quote":"Biogas Generation Estimate (cu-ft/day)","url":"https://www.epa.gov/sites/default/files/2020-10/agstar-livestock-ad-database.xlsx","attempts":[]},"inclusion_rule":{"value":"The Excel file includes projects under construction.","quote":"The downloadable Excel file includes projects that are under construction and projects that have been shut down.","url":"https://www.epa.gov/agstar/livestock-anaerobic-digester-database","attempts":[]},"reference_date":{"value":"Data available through June 2024 according to the page label.","quote":"AgSTAR Livestock Anaerobic Digester Database (xlsx) (based on data available through June 2024)","url":"https://www.epa.gov/agstar/livestock-anaerobic-digester-database","attempts":[]},"update_frequency":{"value":"Generally twice a year.","quote":"AgSTAR publishes updated data on this website periodically (generally, two times per year)","url":"https://www.epa.gov/agstar/livestock-anaerobic-digester-database","attempts":[]},"exclusions":{"value":"Livestock farms only; voluntary; not exhaustive.","quote":"the database is not exhaustive","url":"https://www.epa.gov/agstar/livestock-anaerobic-digester-database","attempts":[]}},"key_fields":[{"field":"Project Name / City / County / State","meaning":"Project and municipality."},{"field":"Status = Construction; Year Operational","meaning":"For Construction rows the year is the expected start of operation."},{"field":"Biogas End Use(s); System Designer(s)/Developer(s) and Affiliates","meaning":"Pipeline Gas on 35 construction rows; developers on 58."}],"how_to_use":{"example_request":"curl -sL -o agstar.xlsx https://www.epa.gov/sites/default/files/2020-10/agstar-livestock-ad-database.xlsx ; sheet 'Operational and Construction'; keep Status == 'Construction'.","example_result":"73 rows. Example: Couco Creek Dairy Digester, Turlock, Stanislaus CA, Construction, Year Operational 2026, Cluster Maas Merced, developer Maas Energy Works, 5,737 dairy head, end use CNG.","steps":["Download and filter Status = Construction.","Read Year Operational as an expected year.","Cross-check names with CEQAnet or state records for a permit stage."],"reading_traps":["49 of 73 construction rows give an expected year of 2024 or earlier although the file ends in June 2024: status is stale.","No permit stage or date: 'Construction' does not say whether permits were granted.","Construction rows are digesters; upgrading and injection sites (such as Couco Creek's injection site) can be separate projects."]},"test":{"tested_on":"2026-11-24","method":"download","http_status":200,"content_type":"application/vnd.openxmlformats-officedocument.spreadsheetml.sheet","size_bytes":98977,"records_total":473,"records_for_country":73,"problems":[]},"evidence":[{"claim":"Couco Creek digester is listed under construction.","url":"https://www.epa.gov/sites/default/files/2020-10/agstar-livestock-ad-database.xlsx","quote":"Couco Creek Dairy Digester | Maas Merced | Farm Scale | Turlock | Stanislaus | CA | Covered Lagoon | Construction | 2026 (row of sheet Operational and Construction)"}],"members":[],"members_summary":null},{"source_id":"cdfa-ddrdp","name":"DDRDP Project-Level Data of Executed and Funded Grant Projects (updated 2026-10-15)","publisher":"California Department of Food and Agriculture (CDFA), Dairy Digester Research and Development Program","official":true,"landing_url":"https://www.cdfa.ca.gov/oars/ddrdp/","data_url":"https://www.cdfa.ca.gov/oefi/DDRDP/docs/DDRDP_Project_Level_Data.pdf","access":"pdf","format":"PDF table (text extractable with pdftotext -layout)","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"municipality","adds":"Funding stage of California dairy-digester projects: grant year, developer, percent of funds disbursed, end use, city, county and start and completion dates, including cancelled projects.","first_seen_pass":1,"rank":4,"summary":"142 funded California dairy-digester grants (16 below 100% disbursed, 13 of them RNG) with developer, city, county and grant dates; updated 2026-10-15.","coverage_note":"California grants only; funding stage, not permitting.","data_date":"2026-10-15","caveats":["Grant dates are not permit dates.","Cancelled projects are mixed in the table."],"coverage":{"geographic":"California dairy digester grants 2015-2025: 142 funded projects, $228.2 million awarded (program page)."},"fine_print":{"unit":{"value":"Estimated annual GHG reduction in MTCO2e; grant and cost share in US dollars; no gas volume.","quote":"Estimated Annual GHG Emissions Reduction (MTCO2e)","url":"https://www.cdfa.ca.gov/oefi/DDRDP/docs/DDRDP_Project_Level_Data.pdf","attempts":[]},"inclusion_rule":{"value":"Executed and funded grant projects, including cancelled ones.","quote":"DDRDP Project-Level Data of Executed and Funded Grant Projects","url":"https://www.cdfa.ca.gov/oars/ddrdp/","attempts":[]},"reference_date":{"value":"Updated 2026-10-15.","quote":"Updated 10/15/2026","url":"https://www.cdfa.ca.gov/oefi/DDRDP/docs/DDRDP_Project_Level_Data.pdf","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.cdfa.ca.gov/oars/ddrdp/","note":"No schedule stated; both data files carry the same October 2026 date."}]},"exclusions":{"value":"Only projects that applied for or received this grant; no unfunded projects.","quote":null,"url":"https://www.cdfa.ca.gov/oars/ddrdp/","attempts":[]}},"key_fields":[{"field":"Year; Project Title; Developer; Cluster","meaning":"Grant year, project and developer company."},{"field":"% Funds Disbursed","meaning":"Progress proxy; 100% means paid out, not necessarily operating."},{"field":"Biogas End-Use","meaning":"RNG or Electricity."},{"field":"City; County; Start Date; Completion Date","meaning":"Place and grant project dates (not permit dates); 'Verification in Progress' can replace the completion date."}],"how_to_use":{"example_request":"curl -sL -o ddrdp-proj.pdf https://www.cdfa.ca.gov/oefi/DDRDP/docs/DDRDP_Project_Level_Data.pdf ; pdftotext -layout ddrdp-proj.pdf ddrdp-proj.txt ; split each line on runs of two or more spaces and keep lines starting with a four-digit year and a percentage.","example_result":"156 table rows: 134 with 15 fields, 8 with 14, 14 terminated or cancelled notes; 142 funded after removing the 14. In progress (below 100%): 16, of which 13 RNG. Example: 2024 Top Line Dairy Biogas LLC, 0%, RNG, Hanford, Kings, start 8/1/2025, completion 2/1/2028, developer California Bioenergy.","steps":["Extract text and split columns on multiple spaces.","Drop rows whose last column is a termination note.","Treat % Funds Disbursed < 100 as in progress.","Check the project in CEQAnet or county records for permit stage."],"reading_traps":["Grant start and completion dates are not permit dates.","The table has two layouts (with and without a Cluster value) and 14 termination rows with a text note in place of numbers.","Funded does not mean built: projects such as De Groot North Dairy Biogas are cancelled with funds returned."]},"test":{"tested_on":"2026-11-24","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":221173,"records_total":156,"records_for_country":156,"problems":[]},"evidence":[{"claim":"Program page counts and date.","url":"https://www.cdfa.ca.gov/oars/ddrdp/","quote":"142 Projects Funded $228.2 Million Awarded 24.8 million MTCO2e reduction over the expected lifespan of projects"},{"claim":"88% of incentive projects completed as of the update date.","url":"https://www.cdfa.ca.gov/oars/ddrdp/","quote":"As of October 15, 2026, 88% of DDRDP's incentive projects have been completed."}],"members":[],"members_summary":null},{"source_id":"wi-dnr-warp","name":"Wisconsin DNR Air Management Permit Tracking (WARP) facility pages","publisher":"Wisconsin Department of Natural Resources, Air Management Program","official":true,"landing_url":"https://apps.dnr.wi.gov/warp_ext/am_permittracking2.aspx?id=32501","data_url":null,"access":"web_viewer_only","format":"HTML pages (ASP.NET) with permit tables and PDF documents behind page postbacks","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"address","adds":"State air-permit milestones per facility (application received, completeness, public notice, decision) with permit numbers and document names; example Chevron C-Dairy RNG LLC, Mondovi.","first_seen_pass":1,"rank":5,"summary":"Wisconsin DNR air-permit milestones per facility (application, public notice, decision), e.g. Chevron C-Dairy RNG LLC, Mondovi: construction permit 24-MIN-280 decided 2025-08-19.","coverage_note":"Wisconsin air permits only; three facility pages opened; documents not read.","data_date":"2025-08-19","caveats":["Facility must be found first; documents sit behind postbacks.","Permit scope (new project vs expansion) not verified."],"coverage":{"geographic":"Wisconsin facilities with DNR air permit records; only three facility pages were opened."},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://apps.dnr.wi.gov/warp_ext/am_permittracking2.aspx?id=32501","note":"No capacity field on the facility page; permit documents were not read."}]},"inclusion_rule":{"value":"Permit and permit application records by facility ID.","quote":"Permits and Permit Applications","url":"https://apps.dnr.wi.gov/warp_ext/am_permittracking2.aspx?id=32501","attempts":[]},"reference_date":{"value":"Record shown on 2026-11-24; latest decision on the Chevron C-Dairy page is 08/19/2025.","quote":null,"url":"https://apps.dnr.wi.gov/warp_ext/am_permittracking2.aspx?id=32501","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://apps.dnr.wi.gov/warp_ext/am_permittracking2.aspx?id=32501","note":"Not stated."}]},"exclusions":{"value":"Air permits only; county zoning, wastewater and other permits are separate records.","quote":null,"url":"https://apps.dnr.wi.gov/warp_ext/am_permittracking2.aspx?id=32501","attempts":[]}},"key_fields":[{"field":"Facility Information (name, address, SIC/NAICS)","meaning":"606047200 Chevron C-Dairy RNG LLC, 7803 90th AVE Mondovi WI, SIC 4925."},{"field":"Permit # / Type / App Received / App. Comp. / Public Notice / Decision / Status","meaning":"Permit milestones."},{"field":"Permit documents list","meaning":"Names such as ..._application.pdf, ..._preliminary_determination.pdf, ..._public_notice.pdf, ..._final_permit.pdf."}],"how_to_use":{"example_request":"curl -sL 'https://apps.dnr.wi.gov/warp_ext/am_permittracking2.aspx?id=32501' ; selecting a permit or document requires an ASP.NET postback (VIEWSTATE) on the same page.","example_result":"Permit 24-MIN-280 (Construction): application received 01/30/2025, public notice 07/15/2025, decision 08/19/2025, Active; FESOP 60604720A-F04: application 05/22/2025, decision pending; 25-EXM-051 exemption request 05/23/2025.","steps":["Find the facility ID (id= in the URL) from DNR's Air Permit Search or a document link.","Read the permit table for dates.","Select a permit to list its documents; downloading a document needs the page's postback."],"reading_traps":["The page shows permits for an existing RNG facility (emission reports from 2022 on); the permit content, and so whether an application is a new project or an expansion, was not read.","Selecting a document by postback returned the same HTML page, not the PDF, in my attempt; document contents are unverified.","Facility IDs are not discoverable by script from a project name."]},"test":{"tested_on":"2026-11-24","method":"page_only","http_status":200,"content_type":"text/html; charset=utf-8","size_bytes":37224,"records_total":null,"records_for_country":null,"problems":["Permit documents are served through ASP.NET postbacks; a scripted postback for a document returned HTML again."]},"evidence":[{"claim":"Construction permit milestones for the facility.","url":"https://apps.dnr.wi.gov/warp_ext/am_permittracking2.aspx?id=32501","quote":"24-MIN-280 Construction 01/30/2025 03/05/2025 07/15/2025 08/19/2025 Active Janssen, Colin W"},{"claim":"Pending permit revision.","url":"https://apps.dnr.wi.gov/warp_ext/am_permittracking2.aspx?id=32501","quote":"60604720A-F04 FESOP 05/22/2025 06/11/2025 Requested -1"}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"Local lead agencies (counties), air districts and state agencies; federal programs (EPA AgSTAR, LMOP) only track status","url":"https://ceqanet.lci.ca.gov/"},"operators":{"structure":"many","note":"Developers include Maas Energy Works, California Bioenergy, DTE and many project LLCs; no census was found.","census_url":null},"publication_obligation":{"exists":"yes","norm":"California CEQA: lead agencies file notices with the State Clearinghouse; notices of determination are filed after approval.","url":"https://ceqanet.lci.ca.gov/","what_must_be_published":"Notices and environmental documents for projects under CEQA.","frequency":"Per project"},"consolidated_republication":{"found":"partial","note":"CEQAnet republishes California filings; no national or multi-state equivalent was found for biogas projects.","checked_pages":[{"organization":"California LCI (CEQAnet)","url":"https://ceqanet.lci.ca.gov/2026060079/3","saw":"Notice of determination for SCH 2026060079 with approval date and applicant."},{"organization":"CDFA DDRDP","url":"https://www.cdfa.ca.gov/oars/ddrdp/","saw":"Project-level grant data, updated 2026-10-15."},{"organization":"U.S. EPA Fuels Registration","url":"https://www.epa.gov/fuels-registration-reporting-and-compliance-help/40-cfr-part-80-and-40-cfr-part-1090-pending","saw":"Pending registration list identified only by IDs known to the requester."}]}},"national_registry":{"exists":"no_evidence_found","note":"No national list of biogas/RNG projects in permitting found. EPA LMOP and AgSTAR give construction status for subsectors; EPA's pending-registration list has no project names; CEQAnet and Wisconsin WARP are state portals.","checked_pages":[{"organization":"U.S. EPA LMOP","url":"https://www.epa.gov/lmop/landfill-gas-energy-project-data","saw":"Under-construction or planned file, September 2024, no permit fields."},{"organization":"U.S. EPA AgSTAR","url":"https://www.epa.gov/agstar/livestock-anaerobic-digester-database","saw":"Excel with construction rows; no permit fields."},{"organization":"U.S. EPA Fuels Registration","url":"https://www.epa.gov/fuels-registration-reporting-and-compliance-help/40-cfr-part-80-and-40-cfr-part-1090-pending","saw":"Pending registrations are anonymous."},{"organization":"California CDFA","url":"https://www.cdfa.ca.gov/oars/ddrdp/","saw":"Grant list, not permits."}]},"if_unstructured":{"summary":"Stage, date, applicant and site are in permit documents, not in a list: county use permits and CEQA filings, air-district notices and state air permits.","recipe":["Start from a project name in AgSTAR, LMOP, CDFA or a developer press release.","Search CEQAnet for the county's filings (facets) and open each document of the SCH number to read the document type, dates and applicant.","Open the notice-of-determination PDF to confirm the approving agency, approval date and address or APN.","Check the air district or state air-permit portal for the ATC or construction permit number quoted in the record.","Do not infer capacity: none of the records opened states it."],"location_method":"Use the address or APN on the notice of determination; Orland's MND record also gives coordinates 37°43'44\"N 121°11'52\"W.","cross_with":"EPA Part 80 registry (registered biogas producers), AgSTAR construction rows and LMOP planned rows.","where_published":[{"name":"CEQAnet (California)","url":"https://ceqanet.lci.ca.gov/","what":"Dated CEQA filings per SCH number with applicant, location and attachments.","how_to_search_inside":"Advanced Search facets (county, document type, date range) or open https://ceqanet.lci.ca.gov/<SCH>/<n>; the keyword box is a Google Custom Search.","example_document":{"url":"https://ceqanet.lci.ca.gov/2026060079/3","what_it_gives":"Notice of Determination, SCH 2026060079: 'Orland Power Solutions, LLC, the applicant, proposed to install a dairy digester system ...'; 'Approved On 9/9/2026'; '8350 E Brady Road in Manteca, CA (APN: 257-220-05, -04)' (record page and PDF)."}},{"name":"Wisconsin DNR Air Management permit tracking","url":"https://apps.dnr.wi.gov/warp_ext/am_permittracking2.aspx?id=32501","what":"Permit milestones per facility.","how_to_search_inside":"By facility ID in the URL; DNR's Air Permit Search page was not opened.","example_document":{"url":"https://apps.dnr.wi.gov/warp_ext/am_permittracking2.aspx?id=32501","what_it_gives":"Permit table: '24-MIN-280 Construction 01/30/2025 03/05/2025 07/15/2025 08/19/2025 Active' for Chevron C-Dairy RNG LLC (documents not read)."}}]},"related_not_answering":[{"name":"RNG Coalition project database infographic 'RNG Facilities by Geography' (YTD 2026)","url":"https://www.rngcoalition.com","why":"Image with totals (162 under construction, 294 planned; United States and Canada); no list, no stage dates; not reconciled with LMOP's 102 or AgSTAR's 73."},{"name":"EPA Part 80 Registered Company/Facility ID List (Biogas Producer facilities)","url":"https://www.epa.gov/fuels-registration-reporting-and-compliance-help/registered-companies-and-facilities-epas-fuel","why":"Shows registration, not permit stage or date (COUCO CREEK DIGESTER is registered); Orland Power Solutions is not in it."},{"name":"EPA Part 80 Pending Registration List","url":"https://www.epa.gov/fuels-registration-reporting-and-compliance-help/40-cfr-part-80-and-40-cfr-part-1090-pending","why":"Lists requests by an ID known only to the requester; no project names."}],"open_questions":[{"question":"Are the Manteca (Orland Power Solutions) and Turlock (Couco Creek) projects under construction or operating?","starting_point":"CEQAnet shows approvals on 2026-07-16 and 2026-09-09 and 2025-08-21; AgSTAR lists Couco Creek digester under construction (expected 2026); EPA Part 80 lists Couco Creek Digester as registered.","next_step":"Check Stanislaus and San Joaquin County building permits and the air districts' ATC records."},{"question":"What is the permitted capacity of these projects?","starting_point":"Mitigated negative declaration attachments on https://ceqanet.lci.ca.gov/2026060079/1 and the Couco Creek negative declaration attachments (documents not read).","next_step":"Open the attached PDFs and the air-district evaluations for gas volume or MMBtu figures."},{"question":"Which state and county portals outside California and Wisconsin carry biogas permit stages (Oregon, other states)?","starting_point":"An Oregon search returned only old Threemile Canyon coverage; no Oregon portal page was opened.","next_step":"Open Oregon DEQ air-permit and county planning pages; repeat for states with most LMOP planned RNG rows."},{"question":"What is the permit scope behind Chevron C-Dairy RNG LLC's 2025 Wisconsin permits?","starting_point":"WARP permit table for facility 606047200; documents are behind postbacks.","next_step":"Obtain the preliminary determination and application PDFs through a browser or ask DNR."},{"question":"Do non-official sources (OpenStreetMap, RNG Coalition project list, trade press trackers) list projects with stages?","starting_point":"Only the RNG Coalition infographic with totals was opened; OpenStreetMap and others were not tested.","next_step":"Query OpenStreetMap for biogas plants under construction and request or download the Coalition list."},{"question":"How do LMOP's 102 and AgSTAR's 73 compare with the RNG Coalition's 162 under construction and 294 planned (United States and Canada)?","starting_point":"Different sectors, dates and statuses.","next_step":"Obtain the Coalition's project list and match facilities by name."}],"history":[{"pass":1,"date":"2026-11-24","role":"research","model":"claude-sonnet-5-5","rules_version":"2026-11-24-eeuu-gases-renovables","note":"First pass; reasoning effort and minutes not recorded. Pages count is approximate.","headline":{"official_data":"partial","non_official_data":"none_found","national_registry":"no_evidence_found"},"sources":{"total":5,"new":5,"dropped":0},"negatives":{},"effort":{"pages":20,"minutes":null}}],"local_terms":[{"term":"CEQAnet / Notice of Determination (NOD)","language":"en","meaning":"California portal and the notice filed after a project is approved; open the SCH number's documents 1, 2, 3."},{"term":"Conditional Use Permit (CUP) / Use Permit Application","language":"en","meaning":"County zoning permit for a digester or injection site; appears as the CEQAnet title."},{"term":"Authority to Construct (ATC) project number","language":"en","meaning":"Air-district permit key such as N-1261215 in San Joaquin Valley APCD records."},{"term":"Mitigated Negative Declaration (MND)","language":"en","meaning":"CEQA document type posted for state review before county approval."},{"term":"LMOP under-construction or planned projects","language":"en","meaning":"EPA file of landfill-gas projects not yet operating."},{"term":"DDRDP","language":"en","meaning":"CDFA Dairy Digester Research and Development Program; project-level grant list."},{"term":"WARP permit tracking / construction permit (MIN, BAP)","language":"en","meaning":"Wisconsin DNR air permit pages with numbers such as 24-MIN-280."},{"term":"Biogas pipeline injection site","language":"en","meaning":"Facility that off-loads trucked biogas into a utility pipeline, as at Couco Creek."}],"provenance":{"pass_count":1,"models":["claude-sonnet-5-5"],"minutes_estimate":null,"pages_opened":20,"passes":[{"pass":1,"date":"2026-11-24","model":"claude-sonnet-5-5"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/us/biomethane-plants-in-permitting.json","detail_url":"https://georutter.org/v1/us/biomethane-plants-in-permitting/detail.json","html_url":"https://georutter.org/us/biomethane-plants-in-permitting/","country_url":"https://georutter.org/v1/countries/us.json"}
