{"schema_version":"1.0","country":"us","country_name":"United States","topic":"energy-auctions","question":"Where can I get the results of renewable and storage auctions in the United States, with awarded projects, capacity (MW), price, technology and location?","territory":"us","territory_level":"country","parent_url":null,"published_on":"2026-11-27","research_reviewed_on":"2026-11-27","access_checked_on":"2026-11-27","answer":{"official_data":"partial","non_official_data":"none_found","summary":"No federal renewable or storage auction or national award list was found; results are published state by state. Best structured source: NYSERDA open data (data.ny.gov dprp-55ye), one row per award with RFP code, technology, county/ZIP, contracted MW, REC strike price and status; NY bulk storage awards are in ugya-enpy (kW, address, no price). Illinois publishes an awards workbook plus ICC notices with average prices; New Jersey BPU orders give per-project prices; California lists utility contracts without price; Massachusetts prices sit in DPU dockets that block automated clients.","main_caveats":["Selection, contract filing, approval and cancellation are separate stages: NY open data keeps 147 cancelled awards; MA 83E selected 1,268 MW but filed contracts for 1,118 MW; MA offshore wind rounds II-III were cancelled.","Prices are not comparable across mechanisms: NY Index vs Fixed REC, IL indexed REC/ISC strike (event average, $/MWh), NJ storage $/MW-year, DOE table mixing PPA and OREC levelized prices.","NY open data leaves the price blank for RESRFP24-1 and later awards until commercial operation; 83 of 326 rows carry no price.","Storage awards are published in MW of power; MWh is absent from NY bulk storage, IL and NJ award records and appears only in MA news and bids.","NYSERDA's website, the MA DPU fileroom, FERC and LBNL pages return 403 to automated clients; data.ny.gov, ICC/IPA, NJ BPU and CPUC files were reachable."],"confidence":"medium","confidence_reason":"Five state programs tested with real records; other procuring states (CT, RI, ME, MD, VA, utility all-source RFPs) not checked; key NYSERDA and MA DPU pages blocked to automated clients.","attributes":[{"attribute":"awarded_project","covered":"yes","source_ids":["nyserda-lsr-open-data","state-award-documents","nyserda-storage-open-data","cpuc-rps-public-data","il-competitive-procurements"],"note":"Named projects tied to their RFP or event in NY, IL, NJ and MA; CA gives program and RAM round. State by state only; no national list.","gap":null,"gap_note":null},{"attribute":"capacity_mw","covered":"yes","source_ids":["nyserda-lsr-open-data","state-award-documents","nyserda-storage-open-data","cpuc-rps-public-data","il-competitive-procurements"],"note":"MW per project; basis differs (NY contracted portion, IL/NJ AC nameplate, NY storage kW AC). Storage MWh is rarely in official award records.","gap":null,"gap_note":null},{"attribute":"price","covered":"partial","source_ids":["nyserda-lsr-open-data","state-award-documents","doe-offshore-wind-market-report"],"note":"NY REC strike per project (blank for RESRFP24-1+ until operation); NJ $/MW-year per project; IL only event averages in $/MWh.","gap":"not_checked","gap_note":"MA contract prices are in DPU dockets 26-87/88/89 (fileroom returns 403 to automated clients); CA terms confidential for 3 years; NY bulk storage price absent from open data."},{"attribute":"technology","covered":"yes","source_ids":["nyserda-lsr-open-data","state-award-documents","nyserda-storage-open-data","cpuc-rps-public-data","il-competitive-procurements"],"note":"Technology per project in every source checked (e.g., Land-based Wind, Solar, Hydroelectric, Lithium Ion, Utility-Scale Wind).","gap":null,"gap_note":null},{"attribute":"location","covered":"partial","source_ids":["nyserda-lsr-open-data","state-award-documents","nyserda-storage-open-data","cpuc-rps-public-data","il-competitive-procurements"],"note":"IL address or coordinates; CA lat/long; NY storage street address; NJ municipality; NY renewables county/ZIP only (point = ZIP centroid).","gap":"not_published","gap_note":"No official site location found for MA awards on macleanenergy.com or mass.gov pages opened; NY dprp-55ye gives county and ZIP, not the site."},{"attribute":"latest_data","covered":"yes","source_ids":["nyserda-lsr-open-data","nyserda-storage-open-data","state-award-documents","cpuc-rps-public-data","il-competitive-procurements"],"note":"NY renewables through 2026-09-30 (RESRFP25-1); NY storage 2026-11-04; IL file 2026-10-30, IL storage notice 2026-09-01; CA file October 2026.","gap":null,"gap_note":null},{"attribute":"historical_series","covered":"yes","source_ids":["nyserda-lsr-open-data","cpuc-rps-public-data","state-award-documents","doe-offshore-wind-market-report","il-competitive-procurements"],"note":"NY awards since 2004 incl. cancelled; IL awards since 2010 (LTPPA to Summer 2026); CA contracts incl. RAM rounds 1-7. Price mechanisms change between rounds.","gap":null,"gap_note":null},{"attribute":"update_frequency","covered":"yes","source_ids":["nyserda-lsr-open-data","nyserda-storage-open-data","state-award-documents","il-competitive-procurements"],"note":"Publisher-stated: NY renewables quarterly, NY storage and IL workbook monthly; IL notices per event (REC events twice a year); NJ, MA per solicitation.","gap":null,"gap_note":null}]},"sources":[{"source_id":"nyserda-lsr-open-data","name":"Large-scale Renewable Projects Reported by NYSERDA: Beginning 2004 (data.ny.gov dprp-55ye)","publisher":"New York State Energy Research and Development Authority (NYSERDA), on the New York State open data portal","official":true,"landing_url":"https://data.ny.gov/Energy-Environment/Large-scale-Renewable-Projects-Reported-by-NYSERDA/dprp-55ye","data_url":"https://data.ny.gov/resource/dprp-55ye.json","access":"api","format":"Socrata SODA API (JSON); CSV export at https://data.ny.gov/api/views/dprp-55ye/rows.csv?accessType=DOWNLOAD","license":"unknown (no license field in the portal metadata)","language":"en","has_coordinates":true,"location_precision":"municipality","publisher_type":"regional_government","adds":"The only structured per-award record found: one row per NYSERDA award (Tier 1 RES, offshore wind OREC, Tier 2/4, RPS) with RFP code, technology, county/ZIP, contracted MW, Index or Fixed REC price and status including cancellations.","first_seen_pass":1,"rank":1,"summary":"Per-award table of NYSERDA renewable and offshore wind procurements since 2004, with RFP code, technology, county/ZIP, contracted MW, REC strike or fixed price and status; SODA API, refreshed quarterly.","coverage_note":"New York only; 326 award rows through 2026-09-30 including RESRFP25-1; bulk storage awards are in ugya-enpy, not here.","data_date":"2026-09-30","caveats":["Price blank for RESRFP24-1+ until commercial operation.","Location is county/ZIP; the point is a ZIP centroid."],"coverage":{"geographic":"New York State procurements run by NYSERDA; state_province is NY in 308 rows, PA in 4, QC in 1 and blank in 13; excludes LIPA procurements and NYSERDA bulk storage awards"},"fine_print":{"unit":{"value":"Capacity in MW (bid_capacity_mw = NYSERDA-contracted portion; new_renewable_capacity_mw = nameplate). Prices in US dollars; the per-unit basis (per REC/MWh) is not labelled in the metadata.","quote":"The NYSERDA-contracted portion of the New Renewable Capacity in Megawatts.","url":"https://data.ny.gov/api/views/dprp-55ye.json","attempts":[{"url":"https://data.ny.gov/api/views/dprp-55ye.json","note":"index_orec_strike_price description: 'The Index OREC bid price or the Index REC Conversion Offer Price of Tier 1 or Off-shore wind projects in US dollars' - no per-unit basis."},{"url":"https://www.nyserda.ny.gov/-/media/Project/Nyserda/Files/Programs/LSR/2024-Renewable-Energy-Standard-Solicitation-Fact-Sheet.pdf","note":"NYSERDA fact sheet returned 403 (Cloudflare) to curl; unit definition not reachable."}]},"inclusion_rule":{"value":"Projects NYSERDA has awarded and approved, under development, operational, completed or cancelled.","quote":"Projects reported by NYSERDA represent projects which NYSERDA has awarded and approved.","url":"https://data.ny.gov/api/views/dprp-55ye.json","attempts":[]},"reference_date":{"value":"2026-09-30 (data_through_date of every row checked on 2026-11-27)","quote":"Data Through Date: The date the dataset was refreshed","url":"https://data.ny.gov/resource/dprp-55ye.json?$select=data_through_date&$group=data_through_date","attempts":[]},"update_frequency":{"value":"Quarterly (publisher-stated posting frequency)","quote":"\"Posting Frequency\": \"Quarterly\"","url":"https://data.ny.gov/api/views/dprp-55ye.json","attempts":[]},"exclusions":{"value":"Not all renewable projects in New York; Long Island projects are referred to LIPA; prices for RESRFP24-1 and later awards are withheld until commercial operation.","quote":"This dataset does not represent all renewable projects in New York State. Information pertaining to projects located in Long Island please visit LIPA’s 2024 Report.","url":"https://data.ny.gov/api/views/dprp-55ye.json","attempts":[]}},"key_fields":[{"field":"solicitation_name","meaning":"RFP code (e.g., RESRFP25-1, ORECRFP23-1) or older RPS agreement number; ties each award to its round."},{"field":"project_name","meaning":"Awarded project; the same name can recur across rounds (e.g., Canisteo Wind Energy Center in RESRFP23-1 and RESRFP25-1)."},{"field":"renewable_technology","meaning":"Land-based Wind, Offshore Wind, Solar, Hydroelectric, Biogas, Fuel Cell, etc."},{"field":"bid_capacity_mw","meaning":"NYSERDA-contracted MW; new_renewable_capacity_mw is the nameplate of new equipment."},{"field":"energy_storage_power_capacity_mwac / energy_storage_energy_capacity_mwh","meaning":"Co-located storage power and energy, filled in 15 rows only."},{"field":"index_orec_strike_price / fixed_rec_price","meaning":"Awarded Index (O)REC strike price or Fixed REC price in US dollars; two different mechanisms."},{"field":"price_adjustment","meaning":"Whether the strike or fixed price may be adjusted by commodity indices under the RFP."},{"field":"county_province, zip_code, georeference","meaning":"County and ZIP; georeference is a Socrata geocode of the address components (ZIP centroid in practice)."},{"field":"project_status","meaning":"Cancelled, Canceled - Other, Completed, Operational or Under Development as of the data-through date."},{"field":"year_of_delivery_start_date, contract_duration","meaning":"Year NYSERDA payments start (expected for projects under development) and contract years."}],"how_to_use":{"example_request":"curl -s -G 'https://data.ny.gov/resource/dprp-55ye.json' --data-urlencode '$where=solicitation_name='\"'\"'RESRFP23-1'\"'\"'' --data-urlencode '$select=project_name,solicitation_name,renewable_technology,county_province,zip_code,bid_capacity_mw,index_orec_strike_price,fixed_rec_price,project_status' --data-urlencode '$order=project_name' --data-urlencode '$limit=2'","example_result":"{\"project_name\":\"Alle-Catt Wind\",\"solicitation_name\":\"RESRFP23-1\",\"renewable_technology\":\"Land-based Wind\",\"county_province\":\"Cattaraugus\",\"zip_code\":\"14060\",\"bid_capacity_mw\":\"340\",\"index_orec_strike_price\":\"93.65\",\"project_status\":\"Under Development\"}","steps":["Query https://data.ny.gov/resource/dprp-55ye.json with SoQL ($select, $where, $order, $limit); 326 rows on 2026-11-27, so one request with $limit=1000 returns the whole table.","Filter by solicitation_name to get one round; the latest round on 2026-11-27 is RESRFP25-1 (13 rows, 718.91 MW of bid_capacity_mw).","Keep project_status to separate cancelled awards (Cancelled 140, Canceled - Other 7) from Under Development (63), Operational (40) and Completed (76).","Read index_orec_strike_price and fixed_rec_price as separate columns; neither is filled for most offshore wind rows or for RESRFP24-1+ rows that are not yet operational.","Offshore wind awards (ORECRFP18-1 to ORECRFP23-1) are in the same table with renewable_technology = 'Offshore Wind'."],"reading_traps":["georeference is a Socrata geocode of address components: Flint Mine Solar, Hecate Energy Greene 1 and Greene 2 share the same point (-73.80015, 42.34806), the ZIP 12051 centroid; offshore wind rows carry the onshore county (Kings, Suffolk).","Price fields are blank in 83 of 326 rows; for RESRFP25-1 only the two operational hydro projects show a price (Theresa 92, High Dam 89.7).","A row is an award, not a project: Canisteo appears in RESRFP18-1 (290 MW, Cancelled), RESRFP23-1 (252 MW) and RESRFP25-1 (27 MW); the asterisk convention for repeated names is not applied to all of them.","Status spelling differs ('Cancelled' vs 'Canceled - Other'); group both when counting cancellations.","County can disagree with NYSERDA's announcement: Chateaugay Windpark is Clinton in the data but Franklin County in the 2026-09-23 award notice.","Bulk energy storage awards are not in this table; they are in dataset ugya-enpy.","state_province is blank in 13 rows and points outside New York in 5 (PA 4, QC 1); filter it before mapping."]},"test":{"tested_on":"2026-11-27","method":"api_query","http_status":200,"content_type":"application/json; charset=utf-8","size_bytes":null,"records_total":326,"records_for_country":312,"problems":[]},"evidence":[{"claim":"The dataset covers awarded projects in all life-cycle states.","url":"https://data.ny.gov/api/views/dprp-55ye.json","quote":"Large-scale Renewable Projects Reported by NYSERDA Beginning 2004 dataset includes information for projects completed, operational, cancelled, and under development."},{"claim":"Recent-round prices are withheld until operation.","url":"https://data.ny.gov/api/views/dprp-55ye.json","quote":"For any project awarded in RESRFP24-1 or a subsequent solicitation, this cell will be populated when the project reaches commercial operation, and the project achieves Operational Certification with NYSERDA."},{"claim":"Cancelled means the award or contract ended.","url":"https://data.ny.gov/api/views/dprp-55ye.json","quote":"A status of Cancelled means that NYSERDA's award or contract with the counterparty was cancelled or terminated."}],"members":[],"members_summary":null},{"source_id":"state-award-documents","name":"State procurement award notices, regulator orders and contract filings","publisher":"State procurement bodies and utility regulators (Illinois Power Agency and Illinois Commerce Commission, New Jersey Board of Public Utilities, Massachusetts DOER with the distribution companies and DPU, NYSERDA)","official":true,"landing_url":null,"data_url":null,"access":"pdf","format":"PDF notices and board orders; HTML notices","license":"unknown","language":"en","has_coordinates":true,"location_precision":null,"publisher_type":"regional_government","adds":"Award results for states without structured award data: winners, MW, address or municipality and price per event (Illinois, New Jersey) and selection and contract-filing notices with MW (Massachusetts).","first_seen_pass":1,"rank":2,"summary":"Official award notices and orders that name winners with MW and location, and give prices per event (IL averages in $/MWh) or per project (NJ $/MW-year); MA notices give selection and contract-filing stages.","coverage_note":"Choose the state: IL for indexed REC and storage events since 2017 (example used here: 2026-09-01 storage notice); NJ for BPU-ordered storage awards; MA for 83C/83E stages, with prices only in blocked DPU dockets.","data_date":"2026-09-01","caveats":["IL prices are averages of indexed strike prices.","Precision varies: IL address or coordinates, NJ municipality, MA none."],"coverage":{"geographic":"Sample of state procurements: Illinois, New Jersey, Massachusetts and New York; other states with renewable or storage procurements were not checked"},"fine_print":{"unit":{"value":"Illinois: strike price in $/MWh (event or category average), capacity in MW AC. New Jersey storage: annual incentive in $/MW ICAP-year and $/MW UCAP-year per project, capacity in MW ICAP.","quote":"The Average Winning Bid Price in the table below reflects the Strike Price ($/MWh) in the bid for each project.","url":"https://nera-content-media.s3.us-east-1.amazonaws.com/ipa/Public_Notice_of_August_2026_Energy_Storage_Procurement_Results_2026_09_01_97ba2f4392.pdf","attempts":[]},"inclusion_rule":{"value":"Illinois discloses winners, the average winning price, the project address and capacity at ICC approval; New Jersey's order names each winner, bid price, capacity and county.","quote":"In accordance with Section 16-111.5(h) of the Public Utilities Act and ICC Orders, the following information is made public at the time of Commission approval of a procurement event under the energy storage RFP: (i) the names, business address, and contact information of successful bidders; (ii) the weighted average of the winning bid prices; and (iii) the address and storage capacity of the project.","url":"https://nera-content-media.s3.us-east-1.amazonaws.com/ipa/Public_Notice_of_August_2026_Energy_Storage_Procurement_Results_2026_09_01_97ba2f4392.pdf","attempts":[]},"reference_date":{"value":"Latest documents opened: IL storage notice 2026-09-01; IL indexed REC notice 2026-06-24; NJ GSESP Tranche 1 order 2026-03-04; MA 83E contract filing 2026-07-02.","quote":"On September 1, 2026, voting in open session, the Commission approved the procurement administrator’s selection of winning bids.","url":"https://nera-content-media.s3.us-east-1.amazonaws.com/ipa/Public_Notice_of_August_2026_Energy_Storage_Procurement_Results_2026_09_01_97ba2f4392.pdf","attempts":[]},"update_frequency":{"value":"Per procurement event; Illinois runs indexed REC events twice a year.","quote":"To meet its procurement targets, the IPA along with its Procurement Administrator, runs competitive procurement events twice a year to procure RECs from utility-scale wind, utility-scale solar, brownfield site photovoltaic and new or retooled hydropower facilities.","url":"https://ipa.illinois.gov/renewable-resources/utility-scale.html","attempts":[]},"exclusions":{"value":"Illinois publishes only averages, not each project's price; Illinois REC contracts pay for RECs only, energy and capacity are sold separately.","quote":"Projects selected in this RFP are agreeing only to supply RECs. Energy and capacity from the projects may be sold to other parties or into the PJM and MISO wholesale markets.","url":"https://icc.illinois.gov/api/web-management/documents/downloads/public/Public%20Notice%20of%20June%202026%20Wind%20Solar%20Hydropower%20and%20Brownfield%20Indexed%20REC%20Procurement%20Results%202026-6-24.pdf","attempts":[]}},"key_fields":[{"field":"IL: Supplier Name, Address of Selected Project, Project Type, Nameplate Capacity (in MW AC rating), Annual Quantity of RECs Selected, Average Winning Bid Price ($/MWh)","meaning":"Columns of the ICC public notice tables; the price cell is merged across all rows of a category or event."},{"field":"IL storage: Utility Area, Storage Capacity (in MW AC rating), Average Winning Bid Price ($/MWh)","meaning":"Indexed Storage Credit (ISC) event; one weighted-average strike price for all winners."},{"field":"NJ: AC Installed Capacity (MW ICAP), Annual Incentive Requested, Bid Incentive Requested ($/MW ICAP-Year), Incentive Cost per MW of Est. Accredited Capacity ($/MW UCAP-year), Municipality, County","meaning":"GSESP Tranche 1 award table in the BPU order (p.5)."},{"field":"MA: project name, MW, developer, D.P.U. docket numbers","meaning":"Selection and contract-filing notices on MACleanEnergy.com; prices only in the DPU dockets."}],"how_to_use":{"example_request":"curl -sL -o ipa-2026-storage-notice.pdf 'https://nera-content-media.s3.us-east-1.amazonaws.com/ipa/Public_Notice_of_August_2026_Energy_Storage_Procurement_Results_2026_09_01_97ba2f4392.pdf' && pdftotext -layout ipa-2026-storage-notice.pdf - (table on p.4)","example_result":"Ameren Illinois | KCE IL 1, LLC | (38.6997, -88.5476) Flora, IL 62839 | 100 ... Ameren Illinois | KCE IL 2, LLC | (39.1848, -89.0244) Herrick, IL 62431 | 100 | 110.52 ... ComEd | Lincoln Reserve Energy, LLC | 16601 Ridge Road Calumet City, IL 60409 | 80","steps":["Illinois (member example): open https://ipa.illinois.gov/energy-procurement/procurement-results.html, pick the event under 'Indexed REC Procurement Results' or 'Energy Storage Procurement Results' and download the ICC 'Public Notice of Successful Bidders and Average Prices' PDF (4 pages).","Extract the tables with pdftotext -layout; each project spans several lines (supplier address, project address or coordinates); rebuild one row per project and copy the single average price to every row of that category.","New Jersey: the GSESP Tranche 1 award table is on p.5 of the BPU order (docket QO22080540); the payment schedule per project is in Appendix A.","Massachusetts: selection and contract-filing notices are posted under the 83C, 83D and 83E menus of https://macleanenergy.com/; the contracts and prices are in the DPU dockets named in the notice (26-87, 26-88, 26-89 for 83E Round I).","New York: NYSERDA award announcements list projects by county only; use the data.ny.gov datasets for MW and price."],"reading_traps":["Illinois prices are averages: 92.60 $/MWh for all wind/hydro winners and 76.24 $/MWh for all solar winners in June 2026; 110.52 $/MWh for all five storage winners in the 2026-09-01 notice.","Illinois strike prices are indexed: the REC or ISC payment is the strike minus a market index and can be negative, so a strike price is not the payment per MWh.","In the June 2026 Illinois notice Four Creeks LLC (250.00 MW, 731,029 RECs) is printed twice in the wind/hydro table.","New Jersey ranks bids in $/MW UCAP-year but awards and pays in $/MW ICAP-year: Woods Landing is $75,000 per MW ICAP-year and $156,904 per MW UCAP-year.","Massachusetts 'bids' pages list every proposal (13 for 83E Round I), not winners; winners appear in selection and contract-filing notices."]},"test":{"tested_on":"2026-11-27","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":186508,"records_total":5,"records_for_country":5,"problems":[]},"evidence":[{"claim":"New Jersey's order discloses winner, price, capacity and county.","url":"https://www.nj.gov/bpu/pdf/boardorders/2026/20260304/8A%20ORDER%20GSESP%20Phase%201%20Tranche%201.pdf","quote":"In this Order, the Board also announces the name of each winning bidding party and project, as well as their bid price, project capacity, and the county in which the project is located."},{"claim":"Massachusetts 83E Round I contracts were filed for three of the selected projects.","url":"https://macleanenergy.com/2026/07/02/83e-i-long-term-contracts-filed-for-dpu-approval/","quote":"The Electric Distribution Companies (“EDCs”) announced that they have filed, on July 2, 2026, long-term contracts with Trimount for a 700 megawatt storage project developed by Jupiter Power, Energizar for a 250 megawatt storage project developed by Flatiron Energy, and Salt Cod for a 168 MW storage project developed by Flatiron Energy for review and approval by the Department of Public Utilities."},{"claim":"Massachusetts 83E Round I selection total.","url":"https://www.mass.gov/doc/doer-2025-annual-report-pdf/download","quote":"On December 19th, DOER announced the selected projects for a total of 1,268 MW."}],"members":[{"name":"Illinois - IPA procurement results and ICC public notices (indexed REC and storage events)","landing_url":"https://ipa.illinois.gov/energy-procurement/procurement-results.html","data_url":"https://nera-content-media.s3.us-east-1.amazonaws.com/ipa/Public_Notice_of_August_2026_Energy_Storage_Procurement_Results_2026_09_01_97ba2f4392.pdf","access":"pdf","tested":true,"data_found":true,"note":"Example member. Index lists indexed REC notices Spring 2022-Summer 2026 and the first storage event (2026-09-01). Per project: supplier, address or coordinates, type, MW AC; price only as average. Structured list: il-competitive-procurements."},{"name":"New Jersey - Board of Public Utilities board orders (GSESP storage Tranche 1)","landing_url":"https://www.nj.gov/bpu/agenda/orders/","data_url":"https://www.nj.gov/bpu/pdf/boardorders/2026/20260304/8A%20ORDER%20GSESP%20Phase%201%20Tranche%201.pdf","access":"pdf","tested":true,"data_found":true,"note":"Order of 2026-03-04: 3 storage projects, 355 MW, $/MW-year per project, municipality and county; no MWh. Offshore wind OREC orders not opened."},{"name":"Massachusetts - MACleanEnergy.com (DOER and distribution companies, Sections 83C/83D/83E)","landing_url":"https://macleanenergy.com/","data_url":"https://macleanenergy.com/2026/07/02/83e-i-long-term-contracts-filed-for-dpu-approval/","access":"pdf","tested":true,"data_found":true,"note":"RFPs, public bids, timelines and notices; 83E Round I contract filing names 3 projects with MW and DPU dockets. No price or site location in the notices."},{"name":"Massachusetts - DPU long-term contract filings (fileroom dockets)","landing_url":"https://www.mass.gov/info-details/long-term-contracts-for-renewable-energy-filings","data_url":null,"access":"web_viewer_only","tested":true,"data_found":null,"note":"Docket list by utility and section (83 to 83E), last updated 2026-02-26; the eeaonline fileroom and fileservice documents returned 403 to curl and WebFetch."},{"name":"New York - NYSERDA award announcements and solicitation pages","landing_url":"https://www.nyserda.ny.gov/About/Newsroom/2026-Announcements/2026-09-23-NYSERDA-Awards-Eight-Bulk-Energy-Storage-Projects-13-LSR-Projects","data_url":null,"access":"web_viewer_only","tested":true,"data_found":null,"note":"Live site returns 403 (Cloudflare) to curl and WebFetch. A web.archive.org copy of 2026-10-06 lists 8 storage and 13 renewable awards by county, without MW or price."}],"members_summary":{"total":null,"listed":5,"tested":5,"data_found":3,"scope_note":"5 resources from 4 states opened (IL, NJ, MA, NY); IL and NJ tested to the award table, MA notices tested, MA DPU and NYSERDA site blocked. The number of US states running renewable or storage procurements was not established; others (e.g., CT, RI, ME, MD, VA) were not checked.","pattern":null},"member_scope":{"total":null,"note":"5 resources from 4 states opened (IL, NJ, MA, NY); IL and NJ tested to the award table, MA notices tested, MA DPU and NYSERDA site blocked. The number of US states running renewable or storage procurements was not established; others (e.g., CT, RI, ME, MD, VA) were not checked."}},{"source_id":"nyserda-storage-open-data","name":"Residential, Retail and Bulk Energy Storage Incentive Programs Reported by NYSERDA: Beginning 2019 (data.ny.gov ugya-enpy)","publisher":"New York State Energy Research and Development Authority (NYSERDA), on the New York State open data portal","official":true,"landing_url":"https://data.ny.gov/Energy-Environment/Residential-Retail-and-Bulk-Energy-Storage-Incenti/ugya-enpy","data_url":"https://data.ny.gov/resource/ugya-enpy.json","access":"api","format":"Socrata SODA API (JSON, CSV export)","license":"unknown (no license field in the portal metadata)","language":"en","has_coordinates":false,"location_precision":"address","publisher_type":"regional_government","adds":"New York's first Bulk Energy Storage solicitation awards (8 projects, 950 MW, program_type 'Bulk Storage'), which are not in dprp-55ye, with street address, county, kW AC and battery technology.","first_seen_pass":1,"rank":3,"summary":"NYSERDA storage incentive projects; the 'Bulk Storage' rows are the 8 awards of the first Bulk Energy Storage solicitation (950 MW) with address, county, kW AC and lithium-ion technology.","coverage_note":"New York only; filter program_type = 'Bulk Storage'. No price, MWh or approval date in those rows.","data_date":"2026-11-04","caveats":["Power in kW, not MW.","No price or MWh for bulk awards."],"coverage":{"geographic":"New York State; residential, retail (up to 5 MW) and bulk (over 5 MW) storage projects supported by NYSERDA since April 2019"},"fine_print":{"unit":{"value":"Power in kW AC (energy_storage_power_capacity_kwac); energy in kWh AC (installed_energy_storage_kwhac), blank for the 2026 bulk awards.","quote":"Rating of the electric power that can be delivered from an energy storage project in alternating current (AC) power","url":"https://data.ny.gov/api/views/ugya-enpy.json","attempts":[]},"inclusion_rule":{"value":"Projects completed or in development receiving NYSERDA storage incentives; bulk projects are larger than 5 MW.","quote":"Residential projects are installed at a 1-2 family home.  Retail projects are up to 5MW.  Bulk projects are larger than 5MW.","url":"https://data.ny.gov/api/views/ugya-enpy.json","attempts":[]},"reference_date":{"value":"2026-11-04 (reporting_period of the rows queried; rowsUpdatedAt 2026-11-04)","quote":"reporting_period: The time period covered by the data set","url":"https://data.ny.gov/api/views/ugya-enpy.json","attempts":[]},"update_frequency":{"value":"Monthly (publisher-stated posting frequency)","quote":"\"Posting Frequency\": \"Monthly\"","url":"https://data.ny.gov/api/views/ugya-enpy.json","attempts":[]},"exclusions":{"value":"No award price, energy capacity or approval date in the 2026 'Bulk Storage' rows; residential rows have no street address.","quote":"Street address is not provided for residential projects due to privacy considerations","url":"https://data.ny.gov/api/views/ugya-enpy.json","attempts":[{"url":"https://data.ny.gov/resource/ugya-enpy.json?$where=program_type='Bulk Storage'","note":"All 8 rows have installed_energy_storage_kwhac, nyserda_funding_amount and date_project_approved empty."}]}},"key_fields":[{"field":"program_type","meaning":"Residential, Retail Storage, Bulk (earlier incentive, 8 rows) or Bulk Storage (2026 solicitation awards, 8 rows)."},{"field":"contractor","meaning":"Project company (e.g., Blue Spruce Storage, LLC); matches award names in NYSERDA's announcement."},{"field":"address, city, county, zip_code, nyiso_zone","meaning":"Project street address and NYISO load zone."},{"field":"energy_storage_power_capacity_kwac","meaning":"Awarded power in kW AC (140000 = 140 MW)."},{"field":"storage_technology_type","meaning":"Battery chemistry, e.g., Lithium Ion."},{"field":"project_status","meaning":"Approved, Completed, Cancelled, Terminated, Received or Pending Approval."}],"how_to_use":{"example_request":"curl -s -G 'https://data.ny.gov/resource/ugya-enpy.json' --data-urlencode '$where=program_type='\"'\"'Bulk Storage'\"'\"'' --data-urlencode '$select=contractor,address,city,county,zip_code,energy_storage_power_capacity_kwac,installed_energy_storage_kwhac,storage_technology_type,project_status' --data-urlencode '$order=contractor' --data-urlencode '$limit=2'","example_result":"{\"contractor\":\"Blue Spruce Storage, LLC\",\"address\":\"828 E 144th St\",\"city\":\"Bronx\",\"county\":\"Bronx\",\"zip_code\":\"10454\",\"energy_storage_power_capacity_kwac\":\"133000\",\"storage_technology_type\":\"Lithium Ion\",\"project_status\":\"Approved\"}","steps":["Filter program_type = 'Bulk Storage' to get the 2026 bulk storage awards (8 rows, 950,000 kW in total on 2026-11-04).","Divide energy_storage_power_capacity_kwac by 1,000 to get MW.","Match contractor names to the award announcement (e.g., Lighthouse Battery, LLC = Lighthouse Energy Storage)."],"reading_traps":["program_type 'Bulk' (older incentive projects since 2019, with nyserda_funding_amount) is a different program from 'Bulk Storage' (2026 solicitation awards).","MWh is not published for the 2026 bulk awards (installed_energy_storage_kwhac empty); NYSERDA's announcement only says durations range from four to eight hours.","Palladium Storage, LLC is in county Bronx but carries ZIP 10001 (Manhattan) and city 'New York City'.","metering_method shows 'On-site metering' for the bulk awards, which does not describe a grid-scale project.","'Approved' means awarded or contracted, not built."]},"test":{"tested_on":"2026-11-27","method":"api_query","http_status":200,"content_type":"application/json; charset=utf-8","size_bytes":null,"records_total":6336,"records_for_country":6336,"problems":[]},"evidence":[{"claim":"The dataset covers NYSERDA storage incentive programs including bulk.","url":"https://data.ny.gov/api/views/ugya-enpy.json","quote":"The Residential, Retail and Bulk Energy Storage Incentive Programs Reported by NYSERDA: Beginning 2019 dataset includes data points for projects completed and in-development projects receiving funding from  NYSERDA’s Incentive Programs since April 2019."}],"members":[],"members_summary":null},{"source_id":"il-competitive-procurements","name":"Illinois Clean Energy Dashboard - Competitive Procurements data (xlsx)","publisher":"State of Illinois Clean Energy Dashboard, with data from the Illinois Power Agency","official":true,"landing_url":"https://cleanenergy.illinois.gov/tools-resources/data.html","data_url":"https://cleanenergy.illinois.gov/content/dam/soi/en/web/cleanenergy/datasources/illinois-clean-energy-dashboard-competitive-procurements.xlsx","access":"direct_download","format":"XLSX (sheets 'Overview', 'Competitive Procurements Data', 'Data Validation')","license":"unknown","language":"en","has_coordinates":false,"location_precision":"municipality","publisher_type":"regional_government","adds":"Structured list of every IPA utility-scale award since 2010 (LTPPA, FEJA forward, CEJA indexed REC events) with seller, technology, nameplate MW, procurement event, ZIP, state and energization status; no price.","first_seen_pass":1,"rank":4,"summary":"Illinois workbook of all IPA utility-scale awards since 2010 with seller, technology, MW, procurement event, status, ZIP and state; refreshed monthly; no prices.","coverage_note":"Illinois Power Agency procurements only (107 rows to the Summer 2026 REC event); prices are in the ICC notices.","data_date":"2026-10-30","caveats":["No price column.","Storage awards not included yet."],"coverage":{"geographic":"Projects contracted through Illinois Power Agency utility-scale procurements: Illinois (94 rows), Indiana (6), Iowa (6), Missouri (1)"},"fine_print":{"unit":{"value":"Nameplate Capacity in MW.","quote":"Nameplate Capacity (MW)","url":"https://cleanenergy.illinois.gov/content/dam/soi/en/web/cleanenergy/datasources/illinois-clean-energy-dashboard-competitive-procurements.xlsx","attempts":[]},"inclusion_rule":{"value":"Results of IPA utility-scale competitive procurements (wind, solar, brownfield solar, hydropower over the eligibility thresholds).","quote":"Data shown here reflects results from the Illinois Power Agency’s utility-scale competitive procurements.","url":"https://cleanenergy.illinois.gov/ipa-initiatives/utility-scale-procurements.html","attempts":[]},"reference_date":{"value":"2026-10-30 (last update in the Overview tab; includes the Summer 2026 Indexed REC RFP)","quote":"Date: 10/30/2026 Version: October 2026 Dataset(s): Competitive Procurements Description: Routine data refresh.","url":"https://cleanenergy.illinois.gov/content/dam/soi/en/web/cleanenergy/datasources/illinois-clean-energy-dashboard-competitive-procurements.xlsx","attempts":[]},"update_frequency":{"value":"Monthly (publisher-stated)","quote":"Competitive Procurements Data | 10 | 46325 | Monthly | 2010 - Present","url":"https://cleanenergy.illinois.gov/content/dam/soi/en/web/cleanenergy/datasources/illinois-clean-energy-dashboard-competitive-procurements.xlsx","attempts":[]},"exclusions":{"value":"No prices and no storage awards (the 2026-09-01 storage event is not in the October 2026 file); location is ZIP code only.","quote":null,"url":null,"attempts":[{"url":"https://cleanenergy.illinois.gov/content/dam/soi/en/web/cleanenergy/datasources/illinois-clean-energy-dashboard-competitive-procurements.xlsx","note":"Field list in the Overview tab has 11 fields and no price field."},{"url":"https://cleanenergy.illinois.gov/ipa-initiatives/utility-scale-procurements.html","note":"Dashboard page describes capacity by project type and location, not prices."}]}},"key_fields":[{"field":"Seller Name","meaning":"Contracting project company (e.g., Diamond Grove Wind, LLC)."},{"field":"Energy Type, Technology","meaning":"Utility-scale Solar, Utility-scale Wind, Utility-scale Hydropower."},{"field":"Nameplate Capacity (MW)","meaning":"Project nameplate MW."},{"field":"Procurement Era, Procurement Event, Procurement Year","meaning":"LTPPA (2010), FEJA Forward Procurement (2017-2019) or CEJA Indexed REC Procurement (2022-2026), and the specific RFP event."},{"field":"Energization Status","meaning":"Energized, Under Development or Terminated."},{"field":"Zip Code, State, Regional Transmission Organization","meaning":"ZIP, state and RTO (PJM or MISO)."}],"how_to_use":{"example_request":"curl -sL -o il-competitive.xlsx 'https://cleanenergy.illinois.gov/content/dam/soi/en/web/cleanenergy/datasources/illinois-clean-energy-dashboard-competitive-procurements.xlsx' (sheet 'Competitive Procurements Data', header in row 1)","example_result":"Diamond Grove Wind, LLC | Utility-scale Wind | Wind | 300 | Under Development | CEJA Indexed REC Procurement (2022-2026) | Summer 2026 Indexed REC RFP | 2026 | 61752 | Illinois | MISO","steps":["Read sheet 'Competitive Procurements Data'; skip empty rows (192 of 299 rows below the header are blank, leaving 107 project rows).","Group by Procurement Event to rebuild each round; take prices from the ICC public notice of the same event (state-award-documents).","Use Energization Status to separate terminated contracts (20) from projects under development (49) or energized (38)."],"reading_traps":["Four Creeks LLC appears twice in the Summer 2026 event, as in the ICC notice.","Event labels are inconsistent ('2018 Fall Wind' vs 'Fall 2018 Wind'; '2018 Fall Brownfield & Utility-Scale Solar RFP' vs 'Fall 2018 Brownfield & Utility-Scale Solar RFP').","No price column; Procurement Era tells which price mechanism applied (bundled LTPPA, fixed-price forward REC or indexed REC).","Storage awards from the 2026-09-01 event are not in the October 2026 file."]},"test":{"tested_on":"2026-11-27","method":"download","http_status":200,"content_type":"application/vnd.openxmlformats-officedocument.spreadsheetml.sheet","size_bytes":122328,"records_total":107,"records_for_country":107,"problems":[]},"evidence":[{"claim":"The dashboard aggregates IPA procurement results and is refreshed with new events.","url":"https://cleanenergy.illinois.gov/ipa-initiatives/utility-scale-procurements.html","quote":"Data is updated as new procurement events take place and as projects reach delivery milestones."}],"members":[],"members_summary":null},{"source_id":"cpuc-rps-public-data","name":"RPS Executed Projects: Public Data (CPUC RPS project database, October 2026)","publisher":"California Public Utilities Commission (Energy Division)","official":true,"landing_url":"https://www.cpuc.ca.gov/RPS_Reports_Data","data_url":"https://www.cpuc.ca.gov/-/media/cpuc-website/industries-and-topics/documents/energy/rps/2026/rps-public-database---october-2026.xlsx","access":"direct_download","format":"XLSX (one sheet 'October 2026')","license":"unknown","language":"en","has_coordinates":true,"location_precision":"exact","publisher_type":"regulator","adds":"California investor-owned utility renewable contracts, including Renewable Auction Mechanism (RAM) rounds and RFO solicitations, with latitude/longitude, technology, contract capacity and approval dates; no price.","first_seen_pass":1,"rank":5,"summary":"CPUC spreadsheet of renewable contracts executed by PG&E, SCE and SDG&E, with program (solicitation, RAM auction round), technology, contract capacity, coordinates, status and approval dates.","coverage_note":"California IOUs only; filter Program Origination to solicitations and RAM; no prices.","data_date":"2026-10","caveats":["Prices confidential for three years.","Text values in coordinate columns."],"coverage":{"geographic":"Contracts of California's three large investor-owned utilities (PG&E, SCE, SDG&E), including projects in other western states and Baja California"},"fine_print":{"unit":{"value":"Contract Capacity is nameplate capacity (MW assumed from values; unit not labelled); Expected Annual Generation not unit-labelled.","quote":"For PPAs:\n• Nameplate capacity if the contract receives energy from the full facility.","url":"https://www.cpuc.ca.gov/-/media/cpuc-website/files/legacyfiles/p/6442461683-public-data-definitionsjune2019.xlsx","attempts":[{"url":"https://www.cpuc.ca.gov/-/media/cpuc-website/files/legacyfiles/p/6442461683-public-data-definitionsjune2019.xlsx","note":"Definitions sheet gives no unit for Contract Capacity."},{"url":"https://www.cpuc.ca.gov/RPS_Reports_Data","note":"Page lists 'capacity' among public fields without a unit."}]},"inclusion_rule":{"value":"All renewable projects executed by the three large IOUs; community choice aggregators are not included.","quote":"Energy Division collects monthly project data through the RPS database which tracks the development status of all renewable energy projects executed by the three large IOUs.","url":"https://www.cpuc.ca.gov/RPS_Reports_Data","attempts":[]},"reference_date":{"value":"October 2026","quote":"RPS Executed Projects: Public Data\n[Updated October 2026]","url":"https://www.cpuc.ca.gov/RPS_Reports_Data","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.cpuc.ca.gov/RPS_Reports_Data","note":"Staff collect data monthly, but the publication schedule of the public file is not stated."},{"url":"https://www.cpuc.ca.gov/-/media/cpuc-website/files/legacyfiles/p/6442461683-public-data-definitionsjune2019.xlsx","note":"Definitions file has no publication frequency."}]},"exclusions":{"value":"Prices and other contract terms are confidential for three years after deliveries begin.","quote":"Other terms of renewable contracts are confidential for three years from the date the contract begins deliveries or until one year following expiration, whichever comes first.","url":"https://www.cpuc.ca.gov/RPS_Reports_Data","attempts":[]}},"key_fields":[{"field":"Program Origination","meaning":"PPA - Solicitation, PSA - Solicitation, Renewable Auction Mechanism (RAM), PPA - Bilateral, FIT, UOG, etc.; only the first three are competitive awards."},{"field":"Origination Year","meaning":"For PPA solicitations and RAM, the year of the solicitation or auction."},{"field":"RAM Auction Round","meaning":"RAM round (RAM 1 to RAM 7) for RAM contracts."},{"field":"Project Name, Technology Type, Overall Project Status","meaning":"Project, technology and status (Online, In Development, Expired, Terminated)."},{"field":"Latitude, Longitude, City, County, State","meaning":"Project location."},{"field":"Contract Capacity, Contract Length (Years)","meaning":"Contracted nameplate capacity and term."},{"field":"AL / Application Filing Date, Resolution / Decision Meeting Date, Termination Date","meaning":"Filing, CPUC approval and termination dates."}],"how_to_use":{"example_request":"curl -sL -o cpuc-rps-2026-10.xlsx 'https://www.cpuc.ca.gov/-/media/cpuc-website/industries-and-topics/documents/energy/rps/2026/rps-public-database---october-2026.xlsx' (sheet 'October 2026', header in row 1, 2,505 data rows)","example_result":"Pacific Gas and Electric (PG) | PPA - Solicitation | 2026 | Hawkins Project I LLC Solar | Solar PV - Ground mount | In Development | Lost Hills | Kern | CA | 93249 | 35.770000000000003 | -119.94 | Hawkins Project I LLC | 20 | Category 1 | 287.98","steps":["Read sheet 'October 2026'; row 1 holds the 23 column names.","Lower-case and trim Program Origination, then keep 'ppa - solicitation', 'psa - solicitation' and 'renewable auction mechanism (ram)' (832 rows) to restrict to competitive awards.","Use Origination Year and RAM Auction Round to group by round; Resolution / Decision Meeting Date gives CPUC approval.","Convert Latitude/Longitude to numbers and drop text values."],"reading_traps":["488 rows have non-numeric latitude ('Multiple' 375, 'Various' 94, degree-minute strings, 'N/A - PSA'); Jaton LLC has longitude -199.5128 in 2 rows.","Categories use inconsistent case ('RAM 5' and 'ram 5', 'Wind' and 'wind'); normalise before counting.","189 rows have no Contract Capacity.","No price column: terms stay confidential for three years after deliveries begin.","Contracts are utility procurements, not a single state auction; 'Under Negotiation' shortlisted projects are a different stage from executed contracts."]},"test":{"tested_on":"2026-11-27","method":"download","http_status":200,"content_type":"application/vnd.openxmlformats-officedocument.spreadsheetml.sheet","size_bytes":292571,"records_total":2505,"records_for_country":2505,"problems":[]},"evidence":[{"claim":"Public fields include location and capacity.","url":"https://www.cpuc.ca.gov/RPS_Reports_Data","quote":"Public information of investor owned utility renewable contracts under the RPS program include: contract summaries, contract counterparties, resource type, location, delivery point, expected deliveries, capacity, length of contract, and online date."},{"claim":"Origination Year means the auction year for RAM and solicitations.","url":"https://www.cpuc.ca.gov/-/media/cpuc-website/files/legacyfiles/p/6442461683-public-data-definitionsjune2019.xlsx","quote":"For PPA Solicitations and RAMs, the year of solicitation/ auction."}],"members":[],"members_summary":null},{"source_id":"doe-offshore-wind-market-report","name":"Offshore Wind Market Report (2022 Edition, Table 11; 2024 Edition, Table 7)","publisher":"U.S. Department of Energy, prepared by the National Renewable Energy Laboratory","official":true,"landing_url":"https://www.energy.gov/sites/default/files/2022-08/offshore_wind_market_report_2022.pdf","data_url":"https://www.osti.gov/servlets/purl/2434294","access":"pdf","format":"PDF","license":"unknown","language":"en","has_coordinates":false,"location_precision":"none","publisher_type":"national_government","adds":"The only national compilation found: offshore wind offtake agreements across states with MW and levelized nominal price ($/MWh) as of 2022-05-31; the 2024 edition updates awarded MW by state without prices.","first_seen_pass":1,"rank":6,"summary":"DOE/NREL market report table of US offshore wind offtake agreements with MW, offtake type and levelized nominal price (2022 snapshot); the 2024 edition lists awarded MW by state without prices.","coverage_note":"Offshore wind only; snapshot dates 2022-05-31 (with price) and 2024-05-31 (without).","data_date":"2022-05-31","caveats":["Includes since-cancelled contracts.","One price column for different mechanisms."],"coverage":{"geographic":"United States offshore wind offtake agreements, by purchasing state"},"fine_print":{"unit":{"value":"Size in MW; Levelized Nominal Price in $/megawatt-hour (2022 edition only).","quote":"Levelized Nominal Price ($/megawatt-hour)","url":"https://www.energy.gov/sites/default/files/2022-08/offshore_wind_market_report_2022.pdf","attempts":[]},"inclusion_rule":{"value":"Signed offtake agreements (PPA, OREC, utility-owned) as of the cut-off date; the 2024 edition excludes cancelled agreements.","quote":"This total does not include projects for which offtake agreements have been canceled.","url":"https://www.osti.gov/servlets/purl/2434294","attempts":[]},"reference_date":{"value":"2022-05-31 (2022 edition); 2024-05-31 (2024 edition)","quote":"Table 11. U.S. Offshore Wind Offtake Agreements As of May 31, 2022","url":"https://www.energy.gov/sites/default/files/2022-08/offshore_wind_market_report_2022.pdf","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.osti.gov/servlets/purl/2434294","note":"2024 edition does not state a release schedule in the pages read."},{"url":"https://www.nrel.gov/wind/offshore-market-assessment","note":"NREL page not reachable (DNS failure in this session)."}]},"exclusions":{"value":"No project location beyond the purchasing state; the 2024 edition drops the price column.","quote":"As of May 31, 2024, 15 offtake agreements have been signed, which are associated with 12,378 MW of contracted capacity.","url":"https://www.osti.gov/servlets/purl/2434294","attempts":[]}},"key_fields":[{"field":"Project, Year Signed, Size (MW), Duration (Years)","meaning":"Agreement identity and size (2022 Table 11)."},{"field":"Offtake Type","meaning":"PPA, MD OREC, NJ OREC, NY OREC or Utility Owned."},{"field":"Regulator Approved","meaning":"Yes/TBD."},{"field":"Levelized Nominal Price ($/megawatt-hour)","meaning":"One price per agreement regardless of mechanism; 'Undisclosed' for some."},{"field":"Offtake Contracts Awarded (MW), Awarded Projects (MW)","meaning":"Per-state totals and project list in 2024 Table 7, no price."}],"how_to_use":{"example_request":"curl -sL -o doe-osw-2022.pdf 'https://www.energy.gov/sites/default/files/2022-08/offshore_wind_market_report_2022.pdf' && pdftotext -layout doe-osw-2022.pdf - (Table 11, pp.35-36)","example_result":"Vineyard Wind 1 | 2018 | 400 | 20 | PPA | Yes | 74 | 2024 | National Grid, Eversource, Unitil ... Empire Wind 1 | 2019 | 816 | 25 | NY OREC | Yes | 83.3 | 2026 | New York utilities","steps":["Extract Table 11 (pp.35-36 of the 2022 PDF) with pdftotext -layout; project names and purchasers wrap over several lines.","Use the 2024 edition (OSTI purl 2434294, Table 7, p.24) for awarded MW by state after cancellations; it has no prices."],"reading_traps":["The single price column mixes bundled PPAs, OREC payments and utility ownership; NY and MD OREC values are not energy prices.","The 2022 table keeps agreements that were later cancelled: NY open data marks Empire Wind 2 and Beacon Wind cancelled, and the MA report says rounds II and III were cancelled.","Some projects appear in two rows (Vineyard Wind 1 at 74 and 65; Revolution Wind three times) because each contract is a row; the text counts 24 agreements while the table has 27 rows."]},"test":{"tested_on":"2026-11-27","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":7120688,"records_total":27,"records_for_country":27,"problems":[]},"evidence":[{"claim":"2022 national count of offshore wind offtake agreements.","url":"https://www.energy.gov/sites/default/files/2022-08/offshore_wind_market_report_2022.pdf","quote":"policies have resulted in 24 power purchase (offtake) agreements, adding up to 17,597 MW in"}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"State public utility commissions approve award contracts (e.g., Massachusetts DPU, New Jersey BPU, Illinois Commerce Commission, California PUC, New York PSC); FERC regulates wholesale markets but runs no renewable auction","url":"https://www.mass.gov/info-details/long-term-contracts-for-renewable-energy-filings"},"operators":{"structure":"many","note":"Procurements are run state by state: NYSERDA (NY), DOER with the distribution companies (MA), NJ BPU, the Illinois Power Agency with NERA as administrator and ICC approval, and California investor-owned utilities under CPUC oversight. No census of state procurement programmes was found.","census_url":null},"publication_obligation":{"exists":"yes","norm":"State-specific; example: Illinois Public Utilities Act Section 16-111.5(h) and ICC orders","url":"https://nera-content-media.s3.us-east-1.amazonaws.com/ipa/Public_Notice_of_August_2026_Energy_Storage_Procurement_Results_2026_09_01_97ba2f4392.pdf","what_must_be_published":"Illinois: names of successful bidders, the (weighted) average of winning bid prices, and the address and capacity of each project, at the time of Commission approval. No federal obligation found.","frequency":"At each procurement event"},"consolidated_republication":{"found":"partial","note":"Only offshore wind is compiled nationally (DOE/NREL market report); no national compilation of onshore renewable or storage award results was found.","checked_pages":[{"organization":"U.S. Department of Energy / NREL","url":"https://www.energy.gov/sites/default/files/2022-08/offshore_wind_market_report_2022.pdf","saw":"Table 11 compiles US offshore wind offtake agreements with MW and levelized nominal price as of 2022-05-31."},{"organization":"U.S. Department of Energy / NREL","url":"https://www.osti.gov/servlets/purl/2434294","saw":"2024 edition, Table 7: awarded offshore wind MW and projects by state, no price."},{"organization":"OpenEI (DOE-funded wiki)","url":"https://openei.org/wiki/OSW_Leasing_Procurement/Regions/New_England","saw":"Announced and awarded offshore wind GW per state and year, no projects or prices."},{"organization":"U.S. Energy Information Administration","url":"https://www.eia.gov/electricity/data/eia860/","saw":"Generator-level survey of existing and planned plants; no procurement awards or prices."},{"organization":"Federal Energy Regulatory Commission","url":"https://www.ferc.gov/power-sales-and-markets/electric-quarterly-reports-eqr","saw":"403 Cloudflare challenge to curl and WebFetch; content not read."}]}},"national_registry":{"exists":"no_evidence_found","note":"No federal renewable or storage auction and no national register of state award results was found; the DOE offshore wind market report is a partial compilation for one technology.","checked_pages":[{"organization":"U.S. Energy Information Administration","url":"https://www.eia.gov/electricity/data/eia860/","saw":"Form EIA-860 collects generator-level data for plants of 1 MW or more, existing and planned; no award, auction round or contract price."},{"organization":"U.S. Department of Energy / NREL","url":"https://www.osti.gov/servlets/purl/2434294","saw":"Offshore Wind Market Report 2024: 15 offtake agreements, 12,378 MW, by state; offshore wind only, no prices."},{"organization":"Bureau of Ocean Energy Management","url":"https://www.boem.gov/renewable-energy/lease-and-grant-information","saw":"Offshore wind lease list and BOEM auction system for seabed leases; no energy offtake awards, MW or $/MWh."},{"organization":"Federal Energy Regulatory Commission","url":"https://www.ferc.gov/power-sales-and-markets/electric-quarterly-reports-eqr","saw":"403 Cloudflare challenge to curl and WebFetch."}]},"if_unstructured":{"summary":"Outside New York's open data, award results sit in procurement notices, regulator orders and contract dockets; prices and storage MWh often appear only there or not at all.","recipe":["List the state's procurement rounds from the index page (IPA results page, BPU agenda calendar, MACleanEnergy.com section menus, DPU docket list).","For each round open the award document (ICC notice, BPU order, MA selection or contract-filing notice) and copy the winners table with pdftotext -layout; rebuild one row per project because names and addresses wrap over several lines.","Record the stage of each document: selection (MA DOER 2024-09-06 offshore wind selection, 2025-12-19 storage selection), contract filing (MA 2026-07-02, DPU 26-87/88/89), regulator approval (ICC vote, BPU order) and later cancellation (MA report Table 2).","Record the price exactly as published with its basis: IL event-average strike $/MWh, NJ $/MW ICAP-year per project, MA round averages such as Vineyard Wind 1 '$89/MWh in nominal dollars'; leave blank where only bids or totals are given.","Keep MW (power) and MWh (energy) apart; official IL, NJ and NY award records give only MW."],"location_method":"Use the location printed in the award document: IL notices give a street address or coordinates per project; NJ orders give municipality and county; NY open data gives county/ZIP (renewables) or street address (bulk storage); CA gives latitude/longitude. MA notices opened give no site location.","cross_with":["EIA-860 (https://www.eia.gov/electricity/data/eia860/) lists existing and planned generators of 1 MW or more; matching by project name can confirm whether an awarded project was later built.","NYSERDA dprp-55ye interconnection_queue_number and regulatory_permitting fields link NY awards to NYISO queue positions and PSC siting cases.","Trade press reports such as https://www.utilitydive.com/news/massachusetts-utilities-dpu-contracts-energy-storage/824614/ give MWh for MA 83E contracts (Trimount 700 MW/2,800 MWh) that the official notices omit."],"where_published":[{"name":"New Jersey BPU board orders (Search Board Orders and Public Document Search)","url":"https://www.nj.gov/bpu/agenda/orders/","what":"Board orders approving solicitation outcomes, as PDFs under /bpu/pdf/boardorders/<year>/<meeting date>/.","how_to_search_inside":"Legacy 'Search Board Orders' takes a keyword, docket number, division or subject (e.g., QO22080540 or 'GSESP'); the Board Agenda calendars list orders by meeting date.","example_document":{"url":"https://www.nj.gov/bpu/pdf/boardorders/2026/20260304/8A%20ORDER%20GSESP%20Phase%201%20Tranche%201.pdf","what_it_gives":"Table on p.5: 'Woods Landing 200 $15,000,000 $75,000 $156,904 $148,916 Sayreville, Middlesex County'; 'Two Rivers 150 $12,276,000 $81,840 $171,213 $165,610 Ridgefield, Bergen County'; 'Total Capacity 355'."}},{"name":"Illinois Commerce Commission public notices linked from the IPA procurement results index","url":"https://ipa.illinois.gov/energy-procurement/procurement-results.html","what":"One PDF notice per procurement event (indexed REC since Spring 2022, forward REC 2017-2019, storage 2026) with winners, project address, MW and average prices.","how_to_search_inside":"Expand the section by product (Indexed REC Procurement Results, Energy Storage Procurement Results) and open the event by date; no search box.","example_document":{"url":"https://icc.illinois.gov/api/web-management/documents/downloads/public/Public%20Notice%20of%20June%202026%20Wind%20Solar%20Hydropower%20and%20Brownfield%20Indexed%20REC%20Procurement%20Results%202026-6-24.pdf","what_it_gives":"Wind/hydro table p.3: 'Diamond Grove Wind, LLC (40.324586°N, 88.813289°W) Le Roy, Illinois 61752 Utility-Scale Wind 300.00 973,291'; category average '92.60'; solar table average '76.24'."}},{"name":"Massachusetts DOER procurement history and DPU contract dockets","url":"https://www.mass.gov/info-details/long-term-contracts-for-renewable-energy-filings","what":"DPU docket list of utility contract approvals by section (83, 83A, 83C, 83D, 83E); DOER's Procurement Effectiveness Report summarises each round's outcome and some prices.","how_to_search_inside":"The DPU page lists docket numbers by utility; the eeaonline fileroom search by docket number returned 403 to automated clients in this session, so documents were not read.","example_document":{"url":"https://www.mass.gov/doc/doer-solicitation-and-procurement-effectiveness-report/download","what_it_gives":"Table 2 (p.21 of the PDF): 'Section 83C Round I 2017 800 MW Vineyard Wind 1'; 'Section 83C Round II 2019 804 MW SouthCoast Wind (formerly Mayflower Wind) – Contract Cancelled'; p.25: 'The contract price, at an average of $89/MWh in nominal dollars'."}}]},"related_not_answering":[{"name":"Summary of Tier 1 and OREC Projects (RES and RPS Solicitations), data.ny.gov 3jem-xu5s","url":"https://data.ny.gov/api/views/3jem-xu5s.json","why":"Totals of projects and MW by status and technology; no individual awards, prices or locations."},{"name":"MACleanEnergy.com 83E Bids","url":"https://macleanenergy.com/83e-bids/","why":"Public versions of all 13 proposals to 83E Round I; bids are not awards (4 were selected)."},{"name":"IPA Block Energy and Capacity Procurement Results","url":"https://ipa.illinois.gov/energy-procurement/procurement-results.html","why":"Standard energy and capacity products bought for utility supply, not renewable or storage project awards."},{"name":"BOEM offshore wind lease and grant information","url":"https://www.boem.gov/renewable-energy/lease-and-grant-information","why":"Seabed lease auctions award lease areas to developers; they carry no offtake price, MW award or project contract."},{"name":"OpenEI OSW Leasing Procurement, New England","url":"https://openei.org/wiki/OSW_Leasing_Procurement/Regions/New_England","why":"Aggregated GW announced and awarded per state and year; no projects or prices, and some values are negative (Connecticut 2023)."},{"name":"EIA-860 Annual Electric Generator Report","url":"https://www.eia.gov/electricity/data/eia860/","why":"Inventory of existing and planned generators; being in the inventory does not mean a project won a procurement."}],"open_questions":["NYSERDA's 2026-09-23 notice places Chateaugay Windpark in Franklin County and Ellenburg Windpark in Clinton and Franklin counties, while dprp-55ye records both in Clinton; only NYSERDA can say which is correct.","NYSERDA's notice says the 13 RESRFP25-1 awards total 'more than 719 MW', but bid_capacity_mw for RESRFP25-1 sums to 718.91 MW in dprp-55ye."],"history":[{"pass":1,"date":"2026-11-27","role":"research","model":"claude-sonnet-5-5","rules_version":"6.14","note":"First pass: NYSERDA open data (renewables, bulk storage) and the Illinois awards workbook as structured sources; IL, NJ, MA documents and CA contract list sampled; no national award register found.","headline":{"official_data":"partial","non_official_data":"none_found","national_registry":"no_evidence_found"},"sources":{"total":6,"new":6,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":52,"minutes":22}}],"local_terms":[{"term":"solicitation / Request for Proposals (RFP)","language":"en","meaning":"Name used for state renewable and storage procurement rounds; NYSERDA codes them as RESRFP25-1, ORECRFP23-1, etc."},{"term":"Public Notice of Successful Bidders and Average Prices","language":"en","meaning":"Title of the Illinois Commerce Commission notice that publishes each IPA procurement result and its average prices."},{"term":"long-term contract filing (Section 83C / 83D / 83E)","language":"en","meaning":"Massachusetts statutory procurements (offshore wind, clean energy, storage) whose contracts are filed for DPU approval."},{"term":"Garden State Energy Storage Program (GSESP)","language":"en","meaning":"New Jersey BPU storage incentive solicitation, awarded by board order."},{"term":"Renewable Auction Mechanism (RAM)","language":"en","meaning":"California utility auction programme; rounds RAM 1 to RAM 7 appear in the CPUC RPS public data."},{"term":"Index REC strike price","language":"en","meaning":"Bid price in NY and IL indexed REC contracts; the payment is the strike minus a market index."},{"term":"OREC (Offshore Renewable Energy Certificate)","language":"en","meaning":"Product bought in NY, NJ and MD offshore wind solicitations."},{"term":"Indexed Storage Credit (ISC)","language":"en","meaning":"Illinois storage contract settled against energy and capacity index prices."}],"provenance":{"pass_count":1,"models":["claude-sonnet-5-5"],"minutes_estimate":22,"pages_opened":52,"passes":[{"pass":1,"date":"2026-11-27","model":"claude-sonnet-5-5"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/us/energy-auctions.json","detail_url":"https://georutter.org/v1/us/energy-auctions/detail.json","html_url":"https://georutter.org/us/energy-auctions/","country_url":"https://georutter.org/v1/countries/us.json"}
