{"schema_version":"1.0","country":"us","country_name":"United States","topic":"ev-charging-stations","question":"Where can I get a list of public electric vehicle charging points in the United States, with location, operator, power (kW) and number of connectors?","territory":"us","territory_level":"country","parent_url":null,"published_on":"2026-11-26","research_reviewed_on":"2026-11-26","access_checked_on":"2026-11-26","answer":{"official_data":"structured","non_official_data":"partial","summary":"The DOE Alternative Fuels Data Center (AFDC) Station Locator is the national official list. Its API (developer.nlr.gov) gives, per station location, coordinates, access, status, charging network and ports by level, and per charging unit the connector types, port counts and kW. On 2026-11-26 it held 84,725 public operating station locations with 267,448 charging ports (station_counts), plus 220 planned. 'Operator' is the network/provider field, not a separate CPO name, and kW is missing for part of Level 2 ports.","main_caveats":["Count units differ: AFDC 'station' = location; station_counts.total and state tables for electric count charging ports; connector entries can exceed ports.","API defaults include private, planned and temporarily unavailable stations; filter access=public&status=E (planned = status=P with expected_date).","Operator is the charging network/provider (ev_network), not a CPO name; AFDC lists 17,948 Non-Networked ports (US and Canada) with no operator name.","California's CEC reports 98,251 public ports (data as of 2026-06-30, adds PlugShare and surveys) vs 70,178 in AFDC for CA on 2026-11-26: different sources, not equivalent.","The legacy developer.nrel.gov API host no longer resolves; use developer.nlr.gov. DEMO_KEY is rate-limited; the CSV form asks for name and email."],"confidence":"high","confidence_reason":"AFDC API, docs and counts pages were opened and tested on 2026-11-26 with a full Connecticut extract and a 97% national ports CSV read; operator limitation confirmed in field lists.","attributes":[{"attribute":"location","covered":"yes","source_ids":["afdc_station_locator","nyserda_ny_ev_stations","osm_charging_station"],"note":"Lat/lon per station location with geocode_status accuracy; in CT 1,431 of 1,665 GPS, all inside the state bbox.","gap":null,"gap_note":null},{"attribute":"operator","covered":"partial","source_ids":["afdc_station_locator","osm_charging_station"],"note":"ev_network names the charging network per station and per charging unit; Non-Networked stations have none.","gap":"not_published","gap_note":"No charge point operator (CPO) name field in the AFDC API/CSV field lists; 23 CFR 680.116(c) requires operator name only in per-network APIs for federally funded chargers."},{"attribute":"power_kw","covered":"partial","source_ids":["afdc_station_locator"],"note":"power_kw per connector type within each charging unit (port level). DC fast filled; Level 2 often null.","gap":"not_published","gap_note":"Nulls in source: CT 931 of 5,356 connector entries without kW; nationally 17,842 of 260,156 port rows read had no kW."},{"attribute":"connector_count","covered":"yes","source_ids":["afdc_station_locator"],"note":"port_count per connector type per charging unit plus ports per level per station; unit is EVSE port, a port may list several connector types.","gap":null,"gap_note":null}]},"sources":[{"source_id":"afdc_station_locator","name":"Alternative Fueling Station Locator data (Alternative Fuel Stations API v1 and EV charging ports CSV)","publisher":"U.S. Department of Energy, Alternative Fuels Data Center (data managed by the National Laboratory of the Rockies, NLR)","official":true,"landing_url":"https://afdc.energy.gov/stations/about","data_url":"https://developer.nlr.gov/api/alt-fuel-stations/v1.json?api_key=DEMO_KEY&fuel_type=ELEC&country=US&access=public&status=E&limit=1","access":"api","format":"JSON, GeoJSON, CSV, XML (API); CSV via web download form","license":"Data Download Terms and Conditions: data 'may be used for any purpose whatsoever'; DOE/NLR names may not be used for endorsement","language":"en","has_coordinates":true,"location_precision":"exact","publisher_type":"national_government","adds":"National station-level list with coordinates, access (public/private), status (open/planned/temporarily unavailable), charging network, and per charging unit the connector types, port counts and power in kW.","first_seen_pass":1,"rank":1,"summary":"Official national list of EV charging station locations with coordinates, access, status, network, ports per level, and per charging unit the connector types, port counts and kW.","coverage_note":"API on 2026-11-26 (fuel_type=ELEC, country=US, access=public, status=E): 84,725 station locations and 267,448 charging ports; plus 220 planned and 1,473 temporarily unavailable public stations.","data_date":"2026-11-26","caveats":["Counting units: station location vs port vs connector; station_counts.total is ports.","Operator = charging network (ev_network); no CPO name field; Non-Networked has none.","kW missing for part of Level 2 ports (about 21% in a CT test)."],"coverage":{"geographic":"United States (50 states, DC and territories such as PR, GU, VI, AS, MP) and Canada; filter country=US."},"fine_print":{"unit":{"value":"One record per station location; ports (EVSE ports) and connectors are nested counts. API station_counts.total for ELEC is the number of charging ports.","quote":"A station appears as one point in the data and on the map, regardless of the number of fuel dispensers or charging outlets at that location.","url":"https://data.ny.gov/api/views/7rrd-248n.json","attempts":[]},"inclusion_rule":{"value":"Networked stations imported from charging networks (daily API or periodic CSV); non-networked stations added manually. Public vs private via access_code; residential chargers are not included.","quote":"For non-networked EV charging stations, the data collection team adds stations to the Station Locator manually as they are identified and verifies the stations every other year.","url":"https://afdc.energy.gov/stations/charging-networks","attempts":[]},"reference_date":{"value":"Live database; last-updated endpoint returned 2026-11-26T06:17:47Z on 2026-11-26. Per-record date_last_confirmed and updated_at.","quote":"date_last_confirmed Type: date The date the station's details were last confirmed.","url":"https://developer.nlr.gov/docs/transportation/alt-fuel-stations-v1/all/","attempts":[]},"update_frequency":{"value":"Daily for networks with API import; periodic for CSV networks; every other year verification for non-networked stations.","quote":"For charging networks with an application programming interface (API), the Station Locator imports data from a direct connection daily.","url":"https://afdc.energy.gov/stations/charging-networks","attempts":[]},"exclusions":{"value":"Residential charging is excluded; private stations are in the data but flagged access_code=private.","quote":"Includes legacy chargers but does not include residential electric vehicle charging infrastructure.","url":"https://afdc.energy.gov/stations/states","attempts":[]}},"key_fields":[{"field":"id","meaning":"AFDC station identifier (one station location)."},{"field":"latitude / longitude / geocode_status","meaning":"Station coordinates and their accuracy class (GPS, 200-8 address, 200-5 postal code, etc.)."},{"field":"access_code","meaning":"public or private."},{"field":"status_code","meaning":"E available, P planned, T temporarily unavailable; expected_date for P/T."},{"field":"ev_network","meaning":"Charging network (network service provider) or Non-Networked; not a separate charge point operator field."},{"field":"ev_level1_evse_num / ev_level2_evse_num / ev_dc_fast_num","meaning":"Number of EVSE ports per charging level at the station."},{"field":"ev_charging_units[].connectors.<TYPE>.power_kw / port_count","meaning":"Power output in kW and number of ports per connector type within each charging unit."},{"field":"owner_type_code / facility_type","meaning":"Owner type (P, LG, SG, FG, J, T) and host facility type; often empty."},{"field":"date_last_confirmed / updated_at","meaning":"Last confirmation date and last update timestamp per station."}],"how_to_use":{"example_request":"curl 'https://developer.nlr.gov/api/alt-fuel-stations/v1.json?api_key=DEMO_KEY&fuel_type=ELEC&country=US&state=CT&access=public&status=E&limit=all'","example_result":"total_results 1665; station_counts ELEC total 4971 (ports). Record id 102092 'Danbury, CT - Tesla Supercharger', 7 Backus Ave, 41.379456,-73.4779, geocode 200-8, ev_network Tesla, ev_dc_fast_num 10; charging unit: TESLA power_kw 150.0 port_count 1.","steps":["Use https://developer.nlr.gov (the former developer.nrel.gov host did not resolve on 2026-11-26).","Always pass fuel_type=ELEC, country=US, access=public and status=E for operating public stations; query status=P separately for planned stations.","Page by state (limit=all) or use the /v1/ev-charging-units.csv endpoint for one row per charging unit with connector counts and kW per connector family.","Flatten ev_charging_units: each unit has charging_level, port_count and a connectors record keyed by type with power_kw and port_count.","For historical snapshots since 2014 or a full CSV use the AFDC data download form (requires name and email)."],"reading_traps":["API defaults are status=all and access=all: without filters planned, temporarily unavailable and private stations are mixed in.","station_counts.total for ELEC counts charging ports, not stations; station_counts.stations.total counts station locations.","ev_network is the network/software provider; AFDC defines station operator (CPO) separately but has no CPO name field. Non-Networked stations carry no operator name.","Connector entries can exceed ports: in CT 5,356 connector entries with ports vs 4,971 ports (a port may offer more than one connector type).","power_kw is often null for Level 2: in CT 3,446 of 4,373 Level 2 connector-ports had kW vs 976 of 976 DC fast.","The ports CSV only has J1772, CCS, CHAdeMO, J3400 and J3271 connector columns; NEMA outlets are not broken out.","Planned records can be stale: e.g. id 63615 status P with expected_date 2023-07-01 and date_last_confirmed 2023-05-03.","DEMO_KEY returned X-RateLimit-Limit 10 although the docs state 30 per hour and 50 per day; full use needs a free key.","owner_type_code empty for 970 and facility_type empty for 967 of 1,665 CT stations."]},"test":{"tested_on":"2026-11-26","method":"api_query","http_status":200,"content_type":"application/json; charset=utf-8","size_bytes":5451231,"records_total":84725,"records_for_country":84725,"problems":["Legacy host developer.nrel.gov does not resolve; the API answers at developer.nlr.gov.","DEMO_KEY rate limit observed at 10 requests (X-RateLimit-Limit: 10); a personal key requires signup.","The web CSV download form asks for first name, last name and email.","Nationwide ev-charging-units.csv exceeds 100 MB; only the first 100,000,000 bytes were read (260,156 port rows of 82,376 stations)."]},"evidence":[{"claim":"The API exposes the Station Locator database including EV charging.","url":"https://developer.nlr.gov/docs/transportation/alt-fuel-stations-v1/","quote":"This dataset powers the Alternative Fueling Station Locator on the Alternative Fuels Data Center."},{"claim":"Power is given in kW per connector type within each charging unit.","url":"https://developer.nlr.gov/docs/transportation/alt-fuel-stations-v1/all/","quote":"power_kw Type: decimal The power output in kilowatts of the charging unit. port_count Type: integer The number of ports for the connector type on the charging unit."},{"claim":"Status distinguishes available, planned and temporarily unavailable.","url":"https://developer.nlr.gov/docs/transportation/alt-fuel-stations-v1/all/","quote":"status_code Type: string The current status of the station, given as code values as described below: Value Description E Available P Planned T Temporarily Unavailable"},{"claim":"The network field is not the same as the station operator.","url":"https://afdc.energy.gov/stations/charging-networks","quote":"Station Operator An entity that runs one or more EV charging stations—also called a charge point operator (CPO)."},{"claim":"National public counts on 2026-11-26.","url":"https://afdc.energy.gov/stations/states","quote":"Total 2,013 679 4,932 84,704 | 267,401 688 | 185,494 | 81,207"},{"claim":"Counts table unit for electric.","url":"https://afdc.energy.gov/stations/states","quote":"For electric, the total includes charging ports rather than station locations."},{"claim":"License.","url":"https://afdc.energy.gov/data_download","quote":"may be used for any purpose whatsoever"}],"members":[],"members_summary":null},{"source_id":"nyserda_ny_ev_stations","name":"Electric Vehicle Charging Stations in New York (Open Data NY 7rrd-248n)","publisher":"New York State Energy Research and Development Authority (NYSERDA), from U.S. DOE AFDC data","official":true,"landing_url":"https://data.ny.gov/Energy-Environment/Electric-Vehicle-Charging-Stations-in-New-York/7rrd-248n","data_url":"https://data.ny.gov/resource/7rrd-248n.json","access":"api","format":"Socrata API (JSON, CSV, GeoJSON)","license":"Unknown","language":"en","has_coordinates":true,"location_precision":"exact","publisher_type":"regional_government","adds":"State-level republication with a keyless Socrata API (SoQL filters, CSV/GeoJSON export) refreshed daily; useful as a check of the AFDC feed for one state, but without kW or connector-level fields.","first_seen_pass":1,"rank":2,"summary":"New York State copy of the AFDC EV station list with a keyless API; station-level ports by level and network, no kW.","coverage_note":"5,790 rows on 2026-11-26 (all access types); New York only.","data_date":"2026-11-25","caveats":["Republication of AFDC; not an independent inventory.","No kW or connector-level counts."],"coverage":{"geographic":"New York State only."},"fine_print":{"unit":{"value":"One row per station location; port counts per level as numbers.","quote":"A station appears as one point in the data and on the map, regardless of the number of fuel dispensers or charging outlets at that location.","url":"https://data.ny.gov/api/views/7rrd-248n.json","attempts":[]},"inclusion_rule":{"value":"Filtered view of the AFDC alternative fuel stations for New York (EV only).","quote":"Go to https://afdc.energy.gov/stations/#/find/nearest to access the full database of alternative fuel station locations nationwide","url":"https://data.ny.gov/api/views/7rrd-248n.json","attempts":[]},"reference_date":{"value":"Catalog data_updated_at 2026-11-25T20:01:18Z; sample row date_last_confirmed 2026-11-25.","quote":null,"url":"https://data.ny.gov/api/catalog/v1?domains=data.ny.gov&q=electric%20vehicle%20charging&limit=10","attempts":[]},"update_frequency":{"value":null,"attempts":[{"url":"https://data.ny.gov/api/views/7rrd-248n.json","note":"Metadata read; no update frequency statement captured. Catalog shows update on 2026-11-25."}]},"exclusions":{"value":null,"attempts":[{"url":"https://data.ny.gov/api/views/7rrd-248n.json","note":"Column list has no power, connector-count or access_code fields; groups_with_access_code text only."}]}},"key_fields":[{"field":"id","meaning":"AFDC station id (allows join to the AFDC API)."},{"field":"latitude / longitude","meaning":"Station coordinates."},{"field":"ev_level1_evse_num / ev_level2_evse_num / ev_dc_fast_count","meaning":"Ports per level (stored as decimals, e.g. 2.0)."},{"field":"ev_network","meaning":"Charging network."},{"field":"groups_with_access_code / status_code","meaning":"Access text (Public, Private...) and status."}],"how_to_use":{"example_request":"curl 'https://data.ny.gov/resource/7rrd-248n.json?$limit=1'","example_result":"{\"station_name\":\"Letchworth\",\"city\":\"Mt Morris\",\"status_code\":\"E\",\"groups_with_access_code\":\"Public\",\"ev_level2_evse_num\":\"2.0\",\"ev_network\":\"EV Connect\",\"latitude\":\"42.735491\",\"longitude\":\"-77.907099\",\"id\":\"123260\"}","steps":["Count rows with $select=count(*) (5,790 on 2026-11-26).","Filter public operating stations with $where=groups_with_access_code like 'Public%' AND status_code='E'.","Join on id to the AFDC API to obtain kW and connector-level counts."],"reading_traps":["It is a copy of AFDC, not an independent state inventory; differences against AFDC are refresh lag only.","No power (kW) field and no per-connector counts.","Rows include private and non-public stations unless filtered."]},"test":{"tested_on":"2026-11-26","method":"api_query","http_status":200,"content_type":"application/json","size_bytes":null,"records_total":5790,"records_for_country":5790,"problems":[]},"evidence":[{"claim":"Dataset is a NYSERDA republication of AFDC data.","url":"https://data.ny.gov/api/views/7rrd-248n.json","quote":"Go to https://afdc.energy.gov/stations/#/find/nearest to access the full database of alternative fuel station locations nationwide, collected and maintained by the U.S. Department of Energy National Renewable Energy Laboratory."}],"members":[],"members_summary":null},{"source_id":"osm_charging_station","name":"OpenStreetMap amenity=charging_station (Overpass API)","publisher":"OpenStreetMap contributors","official":false,"landing_url":"https://wiki.openstreetmap.org/wiki/Tag:amenity%3Dcharging_station","data_url":"https://overpass.kumi.systems/api/interpreter","access":"api","format":"Overpass JSON","license":"ODbL 1.0","language":"en","has_coordinates":true,"location_precision":"exact","publisher_type":"community","adds":"Independent community mapping with operator, brand, capacity and socket:<type>:output tags; can flag sites or attributes missing in AFDC, but far less complete.","first_seen_pass":1,"rank":3,"summary":"Community-mapped charging sites with operator and socket power tags where contributors added them.","coverage_note":"Connecticut bbox test: 126 elements vs 1,665 public AFDC stations; mirror timestamp 2026-06-01.","data_date":"2026-06-01","caveats":["Very incomplete for the U.S.","Main Overpass instance refused default curl (406)."],"coverage":{"geographic":"Worldwide; tested on a Connecticut bounding box."},"fine_print":{"unit":{"value":"One node/way per mapped charging location (site); socket:<type> counts connectors; the same tag is also used for bicycle charging.","quote":"An EV charging station (called “Charging locations” in OCPI terminology) is a place designated for the use by EVs, such as electric motorcars, trucks and bicycles, for the charging of their battery.","url":"https://wiki.openstreetmap.org/wiki/Tag:amenity%3Dcharging_station","attempts":[]},"inclusion_rule":{"value":null,"attempts":[{"url":"https://overpass.kumi.systems/api/interpreter","note":"Volunteer mapping; no completeness rule."}]},"reference_date":{"value":"The mirror used returned timestamp_osm_base 2026-06-01T08:52:28Z (about six months behind).","quote":null,"url":"https://overpass.kumi.systems/api/interpreter","attempts":[]},"update_frequency":{"value":null,"attempts":[{"url":"https://overpass-api.de/api/interpreter","note":"Main instance answered 406 to default curl requests; mirror used instead."}]},"exclusions":{"value":null,"attempts":[{"url":"https://overpass.kumi.systems/api/interpreter","note":"Not documented; access tag absent on 64 of 126 tested elements."}]}},"key_fields":[{"field":"operator / network / brand","meaning":"Operator and network as mapped (operator present on 77 of 126 in the CT test)."},{"field":"capacity","meaning":"Number of vehicles that can charge simultaneously (85 of 126)."},{"field":"socket:<type> / socket:<type>:output","meaning":"Connector count and power per connector type, e.g. socket:type1_combo:output=350 kW."}],"how_to_use":{"example_request":"curl -s --data-urlencode 'data=[out:json][timeout:90][bbox:40.98,-73.73,42.05,-71.78];nwr[\"amenity\"=\"charging_station\"];out tags center;' https://overpass.kumi.systems/api/interpreter","example_result":"126 elements. {\"name\":\"Electrify America\",\"operator\":\"Electrify America\",\"capacity\":\"4\",\"socket:type1_combo\":\"4\",\"socket:type1_combo:output\":\"350 kW\",\"addr:city\":\"North Haven\"}","steps":["Query by bbox or area; use out center for ways.","Parse socket:*:output strings (e.g. '350 kW') into numbers.","Filter access=yes/customers for public use."],"reading_traps":["126 elements in a CT bbox (which also covers parts of NY/MA) vs 1,665 public AFDC stations in CT: very incomplete.","Power tagged on few sites (socket:nacs:output 41, socket:type1_combo:output 9 of 126).","Mirror data may be months old; check osm3s.timestamp_osm_base.","amenity=charging_station also covers bicycle charging; filter motorcar=designated/yes where tagged."]},"test":{"tested_on":"2026-11-26","method":"api_query","http_status":200,"content_type":"application/json","size_bytes":null,"records_total":126,"records_for_country":126,"problems":["overpass-api.de returned HTTP 406 to requests with the default curl client identification."]},"evidence":[],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"No single regulator of all public charging; FHWA sets minimum standards for federally funded chargers (23 CFR 680); DOE AFDC collects the national station data.","url":"https://www.law.cornell.edu/cfr/text/23/680.116"},"operators":{"structure":"many","note":"Over 100 charging networks plus Non-Networked stations are listed by AFDC with last import dates and port counts (e.g. ChargePoint 93,684, Tesla Supercharger 44,200, Blink 22,351 ports; US and Canada).","census_url":"https://afdc.energy.gov/stations/charging-networks"},"publication_obligation":{"exists":"yes","norm":"23 CFR 680.116(c) (applies to chargers funded under Title 23 programs such as NEVI); California state law cited by CEC requires reporting to the national lab.","url":"https://www.law.cornell.edu/cfr/text/23/680.116","what_must_be_published":"Free API for third-party developers with station id, address, exact coordinates, operator name, network provider name, status, access, number of ports, connector types, charging level and kW per port, real-time status and price.","frequency":"Real-time status/price per OCPI 2.2.1 terms; static-field frequency not stated in the rule text read."},"consolidated_republication":{"found":"partial","note":"AFDC imports networks' data (daily API via OCPI or periodic CSV) and republishes it nationally, but not the operator name or real-time port data required by 680.116(c).","checked_pages":[{"organization":"DOE AFDC","url":"https://afdc.energy.gov/stations/charging-networks","saw":"Definitions of charging network, network service provider and station operator; import methods; table of networks with last import date and port counts."},{"organization":"Cornell LII (eCFR text)","url":"https://www.law.cornell.edu/cfr/text/23/680.116","saw":"680.116(c) list of fields to be shared free via API, including operator name and power by port."},{"organization":"NLR Developer Network","url":"https://developer.nlr.gov/docs/transportation/alt-fuel-stations-v1/","saw":"API endpoints for all stations, EV charging ports CSV, networks and last-updated date."}]}},"national_registry":{"exists":"yes","note":"The AFDC Alternative Fueling Station Locator is the national official database of public and private charging stations (residential excluded).","checked_pages":[{"organization":"DOE AFDC","url":"https://afdc.energy.gov/stations/about","saw":"Description of the Station Locator tools; links to data downloads and developer APIs."},{"organization":"DOE AFDC","url":"https://afdc.energy.gov/stations/states","saw":"Counts by state: electric 84,704 station locations | 267,401 charging ports on 11/26/2026."},{"organization":"DOE AFDC","url":"https://afdc.energy.gov/data_download","saw":"Download form (fuel, access, status, country, state); requires name and email; historical snapshots from 2014."}]},"if_unstructured":{"summary":"Not needed for the core list: AFDC data are structured. Separate operator (CPO) names are only required in per-network APIs under 23 CFR 680.116(c) for federally funded chargers; no such API was tested, so no manual recipe is given.","recipe":[],"where_published":[]},"related_not_answering":[{"name":"CEC Electric Vehicle Chargers in California (EV_Chargers_Last_updated_10-15-2026_ada.xlsx)","url":"https://www.energy.ca.gov/data-reports/energy-almanac/zero-emission-vehicle-and-infrastructure-statistics-collection/electric","why":"County-level port counts only (no site locations); combines AFDC, PlugShare, grant reports and surveys; July 2026 sheet totals 299 public L1, 76,091 public L2, 21,861 public DC fast."},{"name":"CEC Public Chargers (as of March 13, 2025)","url":"https://data.ca.gov/dataset/public-chargers-as-of-march-13-2025","why":"Static March 2025 AFDC extract for California; superseded by the live AFDC API."}],"open_questions":["API count (84,725 stations / 267,448 ports, country=US) differs from the AFDC state table (84,704 / 267,401) on the same day; likely territories or refresh timing, not confirmed. Next step: query by state and sum, or ask AFDC.","Open Charge Map API answered 403 'You must specify an API key'; its operator and kW completeness for the U.S. is unverified. Next step requires a free key (signup not done).","Per-network 680.116(c) APIs (operator name, kW by port) need token requests; no network API documentation URL was located in one search. Starting point: driveelectric.gov API standardized protocol."],"history":[{"pass":1,"date":"2026-11-26","role":"research","model":"claude-sonnet-5-5","rules_version":"2026-11-26-eeuu-infraestructura-y-servicios","note":"First pass: AFDC API tested via developer.nlr.gov (CT full extract, national ports CSV partial read); NY and CEC state sources and OSM contrasted; operator limited to network field.","headline":{"official_data":"structured","non_official_data":"partial","national_registry":"yes"},"sources":{"total":3,"new":3,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":23,"minutes":17}}],"local_terms":[{"term":"Alternative Fueling Station Locator","language":"en","meaning":"AFDC tool and database whose API and download hold the national charging station list."},{"term":"alt-fuel-stations/v1 fuel_type=ELEC","language":"en","meaning":"API endpoint and filter that return EV charging stations on developer.nlr.gov."},{"term":"station locations | charging ports","language":"en","meaning":"AFDC's two counting units in its state tables."},{"term":"EVSE port","language":"en","meaning":"Electric vehicle supply equipment port; the AFDC unit behind Level 1/Level 2/DC Fast counts."},{"term":"Level 2 / DC Fast","language":"en","meaning":"Charging levels used as categories in AFDC and state counts."},{"term":"CPO","language":"en","meaning":"Charge point operator; defined by AFDC but not a field in its data."},{"term":"NEVI (23 CFR 680)","language":"en","meaning":"Federal standards for federally funded chargers, including 680.116(c) third-party data sharing."},{"term":"OCPI","language":"en","meaning":"Open Charge Point Interface, the protocol networks use to send data to AFDC and third parties."}],"provenance":{"pass_count":1,"models":["claude-sonnet-5-5"],"minutes_estimate":17,"pages_opened":23,"passes":[{"pass":1,"date":"2026-11-26","model":"claude-sonnet-5-5"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/us/ev-charging-stations.json","detail_url":"https://georutter.org/v1/us/ev-charging-stations/detail.json","html_url":"https://georutter.org/us/ev-charging-stations/","country_url":"https://georutter.org/v1/countries/us.json"}
