{"schema_version":"1.0","country":"us","country_name":"United States","topic":"gas-injection-capacity","question":"Where can I get the capacity of the gas grid to receive biomethane injection in the United States, by zone or connection point?","territory":"us","territory_level":"country","parent_url":null,"published_on":"2026-11-27","research_reviewed_on":"2026-11-27","access_checked_on":"2026-11-27","answer":{"official_data":"partial","non_official_data":"partial","summary":"No US source publishing grid hosting capacity for new biomethane injection by zone or point was found (federal, CPUC and 5 utilities checked). The closest official data are interstate pipeline informational postings (FERC 18 CFR 284.13): daily design, operating and operationally available capacity in MMBtu for existing RNG/biogas receipt points, e.g. Northern Natural Gas (15 points) and Florida Gas Transmission (5). Gas utilities (PG&E, SoCalGas, Con Edison, NW Natural) give takeaway capacity only in per-project screening or feasibility studies (non-binding under the California tariff); seasonal limits are noted but not published.","main_caveats":["Interstate OAC describes existing receipt points only; it is not available capacity for a new plant and must not be read as hosting capacity.","The distribution utilities checked provide takeaway capacity through project-specific studies.","The public sources checked lack firm and seasonal capacity figures for new connections. Existing point postings vary by gas day and nomination cycle.","Do not infer capacity from plant output (EPA LMOP flows, CPUC injected therms) or from pipeline maps (NPMS, utility maps).","Seven interstate pipeline postings were checked. Two yielded capacity figures for existing biomethane receipt points."],"confidence":"medium","confidence_reason":"Absence of published LDC capacity checked on 5 utilities in 4 states and in the CPUC tariff; interstate data tested on 2 pipelines with queries; SoCalGas/National Grid sites blocked and 176 pipelines unsampled.","attributes":[{"attribute":"injection_capacity","covered":"partial","source_ids":["interstate-oac-postings","ldc-interconnection-studies"],"note":"Published only for existing interstate RNG receipt points: design/operating/available capacity, MMBtu per gas day (NNG, FGT). LDC capacity only in per-project studies.","gap":"not_published","gap_note":"No hosting-capacity map or table for new injection found: PG&E, SoCalGas (via CARB/AQMD copies), Con Edison, NW Natural pages, CPUC D.20-08-035 and PG&E Gas Rule 29 opened."},{"attribute":"zone_or_connection_point","covered":"partial","source_ids":["interstate-oac-postings"],"note":"Per receipt point (Loc number, name, pipeline zone) with county/state from the Locations list; no coordinates. No zone-level LDC data.","gap":"not_published","gap_note":"No utility publishes capacity by distribution zone or candidate point; checked PG&E, SoCalGas, Con Edison, National Grid (blocked), NW Natural."},{"attribute":"latest_data","covered":"partial","source_ids":["interstate-oac-postings"],"note":"Latest: gas day 2026-11-27, Timely cycle posted 2026-11-26 16:48 (NNG); FGT posted 11/26/2026 8:45PM for the Evening cycle.","gap":"not_published","gap_note":"LDC study results carry their own dates but are not released; CPUC annual biomethane reports (2026-04-30) give injected therms, not capacity."},{"attribute":"historical_series","covered":"partial","source_ids":["interstate-oac-postings"],"note":"Daily history by gasDay query: NNG back to at least 2020-11-27, FGT to at least 2024-11-27; NNG screen grid lists 90 days. Point lists grow over time.","gap":"not_checked","gap_note":"Earliest gas day served by each pipeline's API/CSV not determined; other 176 pipelines not checked."},{"attribute":"update_frequency","covered":"partial","source_ids":["interstate-oac-postings"],"note":"Daily by nomination cycle (NNG 7 cycles, FGT Timely/Evening); FERC-551: postings at least daily.","gap":"not_published","gap_note":"LDC capacity is not published, so there is no schedule; studies are on request (15 business days in California)."}]},"sources":[{"source_id":"interstate-oac-postings","name":"Interstate pipeline informational postings: operationally available capacity and location lists per receipt point","publisher":"FERC-regulated interstate natural gas pipelines, each on its own informational postings site","official":true,"landing_url":null,"data_url":null,"access":"api","format":"JSON and CSV (Northern Natural Gas API); CSV/Excel/ODS/PDF/XML downloads (Energy Transfer ipost)","license":"unknown","language":"en","has_coordinates":false,"location_precision":"municipality","summary":"Daily point-level design, operating, scheduled and available capacity (MMBtu) for existing biogas/RNG receipt points on interstate pipelines.","coverage_note":"Only interstate pipelines and only points already built; NNG (15 biogas receipt points, Midwest) and FGT (5 RNG receipt points, Florida) confirmed; other pipelines sampled.","data_date":"2026-11-27","caveats":["Capacity of an existing RNG meter point, not hosting capacity for new plants.","OAC is an estimate per gas day and cycle; delivery (D) rows at the same site are not injection."],"test":{"tested_on":"2026-11-27","method":"api_query","http_status":200,"problems":["Williams 1Line (Transco) and Enbridge infopost (Texas Eastern) return 403 to automated clients.","Kinder Morgan and TC Energy postings load data through ASP.NET postbacks or a JavaScript application; no plain URL to the point table was found."]},"example":{"example_request":"curl -s -X POST -H 'Content-Type: application/json' --data '{\"gasDay\":\"2026-11-27\",\"cycle\":10,\"searchType\":\"Location names containing the following string\",\"searchString\":\"BIOGAS\",\"locationType\":\"All location types\",\"locationZone\":\"\",\"pagination\":{\"pageNumber\":1,\"pageSize\":500},\"download\":false}' \"https://www.northernnaturalgas.com/wp-json/api/capacity/oac/report\"","example_result":"postDateTime 2026-11-26T16:48:03, gasDateTime 2026-11-27T09:00, totalCount 24; {location:79509, locationZone:'MID 17', locationName:'BRIGHTMARK ATHENA BALTIC BIOGAS REC', flowInd:'R', designCapacity:2832, operatingCapacity:2832, scheduledQuantity:500, availableCapacity:2332, interruptInd:'N'}"},"members_summary":{"total":178,"listed":7,"tested":7,"data_found":2,"scope_note":"FERC estimated 178 interstate pipelines under FERC-551. Seven operators' postings were opened and biomethane receipt-point capacity was confirmed in two (NNG and FGT).","pattern":"Informational Postings > Capacity > Operationally Available, filtered by location type (NNG 'BIO', FGT 'RNG') or by names containing RNG, BIOGAS or DAIRY; county/state in Informational Postings > Locations."}},{"source_id":"ldc-interconnection-studies","name":"Gas utility (LDC) renewable gas interconnection screening and feasibility studies","publisher":"Local gas distribution utilities under state commission tariffs (sample: PG&E, SoCalGas, Con Edison, National Grid, NW Natural)","official":true,"landing_url":null,"data_url":null,"access":"request_form","format":"Study report delivered to the applicant (PDF); procedures as web pages and tariff PDFs","license":"unknown","language":"en","has_coordinates":null,"location_precision":null,"summary":"On distribution and utility networks, capacity at a proposed location is given only in a per-project screening/feasibility study requested by the developer.","coverage_note":"PG&E and SoCalGas follow the CPUC standard tariff (free screening, 15 business days); Con Edison, National Grid and NW Natural run similar request-based reviews.","data_date":null,"caveats":["Study results are non-binding, project-specific and not public.","Summer low-demand hours limit distribution takeaway (SoCalGas)."],"test":{"tested_on":"2026-11-27","method":"page_only","http_status":200,"problems":["socalgas.com and nationalgrid.com reject automated clients (403 challenge page).","Study reports are delivered to applicants only; no public copy found."]},"example":null,"members_summary":{"total":null,"listed":5,"tested":5,"data_found":0,"scope_note":"Gas distribution utilities number in the hundreds; 5 utilities serving CA, NY, MA, OR and WA opened, chosen for RNG activity and the brief's PG&E/SoCalGas comparison. None publishes injection capacity by zone or point.","pattern":null}}],"other_sources_count":1,"if_unstructured":{"summary":"Utility-network capacity is not published; public documents (CPUC biomethane reports, project cost cases) describe injected volumes or receipt-capacity upgrades without capacity values. The tested recipe compiles existing interstate RNG receipt-point capacity from postings."},"local_terms":[{"term":"operationally available capacity (OAC)","language":"en","meaning":"Posted capacity still schedulable at a pipeline point for a gas day and cycle; the field to read at RNG receipt points."},{"term":"informational postings","language":"en","meaning":"Public section of an interstate pipeline website where FERC-required capacity and location data are posted."},{"term":"receipt point","language":"en","meaning":"Point where gas, including RNG, enters a pipeline (Flow Ind R)."},{"term":"takeaway capacity","language":"en","meaning":"Utility network capability to move gas away from an interconnection point; reported per project in screening studies."},{"term":"Interconnection Screening Study","language":"en","meaning":"First, non-binding utility study for a proposed RNG interconnection under California tariffs."},{"term":"Standard Renewable Gas Interconnection Tariff","language":"en","meaning":"CPUC-adopted tariff (D.20-08-035): SoCalGas/SDG&E Rule 45, PG&E Gas Rule 29."},{"term":"design capacity","language":"en","meaning":"Nameplate daily capacity of a pipeline point, posted with OAC."},{"term":"MMBtu","language":"en","meaning":"Million British thermal units; unit of interstate capacity postings, per gas day."}],"provenance":{"pass_count":1,"models":["claude-sonnet-5-5"],"minutes_estimate":23,"pages_opened":58,"passes":[{"pass":1,"date":"2026-11-27","model":"claude-sonnet-5-5"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/us/gas-injection-capacity.json","detail_url":"https://georutter.org/v1/us/gas-injection-capacity/detail.json","html_url":"https://georutter.org/us/gas-injection-capacity/","country_url":"https://georutter.org/v1/countries/us.json"}