{"schema_version":"1.0","country":"us","country_name":"United States","topic":"grid-connection-queue","question":"Where can I get the list of grid connection requests in the United States, with project, technology, capacity (MW), connection node, status and date?","territory":"us","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-19","access_checked_on":"2026-11-19","answer":{"official_data":"partial","non_official_data":"partial","summary":"There is no single official national list: each ISO/RTO publishes its own. MISO (JSON), CAISO and NYISO (Excel) were downloaded and give technology, MW, POI, status and dates; only NYISO names developers. PJM has a web viewer with export links not tested; SPP, ISO-NE, ERCOT not retrieved. Berkeley Lab's Queued Up compilation (7 ISOs plus ~50 non-ISO areas) was blocked here.","main_caveats":["Operator lists are regional and use different fields, MW bases and status codes; do not add them up as a national total.","A connection request does not prove permits, financing or construction.","MISO and CAISO omit developer names; NYISO status is a numeric code without legend.","Withdrawn and done requests sit in the same files as active ones; filter by status before counting.","The MISO JSON endpoint is undocumented and no licence was found for any operator file."],"confidence":"medium","confidence_reason":"Three operators in different regions were downloaded and inspected; PJM, SPP, ISO-NE, ERCOT, non-ISO utilities and the compilation were not read.","attributes":[{"attribute":"project","covered":"partial","source_ids":["nyiso-interconnection-queue","caiso-cluster-queue-reports","miso-gi-queue-api"],"note":"NYISO names developer and project; CAISO gives project names; MISO only a request number.","gap":"not_published","gap_note":"MISO and CAISO files tested do not publish developer; PJM rows not read; non-ISO utilities not examined."},{"attribute":"technology","covered":"partial","source_ids":["miso-gi-queue-api","caiso-cluster-queue-reports","nyiso-interconnection-queue"],"note":"MISO fuelType/facilityType, CAISO up to three fuels with MW, NYISO fuel code.","gap":"not_checked","gap_note":"PJM, SPP, ISO-NE, ERCOT and non-ISO utilities not read; LBNL compilation blocked."},{"attribute":"capacity_mw","covered":"partial","source_ids":["miso-gi-queue-api","caiso-cluster-queue-reports","nyiso-interconnection-queue"],"note":"Summer/winter or POI MW; bases differ (MISO net summer/winter, CAISO per fuel and POI, NYISO SP/WP).","gap":"not_checked","gap_note":"Other operators not read; MW bases are not harmonised and are undocumented."},{"attribute":"connection_node","covered":"partial","source_ids":["miso-gi-queue-api","caiso-cluster-queue-reports","nyiso-interconnection-queue"],"note":"Single POI field: MISO poiName (3,746 of 4,101 filled), CAISO POI, NYISO Points of Interconnection.","gap":"not_published","gap_note":"Tested files do not separate requested from assigned node; MISO leaves POI empty on about 355 records."},{"attribute":"status","covered":"partial","source_ids":["miso-gi-queue-api","caiso-cluster-queue-reports","nyiso-interconnection-queue"],"note":"MISO applicationStatus; CAISO active vs Withdrawn sheets; NYISO numeric Project Status # without legend.","gap":"not_published","gap_note":"No queue position in MISO or CAISO; NYISO and MISO status codes undefined; suspended not isolated."},{"attribute":"event_date","covered":"partial","source_ids":["miso-gi-queue-api","caiso-cluster-queue-reports","nyiso-interconnection-queue"],"note":"Queue, application, withdrawal and requested in-service dates; NYISO Date of IR and Last Updated.","gap":"not_checked","gap_note":"Meaning of each date differs by operator; PJM dates not visible in capture; other operators not read."},{"attribute":"latest_data","covered":"partial","source_ids":["miso-gi-queue-api","caiso-cluster-queue-reports","nyiso-interconnection-queue","lbnl-queued-up-dataset"],"note":"MISO live on 2026-11-19 (latest queueDate 2026-11-03); CAISO C16 posted 2026-10-16; NYISO 2026-10-31; LBNL through 2025.","gap":"not_checked","gap_note":"No national file is current to the month; lag differs per operator."},{"attribute":"historical_series","covered":"partial","source_ids":["nyiso-interconnection-queue","miso-gi-queue-api","lbnl-queued-up-dataset"],"note":"NYISO withdrawn back to 1999; MISO records from 2015; LBNL annual editions (not opened).","gap":"not_checked","gap_note":"No dated snapshots from operators were found; CAISO holds one file per cluster; LBNL content not verified."},{"attribute":"update_frequency","covered":"partial","source_ids":["miso-gi-queue-api","caiso-cluster-queue-reports","pjm-service-request-status"],"note":"MISO cache about 5 minutes (observed); CAISO per cluster; PJM statistics PDFs semiannual; none states record cadence.","gap":"not_published","gap_note":"No tested operator states how often request records are updated."}]},"sources":[{"source_id":"miso-gi-queue-api","name":"MISO generator interconnection queue (JSON endpoint behind the Project Status tool)","publisher":"Midcontinent Independent System Operator (MISO)","official":true,"landing_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","data_url":"https://www.misoenergy.org/api/giqueue/getprojects","access":"api","format":"JSON array (one object per request)","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"municipality","summary":"Full MISO queue as JSON: 4,101 requests with status, fuel, MW, POI, TO, state and dates; no developer names.","coverage_note":"MISO footprint only (one of seven ISO/RTOs); not a national list.","data_date":"2026-11-19 (live endpoint; latest queueDate 2026-11-03)","caveats":["Undocumented endpoint, no licence stated.","No developer or project name; Done and LEGACY statuses undefined."],"test":{"tested_on":"2026-11-19","method":"api_query","http_status":200,"problems":["Endpoint is not documented on the landing page; found by testing the Project Status tool's data path. HEAD returns 405 while GET returns 200.","No licence or terms of use found for the data."]},"example":{"example_request":"curl -sL --max-time 120 'https://www.misoenergy.org/api/giqueue/getprojects' -o miso_gi.json","example_result":"{\"projectNumber\":\"J3464\",\"queueDate\":\"2024-04-16T04:00:00+00:00\",\"transmissionOwner\":\"ITC MIDWEST\",\"county\":\"Story\",\"state\":\"IA\",\"studyCycle\":\"DPP-2023\",\"studyPhase\":\"Phase 2\",\"svcType\":\"NRIS\",\"poiName\":\"Fernald\",\"summerNetMW\":200.0,\"fuelType\":\"Solar\",\"facilityType\":\"Photovoltaic\",\"applicationStatus\":\"Active\"}"},"members_summary":null},{"source_id":"caiso-cluster-queue-reports","name":"CAISO generator interconnection queue reports (Cluster 16 and Cluster 15 Excel files)","publisher":"California Independent System Operator (CAISO)","official":true,"landing_url":"https://www.caiso.com/planning/Pages/GeneratorInterconnection/Default.aspx","data_url":"https://www.caiso.com/documents/cluster-16-queue-report.xlsx","access":"direct_download","format":"XLSX (one workbook per cluster; Cluster 15 has Active and Withdrawn sheets)","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"municipality","summary":"Per-cluster Excel files with project name, fuels and MW, POI, county, requested COD and queue/application dates.","coverage_note":"CAISO only; the two latest clusters (15 and 16) were tested, older ones sit in RIMS.","data_date":"2026-10-16 (Cluster 16 posting)","caveats":["No developer name and no status column in Cluster 16.","Cluster files are not cumulative; Excel serial dates."],"test":{"tested_on":"2026-11-19","method":"download","http_status":200,"problems":["Each cluster is a separate file; no cumulative queue file was found in the page text.","No licence or terms found for the files."]},"example":{"example_request":"curl -sL 'https://www.caiso.com/documents/cluster-16-queue-report.xlsx' -o c16.xlsx  # sheet 'Cluster 16 Queue Report', header in row 1","example_result":"55357 | Airchair 1 | Photovoltaic/Solar 250 MW + Storage/Battery 250 MW | NET MW POI 250 | Kern, CA | PG&E FRESNO | PTO PGAE | POI GATES-MIDWAY 500kV | Requested COD 48335 (2032-05-01) | Queue Date 46296 (2026-10-01) | Application Date 46303.49 | Energy Only Requested"},"members_summary":null},{"source_id":"nyiso-interconnection-queue","name":"NYISO Interconnection Queue workbook (active, cluster, withdrawn, in-service)","publisher":"New York Independent System Operator (NYISO)","official":true,"landing_url":"https://www.nyiso.com/interconnections","data_url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-10312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1794581737933","access":"direct_download","format":"XLSX with several sheets","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"municipality","summary":"NYISO workbook with developer, project, MW, fuel, POI, status code and dates; active, cluster, withdrawn and in-service sheets.","coverage_note":"New York only; file dated 2026-10-31.","data_date":"2026-10-31 (file name); posted by 2026-11-13","caveats":["Status # codes undefined in the file.","Mixed sheet layouts and some placeholder dates."],"test":{"tested_on":"2026-11-19","method":"download","http_status":200,"problems":["Status codes are not defined in the workbook or on the page read.","No licence or terms found."]},"example":{"example_request":"curl -sL 'https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-10312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1794581737933' -o nyiso.xlsx  # sheet 'Interconnection Queue', header row 1","example_result":"0571 | Heritage Wind, LLC | Heritage Wind | Date of IR 42614 (2016-09-12) | SP 126 / WP 126 MW | Large Facility | W | Genesee, NY | Zone B | Lockport - Mortimer 115kV | NM-NG | Status # 11 | Last Updated 46326"},"members_summary":null},{"source_id":"pjm-service-request-status","name":"PJM Cycle and Serial Service Request Status pages","publisher":"PJM Interconnection","official":true,"landing_url":"https://www.pjm.com/planning/service-requests","data_url":null,"access":"web_viewer_only","format":"HTML table with XLS/XML export links (export untested); PDFs","license":"Unknown","language":"en","has_coordinates":null,"location_precision":null,"summary":"PJM publishes request lists in a web viewer (cycle and serial pages) with XLS/XML export links; the viewer rows and exports were not read.","coverage_note":"PJM footprint only.","data_date":null,"caveats":["Export and sign-in requirement not verified.","TC2 moved from the serial to the cycle page."],"test":{"tested_on":"2026-11-19","method":"page_only","http_status":200,"problems":["Request rows and exports were not retrieved: the pages are a script-driven viewer.","Whether the exports need a PJM account was not verified."]},"example":null,"members_summary":null},{"source_id":"lbnl-queued-up-dataset","name":"Berkeley Lab Queued Up: interconnection queue data file (through 2025)","publisher":"Lawrence Berkeley National Laboratory with GridTracker","official":false,"landing_url":"https://eta-publications.lbl.gov/publications/us-interconnection-queue-data-0","data_url":"https://eta-publications.lbl.gov/sites/default/files/2026-05/lbnl_ix_queue_data_file_thru2025.xlsx","access":"direct_download","format":"XLSX (project-level dataset, codebook and 36 summary tabs per the publication page)","license":"CC BY 4.0","language":"en","has_coordinates":null,"location_precision":null,"summary":"Annual multi-operator compilation of US generation queues through end-2025 (CC BY 4.0), covering ISO/RTOs and about 50 non-ISO areas.","coverage_note":"Per publisher; fields and records not verified because the file was blocked here.","data_date":"Requests through end of 2025; published 2026-05","caveats":["File could not be downloaded from this environment (403).","Lags operator data by months; generation only."],"test":{"tested_on":"2026-11-19","method":"blocked","http_status":403,"problems":["Automated requests to emp.lbl.gov and to the data-file URL on eta-publications.lbl.gov get a 403 challenge page; the landing page emp.lbl.gov/queues also returned 403 to curl.","Contents of the workbook not verified; description relies on the publication page."]},"example":null,"members_summary":null}],"other_sources_count":1,"if_unstructured":{"summary":"Operator files and viewers are structured; no document-extraction recipe needed for the tested operators."},"local_terms":[{"term":"Interconnection queue","language":"en","meaning":"Ordered list of generator requests to connect to the transmission grid."},{"term":"POI (point of interconnection)","language":"en","meaning":"Requested substation or line where the project would connect."},{"term":"ERIS / NRIS","language":"en","meaning":"Energy Resource / Network Resource Interconnection Service (MISO svcType values)."},{"term":"DPP (Definitive Planning Phase)","language":"en","meaning":"MISO study cycle label such as DPP-2023."},{"term":"Cluster study","language":"en","meaning":"Requests studied in batches (CAISO clusters, PJM Transition Cycles, NYISO cluster projects)."},{"term":"ISO/RTO","language":"en","meaning":"Independent System Operator or Regional Transmission Organization."}],"provenance":{"pass_count":1,"models":["claude-sonnet-5-5 (Claude Sonnet 5.5) via Claude Code in the VS Code extension (Claude Agent SDK)"],"minutes_estimate":null,"pages_opened":20,"passes":[{"pass":1,"date":"2026-11-19","model":"claude-sonnet-5-5 (Claude Sonnet 5.5) via Claude Code in the VS Code extension (Claude Agent SDK)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/us/grid-connection-queue.json","detail_url":"https://georutter.org/v1/us/grid-connection-queue/detail.json","html_url":"https://georutter.org/us/grid-connection-queue/","country_url":"https://georutter.org/v1/countries/us.json"}