{"schema_version":"1.0","country":"us","country_name":"United States","topic":"grid-connection-queue","question":"Where can I get the list of grid connection requests in the United States, with project, technology, capacity (MW), connection node, status and date?","territory":"us","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-19","access_checked_on":"2026-11-19","answer":{"official_data":"partial","non_official_data":"partial","summary":"There is no single official national list: each ISO/RTO publishes its own. MISO (JSON), CAISO and NYISO (Excel) were downloaded and give technology, MW, POI, status and dates; only NYISO names developers. PJM has a web viewer with export links not tested; SPP, ISO-NE, ERCOT not retrieved. Berkeley Lab's Queued Up compilation (7 ISOs plus ~50 non-ISO areas) was blocked here.","main_caveats":["Operator lists are regional and use different fields, MW bases and status codes; do not add them up as a national total.","A connection request does not prove permits, financing or construction.","MISO and CAISO omit developer names; NYISO status is a numeric code without legend.","Withdrawn and done requests sit in the same files as active ones; filter by status before counting.","The MISO JSON endpoint is undocumented and no licence was found for any operator file."],"confidence":"medium","confidence_reason":"Three operators in different regions were downloaded and inspected; PJM, SPP, ISO-NE, ERCOT, non-ISO utilities and the compilation were not read.","attributes":[{"attribute":"project","covered":"partial","source_ids":["nyiso-interconnection-queue","caiso-cluster-queue-reports","miso-gi-queue-api"],"note":"NYISO names developer and project; CAISO gives project names; MISO only a request number.","gap":"not_published","gap_note":"MISO and CAISO files tested do not publish developer; PJM rows not read; non-ISO utilities not examined."},{"attribute":"technology","covered":"partial","source_ids":["miso-gi-queue-api","caiso-cluster-queue-reports","nyiso-interconnection-queue"],"note":"MISO fuelType/facilityType, CAISO up to three fuels with MW, NYISO fuel code.","gap":"not_checked","gap_note":"PJM, SPP, ISO-NE, ERCOT and non-ISO utilities not read; LBNL compilation blocked."},{"attribute":"capacity_mw","covered":"partial","source_ids":["miso-gi-queue-api","caiso-cluster-queue-reports","nyiso-interconnection-queue"],"note":"Summer/winter or POI MW; bases differ (MISO net summer/winter, CAISO per fuel and POI, NYISO SP/WP).","gap":"not_checked","gap_note":"Other operators not read; MW bases are not harmonised and are undocumented."},{"attribute":"connection_node","covered":"partial","source_ids":["miso-gi-queue-api","caiso-cluster-queue-reports","nyiso-interconnection-queue"],"note":"Single POI field: MISO poiName (3,746 of 4,101 filled), CAISO POI, NYISO Points of Interconnection.","gap":"not_published","gap_note":"Tested files do not separate requested from assigned node; MISO leaves POI empty on about 355 records."},{"attribute":"status","covered":"partial","source_ids":["miso-gi-queue-api","caiso-cluster-queue-reports","nyiso-interconnection-queue"],"note":"MISO applicationStatus; CAISO active vs Withdrawn sheets; NYISO numeric Project Status # without legend.","gap":"not_published","gap_note":"No queue position in MISO or CAISO; NYISO and MISO status codes undefined; suspended not isolated."},{"attribute":"event_date","covered":"partial","source_ids":["miso-gi-queue-api","caiso-cluster-queue-reports","nyiso-interconnection-queue"],"note":"Queue, application, withdrawal and requested in-service dates; NYISO Date of IR and Last Updated.","gap":"not_checked","gap_note":"Meaning of each date differs by operator; PJM dates not visible in capture; other operators not read."},{"attribute":"latest_data","covered":"partial","source_ids":["miso-gi-queue-api","caiso-cluster-queue-reports","nyiso-interconnection-queue","lbnl-queued-up-dataset"],"note":"MISO live on 2026-11-19 (latest queueDate 2026-11-03); CAISO C16 posted 2026-10-16; NYISO 2026-10-31; LBNL through 2025.","gap":"not_checked","gap_note":"No national file is current to the month; lag differs per operator."},{"attribute":"historical_series","covered":"partial","source_ids":["nyiso-interconnection-queue","miso-gi-queue-api","lbnl-queued-up-dataset"],"note":"NYISO withdrawn back to 1999; MISO records from 2015; LBNL annual editions (not opened).","gap":"not_checked","gap_note":"No dated snapshots from operators were found; CAISO holds one file per cluster; LBNL content not verified."},{"attribute":"update_frequency","covered":"partial","source_ids":["miso-gi-queue-api","caiso-cluster-queue-reports","pjm-service-request-status"],"note":"MISO cache about 5 minutes (observed); CAISO per cluster; PJM statistics PDFs semiannual; none states record cadence.","gap":"not_published","gap_note":"No tested operator states how often request records are updated."}]},"sources":[{"source_id":"miso-gi-queue-api","name":"MISO generator interconnection queue (JSON endpoint behind the Project Status tool)","publisher":"Midcontinent Independent System Operator (MISO)","official":true,"landing_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","data_url":"https://www.misoenergy.org/api/giqueue/getprojects","access":"api","format":"JSON array (one object per request)","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"municipality","adds":"Only source tested that returns the whole queue of one RTO as structured records without an account, including withdrawn and done requests, POI name and MW.","first_seen_pass":1,"rank":1,"summary":"Full MISO queue as JSON: 4,101 requests with status, fuel, MW, POI, TO, state and dates; no developer names.","coverage_note":"MISO footprint only (one of seven ISO/RTOs); not a national list.","data_date":"2026-11-19 (live endpoint; latest queueDate 2026-11-03)","caveats":["Undocumented endpoint, no licence stated.","No developer or project name; Done and LEGACY statuses undefined."],"coverage":{"geographic":"MISO footprint: Midwest and South (MI, IL, IN, AR, LA, MN, WI, IA, MS, MO, TX, ND, KY and others)."},"fine_print":{"unit":{"value":"MW (field names summerNetMW, winterNetMW, dp1/dp2ErisMw/NrisMw); unit and basis are not documented, inferred from field names.","quote":null,"url":"https://www.misoenergy.org/api/giqueue/getprojects","attempts":[{"url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","note":"Landing page read on 2026-11-19: lists maps, dashboards and a status filter tool; no field list or unit."}]},"inclusion_rule":{"value":"Observed: 4,101 records with applicationStatus Withdrawn, Active, Done, Pending Revision Approval, Pending Transfer and LEGACY: Done; queueDate from 2015-04-15 to 2026-11-03. No inclusion rule published.","quote":null,"url":"https://www.misoenergy.org/api/giqueue/getprojects","attempts":[{"url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","note":"No status definitions or inclusion rule on the landing page."}]},"reference_date":{"value":"Live endpoint. Response headers on 2026-11-19: x-pci-data-fetched-at 15:20:50Z, fresh-until 15:25:50Z.","quote":null,"url":"https://www.misoenergy.org/api/giqueue/getprojects","attempts":[]},"update_frequency":{"value":"Not stated by MISO. Observed cache headers imply the backend is refreshed about every 5 minutes (data fetched-at to fresh-until); this is not a statement about when MISO changes records.","quote":null,"url":"https://www.misoenergy.org/api/giqueue/getprojects","attempts":[]},"exclusions":{"value":"No developer or project name fields are exposed; 507 of 4,101 records have an empty state and 545 an empty fuelType.","quote":null,"url":"https://www.misoenergy.org/api/giqueue/getprojects","attempts":[]}},"key_fields":[{"field":"projectNumber","meaning":"MISO request ID (J = generator, R and S older series); the only identity published."},{"field":"applicationStatus","meaning":"Active, Withdrawn, Done, Pending Revision Approval, Pending Transfer, LEGACY: Done (undefined on the site)."},{"field":"queueDate / withdrawnDate / doneDate / inService / negInService / giaToExec","meaning":"ISO 8601 timestamps; queue entry, withdrawal, completion, requested in-service and GIA execution dates."},{"field":"fuelType / facilityType / svcType","meaning":"Technology (Solar, Battery Storage, Wind, Hybrid, Gas...) and service type ERIS/NRIS."},{"field":"summerNetMW / winterNetMW / dp1ErisMw / dp1NrisMw / dp2ErisMw / dp2NrisMw","meaning":"Requested MW and the MW assigned in decision-point phases 1 and 2."},{"field":"poiName / transmissionOwner / state / county","meaning":"Point of interconnection name (non-empty in 3,746 of 4,101), TO, state and county."},{"field":"studyCycle / studyGroup / studyPhase / postGIAStatus / sisPhase1","meaning":"Study cohort (DPP-2022...), region group and phase; post-GIA status such as Under Construction or In Service."}],"how_to_use":{"example_request":"curl -sL --max-time 120 'https://www.misoenergy.org/api/giqueue/getprojects' -o miso_gi.json","example_result":"{\"projectNumber\":\"J3464\",\"queueDate\":\"2024-04-16T04:00:00+00:00\",\"transmissionOwner\":\"ITC MIDWEST\",\"county\":\"Story\",\"state\":\"IA\",\"studyCycle\":\"DPP-2023\",\"studyPhase\":\"Phase 2\",\"svcType\":\"NRIS\",\"poiName\":\"Fernald\",\"summerNetMW\":200.0,\"fuelType\":\"Solar\",\"facilityType\":\"Photovoltaic\",\"applicationStatus\":\"Active\"}","steps":["GET the endpoint (HEAD returns 405; use GET). The body is a single JSON array of 4,101 objects (2,389,518 bytes on 2026-11-19).","Filter on applicationStatus (Active = 1,133; Withdrawn = 2,327; Done = 548) and on fuelType/state as needed.","Parse dates as UTC timestamps; withdrawnDate is present on 2,310 records, doneDate and negInService only on some.","Treat the endpoint as undocumented: it is not linked as a download on the landing page and may change without notice."],"reading_traps":["No developer or project name: the identity is only projectNumber, so linking to other sources needs POI, county, MW and dates.","Empty strings are used for unknown values: poiName empty on about 355 records, state empty on 507, fuelType empty on 545 (many are recent ERAS or DPP-2026 entries).","summerNetMW can be 0.0 for requests still being revised (e.g. J4182 ERAS Study Cycle 2) even though the request is Active.","Withdrawn records keep their MW and POI, so summing MW without filtering status counts withdrawn requests.","Done and LEGACY: Done are not defined; do not read them as in service. postGIAStatus gives In Service (88) and Under Construction (128)."]},"test":{"tested_on":"2026-11-19","method":"api_query","http_status":200,"content_type":"application/json; charset=utf-8","size_bytes":2389518,"records_total":4101,"records_for_country":4101,"problems":["Endpoint is not documented on the landing page; found by testing the Project Status tool's data path. HEAD returns 405 while GET returns 200.","No licence or terms of use found for the data."]},"evidence":[{"claim":"Landing page lists queue maps, dashboards and the Project Status Tool; no downloads or API are listed.","url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","quote":"Filter projects in the queue by status, fuel type, and/or state."},{"claim":"Observed on 2026-11-19: GET returned 4,101 records; 1,133 Active, 2,327 Withdrawn, 548 Done; queueDate 2015-04-15 to 2026-11-03.","url":"https://www.misoenergy.org/api/giqueue/getprojects","quote":null}],"members":[],"members_summary":null},{"source_id":"caiso-cluster-queue-reports","name":"CAISO generator interconnection queue reports (Cluster 16 and Cluster 15 Excel files)","publisher":"California Independent System Operator (CAISO)","official":true,"landing_url":"https://www.caiso.com/planning/Pages/GeneratorInterconnection/Default.aspx","data_url":"https://www.caiso.com/documents/cluster-16-queue-report.xlsx","access":"direct_download","format":"XLSX (one workbook per cluster; Cluster 15 has Active and Withdrawn sheets)","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"municipality","adds":"Different region from MISO; project names, up to three fuels with MW, POI with voltage and requested COD in directly downloadable Excel files.","first_seen_pass":1,"rank":2,"summary":"Per-cluster Excel files with project name, fuels and MW, POI, county, requested COD and queue/application dates.","coverage_note":"CAISO only; the two latest clusters (15 and 16) were tested, older ones sit in RIMS.","data_date":"2026-10-16 (Cluster 16 posting)","caveats":["No developer name and no status column in Cluster 16.","Cluster files are not cumulative; Excel serial dates."],"coverage":{"geographic":"CAISO balancing area plus out-of-state POIs in the CAISO process (CA, NV, AZ, NM, NY rows seen)."},"fine_print":{"unit":{"value":"MW (NET MW 1-3 per fuel and NET MW POI at the point of interconnection); no definition in the workbook.","quote":null,"url":"https://www.caiso.com/documents/cluster-16-queue-report.xlsx","attempts":[{"url":"https://www.caiso.com/planning/Pages/GeneratorInterconnection/Default.aspx","note":"Page gives no field descriptions."}]},"inclusion_rule":{"value":"Page says the queue report covers 'active, complete and withdrawn interconnection requests' by study process; each file is one cluster. Cluster 14 and earlier are in RIMS (Reporting tab), not tested.","quote":null,"url":"https://www.caiso.com/planning/Pages/GeneratorInterconnection/Default.aspx","attempts":[]},"reference_date":{"value":"Cluster 16 file posted 2026-10-16 (Last-Modified 2026-10-16 18:10 GMT); Cluster 15 file posted 2026-07-16.","quote":null,"url":"https://www.caiso.com/documents/cluster-16-queue-report.xlsx","attempts":[]},"update_frequency":{"value":"Not stated; the page shows only posting timestamps per cluster file. Cluster 16 and Cluster 15 posted three months apart.","quote":null,"url":"https://www.caiso.com/planning/Pages/GeneratorInterconnection/Default.aspx","attempts":[]},"exclusions":{"value":"No developer or applicant column; no status column in the Cluster 16 file; earlier clusters not in these files.","quote":null,"url":"https://www.caiso.com/documents/cluster-16-queue-report.xlsx","attempts":[]}},"key_fields":[{"field":"Project Number / Queue Number / Project Name","meaning":"CAISO project ID (Cluster 15 also a queue number) and project name (not the developer)."},{"field":"Generation/Fuel 1-3 and NET MW 1-3 / NET MW POI","meaning":"Up to three technologies with MW each (e.g. Photovoltaic/Solar + Storage/Battery) and MW at the POI."},{"field":"POI / Voltage kV / PTO / Study Area","meaning":"Requested point of interconnection, voltage, transmission owner and study area."},{"field":"PROJECT_COUNTY / Project State","meaning":"County (free text, e.g. 'king', 'Merced County') and state."},{"field":"Queue Date / Application Date / Withdrawal Date / Requested COD","meaning":"Excel serial dates (queue window, application, withdrawal in Cluster 15 Withdrawn sheet, requested commercial operation date)."},{"field":"Service Type / POI Deliverability Selection / Reimbursement Option","meaning":"Energy Only vs Full Capacity Deliverability; Cluster 16 adds deliverability and reimbursement option."}],"how_to_use":{"example_request":"curl -sL 'https://www.caiso.com/documents/cluster-16-queue-report.xlsx' -o c16.xlsx  # sheet 'Cluster 16 Queue Report', header in row 1","example_result":"55357 | Airchair 1 | Photovoltaic/Solar 250 MW + Storage/Battery 250 MW | NET MW POI 250 | Kern, CA | PG&E FRESNO | PTO PGAE | POI GATES-MIDWAY 500kV | Requested COD 48335 (2032-05-01) | Queue Date 46296 (2026-10-01) | Application Date 46303.49 | Energy Only Requested","steps":["Open https://www.caiso.com/planning/Pages/GeneratorInterconnection/Default.aspx and take the current cluster workbook link (Cluster 16 posted 2026-10-16).","Read the first sheet; Cluster 15 has a sheet for active requests and one named 'Withdrawn'.","Convert Excel serial dates (days since 1899-12-30) to ISO dates; drop fully empty rows.","For Cluster 14 and earlier use the Reporting tab of RIMS (https://rimspub.caiso.com/rimsui/logon.do, landing page returned 200 but contents not tested)."],"reading_traps":["Cluster 15 'Cluster 15 ' sheet has 190 rows of which 104 are completely empty (86 real requests); the Withdrawn sheet has 99 rows with 15 empty (84 requests). Header cell names carry trailing spaces.","Cluster 16 holds 226 requests, all with Queue Date 2026-10-01 (queue window) and distinct application dates 2026-10-01 to 2026-10-15; the date is the cluster window, not a processing position.","NET MW 1 and NET MW 2 are per-fuel nameplate while NET MW POI is the capped POI value, so hybrids do not sum to POI MW.","The Cluster 16 header cell begins with the marking 'CAISO PUBLIC' followed by a newline.","Only the latest two clusters were downloaded; the files are not a cumulative queue."]},"test":{"tested_on":"2026-11-19","method":"download","http_status":200,"content_type":"application/vnd.openxmlformats-officedocument.spreadsheetml.sheet","size_bytes":48059,"records_total":226,"records_for_country":226,"problems":["Each cluster is a separate file; no cumulative queue file was found in the page text.","No licence or terms found for the files."]},"evidence":[{"claim":"Latest listing and file formats on the CAISO page.","url":"https://www.caiso.com/planning/Pages/GeneratorInterconnection/Default.aspx","quote":"active, complete and withdrawn interconnection requests"},{"claim":"Observed: Cluster 16 workbook 226 requests (CA 192, NV 23, AZ 8, NM 2, NY 1); Cluster 15 workbook 86 active and 84 withdrawn requests (SUM NET MW POI 28,449 and 30,564 MW).","url":"https://www.caiso.com/documents/cluster-15-interconnection-requests.xlsx","quote":null}],"members":[],"members_summary":null},{"source_id":"nyiso-interconnection-queue","name":"NYISO Interconnection Queue workbook (active, cluster, withdrawn, in-service)","publisher":"New York Independent System Operator (NYISO)","official":true,"landing_url":"https://www.nyiso.com/interconnections","data_url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-10312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1794581737933","access":"direct_download","format":"XLSX with several sheets","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"municipality","adds":"Only tested operator file that names the developer/interconnection customer and carries a long withdrawn and in-service history back to 1999.","first_seen_pass":1,"rank":3,"summary":"NYISO workbook with developer, project, MW, fuel, POI, status code and dates; active, cluster, withdrawn and in-service sheets.","coverage_note":"New York only; file dated 2026-10-31.","data_date":"2026-10-31 (file name); posted by 2026-11-13","caveats":["Status # codes undefined in the file.","Mixed sheet layouts and some placeholder dates."],"coverage":{"geographic":"New York State (NYISO zones A-K); includes affected-system studies of neighbouring areas."},"fine_print":{"unit":{"value":"MW: 'SP (MW)' summer and 'WP (MW)' winter capacity; load sheet uses 'Peak MW load'.","quote":null,"url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-10312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1794581737933","attempts":[]},"inclusion_rule":{"value":"Workbook sheets: Interconnection Queue (active generation), Cluster Projects, Load Projects, Affected System Studies, Withdrawn, Cluster Projects-Withdrawn, In Service. Withdrawn sheet note: 'note all queue projects in this list may not have been validated'.","quote":null,"url":"https://www.nyiso.com/interconnections","attempts":[]},"reference_date":{"value":"File name carries 10312026 (2026-10-31); server Last-Modified 2026-11-13. The page does not state an 'as of' date.","quote":null,"url":"https://www.nyiso.com/interconnections","attempts":[]},"update_frequency":{"value":"Not stated on the page; the file name embeds a month-end date, suggesting monthly posting (observed once; not confirmed).","quote":null,"url":"https://www.nyiso.com/interconnections","attempts":[]},"exclusions":{"value":"Interconnection Projects Portal (project documents) needs a MyNYISO account and, for all projects tied to an account, a CEII form; the workbook does not include study reports.","quote":null,"url":"https://www.nyiso.com/interconnections","attempts":[]}},"key_fields":[{"field":"Queue Pos.","meaning":"Queue position/ID (e.g. 0276; cluster projects use C24-003)."},{"field":"Developer/Interconnection Customer, Project Name","meaning":"Named developer and project."},{"field":"Date of IR","meaning":"Interconnection request date (Excel serial)."},{"field":"SP (MW) / WP (MW) / Type/ Fuel","meaning":"Summer and winter MW; fuel code (S solar, W wind, ES storage, AC, CR, OSW, NG...)."},{"field":"County / State / NYISO Zone / Points of Interconnection / Utility","meaning":"Location and requested POI; ATO in a separate column."},{"field":"Project Status #","meaning":"Numeric study-stage code (e.g. 7, 11, 14), not defined in the workbook."},{"field":"Last Updated Date / IA Tender Date / Proposed In-Service / Sync / COD","meaning":"Record update and planned milestone dates (some as MM-YYYY text)."}],"how_to_use":{"example_request":"curl -sL 'https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-10312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1794581737933' -o nyiso.xlsx  # sheet 'Interconnection Queue', header row 1","example_result":"0571 | Heritage Wind, LLC | Heritage Wind | Date of IR 42614 (2016-09-12) | SP 126 / WP 126 MW | Large Facility | W | Genesee, NY | Zone B | Lockport - Mortimer 115kV | NM-NG | Status # 11 | Last Updated 46326","steps":["Open https://www.nyiso.com/interconnections and copy the current 'Interconnection Queue' link (the file name changes monthly and carries a ?t= parameter).","Use sheet 'Interconnection Queue' for active generation (107 requests), ' Cluster Projects' (note the leading space; 146), 'Withdrawn' (2,518) and 'In Service' (about 158).","Convert date cells (Excel serials) to ISO dates; proposed dates may be text such as 04-2028.","Read cells by column letter: empty cells are omitted by some parsers, shifting columns on sparse rows."],"reading_traps":["Sheets use different headers (Withdrawn: 'Owner/Developer', 'Z', 'S'; Cluster: 'Interconnection Customer Name'); do not stack them without mapping.","Some Date of IR values are placeholders (minimum parsed 1900-01-02) and some Last Updated Date values lie after the file date (up to 2026-11-30 parsed); treat as data-entry quality issues.","The link carries a time parameter (?t=); fetch the page again for the current file.","Load projects share the workbook but are not generation requests.","Project Status # is a bare number without legend in the file."]},"test":{"tested_on":"2026-11-19","method":"download","http_status":200,"content_type":"application/vnd.openxmlformats-officedocument.spreadsheetml.sheet","size_bytes":483664,"records_total":107,"records_for_country":107,"problems":["Status codes are not defined in the workbook or on the page read.","No licence or terms found."]},"evidence":[{"claim":"Page links the queue workbook and notes the account/CEII requirement for the projects portal.","url":"https://www.nyiso.com/interconnections","quote":null},{"claim":"Observed in the downloaded workbook: sheets Interconnection Queue (107 rows), Cluster Projects (146), Withdrawn (2,518, earliest Date of IR 1999-01-28), In Service.","url":"https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-10312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1794581737933","quote":null}],"members":[],"members_summary":null},{"source_id":"pjm-service-request-status","name":"PJM Cycle and Serial Service Request Status pages","publisher":"PJM Interconnection","official":true,"landing_url":"https://www.pjm.com/planning/service-requests","data_url":null,"access":"web_viewer_only","format":"HTML table with XLS/XML export links (export untested); PDFs","license":"Unknown","language":"en","has_coordinates":null,"location_precision":null,"adds":"Largest RTO by requests, with a filterable web table of Transition Cycle and cycle projects (1,792 items in the captured page) and study statistics PDFs; export not verified.","first_seen_pass":1,"rank":4,"summary":"PJM publishes request lists in a web viewer (cycle and serial pages) with XLS/XML export links; the viewer rows and exports were not read.","coverage_note":"PJM footprint only.","data_date":null,"caveats":["Export and sign-in requirement not verified.","TC2 moved from the serial to the cycle page."],"coverage":{"geographic":"PJM footprint (Mid-Atlantic, parts of the Midwest and Virginia/West Virginia)."},"fine_print":{"unit":{"value":"MW Energy, MW Capacity and MW In Service columns (per the page capture).","quote":null,"url":"https://www.pjm.com/planning/m/cycle-service-request-status","attempts":[]},"inclusion_rule":{"value":"Cycle page covers Transition Cycle 1 and 2 and later cycles; the serial page covers earlier serial requests (AE1-AG1 etc.) and says Transition Cycle 2 data there is no longer current.","quote":null,"url":"https://www.pjm.com/planning/service-requests/serial-service-request-status","attempts":[]},"reference_date":{"value":null,"quote":null,"url":"https://www.pjm.com/planning/m/cycle-service-request-status","attempts":[{"url":"https://www.pjm.com/planning/m/cycle-service-request-status","note":"No last-updated date seen in the captured page."}]},"update_frequency":{"value":"Not stated for the tables. The Interconnection Study Statistics PDFs on the landing page are dated 2025-01-30, 2025-07-30, 2026-01-30 and 2026-07-30 (twice a year).","quote":null,"url":"https://www.pjm.com/planning/service-requests","attempts":[]},"exclusions":{"value":"Project details, study reports and agreements are described as accessible on the cycle page; whether a PJM account is needed for exports or details was not verified.","quote":null,"url":"https://www.pjm.com/planning/m/cycle-service-request-status","attempts":[]}},"key_fields":[{"field":"Project ID, Name, State, Status, TO, MFO","meaning":"Request ID, name, state, status, transmission owner and the 'MFO' column."},{"field":"MW Energy, MW Capacity, MW In Service, Fuel","meaning":"Capacity columns and fuel."},{"field":"Submitted Date, Projected In Service Date, Withdrawn Date","meaning":"Date labels in the detail panel (values not visible in the capture)."},{"field":"Filters","meaning":"Project type, Cycle, Status, TO, State, County; 'Full Export' and 'Filtered Export' as XLS or XML."}],"how_to_use":{"example_request":"Open https://www.pjm.com/planning/m/cycle-service-request-status, choose a project type and use Filtered Export (not executed).","example_result":"Page capture: 'Items per page: 1 - 100 of 1792'; columns Project ID, Name, State, Status, TO, MFO, MW Energy, MW Capacity, MW In Service, Fuel.","steps":["Open the cycle page; pick project type, cycle, status, TO, state or county.","Use Full Export or Filtered Export (XLS or XML) if available without sign-in (not verified).","For pre-cycle requests use the serial status page.","Use the semiannual Interconnection Study Statistics PDFs for aggregate counts only."],"reading_traps":["The tables are a JavaScript viewer: plain page text shows the table frame and column names but not the rows.","Transition Cycle 2 appears on both pages; the serial page says its TC2 data is no longer current.","Aggregate statistics PDFs are not request-level lists."]},"test":{"tested_on":"2026-11-19","method":"page_only","http_status":200,"content_type":"text/html; charset=utf-8","size_bytes":340553,"records_total":1792,"records_for_country":1792,"problems":["Request rows and exports were not retrieved: the pages are a script-driven viewer.","Whether the exports need a PJM account was not verified."]},"evidence":[{"claim":"Cycle page capture: 'Items per page: 1 - 100 of 1792'; export offered as XLS or XML.","url":"https://www.pjm.com/planning/m/cycle-service-request-status","quote":null},{"claim":"Serial page: Transition Cycle 2 data there is no longer current; refer to the Cycle page.","url":"https://www.pjm.com/planning/service-requests/serial-service-request-status","quote":"Transition Cycle 2 (TC2) project data on the Serial Service Request Status page is no longer current."}],"members":[],"members_summary":null},{"source_id":"lbnl-queued-up-dataset","name":"Berkeley Lab Queued Up: interconnection queue data file (through 2025)","publisher":"Lawrence Berkeley National Laboratory with GridTracker","official":false,"landing_url":"https://eta-publications.lbl.gov/publications/us-interconnection-queue-data-0","data_url":"https://eta-publications.lbl.gov/sites/default/files/2026-05/lbnl_ix_queue_data_file_thru2025.xlsx","access":"direct_download","format":"XLSX (project-level dataset, codebook and 36 summary tabs per the publication page)","license":"CC BY 4.0","language":"en","has_coordinates":null,"location_precision":null,"adds":"The only multi-operator compilation found: 7 ISO/RTOs plus about 50 non-ISO balancing areas in one workbook, with annual editions; file itself could not be downloaded.","first_seen_pass":1,"rank":5,"summary":"Annual multi-operator compilation of US generation queues through end-2025 (CC BY 4.0), covering ISO/RTOs and about 50 non-ISO areas.","coverage_note":"Per publisher; fields and records not verified because the file was blocked here.","data_date":"Requests through end of 2025; published 2026-05","caveats":["File could not be downloaded from this environment (403).","Lags operator data by months; generation only."],"coverage":{"geographic":"United States: 7 ISO/RTOs and 50 non-ISO balancing areas, about 98% of installed capacity per the publisher."},"fine_print":{"unit":{"value":null,"quote":null,"url":"https://eta-publications.lbl.gov/publications/us-interconnection-queue-data-0","attempts":[{"url":"https://eta-publications.lbl.gov/sites/default/files/2026-05/lbnl_ix_queue_data_file_thru2025.xlsx","note":"Download refused (403, Cloudflare challenge page) on 2026-11-19; codebook inside the workbook not read."}]},"inclusion_rule":{"value":"Generation requests seeking transmission connection submitted through the end of 2025; excludes load, distribution-connected and behind-the-meter projects (publication page).","quote":null,"url":"https://eta-publications.lbl.gov/publications/us-interconnection-queue-data-0","attempts":[]},"reference_date":{"value":"Requests through end of 2025; published 05/2026 (Queued Up 2026 Edition).","quote":null,"url":"https://eta-publications.lbl.gov/publications/us-interconnection-queue-data-0","attempts":[]},"update_frequency":{"value":"Annual editions (2025 edition covers end of 2024; 2026 edition end of 2025); no schedule stated.","quote":null,"url":"https://eta-publications.lbl.gov/publications/us-interconnection-queue-data-0","attempts":[]},"exclusions":{"value":"Publication page does not address anonymisation; field list not read.","quote":null,"url":"https://eta-publications.lbl.gov/publications/us-interconnection-queue-data-0","attempts":[]}},"key_fields":[{"field":"Project-level dataset + codebook + 36 summary tabs","meaning":"As described on the publication page; fields not listed there and not verified."}],"how_to_use":{"example_request":"https://eta-publications.lbl.gov/sites/default/files/2026-05/lbnl_ix_queue_data_file_thru2025.xlsx (not retrievable from this environment: 403)","example_result":"Not obtained; the response was a Cloudflare 'Just a moment...' HTML page (5,645 bytes).","steps":["Open the publication page and download the XLSX in a normal browser session.","Read the codebook sheet first, then the project-level sheet.","Cite as Berkeley Lab and GridTracker (CC BY 4.0)."],"reading_traps":["Data run to the end of 2025, so they lag operator files by months.","Compiled and cleaned by the authors; operator identifiers may be harmonised or removed (not verified)."]},"test":{"tested_on":"2026-11-19","method":"blocked","http_status":403,"content_type":"text/html; charset=UTF-8","size_bytes":5645,"records_total":null,"records_for_country":null,"problems":["Automated requests to emp.lbl.gov and to the data-file URL on eta-publications.lbl.gov get a 403 challenge page; the landing page emp.lbl.gov/queues also returned 403 to curl.","Contents of the workbook not verified; description relies on the publication page."]},"evidence":[{"claim":"Publication page: scope, files, licence.","url":"https://eta-publications.lbl.gov/publications/us-interconnection-queue-data-0","quote":"CC BY 4.0"},{"claim":"Direct download attempt returned 403 on 2026-11-19 from both emp.lbl.gov and eta-publications.lbl.gov hosts.","url":"https://eta-publications.lbl.gov/sites/default/files/2026-05/lbnl_ix_queue_data_file_thru2025.xlsx","quote":null}],"members":[],"members_summary":null},{"source_id":"other-iso-rto-queue-portals","name":"Other ISO/RTO queue portals (SPP, ISO-NE, ERCOT)","publisher":"SPP, ISO New England, ERCOT","official":true,"landing_url":"https://www.spp.org/engineering/generator-interconnection/","data_url":null,"access":"web_viewer_only","format":"Web viewers, PDF and Excel (varies)","license":"Unknown","language":"en","has_coordinates":null,"location_precision":null,"adds":"Remaining RTOs outside the tested group, with where their queue or status report lives; none was retrieved in this pass.","first_seen_pass":1,"rank":6,"summary":"SPP, ISO-NE and ERCOT queue locations identified but not retrieved.","coverage_note":"Not tested.","data_date":null,"caveats":["Not retrieved here."],"coverage":{"geographic":"SPP, New England and Texas (ERCOT) footprints."},"fine_print":{"unit":null,"inclusion_rule":null,"reference_date":null,"update_frequency":{"value":"SPP weekly cluster status PDF is the only cadence on its page; ISO-NE says its queue can change daily; ERCOT GIS report described by a search result as monthly (not opened).","quote":null,"url":"https://www.spp.org/engineering/generator-interconnection/","attempts":[]},"exclusions":null},"key_fields":[{"field":"SPP GI Queue / weekly status PDF","meaning":"opsportal.spp.org/Studies/GIActive and sppgistudyupdate_weekly.pdf per the SPP landing page."},{"field":"ISO-NE IRTT external report / Excel via Ask ISO","meaning":"Fields listed on the ISO-NE page: QP, Type, Unit, Fuel Type, Net MW, Summer MW, Winter MW, County, ST, Op Date, Sync Date, W/D Date, POI, Serv."}],"how_to_use":{"example_request":"Not executed: opsportal.spp.org and irtt.iso-ne.com did not accept connections from this environment on 2026-11-19.","example_result":"None.","steps":["SPP: open the GI Queue at opsportal.spp.org/Studies/GIActive from the SPP page.","ISO-NE: open irtt.iso-ne.com/reports/external for requests before 2024-06-13; newer ones on the Interconnection Process Guide page.","ERCOT: look for the monthly Generator Interconnection Status report on ercot.com/gridinfo/resource."],"reading_traps":["ISO-NE splits the queue at 2024-06-13 between the old IRTT report and the new cluster process.","ERCOT and LBNL pages return 403 to automated clients."]},"test":{"tested_on":"2026-11-19","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":null,"records_total":null,"records_for_country":null,"problems":["opsportal.spp.org and irtt.iso-ne.com refused the connection or timed out from this host (ECONNREFUSED / curl timeout).","ercot.com/gridinfo/resource and the ERCOT data product page returned 403."]},"evidence":[{"claim":"SPP page links the GI Queue and weekly PDF; no spreadsheet.","url":"https://www.spp.org/engineering/generator-interconnection/","quote":"SPP GI Queue"},{"claim":"ISO-NE page: public queue via IRTT external report for requests before June 13, 2024.","url":"https://www.iso-ne.com/system-planning/transmission-planning/interconnection-request-queue/","quote":null}],"members":[{"name":"SPP GI Queue (opsportal)","landing_url":"https://opsportal.spp.org/Studies/GIActive","data_url":null,"access":"web_viewer_only","tested":false,"data_found":null,"note":"Linked from the SPP page; connection refused from this host."},{"name":"ISO-NE IRTT external report","landing_url":"https://irtt.iso-ne.com/reports/external","data_url":null,"access":"web_viewer_only","tested":false,"data_found":null,"note":"Linked from the ISO-NE queue page; timed out."},{"name":"ERCOT resource adequacy / GIS reports","landing_url":"https://www.ercot.com/gridinfo/resource","data_url":null,"access":"web_viewer_only","tested":false,"data_found":null,"note":"403 to automated clients on 2026-11-19."}],"members_summary":{"total":null,"listed":3,"tested":0,"data_found":0,"scope_note":"Three of seven ISO/RTOs listed here (PJM, MISO, CAISO, NYISO have own entries); utilities outside ISO/RTOs (about 50 balancing areas per LBNL) were not examined.","pattern":"Each RTO runs its own portal; look for an 'interconnection queue', 'GI queue' or 'GIS report' page."},"member_scope":{"total":null,"note":"Three of seven ISO/RTOs listed here (PJM, MISO, CAISO, NYISO have own entries); utilities outside ISO/RTOs (about 50 balancing areas per LBNL) were not examined.","pattern":"Each RTO runs its own portal; look for an 'interconnection queue', 'GI queue' or 'GIS report' page."}}],"sector":{"regulator":{},"operators":{},"publication_obligation":{},"consolidated_republication":{"checked_pages":[]}},"national_registry":{"exists":"unknown","note":"No single operator-neutral official list was found in the pages opened; the Berkeley Lab compilation is academic and was blocked. Regulator (FERC) pages were not opened.","checked_pages":[{"organization":"Berkeley Lab","url":"https://eta-publications.lbl.gov/publications/us-interconnection-queue-data-0","saw":"Compilation of 7 ISO/RTOs and about 50 non-ISO balancing areas, data through end of 2025."},{"organization":"PJM","url":"https://www.pjm.com/planning/service-requests","saw":"Cycle and serial service request status views plus statistics PDFs for PJM only."},{"organization":"MISO","url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","saw":"MISO-only maps and dashboards."}]},"if_unstructured":{"summary":"Operator files and viewers are structured; no document-extraction recipe needed for the tested operators.","recipe":[],"where_published":[]},"related_not_answering":[{"name":"PJM Interconnection Study Statistics PDFs","url":"https://www.pjm.com/planning/service-requests","why":"Aggregate counts by study period, not request-level records (PDF contents not opened)."},{"name":"MISO Queue Cap Tracker and Active Queue Overview (Power BI)","url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","why":"Dashboards of the same MISO queue; not tested as a data source."}],"open_questions":[{"question":"Can PJM's cycle status XLS/XML export be downloaded without an account, and what are its fields and dates?","territory":"PJM","starting_source":"https://www.pjm.com/planning/m/cycle-service-request-status","next_step":"Open the page in a browser session, use Full Export, and record fields, record count and date."},{"question":"What do the SPP, ISO-NE and ERCOT queue files contain and are they downloadable without an account?","territory":"SPP, ISO-NE, ERCOT","starting_source":"https://www.spp.org/engineering/generator-interconnection/","next_step":"Retry opsportal.spp.org and irtt.iso-ne.com from another network; fetch ERCOT's monthly GIS report from its resource page."},{"question":"What fields, anonymisation and history does the Berkeley Lab workbook have?","territory":"National compilation","starting_source":"https://eta-publications.lbl.gov/publications/us-interconnection-queue-data-0","next_step":"Download the XLSX in a browser session and read the codebook sheet."},{"question":"Which queue sources exist for utilities outside the ISO/RTOs (southeast, west, northwest)?","territory":"Non-ISO utilities","starting_source":"https://eta-publications.lbl.gov/publications/us-interconnection-queue-data-0","next_step":"Read the LBNL workbook source column, then open the utilities' OASIS queue pages."},{"question":"Are there MISO status definitions and API documentation?","territory":"MISO","starting_source":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","next_step":"Look for the Business Practice Manual on generator interconnection and the Project Status tool help."}],"history":[{"pass":1,"date":"2026-11-19","role":"research","model":"claude-sonnet-5-5 (Claude Sonnet 5.5) via Claude Code in the VS Code extension (Claude Agent SDK)","rules_version":"us-permitting-2026-11-19","note":"First pass, reported effort level Sonnet High per the run instructions. Downloaded MISO JSON, two CAISO workbooks and the NYISO workbook; PJM page read only; LBNL blocked; SPP/ISO-NE/ERCOT not retrieved.","headline":{"official_data":"partial","non_official_data":"partial"},"sources":{"total":6,"new":6,"dropped":0},"negatives":{},"effort":{"pages":20,"minutes":null}}],"local_terms":[{"term":"Interconnection queue","language":"en","meaning":"Ordered list of generator requests to connect to the transmission grid."},{"term":"POI (point of interconnection)","language":"en","meaning":"Requested substation or line where the project would connect."},{"term":"ERIS / NRIS","language":"en","meaning":"Energy Resource / Network Resource Interconnection Service (MISO svcType values)."},{"term":"DPP (Definitive Planning Phase)","language":"en","meaning":"MISO study cycle label such as DPP-2023."},{"term":"Cluster study","language":"en","meaning":"Requests studied in batches (CAISO clusters, PJM Transition Cycles, NYISO cluster projects)."},{"term":"ISO/RTO","language":"en","meaning":"Independent System Operator or Regional Transmission Organization."}],"provenance":{"pass_count":1,"models":["claude-sonnet-5-5 (Claude Sonnet 5.5) via Claude Code in the VS Code extension (Claude Agent SDK)"],"minutes_estimate":null,"pages_opened":20,"passes":[{"pass":1,"date":"2026-11-19","model":"claude-sonnet-5-5 (Claude Sonnet 5.5) via Claude Code in the VS Code extension (Claude Agent SDK)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/us/grid-connection-queue.json","detail_url":"https://georutter.org/v1/us/grid-connection-queue/detail.json","html_url":"https://georutter.org/us/grid-connection-queue/","country_url":"https://georutter.org/v1/countries/us.json"}