{"schema_version":"1.0","country":"us","country_name":"United States","topic":"grid-expansion-plans","question":"Where can I get the planned new power lines and substations in the United States, with location, voltage, planned date and status?","territory":"us","territory_level":"country","parent_url":null,"published_on":"2026-11-27","research_reviewed_on":"2026-11-19","access_checked_on":"2026-11-19","answer":{"official_data":"partial","non_official_data":"not_tested","summary":"PJM's live XML, CAISO's annual plan and status workbooks, and MISO's MTEP package list regional upgrades and give project descriptions, status and estimated in-service dates. The sources checked give locations by name, state or occasional point. No downloadable route geometry or national dataset was verified. Filter out equipment-only, canceled and completed work when looking for new lines and substations.","main_caveats":["No national list was found: PJM, CAISO and MISO were read, ERCOT was blocked (403), ISO-NE only via a PDF update, and NYISO, SPP, BPA and individual utilities were not opened.","Files give names and state, not routes: only 16 of 15,816 PJM rows embed a coordinate; CAISO and MISO give substation names and text; CAISO route maps are images in the plan.","The 19 Nov 2026 PJM snapshot had 15,816 upgrades and 5,637 pending or active records. Filter out breakers, relays, reconductoring and other work outside the scope of new lines and substations.","Listing or approval is not construction: PJM Board approval, MISO 'Appendix A Approved' and CAISO plan approval precede permits; expected in-service dates are revised often.","Versions change under one URL: CAISO's main plan URL now serves the 2026-08-27 update, MISO's MTEP26 package is a draft, and PJM's XML is overwritten in place."],"confidence":"medium","confidence_reason":"Three operators downloaded and parsed; ERCOT blocked, ISO-NE partial, NYISO, SPP, BPA unopened. Claims are limited to the operators read; no route data was found.","attributes":[{"attribute":"location","covered":"partial","source_ids":["pjm-upgrades","caiso-plan-appendix-h","miso-mtep25"],"note":"Substation or line names and state only (PJM Location, MISO From/To Sub, CAISO descriptions); no routes; 16 of 15,816 PJM rows embed a point.","gap":"not_checked","gap_note":"No route geometry in the files tested; ERCOT, NYISO, SPP, the ISO-NE list file and project permit filings were not checked for routes."},{"attribute":"voltage","covered":"yes","source_ids":["pjm-upgrades","miso-mtep25","caiso-plan-appendix-h"],"note":"PJM Voltage in kV (pairs like 138/69; 642 blank), MISO Max kV and Min kV, CAISO kV in project names and descriptions.","gap":null,"gap_note":null},{"attribute":"planned_date","covered":"yes","source_ids":["pjm-upgrades","miso-mtep25","caiso-plan-appendix-h","caiso-tdf-workbooks"],"note":"PJM ProjectedInServiceDate, MISO Expected ISD, CAISO expected in-service (Appendix H, TDF history); approval and required dates are separate fields.","gap":null,"gap_note":null},{"attribute":"status","covered":"yes","source_ids":["pjm-upgrades","miso-mtep25","caiso-tdf-workbooks"],"note":"PJM Status (PL, EP, UC, IS, Cancelled), MISO Plan Status M1-M4, CAISO TDF Project Status (Initiating, Design, Construction, In-Service, Cancelled).","gap":null,"gap_note":null},{"attribute":"latest_data","covered":"yes","source_ids":["pjm-upgrades","caiso-plan-appendix-h","miso-mtep25"],"note":"PJM XML modified 2026-11-19; CAISO plan updated 2026-08-27; MISO MTEP25 (Dec 2025) and MTEP26 draft (2026-11-06); CAISO TDF workbook retrieved only to Jul 2025.","gap":null,"gap_note":null},{"attribute":"historical_series","covered":"partial","source_ids":["caiso-tdf-workbooks","pjm-upgrades","miso-mtep25"],"note":"CAISO TDF keeps in-service date revisions Jan 2022-Jul 2025; PJM lists projects since 2005 but only its current state; MISO has one package per year.","gap":"not_checked","gap_note":"No versioned archive of the PJM table found (only a 2023 XLS snapshot); CAISO TDF workbooks after Jul 2025 were not retrieved."},{"attribute":"update_frequency","covered":"partial","source_ids":["caiso-tdf-workbooks","caiso-plan-appendix-h","miso-mtep25","pjm-upgrades"],"note":"CAISO states twice-yearly forums and an annual plan; MISO publishes annual MTEP packages; PJM refreshed its XML on the day tested but states no schedule.","gap":"not_checked","gap_note":"PJM and MISO pages read state no update schedule; re-fetching file headers over several days would show PJM's real cadence."}]},"sources":[{"source_id":"pjm-upgrades","name":"PJM RTEP Project Status & Cost Allocation upgrades table (XML and XLS export)","publisher":"PJM Interconnection, L.L.C.","official":true,"landing_url":"https://www.pjm.com/planning/m/project-construction","data_url":"https://www.pjm.com/pjmfiles/media/planning/projectConstruction-data/projectCostUpgrades.xml","access":"direct_download","format":"XML, one Upgrade element per upgrade (the page table also exports to XLS)","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"none","adds":"Largest structured list of planned and built transmission upgrades in one footprint, with voltage, state, status, board-approval and in-service dates per upgrade.","first_seen_pass":1,"rank":1,"summary":"Live XML with description, kV, state, location text, status and dates. The 19 Nov 2026 snapshot had 15,816 upgrades, including 5,637 pending or active records.","coverage_note":"PJM footprint only; names and state, no routes (16 rows embed a point); many rows are equipment upgrades, not new lines or substations.","data_date":"File modified 2026-11-19","caveats":["Active status means queue-linked and not yet under agreement","A 2023 XLS on the same page is stale"],"coverage":{"geographic":"PJM footprint (state codes seen include OH, PA, VA, NJ, WV, IN); SubRegion PJM WEST, PJM MA, PJM SOUTH, Not Specified; 5 rows carry SubRegion MISO"},"fine_print":{"unit":{"value":"Voltage in kV as text (can be a pair such as 138/69); CostEstimate in millions of USD","quote":"Cost (millions)","url":"https://www.pjm.com/planning/m/project-construction","attempts":[]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.pjm.com/planning/m/project-construction","note":"Page refers to RTEP Baseline and Supplemental upgrades; the XML also holds 3,414 Network upgrades (ProjectType) and states no size threshold."}]},"reference_date":{"value":"File last modified 2026-11-19 17:09:37 GMT; per-row LastUpdated up to 2026-11-19; latest PJMBoardApprovalDate 2026-11-17","quote":"last-modified: Thu, 19 Nov 2026 17:09:37 GMT","url":"https://www.pjm.com/pjmfiles/media/planning/projectConstruction-data/projectCostUpgrades.xml","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.pjm.com/pjmfiles/media/planning/projectConstruction-data/projectCostUpgrades.xml","note":"One snapshot: per-row LastUpdated spans 2025-02-20 to 2026-11-19; no schedule stated on the page."}]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.pjm.com/planning/m/project-construction","note":"Status legend defines Active, Canceled, Engineering & Procurement, In Service, On Hold, Under Construction and Withdrawn; no exclusion statement found."}]}},"key_fields":[{"field":"UpgradeId","meaning":"PJM upgrade identifier, e.g. b3780.2; the suffix numbers sub-upgrades"},{"field":"Description","meaning":"Free text scope: new line, rebuild, breaker, transformer, reconductor"},{"field":"ProjectType","meaning":"Baseline, Supplemental or Network"},{"field":"Voltage","meaning":"kV; 642 rows blank; pairs such as 138/69 or 765/500 for multi-voltage assets"},{"field":"State / Location / Equipment","meaning":"State code, substation or line names, and equipment class (Transmission Line, Substation, Circuit Breaker...)"},{"field":"Status","meaning":"IS, EP, UC, UC-ISP, PL, Active, On Hold, Cancelled, W"},{"field":"ProjectedInServiceDate / RevisedInServiceDate / ActualInServiceDate","meaning":"Expected, revised and real in-service dates (m/d/yyyy)"},{"field":"PJMBoardApprovalDate / RequiredDate","meaning":"Approval date and the date the upgrade is needed"},{"field":"ProposalIds / TransmissionOwner / LastUpdated","meaning":"Competitive-window proposal id, owner, last row update"}],"how_to_use":{"example_request":"curl -sL -o projectCostUpgrades.xml 'https://www.pjm.com/pjmfiles/media/planning/projectConstruction-data/projectCostUpgrades.xml' ; parse each <Upgrade>, keep Status in (PL, EP, UC, UC-ISP, Active, On Hold) and Equipment in ('Transmission Line', 'Substation')","example_result":"UpgradeId b3780.2: 'Peach Bottom to Graceton (PECO) - New 500 kV transmission line', Voltage 500, State PA, Status UC, ProjectedInServiceDate 10/23/2028, PJMBoardApprovalDate 7/12/2023, TransmissionOwner PECO, LastUpdated 11/4/2026.","steps":["Download the XML (25.8 MB on 2026-11-19) and parse every Upgrade element into a row; 15,816 rows, all UpgradeIds distinct.","Keep pending work: Status PL, EP, UC, UC-ISP, Active or On Hold (5,637 rows); of these 1,608 are Equipment 'Transmission Line' and 900 'Substation'.","Read Description to tell a new line or substation from a rebuild, reconductor, breaker or transformer upgrade: Equipment alone does not say.","Use ProjectedInServiceDate, or RevisedInServiceDate when present (2,286 rows), as the expected date; PJMBoardApprovalDate is the approval date.","Location: use the text and State; 16 rows carry a '(lat,lon)' pair inside Location (e.g. 'Mountaineer--(38.9761,-81.9418)-{GUID}')."],"reading_traps":["Status codes: IS in service 9,326; EP engineering and procurement 3,848; Cancelled 847; Active 812 (queue-linked network upgrades with no interconnection agreement yet); UC under construction 607; On Hold 226; PL 132; UC-ISP 12; W 6.","The table mixes projects and parts: b3847.1, b3847.2 and b3847.3 are single 765 kV breakers; a new line is usually one row among many sharing a b-number prefix.","Date typos exist: one ProjectedInServiceDate is in 1905 and one LatestTEACDate in 2205; Voltage is blank in 308 pending rows.","The XLS linked as 'Latest TCIC version' is 'As of 7.11.2023' (38 MB, last modified 2023-07-12); use the XML for current data.","A Baseline or Supplemental upgrade at an existing substation is not a new substation; Supplemental upgrades are owner-driven (6,763 rows)."]},"test":{"tested_on":"2026-11-19","method":"download","http_status":200,"content_type":"text/xml","size_bytes":25758638,"records_total":15816,"records_for_country":null,"problems":["The page's 'Latest TCIC version' XLS is a 2023 snapshot (last modified 2023-07-12)."]},"evidence":[{"claim":"Status legend","url":"https://www.pjm.com/planning/m/project-construction","quote":"Engineering & Procurement 0-25% Includes engineering, detailed design, material procurement & resource planning In Service Project complete, fully energized and planning criteria met"},{"claim":"Table size and columns on the page","url":"https://www.pjm.com/planning/m/project-construction","quote":"Showing results 1 - 100 of 15816 [Previous] [Next]"},{"claim":"Stale XLS snapshot","url":"https://www.pjm.com/planning/m/project-construction","quote":"Latest TCIC version: As of 7.11.2023"}],"members":[],"members_summary":null},{"source_id":"caiso-plan-appendix-h","name":"CAISO 2025-2026 Transmission Plan (Board approved 2026-05-19, updated 2026-08-27) and Appendix H project descriptions","publisher":"California Independent System Operator (CAISO)","official":true,"landing_url":"https://www.caiso.com/documents/board-approved-2025-2026-transmission-plan.pdf","data_url":"https://www.caiso.com/documents/board-approved-2025-2026-transmission-plan-appendix-h-projects.pdf","access":"pdf","format":"PDF (plan 181 pages; Appendix H 25 pages, one block per project)","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"none","adds":"Approved new lines and substations in California's ISO area with description, type, need date, expected in-service date and cost range, plus plan IDs and re-scope and cancellation tables.","first_seen_pass":1,"rank":2,"summary":"CAISO's annual plan lists 38 approved projects; Appendix H describes 33 with kV, miles, type, expected in-service date and cost, and plan tables give IDs and previously approved project status.","coverage_note":"CAISO area only; text and PDF; no coordinates; dates are those at approval.","data_date":"Plan approved 2026-05-19, updated 2026-08-27","caveats":["Main plan URL now holds the 2026-08-27 update","Many projects are upgrades, not new lines"],"coverage":{"geographic":"CAISO balancing authority area (California and participating areas); projects by participating transmission owner such as PG&E, SCE, SDG&E"},"fine_print":{"unit":{"value":"kV and miles in the project text; cost as a $ range in text; dates as year or month-year text","quote":"Project Cost    $19M - $37.6M","url":"https://www.caiso.com/documents/board-approved-2025-2026-transmission-plan-appendix-h-projects.pdf","attempts":[]},"inclusion_rule":{"value":"38 new projects found needed in the 2025-2026 planning cycle (33 reliability, 4 policy, 1 economic); Appendix H describes 33 of them","quote":"The 38 new transmission projects found to be needed in the 2025-2026 transmission planning process totaling $6.7 billion at full buildout are as follows:","url":"https://www.caiso.com/documents/board-approved-2025-2026-transmission-plan.pdf","attempts":[]},"reference_date":{"value":"Appendices dated 2026-05-19; plan text updated and approved 2026-08-27 without changing the appendices","quote":"The update to the May 19th, 2026, Board Approved 2025-2026 Transmission Plan was approved by the ISO Board of Governors on August 27th.","url":"https://www.caiso.com/documents/board-approved-2025-2026-transmission-plan.pdf","attempts":[]},"update_frequency":{"value":"Annual transmission planning process","quote":"was prepared through the annual transmission planning process (TPP)","url":"https://www.caiso.com/documents/board-approved-2025-2026-transmission-plan.pdf","attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.caiso.com/documents/board-approved-2025-2026-transmission-plan.pdf","note":"Five re-scoped projects (Table ES-1 items 29-33) are described in plan section 2.3.3, not in Appendix H."}]}},"key_fields":[{"field":"Name / Description","meaning":"Project name and scope, e.g. 'Build a new 500 kV transmission line ... approximately 180 miles'"},{"field":"Type","meaning":"Reliability, Policy or Economic-driven"},{"field":"Project Need Date / Expected In Service Date","meaning":"Year needed and expected in-service year or month-year"},{"field":"Project Cost","meaning":"Cost estimate or range"},{"field":"Plan table ID / PTO / Area","meaning":"e.g. 2526-P-04, SCE, EOP (Tables ES-1 to ES-3)"}],"how_to_use":{"example_request":"curl -sL -o apph.pdf 'https://www.caiso.com/documents/board-approved-2025-2026-transmission-plan-appendix-h-projects.pdf' ; pdftotext -layout apph.pdf apph.txt ; split on lines starting with 'Name'","example_result":"Name 'Trout Canyon - Lugo 500 kV Line': 'Build a new 500 kV transmission line from Trout Canyon 500 kV substation to Lugo 500 kV substation, approximately 180 miles, with 70% series compensation'; Type Policy; Expected In Service Date 2035; Project Cost $1,270 - $1,800 million (plan ID 2526-P-04, SCE).","steps":["Download Appendix H and convert with pdftotext -layout; it yields 33 'Name' blocks.","Read Name, Description (kV, miles, substations), Type, Expected In Service Date and Project Cost per block; the plan body Tables ES-1 to ES-3 add the plan ID, owner (PTO) and area.","Read plan Table 8-2 and Table 8-3 for expected in-service dates and 'On Hold' flags of projects approved in earlier plans (dated from the January 2026 forum).","Check plan Table 8-1 for projects closed out or cancelled in the cycle."],"reading_traps":["Appendix H has 33 blocks while the plan counts 38 projects: the 5 re-scopes are in section 2.3.3.","The main plan URL now serves the 2026-08-27 update (PDF created 2026-09-16); the update removed the hold on 'DeAnza 115 kV Substation' and 'South Bay Reinforcement Project (Re-scope) - Segment G'.","Expected in-service years are at approval; the TDF workbooks track later slippage.","Most 'new' items are reconductoring, breaker or bank upgrades; real new lines or substations here are e.g. DeAnza 115 kV Substation, Penasquitos - Mira Sorrento 69 kV #2 line, Trout Canyon - Lugo 500 kV Line.","Route maps are figures (e.g. Figure 3-6 for Trout Canyon - Lugo); no coordinates in the text."]},"test":{"tested_on":"2026-11-19","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":316556,"records_total":33,"records_for_country":null,"problems":["The original 2026-05-19 plan text is no longer at the main plan URL, which serves the 2026-08-27 update."]},"evidence":[{"claim":"Update approval","url":"https://www.caiso.com/documents/board-approved-2025-2026-transmission-plan.pdf","quote":"The update to the May 19th, 2026, Board Approved 2025-2026 Transmission Plan was approved by the ISO Board of Governors on August 27th."},{"claim":"New 500 kV line with length, type and date","url":"https://www.caiso.com/documents/board-approved-2025-2026-transmission-plan-appendix-h-projects.pdf","quote":"Build a new 500 kV transmission line from Trout Canyon 500 kV substation to Lugo 500 kV substation, approximately 180 miles, with 70% series compensation"},{"claim":"In-service dates in Table 8-2 come from the January 2026 forum","url":"https://www.caiso.com/documents/board-approved-2025-2026-transmission-plan.pdf","quote":"Draft Transmission Plan in-service dates are based on the January 2026 Transmission Development Forum"}],"members":[],"members_summary":null},{"source_id":"caiso-tdf-workbooks","name":"CAISO Transmission Development Forum workbooks: Approved Projects - Transmission Planning Process","publisher":"California Independent System Operator (CAISO)","official":true,"landing_url":"https://stakeholdercenter.caiso.com/RecurringStakeholderProcesses/Transmission-development-forum","data_url":"https://stakeholdercenter.caiso.com/InitiativeDocuments/Approved-Projects-Transmission-Planning-Process-Jul-2025.xlsx","access":"direct_download","format":"XLSX, one sheet per transmission owner (PGaE, SCE, SDGaE, VEA_GLW, DCRT, LSPower, CitizensEnergy, Lotus, HWT)","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"none","adds":"Status and in-service date history of every approved CAISO transmission project, with expected permit filing and construction start, by transmission owner.","first_seen_pass":1,"rank":3,"summary":"Twice-yearly CAISO workbooks track every approved transmission project with status, permit filing and construction milestones, and expected in-service dates by forum since 2022.","coverage_note":"Retrieved edition is July 2025 (230 projects); no kV or location columns; January and July 2026 editions not found.","data_date":"July 2025 forum","caveats":["Newer 2026 workbooks exist but were not located","Includes finished and cancelled projects"],"coverage":{"geographic":"Projects approved in CAISO transmission plans, all participating transmission owners"},"fine_print":{"unit":{"value":"Dates are Excel serial numbers or text such as TBD, Pending, N/A, In-Service; no voltage column","quote":"Expected In-Service","url":"https://stakeholdercenter.caiso.com/InitiativeDocuments/Approved-Projects-Transmission-Planning-Process-Jul-2025.xlsx","attempts":[]},"inclusion_rule":{"value":"All approved transmission projects from the annual planning process, plus a separate workbook for generator-interconnection network upgrades","quote":"one listing all approved transmission projects from the annual transmission planning process, and the other showing the transmission network upgrade projects required through the generator interconnection process.","url":"https://www.caiso.com/documents/transmission-development-forum-update-memo-apr-2026.pdf","attempts":[]},"reference_date":{"value":"Workbook retrieved reflects the July 2025 forum (columns up to 'Expected In-Service July 2025'); later forums on 2026-01-28 and July 2026 exist","quote":"This memorandum provides an update on the most recent transmission development forum held on January 28, 2026.","url":"https://www.caiso.com/documents/transmission-development-forum-update-memo-apr-2026.pdf","attempts":[]},"update_frequency":{"value":"Twice a year, January and July","quote":"The forum is now held twice a year, in January and July","url":"https://www.caiso.com/documents/transmission-development-forum-update-memo-apr-2026.pdf","attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://stakeholdercenter.caiso.com/RecurringStakeholderProcesses/Transmission-development-forum","note":"No exclusion statement read; the workbooks carry no voltage or location columns."}]}},"key_fields":[{"field":"Project / PTO","meaning":"Project name and transmission owner"},{"field":"Transmission Plan Approved / In-service Year at Approval","meaning":"Plan cycle (e.g. 2022-2023) and the in-service year foreseen then"},{"field":"Expected In-Service (one column per forum, Jan 2022 to Jul 2025)","meaning":"History of expected in-service dates"},{"field":"Project Status","meaning":"Initiating, In-Flight, Preliminary Engineering, Design, Permitting, Construction, In-Service, Close-out, Cancelled"},{"field":"Expected CPUC Permit Application / Expected Construction Start / Notes","meaning":"Permit and construction milestones and delay reasons"}],"how_to_use":{"example_request":"curl -sL -o tdf_jul2025.xlsx 'https://stakeholdercenter.caiso.com/InitiativeDocuments/Approved-Projects-Transmission-Planning-Process-Jul-2025.xlsx' ; read sheet 'SCE' (row 1 headers)","example_result":"SCE sheet: 'Alberhill 500 kV Method of Service', approved plan 2009, Expected In-Service at the Jul 2025 forum 47453 (2029-12-01 as Excel serial), Project Status 'Engineering', Expected CPUC Permit Application 40057 (2009-09-01).","steps":["Download the workbook and read each sheet; keep rows with a non-empty 'Project' (230 rows across 9 sheets).","Convert Excel serial dates to calendar dates; treat 'TBD', 'Pending', 'N/A' and 'New' as text values.","Read the Expected In-Service columns left to right to see slippage, and Project Status for the stage.","Join to the plan IDs by project name (the workbook has no plan ID)."],"reading_traps":["The workbook lists projects of all kinds and sizes and has no kV or location column.","Status vocabulary differs by sheet ('In-Flight' vs 'In flight', 'In-Service' vs 'In service', 'Close-out').","Rows already In-Service (22) or Cancelled (6) are in the same sheets as pending work.","Header text is truncated in some forum columns; read them as one forum date each."]},"test":{"tested_on":"2026-11-19","method":"download","http_status":200,"content_type":"application/octet-stream","size_bytes":591323,"records_total":230,"records_for_country":null,"problems":["The stakeholder page's static HTML lists documents only through the July 2025 forum; guessed names for the January and July 2026 workbooks returned HTTP 500."]},"evidence":[{"claim":"What the two workbooks hold","url":"https://www.caiso.com/documents/transmission-development-forum-update-memo-apr-2026.pdf","quote":"For each forum, the ISO posts two workbooks: one listing all approved transmission projects from the annual transmission planning process, and the other showing the transmission network upgrade projects required through the generator interconnection process."},{"claim":"Delays outnumber advances","url":"https://www.caiso.com/documents/transmission-development-forum-update-memo-apr-2026.pdf","quote":"The table indicates that while some transmission projects and network upgrades now have earlier in-service dates, a greater number of projects have had their in-service dates delayed."}],"members":[],"members_summary":null},{"source_id":"miso-mtep25","name":"MISO Transmission Expansion Plan MTEP25 package: Appendix A new local reliability projects and facilities list","publisher":"Midcontinent Independent System Operator (MISO)","official":true,"landing_url":"https://www.misoenergy.org/planning/transmission-planning/mtep/","data_url":"https://cdn.misoenergy.org/MTEP25731615.zip","access":"direct_download","format":"ZIP with XLSX workbooks and PDF chapters","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"none","adds":"Project and facility rows across MISO's Midwest and South planning regions with from/to substations, max and min kV, new and upgraded miles, plan status and expected in-service date.","first_seen_pass":1,"rank":4,"summary":"MISO's MTEP25 package gives 432 Appendix A projects and 678 facility rows with from/to substations, kV, new miles, plan status M1-M4 and expected in-service date; a draft MTEP26 has 532 projects.","coverage_note":"MISO footprint; substation names and state only; interactive status reports need sign-in.","data_date":"MTEP25 package 2025-12-11; MTEP26 draft 2026-11-06","caveats":["Appendix A is recommended for approval, mostly M1 Proposed","'Other' project type mixes load-growth and local needs"],"coverage":{"geographic":"MISO footprint: planning regions West, Central, East and South (states such as WI, IA, IN, MN)"},"fine_print":{"unit":{"value":"Max kV and Min kV in kV; Current Cost and Estimated Cost in whole USD (e.g. 345000000); Expected ISD as Excel serial; Miles New and Miles Upgrade in miles","quote":"Expected ISD","url":"https://cdn.misoenergy.org/MTEP25731615.zip","attempts":[]},"inclusion_rule":{"value":"Appendix A holds new local reliability projects recommended for approval in the MTEP25 cycle","quote":"MTEP25 Appendix A - New Local Reliability Projects recommended for approval","url":"https://cdn.misoenergy.org/MTEP25731615.zip","attempts":[]},"reference_date":{"value":"MTEP25 ZIP last modified 2025-12-11; draft MTEP26 package last modified 2026-11-06","quote":"last-modified: Thu, 11 Dec 2025 19:36:51 GMT","url":"https://cdn.misoenergy.org/MTEP25731615.zip","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.misoenergy.org/planning/transmission-planning/mtep/","note":"Page lists the MTEP25 report ZIP and a draft MTEP26 ZIP, implying an annual cycle, but no schedule statement was read."}]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.misoenergy.org/planning/transmission-planning/mtep/","note":"Interactive status reports (Appendix A status, in-service projects, projects under evaluation) need a sign-in; no exclusion statement read."}]}},"key_fields":[{"field":"MTEP Project ID / Project Name / Project Description","meaning":"Project identifier, name and scope text"},{"field":"Planning Region / State(s) / Submitting TO","meaning":"Region, states and transmission owner"},{"field":"Max kV (Appendix A); Max kV and Min kV (Facilities)","meaning":"Highest voltage; the facilities sheet keeps both sides of transformers"},{"field":"Facility Type / From Sub / To Sub / Miles New / Miles Upgrade","meaning":"Substation, Line New, Line Upgrade, Transformer, Voltage Device, Misc.; endpoints and miles"},{"field":"Plan Status","meaning":"M1 - Proposed, M2 - Appendix A Approved, M3 - Under Construction, M4 - Project in Service"},{"field":"Expected ISD","meaning":"Expected in-service date (Excel serial)"}],"how_to_use":{"example_request":"curl -sL -o MTEP25.zip 'https://cdn.misoenergy.org/MTEP25731615.zip' ; unzip, open 'MTEP25 Appendix A - New Local Reliability Projects.xlsx', sheets 'MTEP25 Appendix A' (header row 2) and 'MTEP25 Facilities' (header row 1)","example_result":"Facilities row PrjID 50628: Transformer Fayette/Wolf Creek - Edwards, Max kV 345, Min kV 138, Miles New 33, IN, Plan Status 'M2 - Appendix A Approved', Expected ISD 47299 (2029-06-30); owner Wabash Valley Power Association.","steps":["Download the 54 MB ZIP and open the Appendix A workbook; 'MTEP25 Appendix A' has 432 projects, 'MTEP25 Facilities' 678 rows for those projects.","Convert Expected ISD from Excel serial to a date; the range in the Appendix is 2024-05-03 to 2035-01-01.","Use Facility Type 'Line New' (93 rows, 57 with Miles New above zero) and 'Substation' (271 rows) for new components; 'Line Upgrade' (169) are rebuilds.","Read Plan Status M1-M4 for the stage: 569 facility rows M1, 89 M2, 8 M3, 12 M4."],"reading_traps":["Appendix A is 'recommended for approval' (M1 Proposed dominates); an M2 row is approved by MISO, not permitted or built.","Project Type 'Other' (306 of 432) mixes local needs, load growth and customer projects; 'GIP' (60) are generator-interconnection projects.","Voltage is Max kV; 0 appears for non-voltage items such as telecom equipment.","The ZIP at this URL is the MTEP25 edition (Dec 2025); a separate draft MTEP26 ZIP (Nov 2026) has 532 Appendix A projects and may change.","The interactive status and in-service reports require a sign-in and were not reachable."]},"test":{"tested_on":"2026-11-19","method":"download","http_status":200,"content_type":"application/zip","size_bytes":54222456,"records_total":432,"records_for_country":null,"problems":["MTEP Project Tracking pages (Appendix A Status Report, In-Service Projects, Projects Under Evaluation) redirect to a sign-in page."]},"evidence":[{"claim":"Appendix A is a recommended-for-approval list","url":"https://cdn.misoenergy.org/MTEP25731615.zip","quote":"MTEP25 Appendix A - New Local Reliability Projects recommended for approval"},{"claim":"Draft next-cycle package","url":"https://www.misoenergy.org/planning/transmission-planning/mtep/","quote":"Draft Report-Link"}],"members":[],"members_summary":null},{"source_id":"other-iso-rto-lists","name":"Other ISO and RTO planning lists (ISO-NE RSP Project List; ERCOT regional planning)","publisher":"ISO New England; Electric Reliability Council of Texas (ERCOT)","official":true,"landing_url":null,"data_url":null,"access":"pdf","format":"PDF update presentation (ISO-NE); ERCOT not reached","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"none","adds":"Operators outside CAISO, PJM and MISO; ISO-NE publishes project IDs, descriptions, cost and owner in semiannual update presentations; ERCOT's planning pages could not be read.","first_seen_pass":1,"rank":5,"summary":"ISO-NE posts semiannual RSP Project List updates as presentations with project IDs, descriptions, cost and owner; ERCOT's planning page was blocked.","coverage_note":"ISO-NE only through one PDF of changes; the full list and ERCOT data were not retrieved.","data_date":"ISO-NE update 2025-10-23","caveats":["Presentation lists changes, not the whole list","ERCOT returned 403"],"coverage":{"geographic":"New England (ISO-NE) and Texas (ERCOT, not read)"},"fine_print":{"unit":{"value":"Cost in millions of USD per project row","quote":"Cost (in millions $)","url":"https://www.iso-ne.com/static-assets/documents/100029/final_project_list_presentation_oct_2025.pdf","attempts":[]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.iso-ne.com/static-assets/documents/100029/final_project_list_presentation_oct_2025.pdf","note":"The presentation shows only changes since the June 2025 update (no new projects, three placed in service), not the whole list."}]},"reference_date":{"value":"Presentation dated 2025-10-23 (Planning Advisory Committee meeting)","quote":"OCTOBER 23, 2025 | WEBEX","url":"https://www.iso-ne.com/static-assets/documents/100029/final_project_list_presentation_oct_2025.pdf","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.iso-ne.com/static-assets/documents/100029/final_project_list_presentation_oct_2025.pdf","note":"Presentation compares June and October 2025 updates; a schedule is not stated."}]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.iso-ne.com/system-planning/system-plans-studies/rsp/rsp-project-list-and-the-asset-condition-list","note":"Link to the full RSP Project List file was not found in the page's static HTML."}]}},"key_fields":[{"field":"Project ID #","meaning":"ISO-NE project number, e.g. 1672"},{"field":"Transmission System Upgrades","meaning":"Description of the work and area, e.g. new 115 kV line"},{"field":"Cost / Primary Equipment Owner / Improvement/Need","meaning":"Cost in millions, owner and need"}],"how_to_use":{"example_request":"curl -sL -o isone_oct25.pdf 'https://www.iso-ne.com/static-assets/documents/100029/final_project_list_presentation_oct_2025.pdf' ; pdftotext -layout isone_oct25.pdf","example_result":"Project 1672: 'Forest Ave Substation modification required to build a new 115 kV line from Sudbury Station 342 substation to Hudson substation', cost 8.5 ($M), Hudson Light and Power, placed in service since the June 2025 update.","steps":["Open the update presentation and read the project tables (slides 4-9 and the status of major projects on slide 10).","Look for the full RSP Project List and Asset Condition List on the landing page; the file link was not found in the static HTML."],"reading_traps":["The presentation lists changes, not the full list; the project examples shown are already in service.","No coordinates; voltage appears only inside descriptions."]},"test":{"tested_on":"2026-11-19","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":515396,"records_total":null,"records_for_country":null,"problems":["ERCOT planning page https://www.ercot.com/gridinfo/planning returned HTTP 403 to a default client, so no ERCOT planning list was read."]},"evidence":[{"claim":"Changes only since the June update","url":"https://www.iso-ne.com/static-assets/documents/100029/final_project_list_presentation_oct_2025.pdf","quote":"Three upgrades have been placed in-service since the June 2025 update"},{"claim":"Final lists posted on the landing page after comments","url":"https://www.iso-ne.com/static-assets/documents/100029/final_project_list_presentation_oct_2025.pdf","quote":"The final version of the RSP Project list, Asset Condition list, and the presentation will be posted on the RSP Project List and the Asset Condition List website"}],"members":[{"name":"ISO New England RSP Project List and Asset Condition List","landing_url":"https://www.iso-ne.com/system-planning/system-plans-studies/rsp/rsp-project-list-and-the-asset-condition-list","data_url":"https://www.iso-ne.com/static-assets/documents/100029/final_project_list_presentation_oct_2025.pdf","access":"pdf","tested":true,"data_found":true,"note":"October 2025 update presentation read; the full list file was not located."},{"name":"ERCOT regional planning and project listings","landing_url":"https://www.ercot.com/gridinfo/planning","data_url":null,"access":null,"tested":true,"data_found":null,"note":"HTTP 403 to a default client; nothing read."}],"members_summary":{"total":null,"listed":2,"tested":2,"data_found":1,"scope_note":"Universe: US grid planners outside CAISO, PJM and MISO (other ISO/RTOs and non-RTO utilities); no census page opened, so the total is not established. Listed and tested: ISO-NE (presentation only) and ERCOT (blocked). Not opened: NYISO, SPP, BPA, TVA and utility plans.","pattern":null},"member_scope":{"total":null,"note":"Universe: US grid planners outside CAISO, PJM and MISO (other ISO/RTOs and non-RTO utilities); no census page opened, so the total is not established. Listed and tested: ISO-NE (presentation only) and ERCOT (blocked). Not opened: NYISO, SPP, BPA, TVA and utility plans."}}],"sector":{"regulator":{"name":"No single national planner: ISOs and RTOs plan their regions under federal rules (the CAISO plan discusses FERC Order 1920/1920A) and state commissions such as the CPUC review projects","url":null},"operators":{"structure":"many","note":"Regional operators (CAISO, PJM, MISO, ISO-NE, ERCOT and others) plus non-RTO utilities; each publishes its own plan.","census_url":null},"publication_obligation":{"exists":"unknown","norm":null,"url":null,"what_must_be_published":null,"frequency":null},"consolidated_republication":{"found":"no_evidence_found","note":"No national republication of planned lines and substations was found in the pages opened; a DOE data review PDF dated 2018 and an ArcGIS lines layer (mostly existing lines) were the closest.","checked_pages":[{"organization":"U.S. Department of Energy","url":"https://www.energy.gov/oe/articles/annual-us-transmission-data-review-march-2018","saw":"URL serves a PDF titled 'Transmission Data Review' created 2018-03-16; contents not read in this pass"},{"organization":"ArcGIS Online feature layer Electric_Power_Transmission_Lines","url":"https://services1.arcgis.com/Hp6G80Pky0om7QvQ/arcgis/rest/services/Electric_Power_Transmission_Lines/FeatureServer/0","saw":"STATUS counts: IN SERVICE 41,237; NOT AVAILABLE 10,942; INACTIVE 53; UNDER CONSTRUCTION 11; PROPOSED 1"}]}},"national_registry":{"exists":"no_evidence_found","note":"No national register of planned lines and substations found in the operator pages, a DOE PDF and an ArcGIS lines layer opened; searches also showed commercial databases that were not opened.","checked_pages":[{"organization":"PJM","url":"https://www.pjm.com/planning/m/project-construction","saw":"PJM-only upgrades table of 15,816 rows"},{"organization":"CAISO","url":"https://stakeholdercenter.caiso.com/RecurringStakeholderProcesses/Transmission-development-forum","saw":"CAISO-only forum documents through July 2025 in static HTML"},{"organization":"MISO","url":"https://www.misoenergy.org/planning/transmission-planning/mtep/","saw":"MISO-only MTEP25 report ZIP and draft MTEP26"},{"organization":"ISO New England","url":"https://www.iso-ne.com/system-planning/system-plans-studies/rsp/rsp-project-list-and-the-asset-condition-list","saw":"New England-only RSP Project List page"}]},"if_unstructured":{"summary":"CAISO's approved projects live in PDF appendices and plan tables; extract them to get kV, miles and expected years. PJM and MISO publish tables; routes are only in plan figures and permit filings.","recipe":["Download the CAISO Appendix H PDF, run pdftotext -layout and split on the 'Name' labels to get one record per project with description, type, in-service date and cost (tested: 33 blocks).","Join plan IDs, owners and areas from Tables ES-1 to ES-3 of the plan PDF by project name; read Table 8-2 and 8-3 for earlier-approved projects.","For PJM and MISO use the XML and the MTEP workbooks directly; for status history at CAISO use the TDF workbook columns.","Mark each project's stage with the operator's own vocabulary and do not translate approval into construction."],"location_method":"No route or coordinates were found in the files tested, except 16 PJM rows with an embedded latitude/longitude in Location and CAISO route maps as figures in the plan PDF; location is substation or line names plus state.","cross_with":"PJM UpgradeId with ProposalIds; CAISO plan ID (e.g. 2526-R-03) with TDF project names; MISO MTEP Project ID with the PrjID in the Facilities sheet; state permit dockets (not checked) for routes.","where_published":[{"name":"CAISO Board-approved Transmission Plan, Appendix H and plan body tables","url":"https://www.caiso.com/documents/board-approved-2025-2026-transmission-plan.pdf","what":"Approved project IDs, owners, costs (Tables ES-1 to ES-3), previously approved project status (Tables 8-1 to 8-3) and project descriptions (Appendix H)","how_to_search_inside":"Convert with pdftotext -layout and search for the project name or plan ID (e.g. 2526-P-04); Appendix H is a separate PDF with one block per project.","example_document":{"url":"https://www.caiso.com/documents/board-approved-2025-2026-transmission-plan-appendix-h-projects.pdf","what_it_gives":"'Name Trout Canyon - Lugo 500 kV Line', 'approximately 180 miles, with 70% series compensation', 'Expected In Service Date 2035', 'Project Cost $1,270 - $1,800 million' (project block on page 24)."}},{"name":"CAISO Transmission Development Forum memo","url":"https://www.caiso.com/documents/transmission-development-forum-update-memo-apr-2026.pdf","what":"Summary of how many project in-service dates moved earlier or later between forums, by transmission owner","how_to_search_inside":"Read Table 1 (in-service date changes) and the attachment references; the workbooks are the data source.","example_document":{"url":"https://www.caiso.com/documents/transmission-development-forum-update-memo-apr-2026.pdf","what_it_gives":"'Table 1 In-service date changes from previous to latest meeting' with rows such as 'PG&E 4 3 3 53 33 15 10' for approved transmission expansion projects (page 2)."}}]},"related_not_answering":[{"name":"ArcGIS feature layer Electric_Power_Transmission_Lines","url":"https://services1.arcgis.com/Hp6G80Pky0om7QvQ/arcgis/rest/services/Electric_Power_Transmission_Lines/FeatureServer/0","why":"Line geometry with VOLTAGE and STATUS, but almost all existing lines (41,237 IN SERVICE; 11 UNDER CONSTRUCTION; 1 PROPOSED); not a plan."},{"name":"DOE Annual U.S. Transmission Data Review (March 2018)","url":"https://www.energy.gov/oe/articles/annual-us-transmission-data-review-march-2018","why":"A 2018 report, not a project-level or current dataset; contents were not read in this pass."},{"name":"PJM TCIC XLS 'As of 7.11.2023'","url":"https://www.pjm.com/pub/planning/tcic/tcic.xlsm","why":"38 MB snapshot last modified 2023-07-12; a past state of the PJM table, not current planning data."}],"open_questions":[{"question":"What do the January 2026 and July 2026 CAISO TDF workbooks show for in-service dates and status?","starting_point":"April 2026 memo (forum of 2026-01-28) and the TDF stakeholder page, whose static HTML lists documents only through July 2025.","next_step":"Find the workbook file names with a client that runs the page script, then compare their Expected In-Service columns with July 2025."},{"question":"Does ERCOT publish a downloadable list of planned transmission projects with voltage and in-service dates?","starting_point":"https://www.ercot.com/gridinfo/planning returned 403 to a default client; search results pointed to monthly System Planning status updates and a TPIT file.","next_step":"Reach ERCOT's planning documents by another allowed route and check for an Excel project list and its fields."},{"question":"Where is ISO-NE's full RSP Project List file and how does it record status and in-service dates?","starting_point":"RSP Project List page opened and the October 2025 update presentation read.","next_step":"Locate the list file link on the page (not in static HTML) and read its columns."},{"question":"Do NYISO, SPP, BPA, TVA and individual utilities publish planned project lists with kV and dates?","starting_point":"Not opened in this pass; BPA appeared in a search snippet as proposing new lines and substations in its service area.","next_step":"Open each operator's planning page and record format, coverage and access."},{"question":"Can state permit filings (e.g. CPCN or siting dockets) supply routes for the projects found?","starting_point":"CAISO TDF 'Expected CPUC Permit Application' column and PJM transmission owner names.","next_step":"Pick one project (e.g. Trout Canyon - Lugo 500 kV Line or PJM b3780.2) and find its permit docket and route documents."}],"history":[{"pass":1,"date":"2026-11-19","role":"research","model":"claude-sonnet-5-5","rules_version":"us-red-ambiente-2026-11-19","note":"First pass from the run templates; PJM, CAISO and MISO files downloaded and parsed, ISO-NE partial, ERCOT blocked. Effort level 'Sonnet High' is stated in INSTRUCCIONES.md and could not be verified from inside the session.","headline":{"official_data":"partial","non_official_data":"not_tested","national_registry":"no_evidence_found"},"sources":{"total":5,"new":5,"dropped":0},"negatives":{},"effort":{"pages":26,"minutes":12}}],"local_terms":[{"term":"RTEP (Regional Transmission Expansion Plan)","language":"en","meaning":"PJM's regional plan; its upgrades have b-numbers such as b3780.2"},{"term":"MTEP (MISO Transmission Expansion Plan)","language":"en","meaning":"MISO's annual plan; Appendix A lists new projects recommended for approval"},{"term":"TPP (Transmission Planning Process)","language":"en","meaning":"CAISO's annual cycle producing the Board-approved transmission plan"},{"term":"TDF (Transmission Development Forum)","language":"en","meaning":"CAISO's twice-yearly status review of approved projects"},{"term":"PTO (Participating Transmission Owner)","language":"en","meaning":"Utility that builds and owns a CAISO-approved project, e.g. PG&E or SCE"},{"term":"ISD (in-service date)","language":"en","meaning":"Expected date a project enters service"},{"term":"Baseline, Supplemental, Network upgrade","language":"en","meaning":"PJM project types: regional reliability, owner-driven, and generator-interconnection upgrades"},{"term":"Re-scope","language":"en","meaning":"A previously approved project whose scope or cost was changed in a later plan"}],"provenance":{"pass_count":1,"models":["claude-sonnet-5-5"],"minutes_estimate":12,"pages_opened":26,"passes":[{"pass":1,"date":"2026-11-19","model":"claude-sonnet-5-5"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/us/grid-expansion-plans.json","detail_url":"https://georutter.org/v1/us/grid-expansion-plans/detail.json","html_url":"https://georutter.org/us/grid-expansion-plans/","country_url":"https://georutter.org/v1/countries/us.json"}