{"schema_version":"1.0","country":"us","country_name":"United States","topic":"hydrogen-plants-in-permitting","question":"Where can I get a list of hydrogen production projects currently in permitting in the United States, with location, capacity (MW), developer, permitting stage and date?","territory":"us","territory_level":"country","parent_url":null,"published_on":"2026-11-24","research_reviewed_on":"2026-11-24","access_checked_on":"2026-11-24","answer":{"official_data":"partial","non_official_data":"not_tested","summary":"No single list gives stage and date for electrolysis projects in permitting. DOE Record 24001 (May 2024) lists 43 planned rows without developers or dates; stage, developer and MW come from dockets: Lancaster Clean Energy Center (CEQA approval 2024-03-11, 400 MWe) and Plug Power's Graham, Texas project (DOE FONSI 2025-01-10, twelve 10 MW; agreed for sale July 2026). DOE hub pages are hub-level and stale; the PNWH2 award was reported rescinded in October 2025.","main_caveats":["DOE Record 24001 is dated May 2024: it lists Graham, TX as Planned/Under Construction although Plug Power agreed in July 2026 to sell that project; it has no developer or stage date.","A DOE FONSI (Graham, 2025-01-10) and a CEQA approval (Lancaster, 2024-03-11) are not financing, construction or operation: no building or start-of-construction document was found for either.","MW bases differ: 120 MW of electrolyzers, 45 tpd of hydrogen and 164 MW of grid interconnection describe Graham; Lancaster's '400 MWe' is undefined. None converts into another.","DOE hub pages predate the 2025 cuts (Canary Media: awards to two hubs rescinded) and show no electrolyzer-level project, MW or permit; DOE's EIS-0571 dates are anticipated only.","Only California and Texas dockets were opened; Washington, Oregon and other state portals and the IEA project file (account required) were not checked."],"confidence":"medium","confidence_reason":"Two projects were traced from portal and DOE documents to dated stages and DOE's table counts reconcile, but no hub project was matched to a docket and most projects, states and the IEA file were not checked.","attributes":[{"attribute":"location","covered":"partial","source_ids":["ceqanet-hydrogen","doe-nepa-hydrogen","doe-record-24001"],"note":"Lancaster CA (parcels, cross streets) and Graham TX (2264 FM 209) are documented to address level; DOE Table 1 gives city and state for planned rows; no list has coordinates.","gap":"not_checked","gap_note":"Only two projects were traced to site documents; hub projects and other states' dockets were not opened."},{"attribute":"capacity_mw","covered":"partial","source_ids":["ceqanet-hydrogen","doe-nepa-hydrogen","doe-record-24001"],"note":"Lancaster 400 MWe of electrolyzers; Graham twelve 10 MW units (45 tpd, a separate measure); DOE gives kW for 43 planned rows. Hub documents give tons per day only.","gap":"not_checked","gap_note":"Basis of DOE's kW and of Lancaster's 'MWe' not defined; capacity for other projects was not checked."},{"attribute":"developer","covered":"partial","source_ids":["ceqanet-hydrogen","doe-nepa-hydrogen","operator-project-announcements"],"note":"Element New Energy Lancaster 1, LLC (Lancaster) and Plug Power (Graham) are named in dockets; DOE Table 1 omits developers and hub pages name consortia.","gap":"not_checked","gap_note":"Developers of the other 41 planned rows and of hub projects were not identified."},{"attribute":"permitting_stage","covered":"partial","source_ids":["ceqanet-hydrogen","doe-nepa-hydrogen","operator-project-announcements"],"note":"Lancaster: CEQA approval (MND) 2024-03-11. Graham: DOE FONSI 2025-01-10, work paused since Dec 2023, sale agreed July 2026. DOE's statuses are only Planned/Under Construction.","gap":"not_checked","gap_note":"No national stage field; hub projects have no site-specific review yet; construction status of Lancaster after March 2024 was not verified."},{"attribute":"stage_date","covered":"partial","source_ids":["ceqanet-hydrogen","doe-nepa-hydrogen","operator-project-announcements"],"note":"Dated events for two projects: Lancaster NOD 2024-03-12 (approved 03-11); Graham EA public comment from 2024-12-06, FONSI 2025-01-10, sale release 2026-07-13.","gap":"not_checked","gap_note":"No list gives stage dates; DOE Record 24001 has none; EIS-0571 dates are anticipated."}]},"sources":[{"source_id":"ceqanet-hydrogen","name":"CEQAnet: California CEQA records for hydrogen production projects (example SCH 2024020266, Lancaster Clean Energy Center)","publisher":"California Governor's Office of Land Use and Climate Innovation (LCI), State Clearinghouse","official":true,"landing_url":"https://ceqanet.lci.ca.gov/","data_url":null,"access":"web_viewer_only","format":"HTML record pages, per-document CSV export and PDF attachments","license":"Unknown","language":"en","has_coordinates":null,"location_precision":"address","summary":"City of Lancaster CEQA record: Lancaster Clean Energy Center (Element New Energy Lancaster 1, LLC), 400 MWe of electrolyzers with 650 MW PV; MND 2024-02-07, approved 2024-03-11.","coverage_note":"California only; one hydrogen project opened; approval stage, not construction.","data_date":"2024-03-12","caveats":["Keyword search not scriptable.","Approval is not construction or operation."],"test":{"tested_on":"2026-11-24","method":"page_only","http_status":200,"problems":["Free-text search is a Google Custom Search widget; a /Search 'q' parameter returned unrelated documents."]},"example":{"example_request":"curl -sL https://ceqanet.lci.ca.gov/2024020266/1 ; curl -sL https://ceqanet.lci.ca.gov/2024020266/2 ; the attachment link on each record page is /2024020266/2/Attachment/<id>.","example_result":"SCH 2024020266, Lead Agency City of Lancaster: document 1 MND received 2/7/2024 (state review 2/7-3/8/2024); document 2 NOD received 3/12/2024, approved 3/11/2024. Applicant Element New Energy Lancaster 1, LLC; 650 MW PV, 330 MWh storage, 400 MWe electrolyzers."},"members_summary":null},{"source_id":"doe-nepa-hydrogen","name":"DOE Office of NEPA Policy and Compliance pages for hydrogen production projects (DOE/EA-2281 Limestone; DOE/EIS-0571 Pacific Northwest Hydrogen Hub)","publisher":"U.S. Department of Energy, Office of NEPA Policy and Compliance","official":true,"landing_url":null,"data_url":null,"access":"pdf","format":"HTML project pages and PDF environmental assessment (5.9 MB, 5,764 text lines)","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"address","summary":"DOE NEPA records: Limestone (Plug Power, Graham TX) EA with twelve 10 MW electrolyzers, 45 tpd, FONSI signed 2025-01-10; Pacific Northwest Hub EIS scope (about 10 projects) without sites or MW.","coverage_note":"Only DOE-financed projects; two pages opened; Limestone's later fate is outside DOE's page.","data_date":"2025-01-10","caveats":["FONSI is not a loan or a building permit.","EIS schedule dates are anticipated, not confirmed."],"test":{"tested_on":"2026-11-24","method":"download","http_status":200,"problems":[]},"example":null,"members_summary":{"total":null,"listed":2,"tested":2,"data_found":2,"scope_note":"Universe not counted: DOE NEPA pages for hydrogen production were found through search, not by listing. Two pages were opened; hub-related categorical exclusions (HyVelocity, Heartland) appeared in search results and were not opened.","pattern":"Search energy.gov/nepa for 'hydrogen' with the project or hub name; pages are titled DOE/EA-#### or DOE/EIS-####."}},{"source_id":"doe-record-24001","name":"DOE Hydrogen Program Record 24001, Electrolyzer Installations in the United States (planned and under-construction rows)","publisher":"U.S. Department of Energy, Hydrogen Program (HFTO)","official":true,"landing_url":"https://www.hydrogen.energy.gov/library/program-records","data_url":"https://www.hydrogen.energy.gov/docs/hydrogenprogramlibraries/pdfs/24001-electrolyzer-installations-united-states.pdf","access":"pdf","format":"PDF (Table 1)","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"municipality","summary":"43 planned or under-construction electrolyzer rows (657 MW under construction, 3.75 GW planned) with city, kW and status; May 2024.","coverage_note":"No developer, no stage date; 18 months old; cancelled projects still listed.","data_date":"2024-05","caveats":["No developer or dates.","Stale: Graham, TX has since been put up for sale."],"test":{"tested_on":"2026-11-24","method":"download","http_status":200,"problems":[]},"example":null,"members_summary":null},{"source_id":"doe-h2hubs-pages","name":"DOE Regional Clean Hydrogen Hubs selection pages (example: Pacific Northwest Hydrogen Hub, PNWH2)","publisher":"U.S. Department of Energy, Office of Clean Energy Demonstrations (OCED)","official":true,"landing_url":null,"data_url":null,"access":"web_viewer_only","format":"HTML pages","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"none","summary":"DOE hub selection pages give consortium, states and cost share only (PNWH2: up to $1 billion); the page predates the October 2025 rescission of two hubs' awards reported by Canary Media.","coverage_note":"Hub-level; no electrolyzer docket; one hub page opened; list page returns 404.","data_date":"2025-01-27","caveats":["Page is stale relative to news of terminations.","No project-level MW or stage."],"test":{"tested_on":"2026-11-24","method":"page_only","http_status":200,"problems":["DOE's regional-hubs overview URLs (energy.gov/oced/regional-clean-hydrogen-hubs-0 and /cmei/oced/regional-clean-hydrogen-hubs) returned 404."]},"example":null,"members_summary":{"total":7,"listed":1,"tested":1,"data_found":0,"scope_note":"Seven hubs per Canary Media and CATF; only PNWH2 was opened. ARCHES (California) and PNWH2 awards were rescinded per Canary Media (2025-10-10); CATF (2026-05-11) says DOE's retain/modify list covers awards for five of the seven hubs.","pattern":"Open each hub's DOE page and its NEPA page, then search the hub's partners' permit dockets."}},{"source_id":"operator-project-announcements","name":"Developer and city announcements on project status (Plug Power Graham sale release; City of Lancaster release)","publisher":"Plug Power Inc.; City of Lancaster, CA (via GlobeNewswire and PR Newswire reprints)","official":true,"landing_url":null,"data_url":null,"access":"web_viewer_only","format":"HTML press-release reprints","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"municipality","summary":"Plug Power agreed on 2026-07-13 to sell its Graham, Texas project (land and 164 MW of interconnection) to Stream; the City of Lancaster announced its commission's approval on 2024-03-20.","coverage_note":"Two projects; reprints of releases; closing of the Graham sale not confirmed.","data_date":"2026-07-13","caveats":["Plug's release does not name Limestone or electrolyzers.","Sale closing only expected, not confirmed."],"test":{"tested_on":"2026-11-24","method":"page_only","http_status":200,"problems":[]},"example":null,"members_summary":{"total":null,"listed":2,"tested":2,"data_found":2,"scope_note":"No universe: only the two projects traced in this card were checked.","pattern":"Search the developer's newsroom for the project's city and name."}}],"other_sources_count":2,"if_unstructured":{"summary":"Stage and dates are in project-specific documents: CEQA records for California projects, DOE NEPA documents for federally financed projects, and company or city releases for later status."},"local_terms":[{"term":"CEQAnet / Notice of Determination (NOD) / Mitigated Negative Declaration (MND)","language":"en","meaning":"California portal and documents; open each document of the SCH number for stage and date."},{"term":"DOE/EA-#### Final Environmental Assessment and FONSI","language":"en","meaning":"DOE NEPA documents for financed projects; energy.gov/nepa pages carry the applicant, site and permits."},{"term":"Regional Clean Hydrogen Hubs (H2Hubs)","language":"en","meaning":"Seven DOE-selected hubs; hub pages are consortium-level."},{"term":"Hydrogen Program Record 24001","language":"en","meaning":"DOE table of installed and planned electrolyzers; planned rows have no developer."},{"term":"Conditional Use Permit (CUP) No. ...","language":"en","meaning":"City or county use permit that appears as the CEQAnet title (for example CUP 23-019)."},{"term":"Loan Programs Office (LPO) conditional commitment / loan guarantee","language":"en","meaning":"DOE financing step referred to in the Graham EA; a FONSI is not the financing decision."},{"term":"Permit by Rule (PBR), TCEQ","language":"en","meaning":"Texas air authorisation noted in the Graham EA (coverage began September 2023); no public docket was found."},{"term":"retain/modify list","language":"en","meaning":"DOE's 2026 list of awards it may keep; CATF reports it covers five of seven hubs."}],"provenance":{"pass_count":1,"models":["claude-sonnet-5-5"],"minutes_estimate":null,"pages_opened":20,"passes":[{"pass":1,"date":"2026-11-24","model":"claude-sonnet-5-5"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/us/hydrogen-plants-in-permitting.json","detail_url":"https://georutter.org/v1/us/hydrogen-plants-in-permitting/detail.json","html_url":"https://georutter.org/us/hydrogen-plants-in-permitting/","country_url":"https://georutter.org/v1/countries/us.json"}