{"schema_version":"1.0","country":"us","country_name":"United States","topic":"hydrogen-plants","question":"Where can I get a list of hydrogen production plants (electrolysers) in operation in the United States, with location, capacity (MW), operator and commissioning date?","territory":"us","territory_level":"country","parent_url":null,"published_on":"2026-11-24","research_reviewed_on":"2026-11-24","access_checked_on":"2026-11-24","answer":{"official_data":"partial","non_official_data":"not_tested","summary":"Best source is DOE Hydrogen Program Record 24001 (May 2024): 113 existing and planned US electrolyzer rows, 70 installed rows totalling about 116 MW (largest Woodbine GA, 40 MW), with city, kW and status only. It names no operator and gives no commissioning date; those came from company documents for two sites (Plug Power Woodbine, FPL Okeechobee). IEA's June 2026 project database needs an account and was not opened. Newer plants are missing from DOE's edition.","main_caveats":["DOE Record 24001 is dated May 2024 and is still the newest electrolyzer-installations record on DOE's program page; later plants and status changes are missing.","Table 1 gives kW per installation row without stating the electrical or output basis; hydrogen output (for example 15 tons per day at Woodbine) is a different measure.","No operator or commissioning date in the DOE table; 'Installed' rows include 46 units of 120-180 kW and 4 'Commissioning' rows, so installed is not proof of operation.","Woodbine GA appears three times (40 MW and 5 MW operational, 40 MW planned); rows are installations, not unique plants.","IEA's June 2026 database and Clean Energy Group's April 2025 map were not inspected beyond their pages; Plug Power's own release page blocks automated clients."],"confidence":"medium","confidence_reason":"Table counts reconcile with DOE's totals and two sites were traced to operator releases, but the list is 18 months old and the IEA file and most operators were not checked.","attributes":[{"attribute":"location","covered":"partial","source_ids":["doe-record-24001","operator-site-documents"],"note":"DOE Table 1 gives city and state per installation (28 of 70 installed rows state only); no coordinates. Operator releases name the site for two plants.","gap":"not_checked","gap_note":"Coordinates and street addresses were not found; IEA's file (location fields unknown) needs an account."},{"attribute":"capacity_mw","covered":"partial","source_ids":["doe-record-24001","operator-site-documents"],"note":"DOE gives kW per row (70 installed rows, 115,980 kW; basis not stated); releases give 8 x 5 MW (Plug) and 25 MW (FPL). Tons per day is a separate measure.","gap":"not_checked","gap_note":"The electrical or output basis of DOE's kW is not stated and was not verified against operator documents beyond two sites."},{"attribute":"operator","covered":"partial","source_ids":["operator-site-documents"],"note":"DOE Table 1 omits operators by design; only two per-site documents (Plug Power, Florida Power & Light) name one. No list with operators was found.","gap":"not_checked","gap_note":"Operators for the other 11 installed sites of 1 MW or more and for the small units were not checked; IEA's database may list developers but needs an account."},{"attribute":"commissioning_date","covered":"partial","source_ids":["operator-site-documents","doe-record-24001"],"note":"DOE labels status (Installed/Operational, Installed/Commissioning) without dates. Releases give Jan 2024 (Plug) and Oct 2023 first hydrogen / Feb 2024 completion (FPL).","gap":"not_checked","gap_note":"Dates for all other installations were not found; no source states the date of continuous operation."}]},"sources":[{"source_id":"doe-record-24001","name":"DOE Hydrogen Program Record 24001, Electrolyzer Installations in the United States (Table 1)","publisher":"U.S. Department of Energy, Hydrogen Program (HFTO)","official":true,"landing_url":"https://www.hydrogen.energy.gov/library/program-records","data_url":"https://www.hydrogen.energy.gov/docs/hydrogenprogramlibraries/pdfs/24001-electrolyzer-installations-united-states.pdf","access":"pdf","format":"PDF (Table 1 extractable with pdftotext -layout; map as figure)","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"municipality","adds":"Only national list of existing and planned US electrolyzer installations with location and power per row and a status (Installed/Operational, Installed/Commissioning, Installed, Under Construction, Planned); 70 installed rows total about 116 MW.","first_seen_pass":1,"rank":1,"summary":"Table of 113 existing and planned US electrolyzer rows (May 2024): 70 installed rows with 115,980 kW, 13 of them 1 MW or more (largest Woodbine GA 40 MW); location, kW and status only.","coverage_note":"No operator or commissioning date; city sometimes missing; 18 months old; sites repeat across rows.","data_date":"2024-05","caveats":["No operator and no commissioning date.","Installed is not proof of operation; edition is May 2024."],"coverage":{"geographic":"United States electrolyzer installations of 120 kW or more per site; 113 table rows as of May 2024."},"fine_print":{"unit":{"value":"Power in kW per row; the record does not say whether it is electrical input or nominal output.","quote":"Table 1. Existing and Planned Installations of Electrolyzers (PEM, SOEC, Alkaline) in the U.S. as of May 2024 | Location | Power (kW) | Status","url":"https://www.hydrogen.energy.gov/docs/hydrogenprogramlibraries/pdfs/24001-electrolyzer-installations-united-states.pdf","attempts":[]},"inclusion_rule":{"value":"Installed and planned (funded) electrolyzers of 120 kW or more per site; input from manufacturers and public information.","quote":"This Record only accounts for planned and installed electrolyzer capacities of 120 kW or greater per site in this total, not including smaller units such as those under development or used for laboratory research.","url":"https://www.hydrogen.energy.gov/docs/hydrogenprogramlibraries/pdfs/24001-electrolyzer-installations-united-states.pdf","attempts":[]},"reference_date":{"value":"May 2024 (record dated May 4, approved May 6, 2024).","quote":"Record: 24001 Date: May 4, 2024","url":"https://www.hydrogen.energy.gov/docs/hydrogenprogramlibraries/pdfs/24001-electrolyzer-installations-united-states.pdf","attempts":[]},"update_frequency":{"value":"Roughly yearly: records 20009, 22001, 23003 and 24001 exist; none newer was listed on the program records page on 2026-11-24.","quote":null,"url":"https://www.hydrogen.energy.gov/library/program-records","attempts":[]},"exclusions":{"value":"No attribution to companies or end users; the city is sometimes missing; planned items only if funded.","quote":"listed without attribution to any individual electrolyzer company or to specific end users","url":"https://www.hydrogen.energy.gov/docs/hydrogenprogramlibraries/pdfs/24001-electrolyzer-installations-united-states.pdf","attempts":[]}},"key_fields":[{"field":"Location","meaning":"City and state, or state only (28 of 70 installed rows are state only)."},{"field":"Power (kW)","meaning":"Nominal power per row; basis not stated."},{"field":"Status","meaning":"Installed/Operational (20 rows, 61,665 kW), Installed/Commissioning (4, 46,430 kW), Installed (46, 7,885 kW), Planned/Under Construction (21, 657,290 kW), Planned (22, 3,750,715 kW)."}],"how_to_use":{"example_request":"curl -sL -o rec24001.pdf https://www.hydrogen.energy.gov/docs/hydrogenprogramlibraries/pdfs/24001-electrolyzer-installations-united-states.pdf ; pdftotext -layout rec24001.pdf rec24001.txt ; keep lines of Table 1 matching '<location>  <kW>  <status>' (three columns separated by two or more spaces).","example_result":"113 rows, 4,523,985 kW in total. Installed: 70 rows, 115,980 kW. Example rows: 'Woodbine, GA 40,000 Installed/Operational'; 'Okeechobee, FL 25,000 Installed/Commissioning'; 'Donaldsonville, LA 20,000 Installed/Commissioning'.","steps":["Download the PDF and extract text with layout; Table 1 spans pages 3-5.","Parse each row; statuses beginning with Installed are existing, others are planned or under construction.","Sum by status to reproduce the headline (116 MW installed, 657 MW under construction, 3.8 GW planned).","For operator and commissioning date, open company or utility documents for each site; the record gives neither."],"reading_traps":["A site can have several rows: Woodbine, GA appears three times (40,000 kW Installed/Operational, 40,000 kW Planned, 5,000 kW Installed/Operational); a row is an installation, not a unique plant.","46 of 70 installed rows (120-180 kW, status just 'Installed') are small units, many in California; 13 installed rows of 1 MW or more hold 105,250 kW of the 115,980.","'Installed' does not prove operation: four rows are Installed/Commissioning, 46 have no operating qualifier.","Edition is May 2024: plants commissioned later are absent and statuses are stale (for example Niagara Falls, NY 35,000 kW is Planned/Under Construction).","Electrolyzers only: no reformers, and consumers and refueling stations are not listed."]},"test":{"tested_on":"2026-11-24","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":288896,"records_total":113,"records_for_country":113,"problems":[]},"evidence":[{"claim":"Installed capacity, under construction and planned totals.","url":"https://www.hydrogen.energy.gov/docs/hydrogenprogramlibraries/pdfs/24001-electrolyzer-installations-united-states.pdf","quote":"Current installed capacity is approximately 116 MW, with another approximately 657 MW under construction and 3.8 GW planned (firm commitments)."},{"claim":"Table 1 has no operator attribution.","url":"https://www.hydrogen.energy.gov/docs/hydrogenprogramlibraries/pdfs/24001-electrolyzer-installations-united-states.pdf","quote":"This information is based on input from electrolyzer manufacturers and publicly available information, but listed without attribution to any individual electrolyzer company or to specific end users."},{"claim":"Largest installed site.","url":"https://www.hydrogen.energy.gov/docs/hydrogenprogramlibraries/pdfs/24001-electrolyzer-installations-united-states.pdf","quote":"The capacity of electrolyzers installed at a single site today ranges up to 40 MW"},{"claim":"Record 24001 is the newest electrolyzer-installations record on the program page.","url":"https://www.hydrogen.energy.gov/library/program-records","quote":"Electrolyzer Installations in the United States"}],"members":[],"members_summary":null},{"source_id":"iea-hydrogen-projects","name":"IEA Hydrogen Production and Infrastructure Projects Database (hydrogen production projects file)","publisher":"International Energy Agency (IEA)","official":false,"landing_url":"https://www.iea.org/data-and-statistics/data-product/hydrogen-production-and-infrastructure-projects-database","data_url":null,"access":"registration_required","format":"XLSX per its page (also .Stat Data Explorer)","license":"CC BY 4.0","language":"en","has_coordinates":null,"location_precision":null,"adds":"Worldwide project database refreshed June 2026, the only more recent national-scale candidate; fields and US rows could not be inspected because the download needs a free IEA account.","first_seen_pass":1,"rank":2,"summary":"IEA's worldwide hydrogen production projects file (XLSX, June 2026, CC BY 4.0, free with an IEA account); contents and US rows not inspected.","coverage_note":"Registration required; fields and status wording unverified.","data_date":"2026-06-18","caveats":["Not tested: nothing about fields is verified.","Global file; filter to the US yourself."],"coverage":{"geographic":"Worldwide; the US subset was not counted."},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.iea.org/data-and-statistics/data-product/hydrogen-production-and-infrastructure-projects-database","note":"The overview page does not describe fields or units."}]},"inclusion_rule":{"value":"Projects for hydrogen production for energy or climate-mitigation purposes and hydrogen infrastructure.","quote":"tracks data on projects for the production of hydrogen for energy or climate change-mitigation purposes and the development of hydrogen infrastructure","url":"https://www.iea.org/data-and-statistics/data-product/hydrogen-production-and-infrastructure-projects-database","attempts":[]},"reference_date":{"value":"File dated 2026-06-18; page says last updated June 2026.","quote":"Hydrogen production projects 18/06/2026 XLSX","url":"https://www.iea.org/data-and-statistics/data-product/hydrogen-production-and-infrastructure-projects-database","attempts":[]},"update_frequency":{"value":"Annually.","quote":"The Hydrogen Production and Infrastructure Projects Database is updated annually.","url":"https://www.iea.org/data-and-statistics/data-product/hydrogen-production-and-infrastructure-projects-database","attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.iea.org/data-and-statistics/data-product/hydrogen-production-and-infrastructure-projects-database","note":"Not stated on the page; file not opened."}]}},"key_fields":[],"how_to_use":{"example_request":"","example_result":"","steps":["Create or use a free IEA account and download the 'Hydrogen production projects' XLSX, or use the .Stat Data Explorer.","Filter country = United States and project status, then compare with DOE Record 24001; field names, operator and date columns are untested."],"reading_traps":["Content, fields and US counts are unverified: no account was created, as the run forbids it.","Global scope; status wording differs from DOE's."]},"test":{"tested_on":"2026-11-24","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":251296,"records_total":null,"records_for_country":null,"problems":["Download requires an IEA account: 'You are either not logged in or your login session has expired, please login again or create an IEA account to download data.'"]},"evidence":[{"claim":"Current file date and licence.","url":"https://www.iea.org/data-and-statistics/data-product/hydrogen-production-and-infrastructure-projects-database","quote":"Hydrogen production projects 18/06/2026 XLSX ... Licence CC BY 4.0"},{"claim":"Download is gated by an account.","url":"https://www.iea.org/data-and-statistics/data-product/hydrogen-production-and-infrastructure-projects-database","quote":"You are either not logged in or your login session has expired, please login again or create an IEA account to download data."}],"members":[],"members_summary":null},{"source_id":"operator-site-documents","name":"Operator and utility documents for individual electrolyzer sites (press releases and supplier announcements)","publisher":"Plug Power Inc.; Florida Power & Light Company (NextEra Energy); Cummins Inc.","official":true,"landing_url":null,"data_url":null,"access":"web_viewer_only","format":"HTML press releases and one PDF fact sheet","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"municipality","adds":"Only place found for operator, start milestone and electrolyzer power per site: Woodbine GA (Plug Power) and Okeechobee FL (FPL Cavendish NextGen Hydrogen Hub).","first_seen_pass":1,"rank":3,"summary":"Operator documents: Plug Power Woodbine GA (eight 5 MW PEM units, operations announced Jan 2024) and FPL Okeechobee FL (25 MW, first hydrogen Oct 2023, completion announced 2024-02-08).","coverage_note":"Two of 13 installed sites of 1 MW or more checked; company claims; MW and tons per day kept apart.","data_date":"2024-02-08","caveats":["Plug's own page blocked (403); text via a reprint.","Milestone wording differs across releases."],"coverage":{"geographic":"Two US sites verified out of 13 installed sites of 1 MW or more in DOE Record 24001."},"fine_print":{"unit":{"value":"Releases quote MW of PEM electrolyzer power (8 x 5 MW; 25 MW) and, for Plug, 15 tons per day of liquid hydrogen as design output; the two measures are not equivalent.","quote":"By utilizing eight 5 MW PEM electrolyzers","url":"https://energytech.com/renewables/article/21281412/plug-power-commences-operations-at-liquid-green-hydrogen-plant-in-georgia","attempts":[]},"inclusion_rule":{"value":"Whatever each company chooses to announce.","quote":null,"url":null,"attempts":[]},"reference_date":{"value":"Plug: operations announced January 2024 (reprint dated 2024-01-25); FPL: first hydrogen October 2023, completion announced 2024-02-08.","quote":"February 8, 2024","url":"https://newsroom.fpl.com/Florida-Power-Light-Company-announces-completion-of-clean-hydrogen-hub","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://newsroom.fpl.com/Florida-Power-Light-Company-announces-completion-of-clean-hydrogen-hub","note":"One-off releases; no later operational reporting opened."}]},"exclusions":{"value":"Releases do not state the date of continuous or commercial operation, nor measured output.","quote":null,"url":null,"attempts":[]}},"key_fields":[{"field":"Operator and site in the release text","meaning":"'Plug Power ... Woodbine, Georgia'; 'Florida Power & Light Company ... Okeechobee County, Fla.'."},{"field":"Electrolyzer power","meaning":"'eight 5 MW PEM electrolyzers'; 'a 25-megawatt (MW) electrolyzer system'."},{"field":"Milestone wording","meaning":"'has commenced operations'; 'the production of hydrogen'; 'completed its pilot clean hydrogen facility'."}],"how_to_use":{"example_request":"curl -sL https://newsroom.fpl.com/Florida-Power-Light-Company-announces-completion-of-clean-hydrogen-hub (and https://newsroom.fpl.com/Floridas-first-of-its-kind-clean-hydrogen-project-reaches-historic-milestone, https://investor.cummins.com/news/detail/554/fpl-announces-cummins-to-supply-electrolyzer-for, https://energytech.com/renewables/article/21281412/plug-power-commences-operations-at-liquid-green-hydrogen-plant-in-georgia); read the release body text.","example_result":"FPL 2024-02-08: 'Florida Power & Light Company announced it completed its pilot clean hydrogen facility located in Okeechobee County, Fla.' FPL 2023-10-11: 'reached a significant construction milestone this month – the production of hydrogen.' Cummins 2022-02-28: 'will supply a 25-megawatt (MW) electrolyzer system'.","steps":["Take a site row from DOE Record 24001 (city, state, kW).","Search the operator's newsroom and the supplier's investor news for that site; open the release.","Record operator, MW, milestone wording and release date separately, and keep MW apart from tons per day."],"reading_traps":["Plug Power's own release page returns a Cloudflare 403 to scripts; the text used here is a trade-press reprint dated 2024-01-25.","'Commenced operations' (Plug), 'production of hydrogen' (FPL, 2023-10) and 'completed' (FPL, 2024-02) are different milestones; DOE's May 2024 table still labels Okeechobee 'Installed/Commissioning'.","Releases are company claims; no regulator record or measured output was opened.","Woodbine appears three times in DOE's table (40 MW operational, 5 MW operational, 40 MW planned); which rows match the eight 5 MW units is unresolved."]},"test":{"tested_on":"2026-11-24","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":30842,"records_total":null,"records_for_country":null,"problems":["Plug Power investor-relations page returns 403 with a Cloudflare challenge ('Just a moment...') to automated clients."]},"evidence":[{"claim":"Plug Power operations at Woodbine.","url":"https://energytech.com/renewables/article/21281412/plug-power-commences-operations-at-liquid-green-hydrogen-plant-in-georgia","quote":"Plug Power, a hydrogen solutions provider, has commenced operations at the company's new liquid green hydrogen plant located in Woodbine, Georgia."},{"claim":"Electrolyzer power and design output at Woodbine.","url":"https://energytech.com/renewables/article/21281412/plug-power-commences-operations-at-liquid-green-hydrogen-plant-in-georgia","quote":"By utilizing eight 5 MW PEM electrolyzers, water is separated into hydrogen and oxygen. ... The plant is designed to produce 15 tons per day of liquid electrolytic hydrogen"},{"claim":"FPL first hydrogen production.","url":"https://newsroom.fpl.com/Floridas-first-of-its-kind-clean-hydrogen-project-reaches-historic-milestone","quote":"reached a significant construction milestone this month – the production of hydrogen."},{"claim":"FPL completion.","url":"https://newsroom.fpl.com/Florida-Power-Light-Company-announces-completion-of-clean-hydrogen-hub","quote":"Florida Power & Light Company announced it completed its pilot clean hydrogen facility located in Okeechobee County, Fla."},{"claim":"Electrolyzer size at Okeechobee.","url":"https://investor.cummins.com/news/detail/554/fpl-announces-cummins-to-supply-electrolyzer-for","quote":"Cummins Inc. (NYSE: CMI) will supply a 25-megawatt (MW) electrolyzer system for the groundbreaking FPL Cavendish NextGen Hydrogen Hub"}],"members":[{"name":"Plug Power, Woodbine GA liquid green hydrogen plant","landing_url":"https://energytech.com/renewables/article/21281412/plug-power-commences-operations-at-liquid-green-hydrogen-plant-in-georgia","data_url":null,"access":"web_viewer_only","tested":true,"data_found":true,"note":"Reprint of the company release (2024-01-25); company page https://www.ir.plugpower.com/press-releases/news-details/2024/Plug-Power-Starts-Production-of-Liquid-Green-Hydrogen-at-its-Georgia-Plant/default.aspx blocked (403)."},{"name":"FPL Cavendish NextGen Hydrogen Hub, Okeechobee County FL","landing_url":"https://newsroom.fpl.com/Florida-Power-Light-Company-announces-completion-of-clean-hydrogen-hub","data_url":null,"access":"web_viewer_only","tested":true,"data_found":true,"note":"Releases of 2023-10-11 and 2024-02-08 plus Cummins release of 2022-02-28 for the 25 MW size."}],"members_summary":{"total":13,"listed":2,"tested":2,"data_found":2,"scope_note":"Universe: the 13 installed rows of 1 MW or more in DOE Record 24001 (May 2024). Two sites were opened (Woodbine GA, Okeechobee FL); Donaldsonville LA (20 MW) and the California, Colorado, New York, Washington and Illinois sites were not.","pattern":"Search '<operator> <city> electrolyzer commissioning' on the operator newsroom; utilities and gas suppliers announce start-ups."},"member_scope":{"total":13,"note":"Universe: the 13 installed rows of 1 MW or more in DOE Record 24001 (May 2024). Two sites were opened (Woodbine GA, Okeechobee FL); Donaldsonville LA (20 MW) and the California, Colorado, New York, Washington and Illinois sites were not.","pattern":"Search '<operator> <city> electrolyzer commissioning' on the operator newsroom; utilities and gas suppliers announce start-ups."}},{"source_id":"cleg-hydrogen-projects-map","name":"Clean Energy Group, Hydrogen Projects in the US mapping tool (Tableau Public)","publisher":"Clean Energy Group (non-profit)","official":false,"landing_url":"https://www.cleanegroup.org/initiatives/alternative-fuels/projects-in-the-us/","data_url":null,"access":"web_viewer_only","format":"Tableau Public embedded dashboard","license":"Unknown","language":"en","has_coordinates":null,"location_precision":null,"adds":"Map of US hydrogen production projects of all types by status (construction, development, permitting, online) and hydrogen colour, with project details; the data could not be extracted.","first_seen_pass":1,"rank":4,"summary":"Clean Energy Group's map of US hydrogen production projects of every type by status and colour (updated April 2025); the data could not be extracted.","coverage_note":"All production routes; viewer only; not tested.","data_date":"2025-04","caveats":["Not tested beyond the page text.","Mixes electrolysis with fossil routes."],"coverage":{"geographic":"United States hydrogen production projects of all production routes, not only electrolysis."},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.cleanegroup.org/initiatives/alternative-fuels/projects-in-the-us/","note":"The page says production amounts are shown 'when available'; no units stated."}]},"inclusion_rule":{"value":"Hydrogen production projects drawn from EPA FLIGHT, EIA's Refinery Capacity Report and the group's desk research.","quote":"All information included in this tool is based on data from the Environmental Protection Agency's Facility Level Information on GreenHouse gasses Tool (FLIGHT), the Energy Information Administration's Refinery Capacity Report, and Clean Energy Group's own desk research.","url":"https://www.cleanegroup.org/initiatives/alternative-fuels/projects-in-the-us/","attempts":[]},"reference_date":{"value":"April 2025.","quote":"Last updated April 2025.","url":"https://www.cleanegroup.org/initiatives/alternative-fuels/projects-in-the-us/","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.cleanegroup.org/initiatives/alternative-fuels/projects-in-the-us/","note":"Not stated."}]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.cleanegroup.org/initiatives/alternative-fuels/projects-in-the-us/","note":"Not stated; dashboard content not extracted."}]}},"key_fields":[],"how_to_use":{"example_request":"","example_result":"","steps":["Open the page in a browser and use the status and hydrogen-colour filters; green or pink hydrogen corresponds to electrolysis."],"reading_traps":["Includes fossil and pyrolysis projects.","Its inputs include EPA FLIGHT and EIA refinery data, which are not electrolyzer inventories.","No export was available by script."]},"test":{"tested_on":"2026-11-24","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":107471,"records_total":null,"records_for_country":null,"problems":["A Tableau Public CSV request for the workbook (USHydrogenProjects) returned 404 with an AWS WAF captcha script; the dashboard data was not retrieved."]},"evidence":[{"claim":"What the tool shows.","url":"https://www.cleanegroup.org/initiatives/alternative-fuels/projects-in-the-us/","quote":"Users can browse this mapping tool based on the status of the project (construction, development, permitting, online), indicated by shape, and types of hydrogen (blue, green, grey, turquoise, and pink), indicated by color."},{"claim":"Update date.","url":"https://www.cleanegroup.org/initiatives/alternative-fuels/projects-in-the-us/","quote":"Last updated April 2025."}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"U.S. Department of Energy, Hydrogen and Fuel Cell Technologies Office (program tracking, not regulation)","url":"https://www.hydrogen.energy.gov/"},"operators":{"structure":"many","note":"Utilities, industrial gas companies and equipment firms such as Plug Power and FPL; no census found.","census_url":null},"publication_obligation":{"exists":"no_evidence_found","norm":null,"url":null,"what_must_be_published":null,"frequency":null},"consolidated_republication":{"found":"partial","note":"DOE republishes a yearly manufacturer-sourced table without operators; EIA cites it for totals; no operator-level list found.","checked_pages":[{"organization":"U.S. DOE Hydrogen Program","url":"https://www.hydrogen.energy.gov/library/program-records","saw":"Program records list; newest electrolyzer installations record is 24001."},{"organization":"U.S. EIA","url":"https://www.eia.gov/todayinenergy/detail.php?id=62223","saw":"Today in Energy article of 2024-06-06 repeating DOE's 116 MW and 4,524 MW figures."},{"organization":"International Energy Agency","url":"https://www.iea.org/data-and-statistics/data-product/hydrogen-production-and-infrastructure-projects-database","saw":"Database page with June 2026 file; download needs an account."}]}},"national_registry":{"exists":"no_evidence_found","note":"No regulator-maintained register of US electrolyzers with operator and commissioning date found. DOE publishes a yearly table; IEA and Clean Energy Group publish project databases.","checked_pages":[{"organization":"U.S. DOE Hydrogen Program","url":"https://www.hydrogen.energy.gov/library/program-records","saw":"Program records page; electrolyzer installations record 24001 (May 2024) is the newest."},{"organization":"U.S. EIA","url":"https://www.eia.gov/todayinenergy/detail.php?id=62223","saw":"Cites DOE for current and planned electrolyzer capacity."},{"organization":"International Energy Agency","url":"https://www.iea.org/data-and-statistics/data-product/hydrogen-production-and-infrastructure-projects-database","saw":"Worldwide projects database, account required to download."},{"organization":"Clean Energy Group","url":"https://www.cleanegroup.org/initiatives/alternative-fuels/projects-in-the-us/","saw":"Tableau map of US hydrogen production projects, April 2025."}]},"if_unstructured":{"summary":"Operator, start milestone and exact MW are not in DOE's table; they sit in operator and supplier press releases for each site.","recipe":["Pick a site from DOE Record 24001 Table 1 (city, state, kW).","Search the operator's or utility's newsroom and the electrolyzer supplier's news for the site; open the release.","Copy operator, MW, the milestone wording and the release date; keep MW and tons per day in separate fields.","Compare the release's milestone with DOE's status label and note any difference."],"location_method":"Use the city or county in the release; DOE gives only city and state.","cross_with":"IEA project database (US rows), Clean Energy Group map, and state air or building permits for the site.","where_published":[{"name":"FPL Newsroom","url":"https://newsroom.fpl.com/","what":"Utility releases on the Cavendish NextGen Hydrogen Hub.","how_to_search_inside":"Browse News Releases and read the related-content links; the site has no field search I used.","example_document":{"url":"https://newsroom.fpl.com/Florida-Power-Light-Company-announces-completion-of-clean-hydrogen-hub","what_it_gives":"Release of February 8, 2024: 'Florida Power & Light Company announced it completed its pilot clean hydrogen facility located in Okeechobee County, Fla.' (no MW stated in this release)."}},{"name":"Supplier investor news (Cummins)","url":"https://investor.cummins.com/news/detail/554/fpl-announces-cummins-to-supply-electrolyzer-for","what":"Electrolyzer supplier announcements with MW.","how_to_search_inside":"Search the supplier's investor news by customer or project name.","example_document":{"url":"https://investor.cummins.com/news/detail/554/fpl-announces-cummins-to-supply-electrolyzer-for","what_it_gives":"Cummins will supply a 25-megawatt (MW) electrolyzer system for the FPL Cavendish NextGen Hydrogen Hub (February 28, 2022)."}}]},"related_not_answering":[{"name":"EIA Today in Energy: Electrolyzers are a small but growing source of U.S. hydrogen production (2024-06-06)","url":"https://www.eia.gov/todayinenergy/detail.php?id=62223","why":"Repeats DOE's totals (116 MW current, 4,524 MW if planned built); no sites, no new data."},{"name":"CARB LCFS certified pathways, hydrogen fuel category (CARB workbook current-pathways_all.xlsx)","url":"https://ww2.arb.ca.gov/resources/documents/lcfs-pathway-certified-carbon-intensities","why":"159 hydrogen pathways, 8 mention electrolysis and one non-retired (SoHyCal); pathways certify fuel carbon intensity, not operating electrolyzers or MW."},{"name":"Hydrogen refuelling station lists (for example DOE AFDC)","url":"https://afdc.energy.gov/","why":"Stations consume or dispense hydrogen; most do not produce it. Not opened in this run."}],"open_questions":[{"question":"How many US electrolyzers are operating today, and which plants commissioned after May 2024 are missing from DOE Record 24001?","starting_point":"DOE's newest record is May 2024; plants such as Delta UT (220 MW, listed Planned) and Niagara Falls NY (35 MW, Planned/Under Construction) have later news.","next_step":"Get the IEA June 2026 file in a browser with a free account and filter US rows, then check operator releases."},{"question":"What does the IEA file give for US projects (operator, capacity basis, commissioning year, status)?","starting_point":"IEA page: file dated 18/06/2026, CC BY 4.0, free, account required.","next_step":"A person with an IEA account downloads the XLSX; or use the .Stat Data Explorer."},{"question":"Which of DOE's three Woodbine GA rows correspond to Plug Power's eight 5 MW units?","starting_point":"DOE rows 40,000 kW Installed/Operational, 5,000 kW Installed/Operational and 40,000 kW Planned; Plug's release says eight 5 MW PEM electrolyzers.","next_step":"Ask DOE or Plug, or read Plug's later filings."},{"question":"Is the DOE H2 Matchmaker map still online and does it list production sites?","starting_point":"energy.gov/eere/fuelcells/h2-matchmaker redirects to energy.gov/cmei/fuels/h2-matchmaker, which returns 404 (2026-11-24).","next_step":"Find the current DOE page, or ask H2Matchmaker@ee.doe.gov (address from search results, not opened)."},{"question":"What is behind the Clean Energy Group Tableau map?","starting_point":"Tableau Public workbook USHydrogenProjects/HydrogenProductionProjectsintheUS; CSV by script returned 404.","next_step":"Open it in a browser and use the viewer's download if enabled; or contact the group."}],"history":[{"pass":1,"date":"2026-11-24","role":"research","model":"claude-sonnet-5-5","rules_version":"2026-11-24-eeuu-gases-renovables","note":"First pass; reasoning effort and minutes not recorded. Pages count is approximate.","headline":{"official_data":"partial","non_official_data":"not_tested","national_registry":"no_evidence_found"},"sources":{"total":4,"new":4,"dropped":0},"negatives":{},"effort":{"pages":16,"minutes":null}}],"local_terms":[{"term":"Electrolyzer Installations in the United States (DOE Hydrogen Program Record)","language":"en","meaning":"DOE record series 20009, 22001, 23003, 24001; Table 1 is the site list."},{"term":"Hydrogen Production and Infrastructure Projects Database (IEA)","language":"en","meaning":"IEA global project file; download needs a free IEA account."},{"term":"Installed/Operational vs Installed/Commissioning","language":"en","meaning":"Status values in DOE Table 1; plain 'Installed' has no qualifier."},{"term":"Hydrogen Projects in the US (Clean Energy Group)","language":"en","meaning":"Tableau map of production projects by status and hydrogen colour."},{"term":"PEM / alkaline / SOEC electrolyzer","language":"en","meaning":"Electrolyzer technologies named in DOE Table 1; most capacity is PEM."},{"term":"Green hydrogen / electrolytic hydrogen","language":"en","meaning":"Terms used by operators such as Plug Power and FPL for electrolyzer output."},{"term":"Kilowatts (kW) vs tons per day","language":"en","meaning":"DOE lists kW; operators quote MW or tons per day; do not convert one into the other."},{"term":"NextGen Hydrogen Hub (FPL Cavendish)","language":"en","meaning":"Name of FPL's Okeechobee electrolyzer pilot."}],"provenance":{"pass_count":1,"models":["claude-sonnet-5-5"],"minutes_estimate":null,"pages_opened":16,"passes":[{"pass":1,"date":"2026-11-24","model":"claude-sonnet-5-5"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/us/hydrogen-plants.json","detail_url":"https://georutter.org/v1/us/hydrogen-plants/detail.json","html_url":"https://georutter.org/us/hydrogen-plants/","country_url":"https://georutter.org/v1/countries/us.json"}
