{"schema_version":"1.0","country":"us","country_name":"United States","topic":"network-tariffs","question":"Where can I get the current electricity network access tariffs and charges in the United States, by voltage level and period, with their history?","territory":"us","territory_level":"country","parent_url":null,"published_on":"2026-11-26","research_reviewed_on":"2026-11-26","access_checked_on":"2026-11-26","answer":{"official_data":"partial","non_official_data":"partial","summary":"There is no single national table. Transmission access rates are FERC-filed tariffs (eTariff, XML export, versions since 2010) and RTOs post computed rates: PJM zonal NITS in $/MW-year (XLSX), CAISO high/low-voltage access charges in $/MWh (PDF). Distribution charges are in each utility's state-approved tariff, e.g. Oncor (TX) by secondary/primary/transmission service and PG&E (CA) with distribution and transmission components by voltage and TOU period. OpenEI URDB compiles rates nationally but is mostly bundled retail rates.","main_caveats":["Transmission (FERC, wholesale) and distribution (state commissions, retail) are regulated separately; no source covers both nationally.","In vertically integrated states retail tariffs are bundled; a network-only charge may not exist as a published value.","Units differ: PJM $/MW-year, CAISO $/MWh, utility tariffs $/kW, $/kWh and $/customer; do not compare without conversion rules.","URDB is a convenience compilation; its voltage tags and start dates can differ from the official tariff."],"confidence":"medium","confidence_reason":"Sources tested with downloads, but distribution tariffs and RTO postings were sampled (3 utilities, 2 RTOs); PUCT summary blocked to automated clients.","attributes":[{"attribute":"network_tariffs","covered":"partial","source_ids":["ferc-etariff","rto-transmission-rate-postings","state-utility-delivery-tariffs","openei-urdb"],"note":"Transmission: eTariff and RTO postings (PJM, CAISO tested). Distribution: per-utility tariffs, sampled Oncor, PG&E, Con Edison.","gap":"not_checked","gap_note":"No national official compilation found (FERC, PUCT, OpenEI checked). Distribution tariffs tested for 3 utilities only; MISO, SPP, ISO-NE, NYISO postings and other states not opened."},{"attribute":"network_charges","covered":"partial","source_ids":["rto-transmission-rate-postings","state-utility-delivery-tariffs"],"note":"Components separated in sample: PG&E unbundles distribution/transmission; Oncor delivery charges plus TCRF/DCRF riders; CAISO HV/LV TAC.","gap":"not_checked","gap_note":"Separation of network charges was checked only in the sampled tariffs; bundled-rate utilities were not examined individually."},{"attribute":"voltage_level","covered":"partial","source_ids":["rto-transmission-rate-postings","state-utility-delivery-tariffs","openei-urdb"],"note":"CAISO HV (>=200 kV) vs LV; PG&E and Oncor secondary/primary/transmission service; PJM NITS has no voltage split.","gap":"not_checked","gap_note":"Voltage classes verified in 3 utility tariffs and CAISO only; URDB voltagecategory is empty in 44,320 of 58,920 rows and can contradict the rate name."},{"attribute":"time_band","covered":"partial","source_ids":["state-utility-delivery-tariffs","rto-transmission-rate-postings","openei-urdb"],"note":"PG&E B-19 peak 4-9 p.m., part-peak, off-peak, summer Jun-Sep; Oncor distribution and PJM/CAISO transmission rates have no time bands.","gap":"not_checked","gap_note":"Time-of-use definitions read in PG&E B-19 only; other utilities' calendars not checked (URDB holds 12x24 schedules but unverified)."},{"attribute":"latest_data","covered":"partial","source_ids":["ferc-etariff","rto-transmission-rate-postings","state-utility-delivery-tariffs","openei-urdb"],"note":"PJM as of 2026-10-01; CAISO rates eff. 2026-06-01 rev. 2026-09-09; Oncor 2026-06-01; PG&E 2026-03-01; URDB update 2026-08-17.","gap":"not_checked","gap_note":"Latest versions identified only for the tested sources; each other utility or RTO must be checked separately."},{"attribute":"historical_series","covered":"partial","source_ids":["ferc-etariff","rto-transmission-rate-postings","state-utility-delivery-tariffs","openei-urdb"],"note":"eTariff since 2010-10-01; CAISO archive from 2008; PJM files 2021-2026; PG&E B rates from 2019-11-01; URDB rate versions with start dates.","gap":"not_checked","gap_note":"History depth differs by publisher and was only checked for the sampled sources; pre-2010 FERC tariffs (paper era) not checked."},{"attribute":"update_frequency","covered":"partial","source_ids":["state-utility-delivery-tariffs","openei-urdb","rto-transmission-rate-postings"],"note":"Texas TDU tariffs twice a year (March/September TCRF); URDB annual for ~150 utilities; PJM/CAISO observed several dated postings in 2026.","gap":"not_checked","gap_note":"Stated schedules found only for Texas TDUs (archived PUCT page) and URDB; RTO and other utility schedules only observed, not stated."}]},"sources":[{"source_id":"ferc-etariff","name":"eTariff Viewer (tariffs filed with FERC, including Open Access Transmission Tariffs)","publisher":"Federal Energy Regulatory Commission (FERC)","official":true,"landing_url":"https://etariff.ferc.gov/TariffList.aspx","data_url":"https://etariff.ferc.gov/TariffExport.aspx?tid=1763","access":"web_viewer_only","format":"HTML viewer; XML export per tariff (eTariff export schema); RTF/PDF print","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"none","publisher_type":"regulator","adds":"The legally filed text of every FERC-jurisdictional transmission tariff (OATT rate schedules, formula-rate attachments, interconnection and wheeling rates) with section-level version history since electronic filing started in 2010.","first_seen_pass":1,"rank":1,"summary":"FERC's official register of filed tariffs: every FERC-jurisdictional OATT and transmission rate schedule, with section versions and effective dates; XML export per tariff.","coverage_note":"Wholesale/interstate transmission service. Not retail distribution tariffs (state PUCs) and not ERCOT-internal utilities.","data_date":"Export of 2026-11-26; records since 2010-10-01","caveats":["Rates are inside tariff text, not typed fields; formula rates need the RTO's posted results.","ferc.gov pages refuse automated clients; etariff.ferc.gov works."],"coverage":{"geographic":"United States: wholesale/interstate transmission tariffs of FERC-jurisdictional public utilities, RTO/ISOs and federal power administrations. ERCOT-only utilities and most retail distribution tariffs are not filed here."},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://etariff.ferc.gov/TariffExport.aspx?tid=1763","note":"The XML export carries tariff text (record_plain_text) and status/dates, not typed rate fields; units appear only inside the tariff text of each rate schedule."}]},"inclusion_rule":{"value":"Tariffs and tariff revisions of public utilities, gas and oil pipelines and power administrations filed electronically since 2010-10-01 (Order No. 714).","quote":"Order No. 714, the Federal Energy Regulatory Commission revised its regulations to require that, effective October 1, 2010, all tariffs and tariff revisions and rate change applications for the public utilities, natural gas pipelines, oil pipelines and power administrations be filed electronically","url":"https://etariff.ferc.gov/PDF/etariff-viewer-guide.pdf","attempts":[]},"reference_date":{"value":"Each tariff record carries its own effective date and status; the export is stamped with tariff_export_date (2026-11-26T09:33Z in the test).","quote":"<tariff_export_date>2026-11-26T09:33Z</tariff_export_date>","url":"https://etariff.ferc.gov/TariffExport.aspx?tid=1763","attempts":[]},"update_frequency":{"value":"Continuous: records change whenever a filing is accepted; no publisher-stated schedule found.","quote":null,"url":null,"attempts":[{"url":"https://etariff.ferc.gov/PDF/etariff-viewer-guide.pdf","note":"Guide (July 2025) describes statuses and history but states no update schedule."}]},"exclusions":{"value":"The viewer rendition is not the legal filed rate; Commission orders control.","quote":"The rendition of the tariff provisions and the status of these provisions is based on the best efforts of Commission staff, but does not necessarily represent the rates or terms and conditions of service on file at any particular point in time.","url":"https://etariff.ferc.gov/TariffList.aspx","attempts":[]}},"key_fields":[{"field":"record_title / record_content_desc","meaning":"Tariff section title and number, e.g. OATT SCHEDULE 7, OATT Attachment H-1"},{"field":"record_version_num","meaning":"Version of the section (e.g. 15.0.1); history of versions is shown in the viewer"},{"field":"record_current_status","meaning":"Effective, Accepted, Suspended, Pending, Conditionally Accepted/Effective, Tolled"},{"field":"current_effective_date / proposed_effective_date","meaning":"Legal validity of the record, distinct from tariff time-of-use periods"},{"field":"record_plain_text","meaning":"Text of the section, where rate values and units appear"},{"field":"filing_id / ferc_order_date","meaning":"Filing and order that put the record in place"}],"how_to_use":{"example_request":"curl -s -c cj -b cj https://etariff.ferc.gov/TariffExport.aspx?tid=1763 > page.html; then POST the page's hidden ASP.NET fields plus __EVENTTARGET=ctl00$Content1$btnExport, ctl00$Content1$lstStatus$0=9 (Effective), ctl00$Content1$lstBinaryText$1=2 (plain text) to the same URL with the same cookies","example_result":"200 application/octet-stream, Content-Disposition: attachment;filename=Tariff_1763.xml, 1,260,358 bytes; <tariff_title>Interregional Agreements</tariff_title>; 292 record_data elements, first: record_content_desc 19.1, record_version_num 0.0.0","steps":["On TariffList.aspx choose the program 'Electric TCS and MBR' or type a company name (e.g. PJM) and click Find Tariffs; each row gives TariffBrowser.aspx?tid=<id> (sections and history) and TariffExport.aspx?tid=<id> (XML).","For an RTO OATT, rate values sit in schedules and attachments (e.g. PJM OATT Schedule 7, Schedule 8, Attachment H-1 ... H-xx); open the section to see its version history.","For a dated view use the date box in TariffBrowser (sections effective on that date) or the RTF/PDF print link TariffPrint.aspx?tid=<id>&date=MMDDYYYY.","Parse the XML with the namespace http://ferc.gov/etariffExport.xsd; rate tables must be read from record_plain_text."],"reading_traps":["The XML export only covers the statuses ticked in the dialog; the default is Effective, so superseded versions need the viewer history or other statuses.","Formula-rate tariffs (e.g. PJM Attachment H) hold the formula; the resulting annual revenue requirement and $/MW-year rate are posted by the RTO, not as a field in eTariff.","ASP.NET postbacks: section clicks in TariffBrowser need valid view state; a stale postback returned HTTP 302 in the test."]},"test":{"tested_on":"2026-11-26","method":"download","http_status":200,"content_type":"application/octet-stream","size_bytes":1260358,"records_total":292,"records_for_country":292,"problems":["www.ferc.gov and ferc.gov return a Cloudflare 'Just a moment...' 403 page to non-browser clients; the etariff.ferc.gov application itself answered normally.","Queries require ASP.NET form posts (view state); there is no documented public API."]},"evidence":[{"claim":"Electronic tariff filing obligatory since 2010-10-01 (Order No. 714)","url":"https://etariff.ferc.gov/PDF/etariff-viewer-guide.pdf","quote":"effective October 1, 2010, all tariffs and tariff revisions and rate change applications for the public utilities, natural gas pipelines, oil pipelines and power administrations be filed electronically"},{"claim":"XML download of currently effective tariff records","url":"https://etariff.ferc.gov/PDF/etariff-viewer-guide.pdf","quote":"The Commission provides as a service to the public the ability to download currently effective tariff records of a particular tariff."},{"claim":"PJM OATT listed as Intra-PJM Tariffs (tid=1731) with Schedule 7, Schedule 8 and Attachments H-1 onwards; 2,226 versioned section entries in the browser tree on the test date","url":"https://etariff.ferc.gov/TariffBrowser.aspx?tid=1731","quote":"SCHEDULE 7, OATT SCHEDULE 7 (15.0.1)"}],"members":[],"members_summary":null},{"source_id":"rto-transmission-rate-postings","name":"RTO/ISO posted transmission service rates (zonal NITS rates, Transmission Access Charge rates)","publisher":"Regional transmission organizations / independent system operators (PJM, CAISO tested)","official":true,"landing_url":null,"data_url":null,"access":"direct_download","format":"XLSX and PDF (PJM); PDF (CAISO)","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"none","publisher_type":"operator","adds":"Computed current and past transmission access rates by zone or transmission owner, with units and effective dates, which eTariff only holds as formulas; CAISO separates high-voltage (>=200 kV) and low-voltage components.","first_seen_pass":1,"rank":2,"summary":"Computed transmission access rates: PJM zonal NITS rates ($/MW-Year, XLSX per period) and CAISO Transmission Access Charge (high-voltage >=200 kV and low-voltage $/MWh, PDF per effective date).","coverage_note":"Tested PJM and CAISO; MISO, SPP, ISO-NE, NYISO not opened. Transmission level only.","data_date":"PJM as of 2026-10-01; CAISO effective 2026-06-01 (rev. 2026-09-09)","caveats":["CAISO revises sheets for the same effective date; take the latest revision.","PJM NITS rates have no voltage or time-of-day split."],"coverage":{"geographic":"PJM transmission zones and CAISO participating transmission owners in the tested members."},"fine_print":{"unit":{"value":"PJM: $/MW-Year network service rate; CAISO: $/MWh of gross load.","quote":"Network Integration Transmission Service Rate ($/MW-Year)","url":"https://www.pjm.com/-/media/DotCom/markets-ops/settlements/network-integration-trans-service-october-2026-xls.xlsx","attempts":[]},"inclusion_rule":{"value":"PJM: each transmission zone and transmission owner revenue requirement; CAISO: each participating transmission owner's filed TRR and gross load.","quote":"June 01, 2026 TAC Rates Based on Filed Annual TRR/TRBA and Load Data","url":"https://www.caiso.com/documents/high-voltage-access-charge-rates-effective-jun-01-2026-revised-sep-09-2026.pdf","attempts":[]},"reference_date":{"value":"PJM file 'As of 10/1/2026'; CAISO sheet for rates effective 2026-06-01, revision R7 'as of 9/10/2026'.","quote":"As of 10/1/2026","url":"https://www.pjm.com/-/media/DotCom/markets-ops/settlements/network-integration-trans-service-october-2026.pdf","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.pjm.com/markets-and-operations/billing-settlements-and-credit","note":"Observed 2026 postings: January, June, August, October; no stated schedule."},{"url":"https://www.caiso.com/library/high-voltage-access-charge-rates-effective-2026","note":"Observed 2026 effective dates Jan 01, Jan 30, Jun 01 with several revisions; no stated schedule."}]},"exclusions":{"value":"CAISO HV/LV split: facilities below 200 kV are low voltage.","quote":"Wheeling from transmission facilities with a voltage rating of less than 200 kV will result in Low Voltage (LV) Wheeling Access Charges","url":"https://www.caiso.com/documents/wheeling-access-rates-effective-jun-01-2026.pdf","attempts":[]}},"key_fields":[{"field":"Transmission Zone / Transmission Owner","meaning":"PJM pricing zone and the owners whose revenue requirements form it"},{"field":"Annual Revenue Requirement / Total Zonal Annual Revenue Requirement","meaning":"USD per year"},{"field":"Network Integration Transmission Service Rate ($/MW-Year)","meaning":"Zonal NITS rate charged on network service peak load"},{"field":"HV TAC Rate ($/MWH)","meaning":"CAISO system-wide high-voltage access charge"},{"field":"Utility Specific Access Charges ($/MWh) - Total LV","meaning":"CAISO low-voltage charge per transmission owner"},{"field":"TRR - Eff. Date - Docket#","meaning":"Effective date and FERC docket of each revenue requirement"}],"how_to_use":{"example_request":"curl -sLO https://www.pjm.com/-/media/DotCom/markets-ops/settlements/network-integration-trans-service-october-2026-xls.xlsx (sheet 'October 2026', header row 2)","example_result":"['AECO', 'Atlantic City Electric Company', '231657800', '231657800', '85511']  -> zone AECO, NITS rate 85,511 $/MW-Year; CAISO June 01, 2026 R7: PG&E HV 9.3333, LV 17.9118 $/MWh, ISO HV TAC 15.8508 $/MWh","steps":["PJM: open the XLSX, one sheet per validity period; zones with several owners have the zonal total and rate on a separate row below the owner rows.","CAISO: open the latest revision on the yearly library page; page 1 has the HV TAC rate, later pages the HV/LV components per transmission owner with TRR effective date and docket.","Use the yearly archive pages for history (CAISO from 2008-2011; PJM annual files 2021-2025 and 2026 dated files)."],"reading_traps":["CAISO republishes the same effective date with revisions: the Jun 01, 2026 ISO HV TAC rate was 15.8352 $/MWh in an earlier version and 15.8508 $/MWh in the revision dated Sep 09, 2026 (R7).","PJM's PDF has no period heading in its text layer; the period appears in the XLSX sheet names and in a footnote ('As of 10/1/2026').","PJM rates are annual demand rates ($/MW-Year), not energy rates; they are not differentiated by voltage or time of day.","Several PJM zones (ATSI, DAYTON, EKPC, PPL) were revised retroactively to June 1, 2026 by FERC directive, so earlier 2026 files differ."]},"test":{"tested_on":"2026-11-26","method":"download","http_status":200,"content_type":"application/vnd.openxmlformats-officedocument.spreadsheetml.sheet","size_bytes":27765,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"PJM page lists NITS revenue requirements and rates by month and year","url":"https://www.pjm.com/markets-and-operations/billing-settlements-and-credit","quote":"Network Integration Transmission Service Revenue Requirements & Rates"},{"claim":"PJM retroactive revision footnote","url":"https://www.pjm.com/-/media/DotCom/markets-ops/settlements/network-integration-trans-service-october-2026.pdf","quote":"*ATSI, DAYTON, EKPC and PPL ARR/NITS rates revised effective June 1, 2026 pursuant to FERC directive"},{"claim":"CAISO HV threshold","url":"https://www.caiso.com/documents/wheeling-access-rates-effective-jun-01-2026.pdf","quote":"High Voltage (HV) Wheeling Access Charges are assessed for wheeling from transmission facilities with voltage rating of 200 kV or higher."}],"members":[{"name":"PJM - Network Integration Transmission Service Revenue Requirements & Rates","landing_url":"https://www.pjm.com/markets-and-operations/billing-settlements-and-credit","data_url":"https://www.pjm.com/-/media/DotCom/markets-ops/settlements/network-integration-trans-service-october-2026-xls.xlsx","access":"direct_download","tested":true,"data_found":true,"note":"XLSX with one sheet per validity period (October 2026; August-September 2026; June-July 2026); zonal rate in $/MW-Year; annual files 2021-2025 on the same page."},{"name":"CAISO - High voltage access charge rates (TAC) library","landing_url":"https://www.caiso.com/library/transmission-access-charge-high-voltage-access-charge-rates","data_url":"https://www.caiso.com/documents/high-voltage-access-charge-rates-effective-jun-01-2026-revised-sep-09-2026.pdf","access":"pdf","tested":true,"data_found":true,"note":"PDF per effective date and revision; HV TAC $/MWh system-wide and LV utility-specific $/MWh; yearly archive pages from 2008-2011 to 2026."}],"members_summary":{"total":null,"listed":2,"tested":2,"data_found":2,"scope_note":"RTO/ISO markets and transmission providers posting OATT rates; universe not counted in this pass. Tested PJM and CAISO; MISO, SPP, ISO-NE, NYISO and ERCOT were not opened. Utilities outside RTOs post their own OATT rates.","pattern":"Look on each RTO's billing/settlements or tariff pages for 'transmission service rates', 'zonal rates' or 'revenue requirements'."},"member_scope":{"total":null,"note":"RTO/ISO markets and transmission providers posting OATT rates; universe not counted in this pass. Tested PJM and CAISO; MISO, SPP, ISO-NE, NYISO and ERCOT were not opened. Utilities outside RTOs post their own OATT rates.","pattern":"Look on each RTO's billing/settlements or tariff pages for 'transmission service rates', 'zonal rates' or 'revenue requirements'."}},{"source_id":"state-utility-delivery-tariffs","name":"Utility retail delivery (distribution) tariffs approved by state public utility commissions","publisher":"Distribution utilities under state commission approval (Oncor/PUCT, PG&E/CPUC, Con Edison/NYPSC tested)","official":true,"landing_url":null,"data_url":null,"access":"pdf","format":"PDF tariff books; some utilities add XLSX rate summaries (PG&E)","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"none","publisher_type":"operator","adds":"Distribution-level network charges by service voltage (secondary/primary/transmission), customer class and time-of-use period, with effective dates; in unbundled states the delivery charges are separate from supply.","first_seen_pass":1,"rank":3,"summary":"Distribution network charges are in each utility's commission-approved tariff: e.g. Oncor (TX) delivery charges by secondary/primary/transmission service; PG&E (CA) B-19 with distribution and transmission components by voltage and TOU period.","coverage_note":"Sample of 3 utilities (TX, CA, NY); every other utility publishes its own tariff book.","data_date":"Oncor sheets effective 2026-06-01; PG&E B-19 effective 2026-03-01; Con Edison MAC 2026-11-01","caveats":["Vertically integrated utilities publish bundled retail rates; network components may not be separated.","Formats and voltage-class definitions differ by utility."],"coverage":{"geographic":"Tested: Oncor service area (Texas), PG&E (California), Con Edison (New York)."},"fine_print":{"unit":{"value":"Per tariff: $ per Retail Customer or per meter per day (customer charges), $ per kW (demand), $ per kWh (energy).","quote":"Distribution System Charge See Table Below ... per Distribution Billing kW","url":"https://www.oncor.com/content/dam/oncorwww/documents/about-us/regulatory/tariff-and-rate-schedules/Tariff%20for%20Retail%20Delivery%20Service.pdf.coredownload.pdf","attempts":[]},"inclusion_rule":{"value":"Each schedule states its availability (voltage and demand size).","quote":"This schedule is applicable to Delivery Service at secondary voltage with demand greater than 10 kW when such Delivery Service is to one Point of Delivery and measured through one Meter.","url":"https://www.oncor.com/content/dam/oncorwww/documents/about-us/regulatory/tariff-and-rate-schedules/Tariff%20for%20Retail%20Delivery%20Service.pdf.coredownload.pdf","attempts":[]},"reference_date":{"value":"Each sheet carries Effective Date and Revision (Oncor), Advice letter and Effective date (PG&E), Statement No. and Effective Date (Con Edison).","quote":"Effective Date: June 1, 2026","url":"https://www.oncor.com/content/dam/oncorwww/documents/about-us/regulatory/tariff-and-rate-schedules/Tariff%20for%20Retail%20Delivery%20Service.pdf.coredownload.pdf","attempts":[]},"update_frequency":{"value":"Texas TDU tariffs: twice a year after March and September TCRF filings, except after a major rate case (PUCT page, archived copy of 2024-10-27).","quote":"Tariffs will only be updated twice a year (after the March and September TCRF filings) except in the event of a Final Order in a major rate case.","url":"http://web.archive.org/web/20241027033600/https://www.puc.texas.gov/industry/electric/rates/tdr.aspx","attempts":[]},"exclusions":{"value":"PG&E customer charges are assigned wholly to distribution in the unbundling.","quote":"Customer charge rates provided in the Total Rates section above are assigned entirely to the unbundled distribution component.","url":"https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_SCHEDS_B-19.pdf","attempts":[]}},"key_fields":[{"field":"Rate schedule / Service Classification","meaning":"Customer class, e.g. Oncor 6.1.1.1.3 Secondary Service Greater Than 10 kW, PG&E B-19, Con Edison SC"},{"field":"Secondary / Primary / Transmission Voltage","meaning":"Service voltage class defined in each tariff (PG&E: secondary below 2,400 V)"},{"field":"Customer, Metering, Distribution System Charge","meaning":"Oncor delivery components; riders TCRF (transmission) and DCRF (distribution) adjust them"},{"field":"UNBUNDLING OF TOTAL RATES: Generation, Distribution, Transmission","meaning":"PG&E split of each total charge into components"},{"field":"Peak / Part-Peak / Off-Peak, Summer / Winter","meaning":"PG&E time-of-use periods and seasons (Section 6 of the schedule)"},{"field":"Effective Date, Revision, Advice letter","meaning":"Legal validity of each sheet"}],"how_to_use":{"example_request":"PG&E: https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_SCHEDS_B-19.pdf, sheet Cal. P.U.C. 61072-E (UNBUNDLING OF TOTAL RATES), pdftotext -layout","example_result":"Distribution**: Maximum Demand Summer $28.24 (R) $19.98 (R) $7.81 (R) [Secondary, Primary, Transmission voltage, $ per kW]; Transmission Maximum Demand* $9.10 $9.10 $9.10; Advice 7846-E, Effective March 1, 2026","steps":["Identify the distribution utility serving the area and its state commission.","Download the current tariff book and find the schedule for the customer class; Oncor lists delivery schedules under 6.1.1.1, PG&E publishes one PDF per schedule.","Read the voltage columns and TOU period definitions in the same schedule; for unbundled components use PG&E's 'UNBUNDLING OF TOTAL RATES' sheet or Oncor's riders (TCRF, DCRF).","For history use the utility's historic rate files (PG&E: XLSX per validity period; Commercial B schedules from November 1, 2019, residential baseline from July 15, 1993) or the commission's tariff filings."],"reading_traps":["PG&E's historic XLSX files give total bundled rates; the network components (distribution, transmission) only appear in the PDF unbundling sheet.","Oncor's tariff PDF mixes sheets with different effective dates (e.g. June 1, 2026 and January 15, 2015); read the date on each sheet.","In Texas the delivery charge is billed through the retail electric provider; supply prices are not in the TDU tariff.","Con Edison's website copies are convenience copies; the company says official leaves with receipt stamps are those on file with the NYPSC."]},"test":{"tested_on":"2026-11-26","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":3890589,"records_total":null,"records_for_country":null,"problems":["The Texas PUCT site (puc.texas.gov, ftp.puc.texas.gov) returned a Cloudflare block (403) to non-browser requests; the summary of TDU charges was read only through an archived copy of 2024-10-27."]},"evidence":[{"claim":"Oncor rates approved by PUCT and FERC","url":"https://www.oncor.com/content/oncorwww/us/en/home/about-us/regulatory/tariffs-rate-schedules.html","quote":"All rates and charges are approved by the Public Utility Commission of Texas (PUCT) and the Federal Energy Regulatory Commission (FERC), if applicable."},{"claim":"PG&E voltage class definition","url":"https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_SCHEDS_B-19.pdf","quote":"Secondary: This is the voltage class if the service voltage is less than 2,400 volts or if the definitions of “primary” and “transmission” do not apply to the service."},{"claim":"Con Edison: official schedules are on file with the NYPSC","url":"https://www.coned.com/en/rates-tariffs/rates","quote":"The Company's schedules on file with the NYPSC — including current, pending, and canceled or superseded tariff leaves — can be found on the NYPSC's website."}],"members":[{"name":"Oncor Electric Delivery - Tariff for Retail Delivery Service (Texas, PUCT)","landing_url":"https://www.oncor.com/content/oncorwww/us/en/home/about-us/regulatory/tariffs-rate-schedules.html","data_url":"https://www.oncor.com/content/dam/oncorwww/documents/about-us/regulatory/tariff-and-rate-schedules/Tariff%20for%20Retail%20Delivery%20Service.pdf.coredownload.pdf","access":"pdf","tested":true,"data_found":true,"note":"248-page PDF; schedules 6.1.1.1.1-6.1.1.1.8 by Secondary/Primary/Transmission service; many sheets effective June 1, 2026; transmission cost recovery in Rider TCRF."},{"name":"PG&E - Electric Schedule B-19 and historic rate files (California, CPUC)","landing_url":"https://www.pge.com/tariffs/en/rate-information/electric-rates.html","data_url":"https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_SCHEDS_B-19.pdf","access":"pdf","tested":true,"data_found":true,"note":"PDF sheets give total and unbundled Transmission/Distribution components by Secondary/Primary/Transmission voltage and TOU period (Advice 7846-E, effective March 1, 2026); XLSX history gives totals only."},{"name":"Con Edison - Schedule for Electricity Service P.S.C. No. 10 and statements (New York, NYPSC)","landing_url":"https://www.coned.com/en/rates-tariffs/rates/electric-rates-schedule/electric-psc-10","data_url":"https://www.coned.com/-/media/files/coned/documents/rates/electric/psc-10/delivery/monthly-adjustment-clause/mac-202611.pdf","access":"pdf","tested":true,"data_found":true,"note":"Tariff PDF plus monthly statements split into delivery and supply; MAC statement No. 178 effective 11/01/2026 gives 0.01134 $/kWh. The base tariff PDF was not parsed."}],"members_summary":{"total":null,"listed":3,"tested":3,"data_found":3,"scope_note":"One tariff book per regulated distribution utility (investor-owned utilities regulated by each state commission; many cooperatives and municipal utilities set their own rates). Tested one large utility in each of Texas, California and New York; other states and utilities not checked.","pattern":"Search the utility site for 'tariff', 'rate schedules' or 'Tariff for Retail Delivery Service'; check the state commission's tariff filings for official leaves."},"member_scope":{"total":null,"note":"One tariff book per regulated distribution utility (investor-owned utilities regulated by each state commission; many cooperatives and municipal utilities set their own rates). Tested one large utility in each of Texas, California and New York; other states and utilities not checked.","pattern":"Search the utility site for 'tariff', 'rate schedules' or 'Tariff for Retail Delivery Service'; check the state commission's tariff filings for official leaves."}},{"source_id":"openei-urdb","name":"U.S. Utility Rate Database (URDB)","publisher":"OpenEI / National Laboratory of the Rockies (NLR, U.S. Department of Energy laboratory)","official":false,"landing_url":"https://openei.org/wiki/Utility_Rate_Database","data_url":"https://openei.org/apps/USURDB/download/usurdb.csv.gz","access":"direct_download","format":"CSV (gzip) and JSON (gzip); REST API with key","license":"Creative Commons Zero (CC0) unless otherwise noted","language":"en","has_coordinates":false,"location_precision":"none","publisher_type":"academic","adds":"The only national machine-readable compilation of utility rate structures (energy, demand, fixed charges, TOU schedules, voltage category, start/end dates) across about 2,800 EIA utility IDs, bulk download without key.","first_seen_pass":1,"rank":4,"summary":"National CC0 compilation of utility rate structures (energy, demand, fixed, TOU calendars, voltage category, start/end dates); bulk CSV of 58,920 rate versions downloaded 2026-11-26.","coverage_note":"Mostly total retail rates; only 3,252 rows marked Delivery; voltagecategory empty in 75% of rows.","data_date":"Latest record update 2026-08-17; file of 2026-11-25","caveats":["Not an official register; verify against the source tariff.","Voltage tags and start dates can differ from the tariff."],"coverage":{"geographic":"United States, utility service territories identified by EIA utility ID (eiaid)."},"fine_print":{"unit":{"value":"Per field: energyratestructure .../tier0unit (e.g. kWh), demandrateunit, fixedchargeunits; rates in USD.","quote":null,"url":null,"attempts":[{"url":"https://openei.org/apps/USURDB/download/usurdb.csv.gz","note":"Units read from column names and unit columns in the CSV; no unit statement quoted from documentation."}]},"inclusion_rule":{"value":"Approved rates entered for utilities on the EIA list; a subset updated annually.","quote":"We update rates annually for utilities that comprise 70% of the total US electricity load.","url":"https://openei.org/wiki/Utility_Rate_Database","attempts":[]},"reference_date":{"value":"startdate/enddate per rate record and latest_update; latest latest_update in the 2026-11-26 download: 2026-08-17; file Last-Modified 2026-11-25.","quote":null,"url":"https://openei.org/apps/USURDB/download/usurdb.csv.gz","attempts":[]},"update_frequency":{"value":"Annual update for about 150 utilities; bulk file regenerated (Last-Modified 2026-11-25).","quote":"We update rates annually for utilities that comprise 70% of the total US electricity load. This list includes approximately 150 different utilities across the country.","url":"https://openei.org/wiki/Utility_Rate_Database","attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://openei.org/apps/USURDB/download/usurdb.csv.gz","note":"No exclusion statement found; 44,320 of 58,920 rows have an empty voltagecategory and 42,168 an empty servicetype."}]}},"key_fields":[{"field":"label","meaning":"URDB rate record ID"},{"field":"eiaid / utility / name","meaning":"EIA utility ID, utility name, rate name"},{"field":"startdate / enddate / supersedes","meaning":"Validity of the rate version; empty enddate does not prove it is current"},{"field":"sector / servicetype","meaning":"Residential, Commercial, Industrial, Lighting; Bundled, Delivery, Delivery with Standard Offer, Energy"},{"field":"voltagecategory / voltageminimum / voltagemaximum","meaning":"Secondary, Primary, Transmission; service voltage limits (V)"},{"field":"energyratestructure/periodN/tierMrate, energyweekdayschedule","meaning":"Energy rate by period/tier and 12x24 period calendars (TOU)"},{"field":"flatdemand..., demandratestructure..., fixedchargefirstmeter","meaning":"Demand and fixed charges"},{"field":"source","meaning":"URL of the utility tariff used"}],"how_to_use":{"example_request":"curl -sLO https://openei.org/apps/USURDB/download/usurdb.csv.gz ; python: csv.DictReader over gzip, filter eiaid=='14328' and 'B-19' in name, sort by startdate","example_result":"label 69de92556d1ebb0263094f0e | B-19 Medium General Demand TOU Option R (Transmission) Mandatory | startdate 2026-03-27 | voltagecategory Secondary | servicetype Bundled | energyratestructure/period0/tier0rate 0.08878","steps":["Download the bulk CSV (12.2 MB gz, 737 columns, 58,920 rows on 2026-11-26) or use the API (version 7, free api.data.gov key).","Each row is a rate version; group by eiaid and name, and use startdate/enddate/supersedes to build history.","Use servicetype to separate Delivery-only rates (3,252 rows) from Bundled rates (10,039 rows); most rows leave it empty.","Check each value against the 'source' tariff before use."],"reading_traps":["voltagecategory can contradict the rate name: PG&E 'B-19 ... (Transmission) Mandatory' is tagged Secondary.","URDB startdate (2026-03-27) differs from the tariff effective date (March 1, 2026) for PG&E B-19.","30,852 rows have no enddate, including rates last started in 2014 (e.g. Oncor POLR rows), so 'no enddate' is not 'currently effective'.","The wiki states 'over 3,700 U.S. utilities' while the approved-rate download has 2,843 distinct eiaid values; the definitions were not reconciled.","Most rows are total retail rates, not network access charges."]},"test":{"tested_on":"2026-11-26","method":"download","http_status":200,"content_type":"application/x-gzip","size_bytes":12218252,"records_total":58920,"records_for_country":58920,"problems":[]},"evidence":[{"claim":"Bulk download links","url":"https://openei.org/wiki/Utility_Rate_Database","quote":"Download all approved U.S. rates in csv/gzip format or json/gzip format"},{"claim":"Scope stated by the publisher","url":"https://openei.org/wiki/Utility_Rate_Database","quote":"The Utility Rate Database (URDB) provides rate structure information for over 3,700 U.S. utilities."},{"claim":"License","url":"https://openei.org/wiki/Utility_Rate_Database","quote":"Content is available under Creative Commons Zero unless otherwise noted."}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"FERC (interstate transmission and wholesale); state public utility commissions (retail distribution), e.g. PUCT, CPUC, NYPSC","url":"https://etariff.ferc.gov/TariffList.aspx"},"operators":{"structure":"many","note":"RTO/ISOs administer regional OATTs; distribution is run by investor-owned utilities, cooperatives and municipal utilities, each with its own tariff.","census_url":null},"publication_obligation":{"exists":"yes","norm":"FERC Order No. 714 (electronic tariff filing, effective 2010-10-01); state commission tariff filing rules","url":"https://etariff.ferc.gov/PDF/etariff-viewer-guide.pdf","what_must_be_published":"Tariffs and tariff revisions and rate change applications filed electronically with FERC","frequency":"With each tariff change"},"consolidated_republication":{"found":"partial","note":"FERC eTariff republishes all FERC-filed tariffs; PUCT publishes a summary of ERCOT TDU charges (blocked to automated clients). No national consolidation of distribution tariffs found.","checked_pages":[{"organization":"FERC","url":"https://etariff.ferc.gov/TariffList.aspx","saw":"Tariff list by program and company; PJM query returned Intra-PJM Tariffs (tid=1731) with XML and RTF/PDF export."},{"organization":"Public Utility Commission of Texas","url":"http://web.archive.org/web/20241027033600/https://www.puc.texas.gov/industry/electric/rates/tdr.aspx","saw":"Archived page (2024-10-27) linking per-TDU tariffs and a 'Summary of Current Commission-Approved Charges for ERCOT TDUs'; live site answered 403 (Cloudflare)."},{"organization":"OpenEI / NLR","url":"https://openei.org/wiki/Utility_Rate_Database","saw":"National rate database with bulk download; non-official."}]}},"national_registry":{"exists":"partial","note":"FERC eTariff is the national official register of filed transmission tariffs; no national official register of distribution tariffs was found.","checked_pages":[{"organization":"FERC","url":"https://etariff.ferc.gov/TariffList.aspx","saw":"eTariff viewer with tariff list, browser and XML export."},{"organization":"FERC","url":"https://ferc.gov/view-individual-tariffs","saw":"403 Cloudflare challenge page for non-browser client."},{"organization":"Public Utility Commission of Texas","url":"https://www.puc.texas.gov/industry/electric/rates/tdr.aspx","saw":"403 Cloudflare block; archived copy read instead."},{"organization":"OpenEI / NLR","url":"https://openei.org/wiki/Utility_Rate_Database","saw":"Non-official national compilation, 'over 3,700 U.S. utilities'."},{"organization":"Con Edison","url":"https://www.coned.com/en/rates-tariffs/rates","saw":"Points to NYPSC website for official current, pending and cancelled tariff leaves."}]},"if_unstructured":{"summary":"Outside the PJM and PG&E spreadsheets, rate values are inside PDF tariff sheets; extract the schedule table per utility.","recipe":["Download the utility tariff PDF and convert with pdftotext -layout.","Locate the delivery/distribution schedule for the customer class and read Effective Date and Revision on each sheet.","Record each charge with its unit, voltage class and time period; follow rider references (e.g. Rider TCRF) for transmission pass-through charges."],"location_method":null,"cross_with":["OpenEI URDB 'source' URLs to find tariff documents of other utilities","FERC eTariff for the transmission tariffs that the riders pass through"],"where_published":[{"name":"Utility tariff books (state-approved)","url":"https://www.oncor.com/content/oncorwww/us/en/home/about-us/regulatory/tariffs-rate-schedules.html","what":"Current tariff PDF of each distribution utility","how_to_search_inside":"Use the table of contents (Oncor section 6.1.1.1 'Charges for Transmission and Distribution System Service'); pdftotext -layout keeps the columns.","example_document":{"url":"https://www.oncor.com/content/dam/oncorwww/documents/about-us/regulatory/tariff-and-rate-schedules/Tariff%20for%20Retail%20Delivery%20Service.pdf.coredownload.pdf","what_it_gives":"Sheet 1.3, 6.1.1.1.3 Secondary Service Greater Than 10 kW, Effective Date: June 1, 2026: Customer Charge $ 24.00 per Retail Customer; Metering Charge $ 20.99; Distribution System Charge Less than or equal to 20 kW 6.931363 per Distribution Billing kW."}}]},"related_not_answering":[{"name":"PG&E historic rate XLSX files (totals only)","url":"https://www.pge.com/tariffs/en/rate-information/electric-rates.html","why":"Give total bundled rates per period; network components need the PDF unbundling sheet (used under the utility tariffs source)."},{"name":"Con Edison Statement of Market Supply Charge","url":"https://www.coned.com/en/rates-tariffs/rates/electric-rates-schedule/electric-psc-10","why":"Supply (commodity) charge, not a network charge."}],"open_questions":["URDB states 'over 3,700 U.S. utilities' but its approved-rate bulk file has 2,843 distinct eiaid values; the publisher would need to clarify the count definition.","CAISO revised the June 1, 2026 TAC sheet (15.8352 to 15.8508 $/MWh HV); the reason for the revision is not stated in the sheet."],"history":[{"pass":1,"date":"2026-11-26","role":"research","model":"claude-sonnet-5-5","rules_version":"2026-11-26-eeuu-energia-y-regulacion","note":"First pass: eTariff XML export, PJM and CAISO postings, Oncor/PG&E/Con Edison tariffs and URDB bulk file tested; other RTOs and utilities pending.","headline":{"official_data":"partial","non_official_data":"partial","national_registry":"partial"},"sources":{"total":4,"new":4,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":36,"minutes":null}}],"local_terms":[{"term":"Open Access Transmission Tariff (OATT)","language":"en","meaning":"FERC-filed tariff with transmission service terms and rates; searchable in eTariff."},{"term":"Tariff for Retail Delivery Service","language":"en","meaning":"Texas TDU tariff containing distribution delivery charges by service voltage."},{"term":"Unbundling of total rates","language":"en","meaning":"PG&E tariff section splitting each charge into generation, distribution and transmission components."},{"term":"Network Integration Transmission Service (NITS) rate","language":"en","meaning":"PJM zonal transmission rate in $/MW-year posted by PJM settlements."},{"term":"Transmission Access Charge (TAC)","language":"en","meaning":"CAISO high-voltage and low-voltage transmission charge in $/MWh."},{"term":"TCRF / DCRF","language":"en","meaning":"Texas transmission and distribution cost recovery factor riders adjusting delivery charges."},{"term":"TDU / TDSP","language":"en","meaning":"Transmission and distribution utility / service provider in Texas retail choice areas."},{"term":"Secondary / Primary / Transmission voltage","language":"en","meaning":"Service voltage classes used in US retail tariffs; definitions vary by utility."}],"provenance":{"pass_count":1,"models":["claude-sonnet-5-5"],"minutes_estimate":null,"pages_opened":36,"passes":[{"pass":1,"date":"2026-11-26","model":"claude-sonnet-5-5"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/us/network-tariffs.json","detail_url":"https://georutter.org/v1/us/network-tariffs/detail.json","html_url":"https://georutter.org/us/network-tariffs/","country_url":"https://georutter.org/v1/countries/us.json"}