{"schema_version":"1.0","country":"us","country_name":"United States","topic":"permitting-rules","question":"Where can I find, in consolidated form, the current legal texts that set the permitting procedure for energy projects in the United States, by technology and size?","territory":"us","territory_level":"country","parent_url":null,"published_on":"2026-11-26","research_reviewed_on":"2026-11-26","access_checked_on":"2026-11-26","answer":{"official_data":"partial","non_official_data":"partial","summary":"Federal law is consolidated officially: eCFR (regulations, current to 2026-11-24, versions since 2017, API) and the U.S. Code (statutes through Public Law 119-142, XML). They hold e.g. FERC hydro licensing and exemptions for eligible projects up to 10 MW, QF 80 MW limit, offshore renewables, BLM rights-of-way and NEPA deadlines; CEQ's NEPA rules were removed in 2025. State authorization is in each state's code (e.g. MN 216I, NY PSL Art. 8 at 25 MW); local zoning is only compiled non-officially (NLR wind ordinances). Interconnection rules sit in FERC tariffs.","main_caveats":["Permitting is split by level: federal review applies only with a federal nexus (federal land, funding, licence); states and localities authorize most onshore wind and solar.","CEQ NEPA regulations (40 CFR 1500-1508) were removed effective 2025-04-11; older guidance citing them is outdated.","Generator interconnection procedures are in each transmission provider's FERC tariff, not in the CFR.","Local zoning rules have no official national consolidation; the NLR compilation is AI-assisted and non-official."],"confidence":"medium","confidence_reason":"Federal sources tested via API and downloads; state law sampled in 4 of 50 states (California blocked) and local rules only through a non-official compilation.","attributes":[{"attribute":"consolidated_legal_text","covered":"partial","source_ids":["ecfr","us-code-olrc","state-codes","govinfo-cfr-annual"],"note":"Federal regulations and statutes are officially consolidated (eCFR, U.S. Code); state codes checked for MN, NY, TX.","gap":"not_checked","gap_note":"46 states and DC not checked; no official consolidation of local (county/municipal) ordinances found beyond the non-official NLR compilation."},{"attribute":"permitting_procedure","covered":"partial","source_ids":["ecfr","us-code-olrc","state-codes","ferc-oatt-interconnection","nlr-siting-ordinances"],"note":"Federal review (NEPA, FERC, BOEM, BLM, DOE), state authorization (MN, NY, TX), local rules (NLR wind), interconnection (OATT) identified.","gap":"not_checked","gap_note":"Agency procedures read only for sampled parts; other states, local codes and state distribution interconnection rules not opened."},{"attribute":"technology","covered":"partial","source_ids":["ecfr","state-codes","nlr-siting-ordinances"],"note":"Law categories found: hydro, conduit hydro, QF small power production, OCS renewables, solar/wind on BLM land, LWECS, solar generating systems, major renewable facility.","gap":"not_checked","gap_note":"Nuclear (10 CFR 50/52), gas pipelines (18 CFR 157) and storage-specific rules listed by part only, text not read; other states not checked."},{"attribute":"size_threshold","covered":"partial","source_ids":["ecfr","us-code-olrc","state-codes","ferc-oatt-interconnection"],"note":"Hydro <=1.5 MW minor, <=10 MW exemption, <=40 MW conduit; QF <=80 MW; FAST-41 >$200M; MN 5,000/50,000 kW; NY 25,000 kW, 125 kV; PJM 20 MW tiers.","gap":"not_checked","gap_note":"Thresholds verified only in the sampled sections and 3 states; California thresholds seen only in a CEC fact sheet because leginfo was blocked."},{"attribute":"latest_data","covered":"partial","source_ids":["ecfr","us-code-olrc","state-codes"],"note":"eCFR up to date as of 2026-11-24; U.S. Code through P.L. 119-142 (2026-11-10); Minnesota 2026 edition.","gap":"not_checked","gap_note":"Currency dates read for federal sources and Minnesota; New York and Texas pages give no as-of date in the text read; other states not checked."},{"attribute":"historical_series","covered":"partial","source_ids":["ecfr","govinfo-cfr-annual","us-code-olrc","state-codes"],"note":"eCFR point-in-time from 2017-01-03; CFR annual editions 1996-2026; U.S. Code prior release points; MN yearly editions; NY revision dates.","gap":"not_checked","gap_note":"State history checked for MN and NY only; local ordinance history limited to 2022 and 2025 NLR editions."},{"attribute":"update_frequency","covered":"partial","source_ids":["us-code-olrc","ecfr","state-codes"],"note":"U.S. Code updated by release points per new law; eCFR observed current to 2 days before test; MN annual editions observed.","gap":"not_checked","gap_note":"No publisher statement of eCFR frequency read (web pages blocked); state schedules not stated on the pages read."}]},"sources":[{"source_id":"ecfr","name":"Electronic Code of Federal Regulations (eCFR) and its Versioner API","publisher":"Office of the Federal Register (National Archives) / Government Publishing Office","official":true,"landing_url":"https://www.ecfr.gov/","data_url":"https://www.ecfr.gov/api/versioner/v1/titles.json","access":"api","format":"JSON (structure, versions) and XML (full text) via REST API","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"none","publisher_type":"national_government","adds":"Current consolidated text of every federal regulation that sets energy-project procedures (FERC hydro licensing and exemptions, gas certificates, transmission backstop siting, BOEM offshore renewables, BLM rights-of-way, DOE NEPA procedures), with point-in-time versions since 2017-01-03.","first_seen_pass":1,"rank":1,"summary":"Official consolidated federal regulations, current to 2026-11-24, with point-in-time versions since 2017; REST API for structure, versions and full text (e.g. 18 CFR Part 4 hydro, Part 292 QF 80 MW, 30 CFR 585 offshore wind, 43 CFR 2800 BLM rights-of-way).","coverage_note":"Federal regulations only; statutes are in the U.S. Code and state/local rules elsewhere.","data_date":"Up to date as of 2026-11-24","caveats":["CEQ NEPA regulations (40 CFR 1500-1508) removed 2025-04-11.","Web pages block automated clients; use the API with compression."],"coverage":{"geographic":"United States, federal regulations (all 50 titles of the CFR)."},"fine_print":{"unit":{"value":"Legal text; capacity thresholds stated in the text (MW, kW, horsepower).","quote":"may not exceed 80 megawatts","url":"https://www.ecfr.gov/api/versioner/v1/full/2026-11-24/title-18.xml?part=292&section=292.204","attempts":[]},"inclusion_rule":{"value":"All CFR titles; per title the API reports latest_amended_on, latest_issue_date and up_to_date_as_of.","quote":"\"up_to_date_as_of\":\"2026-11-24\"","url":"https://www.ecfr.gov/api/versioner/v1/titles.json","attempts":[]},"reference_date":{"value":"Content up to date as of 2026-11-24 for all titles on the test date (meta date 2026-11-24).","quote":"{\"number\":18,\"name\":\"Conservation of Power and Water Resources\",\"latest_amended_on\":\"2026-11-24\",\"latest_issue_date\":\"2026-11-24\",\"up_to_date_as_of\":\"2026-11-24\"","url":"https://www.ecfr.gov/api/versioner/v1/titles.json","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.ecfr.gov/api/versioner/v1/titles.json","note":"Observed: up_to_date_as_of two days before the test date; no publisher statement read because www.ecfr.gov pages redirect non-browser clients to unblock.federalregister.gov."},{"url":"https://www.ecfr.gov/","note":"Redirected to 'Federal Register :: Request Access'."}]},"exclusions":{"value":"Removed rules stay visible as [Reserved] with version history: CEQ NEPA regulations 40 CFR Parts 1500-1508 removed effective 2025-04-11.","quote":"part 1500-1508 Parts 1500-1508 [Reserved]","url":"https://www.ecfr.gov/api/versioner/v1/structure/2026-11-24/title-40.json?chapter=V","attempts":[]}},"key_fields":[{"field":"titles[].up_to_date_as_of / latest_amended_on","meaning":"Currency of each title"},{"field":"structure: type, identifier, label_description, reserved","meaning":"Hierarchy of chapters, parts, subparts and sections; reserved marks removed text"},{"field":"versions: content_versions[].date, identifier, substantive, removed","meaning":"Point-in-time history per section"},{"field":"full/{date}/title-{n}.xml?part=&section=","meaning":"Full text as of a date"}],"how_to_use":{"example_request":"curl --compressed 'https://www.ecfr.gov/api/versioner/v1/full/2026-11-24/title-18.xml?part=292&section=292.204'","example_result":"§ 292.204 Criteria for qualifying small power production facilities. (a) Size of the facility—(1) Maximum size. ... may not exceed 80 megawatts.","steps":["Get current dates from titles.json, then use that date in structure/{date}/title-{n}.json to list parts.","Retrieve text with full/{date}/title-{n}.xml?part=...&section=... and send Accept-Encoding (curl --compressed).","Use versions/title-{n}.json?part=... for the dates when each section changed or was removed.","Energy procedures sampled: 18 CFR Part 4 (hydro licenses; Subpart K exemption of small hydro of 10 MW or less), Part 5 (integrated licensing), Part 50 (interstate transmission siting permits), Part 157 (gas certificates), Part 292 (PURPA qualifying facilities, 80 MW); 10 CFR Parts 50 and 52 (nuclear licensing, structure only); 30 CFR Part 585 (OCS renewable energy); 43 CFR Part 2800 (FLPMA rights-of-way, subpart 2809 solar and wind); 10 CFR Part 1021 (DOE NEPA procedures)."],"reading_traps":["The full-text endpoint returns HTTP 406 'This endpoint requires response compression' unless Accept-Encoding allows compression.","40 CFR Parts 1500-1508 (CEQ NEPA regulations) are [Reserved]: sections were marked removed on 2025-04-11; agency procedures (e.g. 10 CFR 1021) and the statute now carry NEPA procedure.","Generator interconnection procedures are not in the CFR text: 18 CFR 35.28(f) only requires each OATT to include the standard procedures, so the operative text is in each tariff.","Thresholds differ by purpose: 18 CFR 4.30 defines a minor water power project as 1.5 MW or less, small hydro exemptions 10 MW or less, conduit exemptions up to 40 MW."]},"test":{"tested_on":"2026-11-26","method":"api_query","http_status":200,"content_type":"text/xml","size_bytes":1814,"records_total":null,"records_for_country":null,"problems":["www.ecfr.gov web pages redirect non-browser clients to unblock.federalregister.gov ('Request Access'); the /api/ endpoints answer normally."]},"evidence":[{"claim":"CEQ NEPA regulations reserved in current eCFR","url":"https://www.ecfr.gov/api/versioner/v1/structure/2026-11-24/title-40.json?chapter=V","quote":"Parts 1500-1508 [Reserved]"},{"claim":"Removal date of 40 CFR 1501 sections","url":"https://www.ecfr.gov/api/versioner/v1/versions/title-40.json?part=1501","quote":"\"latest_amendment_date\":\"2025-04-11\""},{"claim":"Small hydro exemption threshold","url":"https://www.ecfr.gov/api/versioner/v1/full/2026-11-24/title-18.xml?part=4&subpart=K","quote":"Subpart K—Exemption of Small Hydroelectric Power Projects of 10 Megawatts or Less"},{"claim":"Earliest point-in-time version in eCFR for 18 CFR Part 4","url":"https://www.ecfr.gov/api/versioner/v1/versions/title-18.json?part=4","quote":"\"date\":\"2017-01-03\",\"amendment_date\":\"2017-01-03\",\"issue_date\":\"2017-01-03\",\"identifier\":\"4.1\""}],"members":[],"members_summary":null},{"source_id":"us-code-olrc","name":"United States Code Online (release points, XML/USLM downloads)","publisher":"Office of the Law Revision Counsel, U.S. House of Representatives","official":true,"landing_url":"https://uscode.house.gov/download.html","data_url":"https://uscode.house.gov/download/releasepoints/us/pl/119/142/xml_usc42@119-142.zip","access":"direct_download","format":"XML (USLM), XHTML, PCC, PDF per title (zip)","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"none","publisher_type":"national_government","adds":"Consolidated federal statutes that set the procedure and its thresholds: NEPA (42 U.S.C. 4321 et seq., including 4336a page limits and deadlines), FAST-41 (42 U.S.C. 4370m, covered projects over $200,000,000), Federal Power Act (16 U.S.C. 797 licensing).","first_seen_pass":1,"rank":2,"summary":"Official consolidated federal statutes, current through Public Law 119-142 (2026-11-10), downloadable as XML per title: NEPA (42 U.S.C. 4321 et seq.), FAST-41 (42 U.S.C. 4370m), Federal Power Act (16 U.S.C. 791a et seq.).","coverage_note":"Federal statutes; procedures are detailed in regulations (eCFR) and state law.","data_date":"Release point 119-142 (2026-11-10)","caveats":["Section view pages were unavailable (temporary format); use the downloads."],"coverage":{"geographic":"United States, federal statutes."},"fine_print":{"unit":{"value":"Legal text; dollar and page thresholds in the text.","quote":"an environmental impact statement shall not exceed 150 pages, not including any citations or appendices","url":"https://uscode.house.gov/download/releasepoints/us/pl/119/142/xml_usc42@119-142.zip","attempts":[]},"inclusion_rule":{"value":"All titles of the Code at the current release point.","quote":"All files are current through Public Law 119-142 (November 10, 2026).","url":"https://uscode.house.gov/download.html","attempts":[]},"reference_date":{"value":"Current through Public Law 119-142 (2026-11-10).","quote":"The United States Code Online is current through Public Law 119-142 (November 10, 2026).","url":"https://uscode.house.gov/download.html","attempts":[]},"update_frequency":{"value":"A new release point with each update; prior release points kept.","quote":"Each update of the United States Code is a release point.","url":"https://uscode.house.gov/download.html","attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://uscode.house.gov/download.html","note":"No exclusion statement read; site notes it is operating in a temporary format with some features unavailable."}]}},"key_fields":[{"field":"identifier=\"/us/usc/t42/s4336a\"","meaning":"USLM identifier of each section"},{"field":"release point (e.g. 119-142)","meaning":"Public Law through which the files are current"},{"field":"sourceCredit / notes","meaning":"Enacting and amending laws of each section"}],"how_to_use":{"example_request":"curl -sLO https://uscode.house.gov/download/releasepoints/us/pl/119/142/xml_usc42@119-142.zip ; search usc42.xml for identifier=\"/us/usc/t42/s4336a\"","example_result":"(e) Page limits (1) Environmental impact statements (A) In general ... an environmental impact statement shall not exceed 150 pages ... (B) Extraordinary complexity ... shall not exceed 300 pages","steps":["Download the title zip from download.html (Title 42 XML 18,163,115 bytes; Title 16 XML 5,395,213 bytes on 2026-11-26).","Locate sections by USLM identifier (/us/usc/t42/s4336a, /us/usc/t42/s4370m, /us/usc/t16/s797).","Use the Prior Release Points page for earlier versions."],"reading_traps":["The section-view URLs (view.xhtml) returned 404 while the site runs in a 'temporary format'; downloads work.","FAST-41 coverage uses an investment threshold (more than $200,000,000) and sector criteria, not a capacity threshold."]},"test":{"tested_on":"2026-11-26","method":"download","http_status":200,"content_type":"application/x-zip-compressed","size_bytes":18163115,"records_total":null,"records_for_country":null,"problems":["The site states it is operating in a temporary format; section view pages (view.xhtml) returned 404 on the test date."]},"evidence":[{"claim":"Temporary format notice","url":"https://uscode.house.gov/download.html","quote":"The uscode.house.gov website is currently operating in a temporary format. While the United States Code remains available from its authoritative source, some website features and functionality are temporarily unavailable."},{"claim":"FAST-41 covered project threshold","url":"https://uscode.house.gov/download/releasepoints/us/pl/119/142/xml_usc42@119-142.zip","quote":"is likely to require a total investment of more than $200,000,000"},{"claim":"NEPA deadlines","url":"https://uscode.house.gov/download/releasepoints/us/pl/119/142/xml_usc42@119-142.zip","quote":"the environmental impact statement not later than the date that is 2 years after the sooner of"}],"members":[],"members_summary":null},{"source_id":"state-codes","name":"State statutes and regulations on energy facility siting (official state legislative code sites)","publisher":"State legislatures and revisor offices (Minnesota, New York, Texas, California tested)","official":true,"landing_url":null,"data_url":null,"access":"web_viewer_only","format":"HTML (Minnesota, New York, Texas); bulk ZIP database dumps (California)","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"none","publisher_type":"regional_government","adds":"State authorization procedures and their capacity thresholds, which federal law does not set: e.g. Minnesota wind 5,000 kW and solar/large plants 50,000 kW; New York major renewable facility 25,000 kW and transmission 125 kV; California opt-in certification 50 MW / 200 MWh storage.","first_seen_pass":1,"rank":3,"summary":"State authorization law is on each state's legislative code site: e.g. Minnesota ch. 216I (wind >=5,000 kW, solar and plants >=50,000 kW; 2026 edition), New York PSL Art. 8 (renewables >=25,000 kW, lines >=125 kV), Texas Util. Code ch. 37.","coverage_note":"4 of 50 states checked; California site blocked to automated clients.","data_date":"MN 2026 edition; NY revision 2024-06-21","caveats":["Each state uses its own categories and units.","Regulations implementing the statutes are in separate state administrative codes."],"coverage":{"geographic":"Tested: Minnesota, New York, Texas; California by headers only."},"fine_print":{"unit":{"value":"Capacity in kilowatts (MN, NY) or MW/MWh; voltage in kilovolts.","quote":"\"Large wind energy conversion system\" means any combination of wind energy conversion systems with a combined nameplate capacity of 5,000 kilowatts or more","url":"https://www.revisor.mn.gov/statutes/cite/216I/full","attempts":[]},"inclusion_rule":{"value":"NY: renewable energy systems of 25,000 kW or more, with co-located storage.","quote":"\"Major renewable energy facility\" means any renewable energy system, as such term is defined in section sixty-six-p of this chapter, with a nameplate generating capacity of twenty-five thousand kilowatts or more","url":"https://www.nysenate.gov/legislation/laws/PBS/137","attempts":[]},"reference_date":{"value":"Minnesota page labelled 2026 Minnesota Statutes; New York page shows historical revision 2024-06-21; Texas page undated in the text read.","quote":"2026 Minnesota Statutes","url":"https://www.revisor.mn.gov/statutes/cite/216I/full","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.revisor.mn.gov/statutes/cite/216I/full","note":"Annual editions observed (2024, 2025, 2026 in URLs); no stated schedule read."},{"url":"https://www.nysenate.gov/legislation/laws/PBS/137","note":"No update statement found on the page."}]},"exclusions":{"value":"Texas: electric cooperatives need no certificate for generating facilities.","quote":"an electric cooperative is not required to obtain a certificate of public convenience and necessity for the construction, installation, operation, or extension of any generating facilities","url":"https://tcss.legis.texas.gov/resources/UT/htm/UT.37.htm","attempts":[]}},"key_fields":[{"field":"Definitions section","meaning":"Technology categories and thresholds (MN 216I.02, NY PSL 137)"},{"field":"Siting authority / applications sections","meaning":"Procedure: MN 216I.03, 216I.05-216I.08; NY PSL 142"},{"field":"History notes / edition year","meaning":"Version of the text"}],"how_to_use":{"example_request":"curl -s https://www.revisor.mn.gov/statutes/cite/216I/full","example_result":"2026 Minnesota Statutes ... \"Solar energy generating system\" means a set of devices ... with a combined nameplate capacity of 50,000 kilowatts alternating current or more.","steps":["Identify the state siting statute (often in the public utilities title) and read its definitions for technology categories and thresholds.","Read the procedure sections (application, environmental review, hearings, deadlines) and the agency rules they cite.","Use yearly editions (Minnesota /statutes/<year>/cite/) or revision dates (New York) for history.","For Texas use https://tcss.legis.texas.gov/resources/<CODE>/htm/<CODE>.<chapter>.htm."],"reading_traps":["State thresholds use different units and bases (nameplate kW, AC kW, MWh of storage, kV and miles for lines).","Minnesota recodified siting law into chapter 216I; earlier chapters 216E/216F remain only in older editions.","Texas has no state siting permit for generation in the text read; the certificate requirement applies to utilities, transmission and ERCOT interconnection."]},"test":{"tested_on":"2026-11-26","method":"page_only","http_status":200,"content_type":"text/html; charset=utf-8","size_bytes":185281,"records_total":null,"records_for_country":null,"problems":["leginfo.legislature.ca.gov returns a Cloudflare 403 challenge to non-browser clients.","New York Open Legislation API requires an API key (401)."]},"evidence":[{"claim":"Minnesota large power plant threshold","url":"https://www.revisor.mn.gov/statutes/cite/216I/full","quote":"\"Large electric power generating plant\" means electric power generating equipment and associated facilities designed for or capable of operation at a capacity of 50,000 kilowatts or more."},{"claim":"New York transmission threshold","url":"https://www.nysenate.gov/legislation/laws/PBS/137","quote":"\"Major electric transmission facility\" means an electric transmission line of a design capacity of one hundred twenty-five kilovolts or more extending a distance of one mile or more"},{"claim":"Texas certificate requirement","url":"https://tcss.legis.texas.gov/resources/UT/htm/UT.37.htm","quote":"An electric utility may not directly or indirectly provide service to the public under a franchise or permit unless the utility first obtains from the commission a certificate"}],"members":[{"name":"Minnesota Statutes chapter 216I (Minnesota Energy Infrastructure Permitting Act)","landing_url":"https://www.revisor.mn.gov/statutes/cite/216I/full","data_url":null,"access":"web_viewer_only","tested":true,"data_found":true,"note":"2026 Minnesota Statutes edition; major, standard and local review procedures (216I.06-216I.08); yearly editions under /statutes/<year>/cite/."},{"name":"New York Public Service Law Article 8 (Siting of Renewable Energy and Electric Transmission)","landing_url":"https://www.nysenate.gov/legislation/laws/PBS/A8","data_url":"https://www.nysenate.gov/legislation/laws/PBS/137","access":"web_viewer_only","tested":true,"data_found":true,"note":"Sections 136-142; historical revision selector (2024-06-21); the Open Legislation API answered 401 without an API key."},{"name":"Texas Utilities Code chapter 37 (certificates of convenience and necessity)","landing_url":"https://statutes.capitol.texas.gov/Docs/UT/htm/UT.37.htm","data_url":"https://tcss.legis.texas.gov/resources/UT/htm/UT.37.htm","access":"web_viewer_only","tested":true,"data_found":true,"note":"statutes.capitol.texas.gov is a JavaScript application; the text is served from tcss.legis.texas.gov/resources/."},{"name":"California Codes (leginfo) - Public Resources Code Division 15","landing_url":"https://leginfo.legislature.ca.gov/faces/codes_displaySection.xhtml?sectionNum=25545.&lawCode=PRC","data_url":"https://downloads.leginfo.legislature.ca.gov/pubinfo_daily_Wed.zip","access":"direct_download","tested":true,"data_found":null,"note":"leginfo answered 403 Cloudflare challenge; bulk database dump of 1,161,973,303 bytes (Last-Modified 2026-11-26) checked by headers only."}],"members_summary":{"total":50,"listed":4,"tested":4,"data_found":3,"scope_note":"50 states (plus DC and territories). Four states tested: Minnesota and New York (state siting acts with thresholds), Texas (certificate of convenience and necessity for utilities and transmission), California (site blocked; bulk files checked by headers). Other states not checked.","pattern":"Search the legislature or revisor site for 'siting', 'certificate of public convenience and necessity', 'energy facility', 'power plant siting'; regulations are in the state administrative code."},"member_scope":{"total":50,"note":"50 states (plus DC and territories). Four states tested: Minnesota and New York (state siting acts with thresholds), Texas (certificate of convenience and necessity for utilities and transmission), California (site blocked; bulk files checked by headers). Other states not checked.","pattern":"Search the legislature or revisor site for 'siting', 'certificate of public convenience and necessity', 'energy facility', 'power plant siting'; regulations are in the state administrative code."}},{"source_id":"govinfo-cfr-annual","name":"Code of Federal Regulations annual editions (GovInfo bulk data)","publisher":"U.S. Government Publishing Office (GovInfo)","official":true,"landing_url":"https://www.govinfo.gov/bulkdata/json/CFR","data_url":"https://www.govinfo.gov/bulkdata/CFR/2025/title-18/CFR-2025-title18-vol1.xml","access":"direct_download","format":"XML per title and volume; JSON listings","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"none","publisher_type":"national_government","adds":"Historical annual editions of the CFR from 1996 to 2026 in XML, extending history before eCFR's 2017 point-in-time start.","first_seen_pass":1,"rank":4,"summary":"GovInfo bulk data holds CFR annual editions 1996-2026 in XML, for versions before eCFR's point-in-time history (2017).","coverage_note":"Federal regulations; annual snapshots.","data_date":"Editions 1996-2026","caveats":["Use the /bulkdata/json/ listing; the XML listing returned 500."],"coverage":{"geographic":"United States, federal regulations."},"fine_print":{"unit":{"value":"Legal text.","quote":null,"url":null,"attempts":[{"url":"https://www.govinfo.gov/bulkdata/json/CFR/2025/title-18","note":"Listing only; no unit statement."}]},"inclusion_rule":{"value":"One folder per edition year: 2026 back to 1996 (plus 'resources').","quote":"\"name\":\"1996\"","url":"https://www.govinfo.gov/bulkdata/json/CFR","attempts":[]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.govinfo.gov/bulkdata/json/CFR/2025/title-18","note":"Listing gives file modification time (CFR-2025-title18-vol1.xml, 16-Nov-2026 21:34) but not the edition's as-of date."}]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.govinfo.gov/bulkdata/json/CFR","note":"Annual folders observed; no stated schedule read."}]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.govinfo.gov/bulkdata/json/CFR/2025/title-18","note":"Not read."}]}},"key_fields":[{"field":"files[].name, link, size, formattedLastModifiedTime","meaning":"Volume files per title and year"}],"how_to_use":{"example_request":"curl -s -H 'Accept: application/json' https://www.govinfo.gov/bulkdata/json/CFR/2025/title-18","example_result":"{\"displayLabel\":\"CFR-2025-title18-vol1.xml\",...,\"formattedSize\":\"7.8 MB\",\"link\":\"https://www.govinfo.gov/bulkdata/CFR/2025/title-18/CFR-2025-title18-vol1.xml\"","steps":["List the year folder via the JSON endpoint, then download the volume XML containing the part."],"reading_traps":["The XML endpoint without /json/ returned HTTP 500 in the test; the /bulkdata/json/ listing worked.","Annual editions are snapshots, not daily versions."]},"test":{"tested_on":"2026-11-26","method":"api_query","http_status":200,"content_type":"application/json","size_bytes":1084,"records_total":32,"records_for_country":null,"problems":["https://www.govinfo.gov/bulkdata/CFR/2025/title-18 with Accept: application/xml returned HTTP 500."]},"evidence":[{"claim":"Year folders available","url":"https://www.govinfo.gov/bulkdata/json/CFR","quote":"\"name\":\"1996\""}],"members":[],"members_summary":null},{"source_id":"ferc-oatt-interconnection","name":"Generator interconnection procedures in FERC-filed Open Access Transmission Tariffs (eTariff)","publisher":"Federal Energy Regulatory Commission (eTariff viewer); tariffs filed by transmission providers and RTOs","official":true,"landing_url":"https://etariff.ferc.gov/TariffList.aspx","data_url":"https://etariff.ferc.gov/TariffBrowser.aspx?tid=1731","access":"web_viewer_only","format":"HTML viewer; XML export per tariff","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"none","publisher_type":"regulator","adds":"The binding interconnection procedure for transmission-level connection, including size tiers (e.g. PJM 'Resource Additions of 20 MW or Less'), which the CFR only references.","first_seen_pass":1,"rank":5,"summary":"Transmission interconnection procedures are binding tariff text in each OATT on FERC eTariff (e.g. PJM Part VIII cycle process and small generation procedures with 20 MW tiers), not in the CFR.","coverage_note":"Tested PJM OATT tree; other providers and state distribution interconnection rules not checked.","data_date":null,"caveats":["Not a consolidated national text; one tariff per provider."],"coverage":{"geographic":"FERC-jurisdictional transmission providers; tested PJM OATT."},"fine_print":{"unit":{"value":"Capacity in MW in section titles and text.","quote":"OATT 111 Permanent Energy Resource Additions of 20 MW or Les (2.0.0)","url":"https://etariff.ferc.gov/TariffBrowser.aspx?tid=1731","attempts":[]},"inclusion_rule":{"value":"Each public utility OATT must contain the standard interconnection procedures.","quote":"Every public utility that is required to have on file a non-discriminatory open access transmission tariff under this section must amend such tariff by adding the standard interconnection procedures and agreement and the standard small generator interconnection procedures and agreement","url":"https://www.ecfr.gov/api/versioner/v1/full/2026-11-24/title-18.xml?part=35&section=35.28","attempts":[]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://etariff.ferc.gov/TariffBrowser.aspx?tid=1731","note":"Section versions shown (e.g. 2.0.0); effective dates require opening each section."}]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://etariff.ferc.gov/TariffBrowser.aspx?tid=1731","note":"Changes with each accepted filing; no schedule."}]},"exclusions":{"value":"Distribution-level interconnection under state rules is not in FERC tariffs (not checked in this pass).","quote":null,"url":null,"attempts":[{"url":"https://etariff.ferc.gov/TariffList.aspx","note":"Only FERC-filed tariffs are listed."}]}},"key_fields":[{"field":"Section title and version","meaning":"e.g. 'OATT Subpart G – SMALL GENERATION INTERCONNECTION PROCEDURE (2.0.0)'"}],"how_to_use":{"example_request":"curl -s 'https://etariff.ferc.gov/TariffBrowser.aspx?tid=1731' and search the section tree for 'INTERCONNECTION'","example_result":"Subpart A, OATT Subpart A – INTERCONNECTION PROCEDURES (0.0.0); OATT Subpart G, OATT Subpart G – SMALL GENERATION INTERCONNECTION PROCEDURE (2.0.0); OATT Part VIII.A 401 Applications for Cycle Process Intro (2.0.0)","steps":["Find the transmission provider's OATT in TariffList.aspx, open TariffBrowser and read the interconnection parts; export XML for the text."],"reading_traps":["Each RTO/utility has its own version and numbering of the pro forma procedures.","Section titles are truncated in the tree (e.g. '20 MW or Les')."]},"test":{"tested_on":"2026-11-26","method":"page_only","http_status":200,"content_type":"text/html; charset=utf-8","size_bytes":2510313,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"CFR delegates the text to tariffs","url":"https://www.ecfr.gov/api/versioner/v1/full/2026-11-24/title-18.xml?part=35&section=35.28","quote":"(f) Standard generator interconnection procedures and agreements."}],"members":[],"members_summary":null},{"source_id":"nlr-siting-ordinances","name":"U.S. Wind Siting Regulation and Zoning Ordinances (2025)","publisher":"National Laboratory of the Rockies (NLR, formerly NREL) via OpenEI / data.gov","official":false,"landing_url":"https://catalog.data.gov/dataset/u-s-wind-siting-regulation-and-zoning-ordinances-2025","data_url":"https://data.openei.org/files/8519/Wind%20Ordinances%202025%20%281%29.xlsx","access":"direct_download","format":"XLSX; GeoPackage of jurisdiction shapes","license":"CC BY 4.0","language":"en","has_coordinates":false,"location_precision":"municipality","publisher_type":"academic","adds":"Machine-readable compilation of state and local (county, township, municipal) wind siting rules with source URLs and ordinance year; the only multi-jurisdiction view of local permitting rules found.","first_seen_pass":1,"rank":6,"summary":"Non-official national compilation of state and local wind siting rules (setbacks, noise, decommissioning) with ordinance year and source URL; 12,297 rule rows in the 2025 edition.","coverage_note":"Wind only; local rules are compiled, not consolidated law.","data_date":"2025 edition (GeoPackage 2025-09-12)","caveats":["Compiled with LLM tooling; verify each value at the source URL."],"coverage":{"geographic":"United States; 47 state names in the All Ordinances sheet (wind)."},"fine_print":{"unit":{"value":"Per row: Value with Units (e.g. tip-height-multiplier, dBA).","quote":"tip-height-multiplier","url":"https://data.openei.org/files/8519/Wind%20Ordinances%202025%20%281%29.xlsx","attempts":[]},"inclusion_rule":{"value":"Documented wind siting ordinances at state and local level, collected with LLM tooling.","quote":"A machine readable collection of documented wind siting ordinances at the state and local (e.g., county, township) level throughout the United States.","url":"https://catalog.data.gov/dataset/u-s-wind-siting-regulation-and-zoning-ordinances-2025","attempts":[]},"reference_date":{"value":"Ordinance Year per row; GeoPackage dated 2025-09-12.","quote":"Wind Ordinances reVX 2025-09-12.gpkg","url":"https://catalog.data.gov/dataset/u-s-wind-siting-regulation-and-zoning-ordinances-2025","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://catalog.data.gov/dataset/u-s-wind-siting-regulation-and-zoning-ordinances-2025","note":"Editions 2022 (OEDI 5733) and 2025 observed; no schedule stated."}]},"exclusions":{"value":"The GeoPackage excludes state-level regulations.","quote":"the GeoPackage file is formatted for ingestion by NREL's reVX setbacks tool and therefore does not contain any of the state-level regulations.","url":"https://catalog.data.gov/dataset/u-s-wind-siting-regulation-and-zoning-ordinances-2025","attempts":[]}},"key_fields":[{"field":"State, County, Subdivision, Jurisdiction Type, County Subdivision FIPS Code","meaning":"Jurisdiction of the rule"},{"field":"Feature","meaning":"Rule type (setbacks, noise, decommissioning, etc.)"},{"field":"Value, Units","meaning":"Numeric requirement and unit"},{"field":"Section, Ordinance Year, Source URL","meaning":"Citation and link to the ordinance"}],"how_to_use":{"example_request":"curl -sLO 'https://data.openei.org/files/8519/Wind%20Ordinances%202025%20%281%29.xlsx' ; sheet 'County-Level', header on row 2","example_result":"['Alabama', 'Baldwin', '1003', 'Structures (Non-Participating)', '5', 'tip-height-multiplier', ..., 'Section 7(n)(1)', '2014', 'https://alison.legislature.state.al.us/files/pdf/SearchableInstruments/2014RS/PrintFiles/SB12-Eng.pdf']","steps":["Sheets: All Ordinances, State-Level, County-Level, Municipal-Level, Column Descriptions, Ordinance Types.","One row per jurisdiction and feature; group by FIPS code for jurisdictions.","Follow Source URL to the ordinance text before relying on a value."],"reading_traps":["Rows are rules (features), not ordinances: 12,297 rows in All Ordinances (6,328 county-level, 5,910 municipal, 59 state-level).","The workbook itself warns: 'This data was collected with the help of generative AI. The Large Language Models used for this effort make mistakes.'","Only wind in this file; solar has a separate dataset (2022 edition found in search, not downloaded)."]},"test":{"tested_on":"2026-11-26","method":"download","http_status":200,"content_type":"application/vnd.openxmlformats-officedocument.spreadsheetml.sheet","size_bytes":2733185,"records_total":12297,"records_for_country":12297,"problems":[]},"evidence":[{"claim":"AI-assisted compilation warning","url":"https://data.openei.org/files/8519/Wind%20Ordinances%202025%20%281%29.xlsx","quote":"This data was collected with the help of generative AI. The Large Language Models used for this effort make mistakes. Always validate the data for critical use cases."}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"Federal: FERC, DOE, Department of the Interior (BLM, BOEM), NRC; state siting boards and utility commissions; local governments for zoning","url":"https://www.ecfr.gov/api/versioner/v1/titles.json"},"operators":{"structure":"many","note":"Permitting authority is spread across federal agencies, 50 states and thousands of counties and municipalities.","census_url":null},"publication_obligation":{"exists":"unknown","norm":null,"url":null,"what_must_be_published":null,"frequency":null},"consolidated_republication":{"found":"partial","note":"Federal regulations and statutes are consolidated (eCFR, U.S. Code); local ordinances are compiled only by NLR (non-official).","checked_pages":[{"organization":"Office of the Federal Register","url":"https://www.ecfr.gov/api/versioner/v1/titles.json","saw":"All CFR titles up to date as of 2026-11-24."},{"organization":"Office of the Law Revision Counsel","url":"https://uscode.house.gov/download.html","saw":"Release point 119-142 downloads for all titles."},{"organization":"NLR via data.gov","url":"https://catalog.data.gov/dataset/u-s-wind-siting-regulation-and-zoning-ordinances-2025","saw":"2025 wind ordinance compilation, CC BY 4.0."}]}},"national_registry":{"exists":"partial","note":"Official national consolidations exist for federal regulations (eCFR) and statutes (U.S. Code); no national official consolidation of state or local permitting law was found.","checked_pages":[{"organization":"Office of the Federal Register","url":"https://www.ecfr.gov/api/versioner/v1/structure/2026-11-24/title-40.json?chapter=V","saw":"CEQ NEPA parts reserved; structure API works."},{"organization":"Office of the Law Revision Counsel","url":"https://uscode.house.gov/download.html","saw":"Current release point downloads."},{"organization":"Government Publishing Office","url":"https://www.govinfo.gov/bulkdata/json/CFR","saw":"CFR annual editions 1996-2026."},{"organization":"California Legislature","url":"https://downloads.leginfo.legislature.ca.gov/","saw":"State-only bulk database dumps; leginfo pages blocked."},{"organization":"NLR via data.gov","url":"https://catalog.data.gov/dataset/u-s-wind-siting-regulation-and-zoning-ordinances-2025","saw":"Non-official compilation of local wind rules."}]},"if_unstructured":{"summary":"Official consolidation exists for federal law; state and local texts must be gathered per jurisdiction from legislative sites and municipal codes.","recipe":["Use the guidance document only to find the governing code sections (e.g. California PRC Division 15, Chapter 6.2).","Retrieve the code text from the state's official source; for California the leginfo site blocked automated access, and the bulk database dumps (pubinfo) exceed 1 GB."],"location_method":null,"cross_with":["NLR ordinance compilation Source URL column for local ordinance texts","FERC eTariff for interconnection procedures"],"where_published":[{"name":"California Energy Commission Opt-In Certification fact sheet (guidance)","url":"https://www.energy.ca.gov/sites/default/files/2026-06/Opt-In_Certification_Factsheet_English_ada.pdf","what":"Guidance summarizing the California opt-in state permitting path and the code sections it rests on","how_to_search_inside":"Two-page PDF; thresholds in the eligibility box, legal basis in the side note.","example_document":{"url":"https://www.energy.ca.gov/sites/default/files/2026-06/Opt-In_Certification_Factsheet_English_ada.pdf","what_it_gives":"\"electrical generating power plants 50 megawatts (MW) or greater\"; \"Energy storage systems capable of storing 200 megawatt-hours (MWh) or more\"; legal basis \"Chapter 6.2 of Division 15 of the Public Resources Code and California Code of Regulations, title 20, sections 1875 through 1882\"."}}]},"related_not_answering":[{"name":"California Energy Commission Opt-In Certification fact sheet","url":"https://www.energy.ca.gov/sites/default/files/2026-06/Opt-In_Certification_Factsheet_English_ada.pdf","why":"Guidance summarizing thresholds; not the legal text."},{"name":"New York Open Legislation API","url":"https://legislation.nysenate.gov/api/3/laws/PBS/137","why":"Requires an API key (401); the same text is on the public law pages used as source."}],"open_questions":["Whether the 20-25 MW opt-in band in New York still applies after the RAPID Act could not be settled from the statute pages read; search snippets conflicted and the implementing rules (16 NYCRR Parts 1100-1102) were not opened."],"history":[{"pass":1,"date":"2026-11-26","role":"research","model":"claude-sonnet-5-5","rules_version":"2026-11-26-eeuu-energia-y-regulacion","note":"First pass: eCFR API, U.S. Code XML, GovInfo CFR editions, 4 state codes, PJM OATT interconnection sections and NLR wind ordinances tested; other states and local codes pending.","headline":{"official_data":"partial","non_official_data":"partial","national_registry":"partial"},"sources":{"total":6,"new":6,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":34,"minutes":null}},{"pass":2,"date":"2026-11-26","role":"revision","model":"GPT-6 (Codex)","note":"Clarified that the 10 MW FERC hydropower licensing exemption applies to eligible projects. FERC guidance: https://www.ferc.gov/licensing/smalllow-impact-hydropower-projects/smalllow-impact-hydropower-projects-types-projects","headline":{},"sources":{},"negatives":{},"effort":{}}],"local_terms":[{"term":"Electronic Code of Federal Regulations (eCFR)","language":"en","meaning":"Continuously updated consolidated federal regulations; query by title and part."},{"term":"Release point","language":"en","meaning":"Dated update of the United States Code downloads, named by the last Public Law included."},{"term":"Certificate of public convenience and necessity (CCN)","language":"en","meaning":"State commission authorization for utility facilities such as transmission lines (e.g. Texas)."},{"term":"Siting permit / site permit","language":"en","meaning":"State authorization for large generation or transmission facilities (e.g. NY PSL Art. 8, MN 216I)."},{"term":"NEPA, EIS, EA","language":"en","meaning":"National Environmental Policy Act; environmental impact statement; environmental assessment."},{"term":"FAST-41","language":"en","meaning":"Title 41 of the FAST Act, federal coordination for covered infrastructure projects (42 U.S.C. 4370m)."},{"term":"LWECS","language":"en","meaning":"Large wind energy conversion system, Minnesota category of 5,000 kW or more."},{"term":"Qualifying facility (QF)","language":"en","meaning":"PURPA small power production facility up to 80 MW under 18 CFR 292.204."}],"provenance":{"pass_count":2,"models":["claude-sonnet-5-5","GPT-6 (Codex)"],"minutes_estimate":null,"pages_opened":null,"passes":[{"pass":1,"date":"2026-11-26","model":"claude-sonnet-5-5"},{"pass":2,"date":"2026-11-26","model":"GPT-6 (Codex)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/us/permitting-rules.json","detail_url":"https://georutter.org/v1/us/permitting-rules/detail.json","html_url":"https://georutter.org/us/permitting-rules/","country_url":"https://georutter.org/v1/countries/us.json"}