{"schema_version":"1.0","country":"us","country_name":"United States","topic":"solar-pv-plants-in-permitting","question":"Where can I get a list of solar PV projects currently in permitting in the United States, with location, capacity (MW), developer, permitting stage and date?","territory":"us","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-19","access_checked_on":"2026-11-19","answer":{"official_data":"partial","non_official_data":"not_tested","summary":"No national list of solar PV projects in permitting exists in the sources examined; permitting is split across federal (BLM) and state or local bodies. Best entry points: state registers (NY ORES, CEC Opt-In) and BLM ePlanning for federal land, plus EIA-860M as a national lead (1,100 planned PV generators with coordinates and approval-status codes, not a permit file).","main_caveats":["No single federal body lists all projects; BLM covers only projects needing BLM action and state or county permits sit elsewhere.","EIA-860M status is survey-reported and undated, and the entity is not always the developer; the same applies to interconnection queues.","NY list and docket can disagree (Addison Solar 120 vs 105 MW); read the docket for the authoritative figures.","Only NY, California opt-in and two BLM pages were examined; Texas, Midwest, Southeast, Arizona and counties are pending.","BLM register records and the federal permitting dashboard could not be read from this environment."],"confidence":"low","confidence_reason":"Two state registers and a national lead were read; BLM records and the federal dashboard were not retrievable and most states were not examined.","attributes":[{"attribute":"location","covered":"partial","source_ids":["eia-860m-planned-generators","ny-ores-permit-applications","ca-cec-opt-in-certification"],"note":"EIA gives coordinates for all 1,100 planned PV rows; NY and CA give town/county only; BLM site geometry not reached.","gap":"not_published","gap_note":"No tested permit register exposes site coordinates in text; BLM and CEC map layers were not opened."},{"attribute":"capacity_mw","covered":"partial","source_ids":["eia-860m-planned-generators","ny-ores-permit-applications","ca-cec-opt-in-certification"],"note":"EIA nameplate MW; NY MW inside description text; CEC 300 MW PV plus separate storage MW.","gap":"not_checked","gap_note":"Capacity bases differ (and NY list/docket disagree for Addison Solar); BLM pages read gave no MW."},{"attribute":"developer","covered":"partial","source_ids":["eia-860m-planned-generators","ny-ores-permit-applications","ca-cec-opt-in-certification"],"note":"NY and CEC name the applicant LLC; EIA gives the reporting entity, not always the developer.","gap":"not_checked","gap_note":"BLM pages read name no applicant; sponsor parent companies are usually absent."},{"attribute":"permitting_stage","covered":"partial","source_ids":["ny-ores-permit-applications","ca-cec-opt-in-certification","eia-860m-planned-generators","blm-eplanning-national-nepa-register"],"note":"NY stage by list section; CEC status and milestones; EIA codes L/T/U; BLM EIS/decision pages.","gap":"not_checked","gap_note":"Only NY, CA opt-in and a few BLM projects examined; other states, counties and the federal dashboard not read."},{"attribute":"stage_date","covered":"partial","source_ids":["ca-cec-opt-in-certification","ny-ores-permit-applications","blm-eplanning-national-nepa-register"],"note":"CEC dated milestones (filed 2024-08-01, Final Order 2026-04-27); NY dates only withdrawals; BLM Libra 2025-12-15.","gap":"not_published","gap_note":"EIA status has no date; NY list has no date column; BLM register dates were not readable as text."}]},"sources":[{"source_id":"eia-860m-planned-generators","name":"EIA-860M Monthly Update, 'Planned' sheet (solar PV generators with status codes)","publisher":"U.S. Energy Information Administration (EIA)","official":true,"landing_url":"https://www.eia.gov/electricity/data/eia860m/","data_url":"https://www.eia.gov/electricity/data/eia860m/xls/september_generator2026.xlsx","access":"direct_download","format":"XLSX (sheets Operating, Planned, Retired, Canceled or Postponed, plus Puerto Rico)","license":"Unknown","language":"en","has_coordinates":true,"location_precision":"exact","adds":"Only nationwide, downloadable inventory of planned solar PV generators with coordinates, owner name and a status code that includes 'Regulatory approvals pending'; complementary, not a permit register.","first_seen_pass":1,"rank":1,"summary":"Monthly national workbook: 1,100 planned PV generators with coordinates, MW, owner entity and status (approvals pending/received, construction).","coverage_note":"Nationwide but survey-based and not a permitting register.","data_date":"As of September 2026 (released 2026-10-23)","caveats":["Status has no date; owner is not always the developer.","Does not prove permits; use it to find the project, then the agency file."],"coverage":{"geographic":"United States and Puerto Rico; plants of at least 1 MW combined nameplate capacity."},"fine_print":{"unit":{"value":"MW nameplate, net summer and net winter (columns M-O of the Planned sheet).","quote":null,"url":"https://www.eia.gov/electricity/data/eia860m/xls/september_generator2026.xlsx","attempts":[]},"inclusion_rule":{"value":"EIA page: tracks existing and proposed generating units at power plants with at least 1 MW of combined nameplate capacity; monthly figures are preliminary.","quote":null,"url":"https://www.eia.gov/electricity/data/eia860m/","attempts":[]},"reference_date":{"value":"Workbook 'Inventory of Planned Generators as of September 2026'; released 2026-10-23.","quote":null,"url":"https://www.eia.gov/electricity/data/eia860m/xls/september_generator2026.xlsx","attempts":[]},"update_frequency":{"value":"Monthly; next release 2026-11-24 (per the EIA page).","quote":null,"url":"https://www.eia.gov/electricity/data/eia860m/","attempts":[]},"exclusions":{"value":"Survey-reported by owners; EIA may correct figures later without notice; plants under 1 MW excluded. Status is not verified against permit files.","quote":null,"url":"https://www.eia.gov/electricity/data/eia860m/","attempts":[]}},"key_fields":[{"field":"Entity Name / Plant Name / Generator ID","meaning":"Reporting owner or operator entity (not necessarily the developer), plant and generator."},{"field":"Plant State / County","meaning":"State and county."},{"field":"Latitude / Longitude","meaning":"Plant coordinates in the Planned sheet (present on all 1,100 solar PV rows)."},{"field":"Nameplate Capacity (MW) / Net Summer / Net Winter","meaning":"Capacity in MW."},{"field":"Technology / Energy Source Code / Prime Mover Code","meaning":"'Solar Photovoltaic' / SUN / PV."},{"field":"Status","meaning":"(P) planned, approvals not initiated; (L) regulatory approvals pending; (T) approvals received; (U) under construction <=50%; (V) >50%; (TS) construction complete, not yet operating."},{"field":"Planned Operation Month / Year","meaning":"Expected start date; no date of the status itself."}],"how_to_use":{"example_request":"curl -sL 'https://www.eia.gov/electricity/data/eia860m/xls/september_generator2026.xlsx' -o eia860m.xlsx  # sheet 'Planned', header on row 3; filter Technology == 'Solar Photovoltaic'","example_result":"Entity 'Nautilus Solar Solutions' | Plant 'Sandoval 2' | IL, Clinton | 2 MW | Solar Photovoltaic | Planned operation 9/2026 | (L) Regulatory approvals pending. Not under construction | 38.5894, -89.1467","steps":["Download the latest monthly workbook from the EIA page (September 2026 edition, 14,013,970 bytes).","Read sheet 'Planned' (data from row 4) and keep Technology == 'Solar Photovoltaic' (1,100 of 2,360 planned generators).","For permitting use Status (L) approvals pending (182), (P) approvals not initiated (167) and (T) approvals received, not under construction (140); (U), (V), (TS) are construction.","Cancelled or indefinitely postponed PV generators are in sheet 'Canceled or Postponed' (636 PV rows).","Use the plant and county to look for the actual permit file in the state or federal register."],"reading_traps":["Entity Name is the survey respondent/owner, which may be a project subsidiary or a future operator rather than the developer.","Rows are generators, not projects: one plant can have several rows.","Status is EIA survey vocabulary; it has no event date and is not a permit decision.","Planned Operation Month/Year is the expected in-service date, not the date of the permitting stage.","Capacity basis (AC nameplate) is stated only by column name; DC capacity is not in the Planned sheet."]},"test":{"tested_on":"2026-11-19","method":"download","http_status":200,"content_type":"application/vnd.openxmlformats-officedocument.spreadsheetml.sheet","size_bytes":14013970,"records_total":1100,"records_for_country":1100,"problems":["Download works without account.","Records_total counts solar PV rows in the Planned sheet."]},"evidence":[{"claim":"EIA page: monthly survey of existing and proposed units at plants of at least 1 MW.","url":"https://www.eia.gov/electricity/data/eia860m/","quote":null},{"claim":"Observed in the Planned sheet: 1,100 solar PV generators; status counts U 264, V 250, L 182, P 167, T 140, TS 97; all 1,100 with latitude/longitude; top states TX 167, IL 141, CA 88, NY 88.","url":"https://www.eia.gov/electricity/data/eia860m/xls/september_generator2026.xlsx","quote":null}],"members":[],"members_summary":null},{"source_id":"ny-ores-permit-applications","name":"NY Office of Renewable Energy Siting (ORES) permit application lists and DPS case pages","publisher":"New York State Department of Public Service, Office of Renewable Energy Siting and Electric Transmission","official":true,"landing_url":"https://dps.ny.gov/ores-permit-applications","data_url":"https://documents.dps.ny.gov/public/MatterManagement/CaseMaster.aspx?MatterSeq=85427&MNO=23-03015","access":"web_viewer_only","format":"HTML list with links to CaseMaster docket pages","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"municipality","adds":"State register by permit stage (incomplete, under review, permitted, withdrawn, denied) with a docket for each project; includes wind, so filter for solar.","first_seen_pass":1,"rank":2,"summary":"NY siting permits by stage with docket links; solar mixed with wind; capacity and location only in description text.","coverage_note":"New York ORES permits only.","data_date":"2026-11-19 (latest dated entry 2026-10-06)","caveats":["No date column; list and docket MW differ for Addison Solar.","Wind projects share the lists."],"coverage":{"geographic":"New York State: major renewable energy facility siting permits under Public Service Law Article VIII."},"fine_print":{"unit":{"value":"MW inside the description text (e.g. 'Cider Solar 500'; Morris Ridge '177 incl. 83 MW storage'); no column.","quote":null,"url":"https://dps.ny.gov/ores-permit-applications","attempts":[]},"inclusion_rule":{"value":"Sections observed: Notices of Intent (1), Incomplete Applications (5), Complete Applications Under Review (1), Permitted Applications (39), Withdrawn/Relinquished (2), Denied (2), Request for Declaratory Ruling (2). Mixed technologies.","quote":null,"url":"https://dps.ny.gov/ores-permit-applications","attempts":[{"url":"https://dps.ny.gov/ores-permit-applications","note":"Capacity threshold for ORES jurisdiction not confirmed from an opened page."}]},"reference_date":{"value":"Page observed 2026-11-19; most recent dated entry: Flat Creek Solar relinquished effective 2026-10-06. No last-updated date.","quote":null,"url":"https://dps.ny.gov/ores-permit-applications","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":"https://dps.ny.gov/ores-permit-applications","attempts":[{"url":"https://dps.ny.gov/ores-permit-applications","note":"No update cadence stated on the page."}]},"exclusions":{"value":"List has no date column; MW, developer and county appear only inside the description text. Projects below the ORES threshold and those under other NY processes are not here.","quote":null,"url":"https://dps.ny.gov/ores-permit-applications","attempts":[]}},"key_fields":[{"field":"Project Permit Application Number","meaning":"Docket number such as 23-03015, linked to documents.dps.ny.gov CaseMaster."},{"field":"Project Name","meaning":"e.g. Cider Solar, Mill Point Solar I, Addison Solar."},{"field":"Description","meaning":"Free text with applicant, MW, town and county."},{"field":"Section heading","meaning":"Stage: Incomplete, Under Review, Permitted, Withdrawn/Relinquished, Denied."},{"field":"CaseMaster filed documents","meaning":"Date Filed, Document Type, Title; 297 filings for 23-03015."}],"how_to_use":{"example_request":"Open https://dps.ny.gov/ores-permit-applications and follow the docket link of 'Addison Solar' (23-03015) to https://documents.dps.ny.gov/public/MatterManagement/CaseMaster.aspx?MatterSeq=85427&MNO=23-03015","example_result":"List: 23-03015 Addison Solar, section Incomplete, 'ADDISON SOLAR, LLC', 120 MW, Steuben. Docket page: 'WEB Addison Solar, LLC', 105-megawatt, Towns of Addison, Campbell and Erwin; 297 filed documents; no status or key dates shown.","steps":["Open the ORES permit applications page and read each section table.","Keep rows whose name or description says Solar; read the stage from the section heading.","Open the docket link (CaseMaster) for filings, dates and parties.","Take dates from the filings (the list itself only dates withdrawals: Flat Creek relinquished effective 2026-10-06; Moss Ridge withdrawn 2025-05-07)."],"reading_traps":["The list and the docket can disagree: Addison Solar is 120 MW 'ADDISON SOLAR, LLC' in the list but 105 MW 'WEB Addison Solar, LLC' in the docket title.","Section counts include wind projects (e.g. North Country Wind, Bull Run Wind, whose description mentions a Solar Energy Facility).","No date column; Flat Creek and Moss Ridge are the only rows with dates.","A status map (ArcGIS dashboard) is linked but was not opened."]},"test":{"tested_on":"2026-11-19","method":"page_only","http_status":200,"content_type":"text/html; charset=UTF-8","size_bytes":66174,"records_total":null,"records_for_country":null,"problems":["No export on the page; the data must be scraped from the HTML tables.","Docket page capture shows no status field and zero calendar entries; the filings tab lists 297 documents but rows were not captured."]},"evidence":[{"claim":"ORES page sections and sample solar rows with docket links.","url":"https://dps.ny.gov/ores-permit-applications","quote":null},{"claim":"Docket 23-03015: WEB Addison Solar, LLC, 105-megawatt, Steuben County, 297 filings.","url":"https://documents.dps.ny.gov/public/MatterManagement/CaseMaster.aspx?MatterSeq=85427&MNO=23-03015","quote":null}],"members":[],"members_summary":null},{"source_id":"ca-cec-opt-in-certification","name":"California Energy Commission Opt-In Certification projects and project pages","publisher":"California Energy Commission (CEC)","official":true,"landing_url":"https://www.energy.ca.gov/programs-and-topics/topics/power-plants/opt-certification-program","data_url":"https://www.energy.ca.gov/powerplant/solar-photovoltaic-pv-battery-energy-storage/soda-mountain-solar-project","access":"web_viewer_only","format":"HTML project pages and e-filing docket logs","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"municipality","adds":"State project pages with applicant, docket, MW, county, status and dated milestones (filed, deemed complete, final order); only for projects that opted in to CEC certification.","first_seen_pass":1,"rank":3,"summary":"CEC opt-in project pages: applicant, docket, MW, county, status and dated milestones.","coverage_note":"California opt-in projects only (11).","data_date":"2026-04-29 (latest dated milestone seen)","caveats":["Opt-In projects only.","No download; page-by-page reading."],"coverage":{"geographic":"California: projects in the CEC Opt-In Certification Program (11 listed on the program page: 3 solar PV with storage, 7 battery storage, 1 wind)."},"fine_print":{"unit":{"value":"MW and MWh as text on the project page (Soda Mountain: 300 MW solar PV; 300 MW / 1,200 MWh storage).","quote":null,"url":"https://www.energy.ca.gov/powerplant/solar-photovoltaic-pv-battery-energy-storage/soda-mountain-solar-project","attempts":[]},"inclusion_rule":{"value":"Program page lists 11 opt-in projects by name only; applicant, MW, county, status and dates are on each project page. Projects permitted through counties or other state routes are not listed.","quote":null,"url":"https://www.energy.ca.gov/programs-and-topics/topics/power-plants/opt-certification-program","attempts":[]},"reference_date":{"value":"Project page observed 2026-11-19; latest dated entry Notice of Determination 2026-04-29; no last-updated date.","quote":null,"url":"https://www.energy.ca.gov/powerplant/solar-photovoltaic-pv-battery-energy-storage/soda-mountain-solar-project","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":"https://www.energy.ca.gov/programs-and-topics/topics/power-plants/opt-certification-program","attempts":[{"url":"https://www.energy.ca.gov/programs-and-topics/topics/power-plants/opt-certification-program","note":"No update cadence or last-updated date on the program or project page."}]},"exclusions":{"value":"Only Opt-In projects; the page points to an Opt-In Certification Dashboard (ArcGIS) for status, which was not opened.","quote":null,"url":"https://www.energy.ca.gov/programs-and-topics/topics/power-plants/opt-certification-program","attempts":[]}},"key_fields":[{"field":"Applicant","meaning":"e.g. Soda Mountain Solar, LLC (press release: subsidiary of VC Renewables)."},{"field":"Docket number","meaning":"24-OPT-03 (original) and 24-OPT-03C (compliance)."},{"field":"Capacity / Technology / County","meaning":"300 MW solar PV, 300 MW / 1,200 MWh storage; San Bernardino."},{"field":"Status","meaning":"'Compliance - Pre-Construction'."},{"field":"Key dates","meaning":"Application filed 2024-08-01; deemed complete 2025-07-31; Final Order 2026-04-27; Notice of Determination 2026-04-29."}],"how_to_use":{"example_request":"Open https://www.energy.ca.gov/powerplant/solar-photovoltaic-pv-battery-energy-storage/soda-mountain-solar-project","example_result":"Soda Mountain Solar Project | Applicant Soda Mountain Solar, LLC | 24-OPT-03C | 300 MW solar PV + 300 MW/1,200 MWh storage | San Bernardino | Status 'Compliance - Pre-Construction' | filed 2024-08-01, complete 2025-07-31, Final Order 2026-04-27.","steps":["Open the Opt-In program page and list the projects (solar PV and battery names are grouped by URL path).","Open each solar project page for applicant, docket, MW, county, status and key dates.","Follow the docket log link (efiling.energy.ca.gov, DocketLog.aspx?docketnumber=...) for filings; documents were not opened.","Land use for Soda Mountain remains contingent on BLM approval, so cross-check the BLM file."],"reading_traps":["Only Opt-In projects are here; most California PV is permitted by counties, with no list in this source.","Compliance docket (24-OPT-03C) differs from the original (24-OPT-03).","MW for PV and storage are separate numbers; storage is not PV capacity.","Press release and project page agree on 300 MW; the release states the BLM approval is still required."]},"test":{"tested_on":"2026-11-19","method":"page_only","http_status":200,"content_type":"text/html; charset=utf-8","size_bytes":84202,"records_total":11,"records_for_country":11,"problems":["No data download or last-updated date found; program page lists names only.","e-filing docket documents were not opened."]},"evidence":[{"claim":"Program page lists 11 projects; status is in a dashboard.","url":"https://www.energy.ca.gov/programs-and-topics/topics/power-plants/opt-certification-program","quote":null},{"claim":"Soda Mountain project page: docket 24-OPT-03C, dates and status.","url":"https://www.energy.ca.gov/powerplant/solar-photovoltaic-pv-battery-energy-storage/soda-mountain-solar-project","quote":null},{"claim":"CEC press release 2026-04-27: approved through Opt-In, second renewable approved, BLM approval still required.","url":"https://www.energy.ca.gov/news/2026-04/cec-approves-soda-mountain-solar-and-battery-storage-project-san-bernardino","quote":null}],"members":[],"members_summary":null},{"source_id":"blm-eplanning-national-nepa-register","name":"BLM ePlanning National NEPA Register and BLM project announcements","publisher":"U.S. Bureau of Land Management (BLM)","official":true,"landing_url":"https://eplanning.blm.gov/","data_url":null,"access":"web_viewer_only","format":"Script-driven web register; PDFs; BLM HTML pages","license":"Unknown","language":"en","has_coordinates":null,"location_precision":null,"adds":"Federal NEPA register for solar on public land (Renewable Energy program, applicant, county, NOI/ROD/FONSI date filters) plus BLM news pages that carry decision dates; covers only projects needing BLM action.","first_seen_pass":1,"rank":4,"summary":"BLM NEPA register for federal-land solar (filters by applicant, county, status, decision date) plus BLM pages with decision dates.","coverage_note":"Projects needing BLM action only; record contents not readable here.","data_date":"2026-08-28 (latest BLM page seen)","caveats":["Register is a script-driven viewer.","News pages lack applicant and MW."],"coverage":{"geographic":"Federal lands managed by BLM (examples: Nevada, Arizona, California)."},"fine_print":{"unit":null,"inclusion_rule":{"value":"Register page: search by keyword, NEPA #, project name or document name; filters include Program (Renewable Energy), state, county, applicant, NEPA status/sub-status and NOI, ROD and FONSI dates; projects from 2015 onward by map search.","quote":null,"url":"https://eplanning.blm.gov/","attempts":[]},"reference_date":{"value":null,"quote":null,"url":"https://eplanning.blm.gov/","attempts":[{"url":"https://eplanning.blm.gov/eplanning-ui/project/2022592/510","note":"Project page returned only the register's home text on fetch; project record not readable as text."}]},"update_frequency":{"value":null,"quote":null,"url":"https://eplanning.blm.gov/","attempts":[{"url":"https://eplanning.blm.gov/","note":"A 'Decisions Posted in Last 30 Days' table exists; no cadence stated."}]},"exclusions":{"value":"Solar on private or state land with no federal action is absent; the BLM solar program page lists no projects and refers to ePlanning.","quote":null,"url":"https://www.blm.gov/programs/energy-and-minerals/renewable-energy/solar-energy","attempts":[]}},"key_fields":[{"field":"NEPA # / Project name / Applicant / County / State","meaning":"Search fields and filters on the register."},{"field":"NEPA status and sub-status / Notice of Intent, ROD, FONSI dates","meaning":"Stage and decision-date filters."},{"field":"Document name","meaning":"Documents such as EIS, EA and Decision Record PDFs."}],"how_to_use":{"example_request":"Open https://eplanning.blm.gov/ , filter Program = Renewable Energy, state = NV, and open a project; for decisions also read https://www.blm.gov/announcement/blm-issues-decision-realignment-libra-solar-project","example_result":"BLM page (2025-12-15): BLM amended the Libra Solar Project (Sierra Front Field Office, Nevada) with gen-tie realignment, expanded pull sites and State Route 2C closure; no MW or applicant on the page. Purple Sage Energy Center: Proposed RMP Amendment and Final EIS protest-resolution page dated 2026-08-28; no applicant or MW on the page.","steps":["Use the register filters to list Renewable Energy projects and read NEPA status and dates.","Open the project home page for documents and comment periods (script-driven; needs a browser session).","Take applicant, MW and county from the EIS/EA documents or BLM press pages.","Cross-check state permits (e.g. CEC for Soda Mountain, which depends on BLM approval)."],"reading_traps":["Plain HTTP fetches of project pages and of public_projects PDF links returned the register's HTML shell, not the record or document.","BLM news and protest pages give dates and stages but not applicant or MW.","A BLM decision (ROD, DNA) is not the final permit stage: state, county and interconnection steps may remain.","Register Download PDF showed an error message on the cached page."]},"test":{"tested_on":"2026-11-19","method":"page_only","http_status":200,"content_type":"text/html; charset=utf-8","size_bytes":null,"records_total":null,"records_for_country":null,"problems":["Project records are not retrievable as text without a browser session; document links under /public_projects/ returned HTML.","No CSV or API found; export is PDF only (and showed an error)."]},"evidence":[{"claim":"ePlanning search and filter options as described on the home page.","url":"https://eplanning.blm.gov/","quote":"Search for a project using a keyword, the NEPA #, project name or document name."},{"claim":"BLM announcement 2025-12-15: Libra Solar Project amended (Sierra Front Field Office).","url":"https://www.blm.gov/announcement/blm-issues-decision-realignment-libra-solar-project","quote":null},{"claim":"Purple Sage Energy Center protest resolution page dated 2026-08-28.","url":"https://www.blm.gov/nevada/directors-protest-resolutions/protest-resolution-report/purple-sage-energy-center-project","quote":null}],"members":[{"name":"Libra Solar Project (NV) announcement","landing_url":"https://www.blm.gov/announcement/blm-issues-decision-realignment-libra-solar-project","data_url":null,"access":"web_viewer_only","tested":true,"data_found":true,"note":"Decision dated 2025-12-15; no MW or applicant on the page."},{"name":"Purple Sage Energy Center (NV) protest report","landing_url":"https://www.blm.gov/nevada/directors-protest-resolutions/protest-resolution-report/purple-sage-energy-center-project","data_url":null,"access":"pdf","tested":true,"data_found":true,"note":"PRMPA/FEIS protest page dated 2026-08-28; PDF not opened."}],"members_summary":{"total":null,"listed":2,"tested":2,"data_found":2,"scope_note":"Two BLM project pages read; the register holds many more renewable projects whose count could not be read.","pattern":"Search the register by Program = Renewable Energy and look for BLM state office news pages."},"member_scope":{"total":null,"note":"Two BLM project pages read; the register holds many more renewable projects whose count could not be read.","pattern":"Search the register by Program = Renewable Energy and look for BLM state office news pages."}},{"source_id":"federal-permitting-dashboard","name":"Federal Permitting Dashboard (FAST-41 project pages)","publisher":"Federal Permitting Improvement Steering Council (permits.performance.gov)","official":true,"landing_url":"https://www.permits.performance.gov/","data_url":null,"access":"web_viewer_only","format":"HTML dashboard","license":"Unknown","language":"en","has_coordinates":null,"location_precision":null,"adds":"Federal multi-agency milestone dashboard for covered projects; found as a lead but blocked to automated clients.","first_seen_pass":1,"rank":5,"summary":"Federal dashboard of covered projects; not readable here.","coverage_note":"Not tested.","data_date":null,"caveats":["Blocked."],"coverage":{"geographic":"Federal covered projects only."},"fine_print":{"unit":null,"inclusion_rule":null,"reference_date":null,"update_frequency":null,"exclusions":null},"key_fields":[],"how_to_use":{"example_request":"https://www.permits.performance.gov/ (403 to automated clients on 2026-11-19)","example_result":"None.","steps":["Open in a browser session and filter for solar projects."],"reading_traps":["Only projects covered by FAST-41 are listed; not all solar projects."]},"test":{"tested_on":"2026-11-19","method":"blocked","http_status":403,"content_type":"text/html","size_bytes":385,"records_total":null,"records_for_country":null,"problems":["Returned 403 to curl and to a page-fetch tool; contents not seen."]},"evidence":[{"claim":"Access attempt returned HTTP 403.","url":"https://www.permits.performance.gov/","quote":null}],"members":[],"members_summary":null}],"sector":{"regulator":{},"operators":{},"publication_obligation":{},"consolidated_republication":{"checked_pages":[]}},"national_registry":{"exists":"unknown","note":"No federal or national register of solar projects in permitting was found in the pages opened; BLM's solar page lists no projects and points to ePlanning; the federal dashboard was blocked.","checked_pages":[{"organization":"BLM","url":"https://www.blm.gov/programs/energy-and-minerals/renewable-energy/solar-energy","saw":"General text; no project list; refers to ePlanning."},{"organization":"BLM ePlanning","url":"https://eplanning.blm.gov/","saw":"NEPA register with Renewable Energy program filter."},{"organization":"EIA","url":"https://www.eia.gov/electricity/data/eia860m/","saw":"Monthly inventory of planned generators, not a permit register."}]},"if_unstructured":{"summary":"Project records are mostly in docket and document pages: read the docket for applicant, MW and filing dates, and the NEPA documents for site and capacity.","recipe":["List candidate projects in a state register (NY ORES lists, CEC Opt-In page).","Open each docket or project page and copy applicant, MW, county and milestone dates.","For federal land, search ePlanning by Program = Renewable Energy and read the EIS/EA and decision pages.","Cross with the EIA-860M Planned sheet by state, county and MW to obtain coordinates."],"cross_with":"EIA-860M Planned sheet; grid-connection queue lists.","where_published":[{"name":"NY DPS CaseMaster dockets","url":"https://documents.dps.ny.gov/public/MatterManagement/CaseMaster.aspx?MatterSeq=85427&MNO=23-03015","what":"Docket per ORES application with filed documents.","how_to_search_inside":"Start from the ORES list, open the docket, use the Filed Documents tab (297 filings for 23-03015) and filter by document type.","example_document":{"url":"https://documents.dps.ny.gov/public/MatterManagement/CaseMaster.aspx?MatterSeq=85427&MNO=23-03015","what_it_gives":"Title 'Application of WEB Addison Solar, LLC, for a Major Renewable Energy Facility Siting Permit'; 105-megawatt; Towns of Addison, Campbell and Erwin, Steuben County (docket page header)."}},{"name":"CEC project page and e-filing docket log","url":"https://www.energy.ca.gov/powerplant/solar-photovoltaic-pv-battery-energy-storage/soda-mountain-solar-project","what":"Opt-In project milestones and document links.","how_to_search_inside":"Open the project page, then the docket log for docket 24-OPT-03C; documents were not opened.","example_document":{"url":"https://www.energy.ca.gov/powerplant/solar-photovoltaic-pv-battery-energy-storage/soda-mountain-solar-project","what_it_gives":"Key dates: application filed 2024-08-01; deemed complete 2025-07-31; Final Order 2026-04-27 (project page)."}}]},"related_not_answering":[{"name":"Grid connection queues (ISO/RTO)","url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","why":"A queue request does not demonstrate the permitting stage."},{"name":"EIA-860M Operating and Canceled sheets","url":"https://www.eia.gov/electricity/data/eia860m/","why":"Operating or cancelled projects fall outside 'currently in permitting'."}],"open_questions":[{"question":"Does any federal list (FAST-41 dashboard) give solar project records with dates?","territory":"Federal","starting_source":"https://www.permits.performance.gov/","next_step":"Open the dashboard in a browser session and filter for solar."},{"question":"Can BLM ePlanning records (NEPA number, applicant, MW, NOI/ROD dates) be exported or read for Nevada, Arizona and California solar projects?","territory":"Federal land: NV, AZ, CA","starting_source":"https://eplanning.blm.gov/","next_step":"Use the register in a browser session; open Libra Solar project 2022592 and Purple Sage."},{"question":"Which state registers cover solar permitting in Texas, Illinois, Minnesota, Michigan, Virginia, Arizona?","territory":"TX, IL, MN, MI, VA, AZ","starting_source":"https://www.eia.gov/electricity/data/eia860m/","next_step":"Take the states with most planned PV in EIA-860M (TX 167, IL 141) and search their commission or siting-board dockets."},{"question":"What is the capacity threshold and update cadence of the NY ORES list, and what does the ORES status map expose?","territory":"New York","starting_source":"https://dps.ny.gov/ores-permit-applications","next_step":"Open the ORES overview page and the ArcGIS status dashboard."},{"question":"What CEC opt-in dashboard data and docket documents exist for the other solar projects (Darden, Perkins)?","territory":"California","starting_source":"https://www.energy.ca.gov/programs-and-topics/topics/power-plants/opt-certification-program","next_step":"Open the Opt-In dashboard and the two project pages."}],"history":[{"pass":1,"date":"2026-11-19","role":"research","model":"claude-sonnet-5-5 (Claude Sonnet 5.5) via Claude Code in the VS Code extension (Claude Agent SDK)","rules_version":"us-permitting-2026-11-19","note":"First pass, reported effort level Sonnet High per the run instructions. Downloaded EIA-860M; read NY ORES list and docket, CEC program, project and press pages, BLM pages; BLM record pages and the federal dashboard were not readable.","headline":{"official_data":"partial","non_official_data":"not_tested"},"sources":{"total":5,"new":5,"dropped":0},"negatives":{},"effort":{"pages":16,"minutes":null}}],"local_terms":[{"term":"Major Renewable Energy Facility Siting Permit","language":"en","meaning":"New York Article VIII permit issued by ORES."},{"term":"Opt-In Certification","language":"en","meaning":"California route where the CEC certifies a project instead of local permits."},{"term":"NEPA / EIS / EA / ROD / FONSI / DNA","language":"en","meaning":"Federal environmental review documents and decisions."},{"term":"Right-of-way (ROW)","language":"en","meaning":"BLM authorisation to use public land for a project."},{"term":"Notice of Intent (NOI)","language":"en","meaning":"Start of an EIS process."}],"provenance":{"pass_count":1,"models":["claude-sonnet-5-5 (Claude Sonnet 5.5) via Claude Code in the VS Code extension (Claude Agent SDK)"],"minutes_estimate":null,"pages_opened":16,"passes":[{"pass":1,"date":"2026-11-19","model":"claude-sonnet-5-5 (Claude Sonnet 5.5) via Claude Code in the VS Code extension (Claude Agent SDK)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/us/solar-pv-plants-in-permitting.json","detail_url":"https://georutter.org/v1/us/solar-pv-plants-in-permitting/detail.json","html_url":"https://georutter.org/us/solar-pv-plants-in-permitting/","country_url":"https://georutter.org/v1/countries/us.json"}