{"schema_version":"1.0","country":"us","country_name":"United States","topic":"wind-farms-in-permitting","question":"Where can I get a list of wind projects currently in permitting in the United States, with location, capacity (MW), developer, permitting stage and date?","territory":"us","territory_level":"country","parent_url":null,"published_on":"2026-11-27","research_reviewed_on":"2026-11-19","access_checked_on":"2026-11-19","answer":{"official_data":"partial","non_official_data":"not_tested","summary":"Start with EIA-860M. Its September 2026 Planned sheet had 77 wind generator rows across 71 plants. Only 17 generator rows carried code L (regulatory approvals pending). The file includes capacity, coordinates and planned operation dates. Check the actual permitting stage and date in the relevant agency files, such as BLM, BOEM or New York ORES.","main_caveats":["EIA-860M only lists generators reported to or researched by EIA; early-stage and unreported projects can be absent, and capacities are 'preliminary' and silently revised.","EIA status (L, T, P, U, V, TS) is not a permit record: Heritage Wind (NY) shows 'P regulatory approvals not initiated' at 126 MW while ORES lists a permit for 184.8 MW.","BLM 'Completed - Completed' means the NEPA process ended, not that a project stands approved: Lava Ridge has ROD 12/4/2024 and a later DOI statement on cancelling it.","BLM, BOEM and ORES each cover only their jurisdiction (federal land, outer continental shelf, one state); wind on private land with no federal or state siting nexus is not in them.","Queue entries, leases and lease areas (BOEM lease layer: 4,892 block polygons) are leads, not authorisations."],"confidence":"medium","confidence_reason":"EIA and BOEM data downloaded/queried; BLM and ORES read from pages and a portal endpoint. Only four jurisdictions checked; other states and the FAST-41 dashboard were not readable.","attributes":[{"attribute":"location","covered":"yes","source_ids":["eia-860m","boem-offshore-wind","blm-nepa-register"],"note":"EIA planned wind rows all carry lat/long (77/77, plant point); BOEM gives lease/phase polygons; BLM a project point on some rows (15 of 32 wind-named).","gap":null,"gap_note":null},{"attribute":"capacity_mw","covered":"yes","source_ids":["eia-860m","boem-offshore-wind","blm-nepa-register"],"note":"EIA nameplate MW per generator row (sum by plant); BOEM/BLM/ORES give MW only in project text and it can differ (Revolution Wind 704 vs 715).","gap":null,"gap_note":null},{"attribute":"developer","covered":"partial","source_ids":["eia-860m","blm-nepa-register","boem-offshore-wind","ny-ores-applications"],"note":"BLM 'Applicant', BOEM DEVELOPER_NAME and ORES text name the applicant; EIA gives only 'Entity Name' (owner/operator entity), not a developer field.","gap":"not_published","gap_note":"EIA-860M has no developer field; only agency records name the applicant, project by project."},{"attribute":"permitting_stage","covered":"partial","source_ids":["eia-860m","blm-nepa-register","boem-offshore-wind","ny-ores-applications"],"note":"EIA has a survey code per generator. Code L flags pending approvals. Verify the stage, date and scope in the relevant BLM, BOEM or state records.","gap":"not_checked","gap_note":"Other state siting bodies and county permits were not opened (CA, TX, WY, IL, MN, etc.); no single national documented-stage list found."},{"attribute":"stage_date","covered":"partial","source_ids":["blm-nepa-register","boem-offshore-wind"],"note":"Dates for a stage appear on BLM project pages (e.g. ROD 12/4/2024) and BOEM project pages (COP approval 2023-11-17); EIA and the ORES list give none.","gap":"not_checked","gap_note":"BLM/DMM document tables with release and filing dates load by script and were not retrieved; EIA gives only planned operation month/year, not a stage date."}]},"sources":[{"source_id":"eia-860m","name":"Preliminary Monthly Electric Generator Inventory (Form EIA-860M) - Planned and Canceled or Postponed sheets","publisher":"U.S. Energy Information Administration (EIA)","official":true,"landing_url":"https://www.eia.gov/electricity/data/eia860m/","data_url":"https://www.eia.gov/electricity/data/eia860m/archive/xls/september_generator2026.xlsx","access":"direct_download","format":"XLSX workbook (sheets Operating, Planned, Retired, Canceled or Postponed and Puerto Rico variants)","license":"Public domain (EIA reuse page: government publications are in the public domain)","language":"en","has_coordinates":true,"location_precision":"exact","adds":"Only national, coordinate-bearing, MW-level list of proposed and under-construction wind generators with a status code; also lists canceled or postponed projects.","first_seen_pass":1,"rank":1,"summary":"Monthly XLSX with capacity, coordinates, entity and survey status. The September 2026 Planned sheet had 77 wind generator rows across 71 plants. Seventeen rows had code L.","coverage_note":"National, 1 MW+ plants reported to or researched by EIA; status is coarse and there is no stage date or developer field.","data_date":"Inventory as of 2026-09 (released 2026-10-23)","caveats":["Status is an EIA survey code, not a permit record","Canceled or Postponed sheet has no reason or date"],"coverage":{"geographic":"United States, plus Puerto Rico on separate sheets; plants with 1 MW or more combined nameplate capacity"},"fine_print":{"unit":{"value":"MW nameplate per generator row; project capacity is the sum of rows sharing a Plant ID","quote":"Nameplate Capacity (MW)","url":"https://www.eia.gov/electricity/data/eia860m/archive/xls/september_generator2026.xlsx","attempts":[]},"inclusion_rule":{"value":"Existing and proposed generating units at plants with combined nameplate capacity of 1 MW or more","quote":"The monthly survey Form EIA-860M, Monthly Update to Annual Electric Generator Report supplements the annual survey form EIA-860 data with monthly information that monitors the current status of existing and proposed generating units at electric power plants with 1 megawatt or greater of combined nameplate capacity.","url":"https://www.eia.gov/electricity/data/eia860m/","attempts":[]},"reference_date":{"value":"Inventory as of September 2026 (sheet title); page release date 2026-10-23","quote":"Inventory of Planned Generators as of September 2026","url":"https://www.eia.gov/electricity/data/eia860m/archive/xls/september_generator2026.xlsx","attempts":[]},"update_frequency":{"value":"Monthly; next release stated as 2026-11-24","quote":"Release Date: October 23, 2026 Next Release Date: November 24, 2026","url":"https://www.eia.gov/electricity/data/eia860m/","attempts":[]},"exclusions":{"value":"Capacities are preliminary estimates, not commitments; projects not reported to or researched by EIA are absent","quote":"Capacities reported in this preliminary inventory are best estimates of current generating capacity, but are not meant to be capacity commitments by the associated facilities.","url":"https://www.eia.gov/electricity/data/eia860m/","attempts":[]}},"key_fields":[{"field":"Entity Name","meaning":"Owner/operator entity reported for the plant; not a developer field"},{"field":"Plant Name / Plant State / County","meaning":"Project name and administrative location"},{"field":"Nameplate Capacity (MW)","meaning":"Nameplate MW of one generator row"},{"field":"Technology","meaning":"'Onshore Wind Turbine' or 'Offshore Wind Turbine'"},{"field":"Status","meaning":"Coded stage, e.g. (L) Regulatory approvals pending, (T) approvals received, (U)/(V) under construction, (TS) complete but not in commercial operation, (P) approvals not initiated"},{"field":"Planned Operation Month / Planned Operation Year","meaning":"Expected commercial operation date; not a permit or stage date"},{"field":"Latitude / Longitude","meaning":"Plant point coordinate (Planned and Canceled sheets)"}],"how_to_use":{"example_request":"curl -sL -o september_generator2026.xlsx 'https://www.eia.gov/electricity/data/eia860m/archive/xls/september_generator2026.xlsx' ; open sheet 'Planned' (header on row 3) and keep rows where 'Energy Source Code' = 'WND'","example_result":"Entity Name 'Orsted Wind Power North America LLC'; Plant Name 'Revolution Wind'; RI, Washington; 715 MW; 'Offshore Wind Turbine'; Status '(V) Under construction, more than 50 percent complete'; planned operation 11/2026; lat 41.15217, lon -71.07783.","steps":["Download the latest monthly workbook from the landing page; use GET (a HEAD request returned 503) and only months already released (October-December 2026 links redirect to /electricity/).","Read sheet 'Planned' from row 3 (row 1 title, row 2 blank); filter 'Energy Source Code' = 'WND'. In the 2026-09 file this gives 77 rows (73 onshore, 4 offshore), about 23,543 MW, 71 distinct plants. Seventeen rows report status L (approvals pending).","Sum 'Nameplate Capacity (MW)' by Entity ID + Plant ID to get project MW; keep the Status code to separate pending approvals (L, P) from approved (T) and under construction (U, V, TS).","For withdrawn or postponed projects read sheet 'Canceled or Postponed' (156 wind rows, about 19,102 MW; no status, date or reason columns).","Confirm any project in an agency record (BLM, BOEM, state siting body) before calling it permitted."],"reading_traps":["Status codes come from EIA's survey, not from a permit register: Heritage Wind (NY) is '(P) regulatory approvals not initiated' at 126 MW while ORES lists a permit for a 184.8 MW project of the same name.","No stage date exists; 'Planned Operation Month/Year' is the expected in-service date.","One project can span several rows and statuses: 'Chokecherry and Sierra Madre Wind' (WY) has four Planned rows (about 3,551 MW, planned operation 2031-2033) plus a 500 MW row in Canceled or Postponed.","Capacity can differ from agency figures: Revolution Wind 715 MW here vs 'estimated capacity of 704 megawatts' on the BOEM page.","Coordinates are one point per plant (offshore points sit in the lease area), not a project boundary; no wind row fell outside the US bounding box.","Operating sheet holds 1,581 wind rows (about 166,942 MW): do not mix it with Planned."]},"test":{"tested_on":"2026-11-19","method":"download","http_status":200,"content_type":"application/vnd.openxmlformats-officedocument.spreadsheetml.sheet","size_bytes":14013970,"records_total":2360,"records_for_country":null,"problems":["Landing page lists October, November and December 2026 XLS links, but those URLs redirect to /electricity/ and return HTML (55,942 bytes) instead of a workbook; the latest downloadable month was September 2026."]},"evidence":[{"claim":"Scope and inclusion threshold","url":"https://www.eia.gov/electricity/data/eia860m/","quote":"The monthly survey Form EIA-860M, Monthly Update to Annual Electric Generator Report supplements the annual survey form EIA-860 data with monthly information that monitors the current status of existing and proposed generating units at electric power plants with 1 megawatt or greater of combined nameplate capacity."},{"claim":"Revisions are silent","url":"https://www.eia.gov/electricity/data/eia860m/","quote":"Estimates will be corrected without specific acknowledgment or explanation in subsequent month's inventory."},{"claim":"Reuse terms","url":"https://www.eia.gov/about/copyrights_reuse.php","quote":"government publications are in the public domain and are not subject to copyright protection."}],"members":[],"members_summary":null},{"source_id":"blm-nepa-register","name":"BLM National NEPA Register (ePlanning), Renewable Energy program","publisher":"U.S. Bureau of Land Management (Department of the Interior)","official":true,"landing_url":"https://eplanning.blm.gov/search/","data_url":"https://eplanning.blm.gov/searchresults/","access":"web_viewer_only","format":"HTML portal pages; JSON returned by the portal's own POST /searchresults/ endpoint (undocumented)","license":"Unknown","language":"en","has_coordinates":true,"location_precision":null,"adds":"Project-level NEPA record on federal onshore land: applicant, county, case file, start, decision and ROD dates, NEPA status, including cancelled and withdrawn projects.","first_seen_pass":1,"rank":2,"summary":"BLM's NEPA Register lists renewable-energy NEPA actions on federal land (485 rows; 32 wind-named); project pages give applicant, county and decision/ROD dates.","coverage_note":"Federal onshore actions only; wind is found by name; MW is text only; coordinates on 15 of 32 wind-named rows.","data_date":"Queried 2026-11-19","caveats":["'Completed' is the NEPA state, not an approval","Endpoint is undocumented"],"coverage":{"geographic":"BLM-managed public lands and BLM actions in all states; wind projects without a BLM decision are absent"},"fine_print":{"unit":{"value":"One row per NEPA number (a NEPA document or action), not per wind farm; one project can appear several times (CX, EA, EIS)","quote":"NEPA#","url":"https://eplanning.blm.gov/search/","attempts":[]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://eplanning.blm.gov/search/","note":"Search page lists filters (state, office, program, type, year) but states no inclusion rule."},{"url":"https://www.blm.gov/programs/planning-and-nepa/eplanning","note":"ePlanning page describes the Register without an inclusion rule."}]},"reference_date":{"value":"Per project: Start Date, Decision Date, NOI publication date and ROD publication date in the Project Dates block","quote":"Start Date 3/13/2021 Decision Date 12/4/2024 Notice of Intent Publication NOI Publication Date 8/20/2021 Record of Decision Publication Actual Date 12/4/2024","url":"https://eplanning.blm.gov/Project-Home/?id=cf5d04cb-a7f2-f011-8407-001dd803d067","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://eplanning.blm.gov/","note":"Home page table 'recent decisions' returned 214 decisions posted in the last 30 days on 2026-11-19; no stated update schedule."},{"url":"https://eplanning.blm.gov/Project-Home/?id=cf5d04cb-a7f2-f011-8407-001dd803d067","note":"'Last Updated' field rendered empty on the project pages opened."}]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://eplanning.blm.gov/search/","note":"No exclusions stated; 'Sub-Program: Wind Energy' appears on project pages but is not a search filter in the dropdowns read."}]}},"key_fields":[{"field":"nepanumber","meaning":"NEPA document number, e.g. DOI-BLM-ID-T030-2021-0015-EIS (type suffix CE, DNA, EA, EIS)"},{"field":"projectname","meaning":"Project name; wind is identified by name because Sub-Program is not a filter"},{"field":"nepastatus","meaning":"e.g. 'Completed - Completed', 'Cancelled - Withdrawn', 'In Progress - Analysis & Document Preparation'"},{"field":"Applicant (project page)","meaning":"Applicant organisation, e.g. Magic Valley Energy, LLC"},{"field":"Decision Date / ROD Publication Actual Date (project page)","meaning":"Date of the BLM decision"},{"field":"coordinates","meaning":"Optional project point (lat, long) in the search JSON"}],"how_to_use":{"example_request":"curl -sL -X POST 'https://eplanning.blm.gov/searchresults/' -H 'Accept: application/json' -H 'Content-Type: application/x-www-form-urlencoded; charset=UTF-8' --data 'order_attribute=0&order_direction=desc&page=1&draw=1&start=0&length=50&program=8be74528-2bea-f011-8544-001dd80f931d&download=false&filter_total_count=0&get_total_count=false'","example_result":"Count call (get_total_count=true): recordsFiltered 485. Row: DOI-BLM-ID-T030-2021-0015-EIS, 'Lava Ridge Wind Project', 'Completed - Completed', EIS, Shoshone Field Office; its project page gives Applicant 'Magic Valley Energy, LLC', Decision Date 12/4/2024.","steps":["POST the form above for the Renewable Energy program GUID (8be74528-2bea-f011-8544-001dd80f931d); page with page=N and length=50 until an empty data array (485 rows on 2026-11-19, 485 distinct NEPA numbers).","Keep rows whose projectname contains 'wind' (32 rows: 17 CE, 8 EIS, 5 EA, 2 DNA; 22 Completed, 9 Cancelled/Withdrawn, 1 In Progress).","Open https://eplanning.blm.gov/Project-Home/?id=<projectid> for Applicant, county, start/decision/ROD dates and the narrative (MW is often only in the description text).","Treat only 'In Progress' rows as pending; read the decision document or notices before calling anything authorised."],"reading_traps":["'Completed - Completed' is the NEPA process state: Lava Ridge shows ROD 12/4/2024 and the same page carries a later DOI statement on cancelling that approval.","Only 1 of 32 wind-named rows is in progress: Chokecherry and Sierra Madre Phase I optimization, a DNA (applicant Power Company of Wyoming LLC, start 6/29/2023), not a new wind farm authorisation.","Coordinates exist on only 15 of the 32 wind-named rows; MW is not a structured field.","Project 'Documents' and 'Map Data' tables (with release dates) load by script and were not retrievable with curl.","The /searchresults/ endpoint is the portal's own, not a documented API, and may change."]},"test":{"tested_on":"2026-11-19","method":"api_query","http_status":200,"content_type":"application/json; charset=utf-8","size_bytes":18306,"records_total":485,"records_for_country":null,"problems":["No API documentation found for /searchresults/; it is the endpoint the public search page calls.","Document list tables and 'Last Updated' do not appear in the static HTML."]},"evidence":[{"claim":"Applicant, decision and ROD date for Lava Ridge","url":"https://eplanning.blm.gov/Project-Home/?id=cf5d04cb-a7f2-f011-8407-001dd803d067","quote":"Applicant Magic Valley Energy, LLC Case File Number IDI-39174 Program Renewable Energy Sub-Program Wind Energy Project Dates Start Date 3/13/2021 Decision Date 12/4/2024"},{"claim":"Capacity appears only in the description","url":"https://eplanning.blm.gov/Project-Home/?id=cf5d04cb-a7f2-f011-8407-001dd803d067","quote":"The project’s estimated generation capacity is 1,000 megawatts or more."},{"claim":"In-progress Wyoming wind item","url":"https://eplanning.blm.gov/Project-Home/?id=821a33dd-a7f2-f011-8407-001dd803d067","quote":"Applicant Power Company of Wyoming LLC Program Renewable Energy Sub-Program Wind Energy Project Dates Start Date 6/29/2023"}],"members":[],"members_summary":null},{"source_id":"boem-offshore-wind","name":"BOEM Offshore Renewable Activities project pages and ArcGIS layers (lease and proposed project phase areas)","publisher":"Bureau of Ocean Energy Management (BOEM), U.S. Department of the Interior","official":true,"landing_url":"https://www.boem.gov/renewable-energy/offshore-renewable-activities","data_url":"https://services7.arcgis.com/G5Ma95RzqJRPKsWL/ArcGIS/rest/services/Offshore_Wind_Proposed_Projects_Phase_Areas/FeatureServer","access":"api","format":"HTML project pages; ArcGIS REST FeatureServer (JSON)","license":"Public domain (BOEM copyright page: materials produced by federal agencies are in the public domain)","language":"en","has_coordinates":true,"location_precision":"exact","adds":"Offshore wind projects on the outer continental shelf: lessee/developer, lease number, approval dates in project pages and polygons for lease and phase areas.","first_seen_pass":1,"rank":3,"summary":"BOEM project pages carry dated approvals and the phase-area ArcGIS layer lists 21 offshore wind project areas with lease number and developer; no MW or stage field.","coverage_note":"Offshore only; MW and stage dates come from page text; lease layer is block-level.","data_date":"Queried 2026-11-19; lease boundaries file updated 2025-02-05","caveats":["Lease or lease area is not a permit","BOEM and EIA capacities differ for Revolution Wind"],"coverage":{"geographic":"U.S. outer continental shelf (Atlantic, Gulf and Pacific); onshore and state-water wind is outside BOEM"},"fine_print":{"unit":{"value":"Phase-area layer: one polygon per project phase (21 features); lease layer: one polygon per lease block (4,892 features); no MW field in either","quote":"Offshore Wind Lease Proposed or Installed Facilities","url":"https://www.boem.gov/renewable-energy/mapping-and-data/renewable-energy-gis-data","attempts":[]},"inclusion_rule":{"value":"Data supplied by lessees with planning documents; features not yet operating are treated as proposed","quote":"All features shown, unless currently installed and operational are considered proposed and can change as project decisions are made.","url":"https://www.boem.gov/renewable-energy/mapping-and-data/renewable-energy-gis-data","attempts":[]},"reference_date":{"value":"Lease boundaries file last updated 02/05/2025; project component layers change frequently and carry no stated date","quote":"Boundaries of renewable energy lease areas, wind planning areas, and marine hydrokinetic planning areas (last file update on 02/05/2025).","url":"https://www.boem.gov/renewable-energy/mapping-and-data/renewable-energy-gis-data","attempts":[]},"update_frequency":{"value":"Component layers 'change frequently'; no schedule stated","quote":"Because these layers change frequently, downloadable data is only available through ArcGIS Online, where the public services are posted.","url":"https://www.boem.gov/renewable-energy/mapping-and-data/renewable-energy-gis-data","attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.boem.gov/renewable-energy/mapping-and-data/renewable-energy-gis-data","note":"No exclusion statement found; BOEM states it rescinded all designated Wind Energy Areas on 2025-07-30, so planning areas are not projects."}]}},"key_fields":[{"field":"LEASE_NUMBER","meaning":"OCS-A lease number, e.g. OCS-A 0486"},{"field":"PROJECT_NAME / DEVELOPER_NAME (phase areas)","meaning":"Project and developer of a phase area"},{"field":"COMPANY / LEASE_DATE (leases)","meaning":"Lessee and lease date string (MM/DD/YYYY)"},{"field":"Project page text","meaning":"Dated events: lease execution, COP approval, ROD, stop-work orders"}],"how_to_use":{"example_request":"curl -sL 'https://services7.arcgis.com/G5Ma95RzqJRPKsWL/ArcGIS/rest/services/Offshore_Wind_Proposed_Projects_Phase_Areas/FeatureServer/0/query?where=PROJECT_NAME%20LIKE%20%27%25Revolution%25%27&outFields=*&returnGeometry=false&f=json'","example_result":"{'LEASE_NUMBER':'OCS-A 0486','PROJECT_NAME':'Revolution Wind','DEVELOPER_NAME':'Revolution Wind LLC','AREA_ACRES':82730.88}; returnCountOnly on the layer gives 21. Lease layer OCS-A 0486: COMPANY 'Revolution Wind, LLC', LEASE_DATE '10/01/2013'.","steps":["Query the phase-area FeatureServer (layer 0) for project name, lease number and developer; add geometry with returnGeometry=true and f=geojson if polygons are needed.","Open https://www.boem.gov/renewable-energy/state-activities/<project-slug> (e.g. revolution-wind) for dated events: ROD (2023-08-22 announcement), COP approval (2023-11-17), stop-work orders (2025-08-22, 2025-12-22).","Take MW only from the page text or EIA; neither layer has a capacity field."],"reading_traps":["A lease or lease block is not a permit: the lease layer returns 4,892 block polygons for 46 distinct lease numbers.","Revolution Wind: page says leases were executed on Sep. 12, 2013 while the layer shows LEASE_DATE 10/01/2013; meaning of each date not verified.","Page text gives 'estimated capacity of 704 megawatts' for the approved project; EIA lists 715 MW.","Layers mix proposed and installed components; non-operating features are proposals that can change."]},"test":{"tested_on":"2026-11-19","method":"api_query","http_status":200,"content_type":"application/json; charset=utf-8","size_bytes":13255,"records_total":21,"records_for_country":21,"problems":["BOEM says downloadable files for project component layers are available only through ArcGIS Online services."]},"evidence":[{"claim":"Approval dates for Revolution Wind","url":"https://www.boem.gov/renewable-energy/state-activities/revolution-wind","quote":"On Nov. 17, 2023, the Bureau of Ocean Energy Management (BOEM) approved the Construction and Operations Plan (COP), as modified by the selected alternative in the Record of Decision, for the Revolution Wind Farm and Revolution Wind Export Cable Project."},{"claim":"Approved capacity statement","url":"https://www.boem.gov/renewable-energy/state-activities/revolution-wind","quote":"the approved version of the project will have an estimated capacity of 704 megawatts of clean energy"},{"claim":"Wind Energy Areas rescinded","url":"https://www.boem.gov/renewable-energy/lease-and-grant-information","quote":"On July 30, 2025, BOEM announced it is rescinding all designated Wind Energy Areas (WEAs) on the OCS."}],"members":[],"members_summary":null},{"source_id":"ny-ores-applications","name":"ORES major renewable energy facility permit applications (with DMM case pages)","publisher":"New York State Department of Public Service, Office of Renewable Energy Siting and Electric Transmission (ORES)","official":true,"landing_url":"https://dps.ny.gov/ores-permit-applications","data_url":null,"access":"web_viewer_only","format":"HTML tables by application stage; DMM case pages (HTML, script-loaded filing lists)","license":"Unknown","language":"en","has_coordinates":false,"location_precision":"municipality","adds":"State-level example: applications by stage (notice of intent, under review, permitted, withdrawn, denied) with applicant, MW and towns in the description; case filings with dates in DMM.","first_seen_pass":1,"rank":4,"summary":"New York's ORES publishes applications by stage with applicant, MW and towns in the text; 14 of 52 rows mention wind (10 permitted).","coverage_note":"One state only; no stage date column; DMM case pages hold dated filings.","data_date":"Read 2026-11-19","caveats":["Project name does not prove technology (Bull Run Wind is described as solar)","Other states were not checked"],"coverage":{"geographic":"New York State only; a sample of one state, other states not checked"},"fine_print":{"unit":{"value":"One row per application or declaratory-ruling request; MW and applicant are inside the description text","quote":"Project Permit Application Number Project Name Description","url":"https://dps.ny.gov/ores-permit-applications","attempts":[]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://dps.ny.gov/ores-permit-applications","note":"Page lists application stages but states no MW threshold or inclusion rule in the text read."}]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://dps.ny.gov/ores-permit-applications","note":"No date column or 'as of' statement on the stage tables."},{"url":"https://documents.dps.ny.gov/public/MatterManagement/CaseMaster.aspx?MatterCaseNo=23-02973","note":"Case page has a 'Date Filed' column, but its rows (764 filed documents) load by script and were not retrieved."}]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://dps.ny.gov/ores-permit-applications","note":"No update schedule stated."}]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://dps.ny.gov/ores-permit-applications","note":"No exclusion statement found on the page."}]}},"key_fields":[{"field":"Project Permit Application Number","meaning":"ORES matter number, e.g. 23-02973, also the DMM matter number"},{"field":"Project Name","meaning":"Project name used to cross with EIA Plant Name"},{"field":"Description","meaning":"Free text with applicant, MW and towns/county"},{"field":"Stage table heading","meaning":"Notices of Intent; Pending Completeness Determination; Incomplete; Complete Applications Under Review; Permitted; Withdrawn/Relinquished; Denied; Request for Declaratory Ruling"}],"how_to_use":{"example_request":"curl -sL 'https://dps.ny.gov/ores-permit-applications' (table 'Permitted Applications'); case page: curl -sL 'https://documents.dps.ny.gov/public/MatterManagement/CaseMaster.aspx?MatterCaseNo=23-02973'","example_result":"Permitted row 21-00026 'Heritage Wind': 'Heritage Wind, LLC has received a Permit ... for construction of a 184.8 megawatt (MW) Wind Electric Generating Facility located in the Town of Barre, Orleans County'. DMM 23-02973: NY NORTH COUNTRY, LLC, 360-Megawatt Wind Energy Facility, Franklin and Clinton counties; 764 filed documents.","steps":["Parse the HTML tables under each stage heading; wind rows are found by 'wind' in name or description (14 of 52 rows on 2026-11-19: 10 permitted, 1 under review, 1 notice, 2 declaratory rulings).","Extract applicant, MW and town/county from the description text; the stage is the table heading.","Open the row's DMM link for filings; stage dates require the 'Date Filed' column of the filing list."],"reading_traps":["'Bull Run Wind' is listed as a Notice of Intent whose description reads '449-Megawatt (MW) Solar Energy Facility': the name does not prove the technology.","Permit text can differ from EIA: Heritage Wind 184.8 MW permitted vs 126 MW in EIA-860M, which codes it 'approvals not initiated'.","Applicant naming differs between list and DMM ('NORTH COUNTRY WIND, LLC' vs 'NY NORTH COUNTRY, LLC').","Repowering items appear as permits or declaratory-ruling requests (Altona Wind 107.5 MW repower) and are not new capacity."]},"test":{"tested_on":"2026-11-19","method":"page_only","http_status":200,"content_type":"text/html; charset=UTF-8","size_bytes":66174,"records_total":52,"records_for_country":null,"problems":["DMM filing lists load by script, so filing dates were not retrieved."]},"evidence":[{"claim":"Permit with MW and location in text","url":"https://dps.ny.gov/ores-permit-applications","quote":"Heritage Wind, LLC has received a Permit for a Major Renewable Energy Facility pursuant to Section 94-c of the New York State Executive Law for construction of a 184.8 megawatt (MW) Wind Electric Generating Facility located in the Town of Barre, Orleans County"},{"claim":"Wind application under review with applicant and MW in DMM","url":"https://documents.dps.ny.gov/public/MatterManagement/CaseMaster.aspx?MatterCaseNo=23-02973","quote":"Application of NY NORTH COUNTRY, LLC, for a Major Renewable Energy Facility Siting Permit Pursuant to Article VIII of the New York State Public Service Law to Develop, Design, Construct, Operate, Maintain, and Decommission a 360-Megawatt Wind Energy Facility Known as the North Country Wind Project"}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"No single national wind permitting regulator: BLM (federal land), BOEM (outer continental shelf), state siting bodies such as NY ORES; EIA only inventories generators","url":"https://www.blm.gov/programs/planning-and-nepa/eplanning"},"operators":{"structure":"many","note":"Hundreds of developers and owner entities; EIA Entity Name is the owner/operator entity, not always the developer.","census_url":null},"publication_obligation":{"exists":"unknown","norm":null,"url":null,"what_must_be_published":null,"frequency":null},"consolidated_republication":{"found":"partial","note":"EIA-860M republishes generator-level status for 1 MW+ proposed units from survey responses and EIA research; it is not a permit register. No official dataset joins BLM, BOEM and state permit records.","checked_pages":[{"organization":"EIA","url":"https://www.eia.gov/electricity/data/eia860m/","saw":"Monthly XLS workbooks with Operating, Planned, Retired and Canceled sheets; release 2026-10-23"},{"organization":"BLM","url":"https://eplanning.blm.gov/search/","saw":"National NEPA Register search by state, office, program, type and year"},{"organization":"BOEM","url":"https://www.boem.gov/renewable-energy/mapping-and-data/renewable-energy-gis-data","saw":"ArcGIS services for leases and proposed offshore wind components"}]}},"national_registry":{"exists":"partial","note":"EIA-860M is a national official inventory but only of reported generators with coarse status; no national register of wind permits was found in the pages opened.","checked_pages":[{"organization":"EIA","url":"https://www.eia.gov/electricity/data/eia860m/","saw":"Preliminary monthly inventory including proposed generators"},{"organization":"BLM","url":"https://eplanning.blm.gov/search/","saw":"NEPA actions on federal land only"},{"organization":"BOEM","url":"https://www.boem.gov/renewable-energy/offshore-renewable-activities","saw":"Offshore project pages only"},{"organization":"New York DPS ORES","url":"https://dps.ny.gov/ores-permit-applications","saw":"One state's permit applications by stage"}]},"if_unstructured":{"summary":"Stage dates, applicants and approvals sit in agency project pages and documents, not in the national list. Build the list from EIA-860M, then confirm each project in the agency record that has jurisdiction.","recipe":["Download the latest EIA-860M workbook, read sheet 'Planned' and keep Energy Source Code WND; group rows by plant to get MW, state/county, coordinates and the status code (tested: 77 rows in the 2026-09 file).","Match each plant by name to the jurisdiction record: BLM NEPA Register (federal land), BOEM project page and layers (offshore) or the state siting body (tested for New York ORES).","Read applicant, decision or approval dates from the record page (tested with Lava Ridge, Revolution Wind, North Country Wind) and note which document type each date belongs to (ROD, COP approval, permit, filing).","Report the project as in permitting only if the agency record shows an open review, an application or approval without construction; keep EIA-only rows as leads."],"location_method":"Use EIA plant latitude/longitude; for offshore use BOEM phase-area polygons; for BLM use the search-result coordinates when present; for state portals use the town/county in the description (administrative precision only).","cross_with":"Plant Name in EIA-860M with project names in BLM, BOEM and ORES; BOEM lease number with BOEM phase-area layer; ORES matter number with DMM matter number.","where_published":[{"name":"BLM National NEPA Register project pages","url":"https://eplanning.blm.gov/search/","what":"Applicant, county, case file, NEPA status, start/decision/ROD dates and Federal Register links for federal-land projects","how_to_search_inside":"Filter by program 'Renewable Energy' (plus state, office, type, year) and match 'wind' in the project name; open Project-Home?id=<projectid>.","example_document":{"url":"https://eplanning.blm.gov/Project-Home/?id=cf5d04cb-a7f2-f011-8407-001dd803d067","what_it_gives":"'Applicant Magic Valley Energy, LLC', 'Case File Number IDI-39174', 'Decision Date 12/4/2024', 'Record of Decision Publication Actual Date 12/4/2024' (Project Information / Project Dates blocks)."}},{"name":"BOEM state activities project pages","url":"https://www.boem.gov/renewable-energy/offshore-renewable-activities","what":"Dated lease, COP, ROD and order events for each offshore wind project","how_to_search_inside":"Pick the project or state in the page's list or map; each project page has sections Leasing History, Construction and Operations Plan, Environmental Review.","example_document":{"url":"https://www.boem.gov/renewable-energy/state-activities/revolution-wind","what_it_gives":"'On Nov. 17, 2023, the Bureau of Ocean Energy Management (BOEM) approved the Construction and Operations Plan (COP)' and 'estimated capacity of 704 megawatts' (Construction and Operations Plan Approval section)."}},{"name":"New York DPS Document and Matter Management (DMM) case pages","url":"https://dps.ny.gov/ores-permit-applications","what":"Matter title with applicant, MW and towns, and the filing list for each ORES application","how_to_search_inside":"Use the matter number from the ORES list in CaseMaster.aspx?MatterCaseNo=<number>; filings list has a 'Date Filed' column loaded by script.","example_document":{"url":"https://documents.dps.ny.gov/public/MatterManagement/CaseMaster.aspx?MatterCaseNo=23-02973","what_it_gives":"'Matter Number: 23-02973', 'Company/Organization: NY North Country, LLC', '360-Megawatt Wind Energy Facility' (Matter header), 'Filed Documents (764)'."}}]},"related_not_answering":[{"name":"EIA-860M Operating sheet (wind)","url":"https://www.eia.gov/electricity/data/eia860m/","why":"Lists 1,581 wind rows already operating (about 166,942 MW); operating plants are not in permitting."},{"name":"BOEM Wind Leases layer","url":"https://services7.arcgis.com/G5Ma95RzqJRPKsWL/ArcGIS/rest/services/Wind_Leases__BOEM_/FeatureServer","why":"Lease blocks (4,892 polygons) show where a lease exists, not whether a project is permitted."},{"name":"Global Energy Monitor Global Wind Power Tracker","url":"https://globalenergymonitor.org/projects/global-wind-power-tracker","why":"Page describes worldwide 10 MW+ wind phases including pre-construction, but the U.S. file was not downloaded, so it is not used as an answer."}],"open_questions":[{"question":"Why does EIA-860M code Heritage Wind (NY, 126 MW) as '(P) regulatory approvals not initiated' while ORES lists a permit for 184.8 MW?","starting_point":"EIA planned row 'Heritage Wind, LLC' and ORES permit 21-00026.","next_step":"Ask EIA/ORES or read the DMM permit order to see capacity and permit date; the difference is left unresolved here."},{"question":"Which Revolution Wind capacity applies: 704 MW (DOI/BOEM approval text) or 715 MW (EIA nameplate)?","starting_point":"BOEM project page and EIA planned row.","next_step":"Compare the COP approved capacity with EIA nameplate definitions; unresolved."},{"question":"What dates do the BLM and DMM document lists give for stages of the projects checked?","starting_point":"BLM Project-Home 'Documents' tab (Lava Ridge, Chokecherry) and DMM matter 23-02973 filing list.","next_step":"Retrieve the script-loaded document tables with a browser-capable client and record Release/Date Filed per document."},{"question":"Does the FAST-41 Permitting Dashboard list wind projects with milestone dates?","starting_point":"permits.performance.gov returned 403 to curl and to WebFetch; permitting.gov is the Council's site.","next_step":"Open the Permitting Council pages with an allowed client and check for wind projects, milestone dates and any export."},{"question":"Which other state siting bodies publish wind application lists?","starting_point":"Candidates not opened: California Energy Commission opt-in certification, Wyoming Industrial Siting Council, Texas, Illinois, Minnesota PUC.","next_step":"Open each body's permit-application page and record applicant, MW, stage and date availability."},{"question":"Can Berkeley Lab 'Queued Up' or the GEM Global Wind Power Tracker give a second non-official project list?","starting_point":"emp.lbl.gov/queues returned 403; GEM landing page opened but download terms and U.S. file not tested.","next_step":"Reach the LBNL data release page and GEM download-data flow, then check fields, license and U.S. wind rows."}],"history":[{"pass":1,"date":"2026-11-19","role":"research","model":"claude-sonnet-5-5","rules_version":"us-red-ambiente-2026-11-19","note":"First pass from the run templates; EIA-860M downloaded, BLM, BOEM and NY ORES checked. Effort level 'Sonnet High' is stated in INSTRUCCIONES.md and could not be verified from inside the session.","headline":{"official_data":"partial","non_official_data":"not_tested","national_registry":"partial"},"sources":{"total":4,"new":4,"dropped":0},"negatives":{},"effort":{"pages":23,"minutes":13}}],"local_terms":[{"term":"NEPA Register","language":"en","meaning":"BLM public list of NEPA projects (EA, EIS, CE, DNA) and their decision documents"},{"term":"Record of Decision (ROD)","language":"en","meaning":"Federal decision document after an EIS; the stage a NEPA 'Completed' status usually refers to"},{"term":"Construction and Operations Plan (COP)","language":"en","meaning":"BOEM-reviewed plan whose approval authorises offshore wind construction"},{"term":"Notice of Intent (NOI)","language":"en","meaning":"Start of a federal EIS process or a New York ORES filing; not an approval"},{"term":"Article VIII / Section 94-c permit","language":"en","meaning":"New York siting permit for major renewable energy facilities issued by ORES"},{"term":"Planned generator","language":"en","meaning":"EIA-860M term for a proposed unit, with status codes L, T, P, U, V, TS"},{"term":"OCS-A lease","language":"en","meaning":"BOEM commercial wind lease number on the outer continental shelf"},{"term":"Repower","language":"en","meaning":"Replacing turbines at an existing wind farm; may be listed as a project without being new capacity"}],"provenance":{"pass_count":1,"models":["claude-sonnet-5-5"],"minutes_estimate":13,"pages_opened":23,"passes":[{"pass":1,"date":"2026-11-19","model":"claude-sonnet-5-5"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/us/wind-farms-in-permitting.json","detail_url":"https://georutter.org/v1/us/wind-farms-in-permitting/detail.json","html_url":"https://georutter.org/us/wind-farms-in-permitting/","country_url":"https://georutter.org/v1/countries/us.json"}