au / battery-storage-in-permitting

Australia battery storage in permitting data sources

Where can I get a list of stand-alone battery storage (BESS) projects currently in permitting in Australia, with location, power (MW), developer, permitting stage and date?

Research reviewed
2026-11-26
Sources tested
2026-11-26
Access checked
2026-11-26
Published
2026-11-27
Sources
5 on this page · 1 in the detail

Answer

Official data
Partial coverage
Non official data
None found in the documented search
Confidence
Medium

There is no single national list. Best official sources: the NSW Major Projects register (102 stand-alone BESS cases across stages with stage, LGA, address, map point, MW in text, decision date once determined) and the national EPBC referrals ArcGIS layer (104 battery-named federal referrals across stages with polygon, state and federal stage). Other states differ: WA's DAP list and VIC permit pages give stage, dates and applicant; QLD and SA lists are script-rendered and refuse automated clients. Developer and open-stage dates are mostly inside PDFs. AEMO's NEM xlsx helps discovery but its commitment status is not a permit stage.

Confidence reason: NSW, EPBC, WA, ACT and AEMO were tested by query or document; QLD and SA rows could not be read (403/script), so coverage outside NSW is partial.

Local search terms

  • State Significant Development (SSD) — NSW state assessment pathway used by large BESS; case numbers SSD-… in the Major Projects register.
  • Electricity generation - Other / Electricity Supply — NSW Major Projects development_type values under which BESS cases are filed.
  • battery storage facility — Queensland Planning Regulation land use; SARA is assessment manager since 12 December 2025.
  • utility installation — Victorian land-use term in BESS permit descriptions ('utility installation comprising a Battery Energy Storage System').
  • Development Facilitation Program (DFP) — Victorian pathway where the Minister decides; shown as 'Program' on ministerial permit pages.
  • Development Assessment Panel (DAP) — WA panels deciding large BESS applications; references DAP/YY/NNNNN.
  • EPBC referral / controlled action — Federal environmental referral and the decision that full assessment is needed.
  • Commitment Status — AEMO development stage (Publicly Announced, Anticipated, Committed); not a planning stage.

Requested attributes

AttributeCoverageSourcesScope and limitations
Project location locationPartially coverednsw-major-projects epbc-referrals-gis state-territory-planning-registersNSW address and map point; EPBC referral polygon; WA/VIC/ACT addresses or lots. Precision: street address or lot, polygon is the referral area.

Not checked: QLD SARA and SA PlanSA rows not readable (403/script); council-level DAs outside NSW sampled only in TAS and NT.

Power power_mwPartially coverednsw-major-projects epbc-public-portal aemo-generation-information state-territory-planning-registersMW only in free text or documents (NSW description, EPBC description, WA/ACT reports); AEMO gives MW AC per unit for the NEM. Basis varies.

Not checked: WA DAP list gives cost not MW (MW only in each agenda report); VIC permit pages often omit MW; QLD/SA not read.

Developer developerPartially coveredepbc-public-portal nsw-major-projects state-territory-planning-registers aemo-generation-informationProponent on EPBC pages; NSW applicant in letters/notices; VIC/WA applicant often a consultant; AEMO site owner. Mostly SPV names.

Not checked: No structured developer field in any planning register; QLD/SA applicants not read.

Permitting stage permitting_stagePartially coverednsw-major-projects state-territory-planning-registers epbc-referrals-gisNSW stage per case; WA current vs determined lists; VIC decision field; ACT approval notices; EPBC federal stage kept separate.

Not checked: QLD SARA and SA lists unreadable to automated clients; TAS/NT have no state BESS list (council samples empty).

Stage date stage_datePartially coverednsw-major-projects state-territory-planning-registersNSW Determination Date once decided, open stages only via document dates; WA received/meeting dates; VIC received/notice/decision dates.

Not checked: EPBC layer gives year only; EPBC notice dates load by script; QLD/SA not read.

Main caveats

  • Federal EPBC referral status is a separate environmental process: a 'Completed' referral says nothing about state development consent, and many BESS are never referred.
  • MW basis differs between sources: grid export, installed rating and AEMO AC nameplate (Wattle Creek: 350 MW export, up to 516 MW rating, 372.6 MW AC).
  • Hybrids: QLD assesses BESS ancillary to wind/solar inside that application; NSW splits hubs into separate cases; WA's list mixes both. Filter by description.
  • VIC, QLD, SA and TAS planning sites and the NT EPA register answered 403 to automated clients on 2026-11-26; VIC was read only through archived copies.
  • AEMO commitment status is not a permit stage: Tramway Road (VIC permit 31/10/2025) is still 'Publicly Announced' in the October 2026 release.

Sources

nsw-major-projectsNSW Planning Portal - Major Projects register (State Significant Development / Infrastructure)

NSW Department of Planning, Housing and Infrastructure (DPHI) · Official · HTML pages (Drupal view with GET filters); per-folder document lists as JSON; documents as PDF · Web viewer only · License: unknown

NSW register of State Significant projects; filter development types 'Electricity generation - Other' and 'Electricity Supply' to list BESS cases with stage, LGA, address and MW text.

Landing url
https://www.planningportal.nsw.gov.au/major-projects/projects
Data url
https://www.planningportal.nsw.gov.au/major-projects/projects?development_type=Electricity%20generation%20-%20Other&status=Assessment
Coverage note
NSW only; 102 stand-alone BESS cases on 2026-11-26 (25 determined, 8 withdrawn, rest in SEARs to Assessment).
Date of data
live, viewed 2026-11-26
Language
en
Location precision
Address
Has coordinates
Yes
Test
2026-11-26 · Page only · HTTP 200
  • No bulk export or documented API for this register found; the list is paged HTML.
  • Applicant and open-stage dates are not structured fields.

Caveats

  • Applicant only in PDFs.
  • MW basis varies (export vs rating).
  • Two development types must be queried.

Example request

https://www.planningportal.nsw.gov.au/major-projects/projects?development_type=Electricity%20generation%20-%20Other&status=Assessment

Example result

13 results; e.g. 'SSD-63345458 | Assessment | State Significant Development | Upper Lachlan Shire | Wattle Creek Battery Energy Storage System | 1001 Canyonleigh Road Brayton Nsw 2579'

epbc-referrals-gisEPBC Referrals Spatial Database - Public (ArcGIS MapServer layer EPBC_Referrals)

Australian Government, Department of Climate Change, Energy, the Environment and Water (DCCEEW) · Official · ArcGIS REST (JSON, polygons); WMS · API · License: unknown

National ArcGIS layer of EPBC referrals; filter NAME for BATTERY/BESS to get federal environmental cases with polygon, state, federal status/stage and year.

Landing url
https://gis.environment.gov.au/gispubmap/rest/services/ogc_services/EPBC_Referrals/MapServer
Data url
https://gis.environment.gov.au/gispubmap/rest/services/ogc_services/EPBC_Referrals/MapServer/0/query
Coverage note
104 battery-named referrals on 2026-11-26: NSW 44, QLD 37, VIC 12, SA 6, WA 3, ACT 2, none NT/TAS. Only referred projects.
Date of data
live, queried 2026-11-26
Language
en
Location precision
Exact
Has coordinates
Yes
Test
2026-11-26 · API query · HTTP 200

Caveats

  • Federal environment process only, not development consent.
  • No proponent, MW or exact dates.

Example request

https://gis.environment.gov.au/gispubmap/rest/services/ogc_services/EPBC_Referrals/MapServer/0/query?where=UPPER(NAME)%20LIKE%20%27%25BATTERY%25%27%20OR%20UPPER(NAME)%20LIKE%20%27%25BESS%25%27&outFields=REFERENCE_NUMBER,NAME,PRIMARY_JURISDICTION,STATUS_DESCRIPTION,STAGE_NAME,YEAR,CRM_ID&returnGeometry=false&f=json

Example result

104 features; e.g. {'REFERENCE_NUMBER': '2024/09970', 'NAME': 'Wattle Creek Energy Hub Battery Energy Storage System Project', 'PRIMARY_JURISDICTION': 'NSW', 'STATUS_DESCRIPTION': 'Assessment Approach Determined', 'STAGE_NAME': 'Assessment', 'YEAR': 2024.0}

state-territory-planning-registersState and territory development-approval registers outside NSW (VIC, QLD, SA, WA, TAS, NT, ACT)

State and territory planning departments and assessment bodies · Official · PDF lists and HTML pages (varies by jurisdiction) · PDF · License: unknown

One register per state/territory; WA (DAP PDF, significant developments) and VIC permit pages give stage, dates and applicant; QLD and SA lists not readable by automated clients.

Coverage note
Tested 7 of 7 non-NSW jurisdictions; BESS rows read in WA, VIC (archived), ACT; none found on NT and Tasmanian samples.
Date of data
WA list as at 2026-11-23
Language
en
Location precision
Address
Has coordinates
No
Example access test
2026-11-26 · Download · HTTP 200
  • Several members reject automated clients (403) or render rows only by script; see members.
Members summary
Total: 7 · Listed: 7 · Tested: 7 · Data found: 3

Seven states/territories other than NSW (NSW is source nsw-major-projects); one register opened per jurisdiction; readable BESS rows in WA, VIC (archived) and ACT.

Look for the state assessment body's 'current applications', 'ministerial permits' or 'notified developments' page; large BESS go to a state pathway (VIC DFP, QLD SARA, WA DAP/SDA, SA SCAP), small ones to councils.

See member links and checks in the detail (state-territory-planning-registers)

Caveats

  • WA list gives cost, not MW.
  • VIC/QLD/SA live sites return 403 to automated clients.

Example request

https://www.planning.wa.gov.au/docs/default-source/daps-docs-website/current-applications.pdf?sfvrsn=ebbf7a78_328 (8 pages; table from page 1)

Example result

Shire of Chittering | FORM1 | DAP/26/03199 | $66m | Battery Energy Storage System (BESS) and associated works | Lot 1261 (RN. 722) Old Gingin Road, Muchea | 04/09/2026 | 01/12/2026 09:30 AM

epbc-public-portalEPBC Act Public Portal - referral summary pages

Australian Government, National Environmental Protection Agency (EPBC Act Public Portal) · Official · HTML (Microsoft Power Pages); list grids loaded by script · Web viewer only · License: unknown

Referral summary page per EPBC number: proponent, address and MW/MWh in the description; open it with the CRM_ID from the ArcGIS layer.

Landing url
https://epbcpublicportal.environment.gov.au/all-referrals/
Coverage note
All EPBC referrals; tested on 2024/09970 (Wattle Creek).
Date of data
live, viewed 2026-11-26
Language
en
Location precision
Address
Has coordinates
No
Test
2026-11-26 · Page only · HTTP 200
  • List and notice grids need a script-issued request with an anti-forgery token; no static list or export without it.

Caveats

  • No dates in the server HTML.
  • Proponent is often a project SPV.

Complete procedure available in the full detail

aemo-generation-informationAEMO NEM Generation Information (October 2026 release, xlsx)

Australian Energy Market Operator (AEMO) · Official · XLSX · Direct download · License: unknown

Quarterly NEM xlsx of proposed and committed projects; 655 battery units with owner, MW AC, MWh and commitment status; use to discover and cross-check, not as permit stage.

Landing url
https://www.aemo.com.au/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-planning-data/generation-information
Data url
https://www.aemo.com.au/-/media/files/electricity/nem/planning_and_forecasting/generation_information/2026/nem-generation-information-oct-2026.xlsx?rev=e4625386b864409786cd79986dd0ac04&sc_lang=en
Coverage note
NEM only (no WA, NT); October 2026 release; 436 battery-only sites not yet in service.
Date of data
2026-10-30
Language
en
Location precision
No location
Has coordinates
No
Test
2026-11-26 · Download · HTTP 200
  • Landing page rejects automated clients (403 challenge); description read from a web.archive.org copy of 2026-11-14.

Caveats

  • Commitment status is not a planning stage.
  • No location below NEM region.

Complete procedure available in the full detail

Additional sources in the detail: 1. Read the full detail; locate each source by its source_id.

Document access

Developer, MW and stage dates are mostly only in planning documents: NSW case PDFs, WA DAP agenda reports, VIC permit pages and ACT approval notices.

Research provenance

Pass count
1
Minutes estimate
47
Pages opened
60
PassDate
12026-11-26

Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed.

Record metadata: Schema version: 1.0 · Country: au · Country name: Australia · Topic: battery-storage-in-permitting · Territory: au · Territory level: Country · Parent url: No parent territory · Html url: https://georutter.org/au/battery-storage-in-permitting/