Spain hydropower plants data sources
Where can I get a list of hydropower plants and dams in Spain, with location, capacity (MW), reservoir volume, operator and annual generation?
Answer
No single un-gated official dataset covers all Spanish hydropower plants with MW, operator, reservoir volume, and annual generation. For dams, MITECO's UP_Presas_y_embalses ArcGIS REST service covers 3,208 dams and 3,170 reservoirs with coordinates, volume (hm3), and operator. For hydro plants, MITECO's WFS (876 plants) lacks MW in 88% of rows and omits operators; PRETOR/REPROv2 use CAPTCHAs; Electra's bulk dump omits technology. Non-official datasets are also partial (JRC 342 plants and WRI 124 plants lack small-hydro operators and current annual MWh); pair them with basin/regional sources (CH Duero, CH Jucar, CH Cantabrico, INEGA, DERA).
- Official data
- Partial coverage
- Non official data
- Partial coverage
- Published
- 2026-11-19
- Research reviewed
- 2026-11-16
- Access checked
Requested attributes
| Attribute | Coverage | Sources | Scope and limitations |
|---|---|---|---|
Plant or dam location location | Partially covered |
| All 3,208 MITECO ArcGIS dams and 342/342 JRC plants have coords; 34/876 MITECO WFS plants have lat=0; Electra, CH Duero, and INEGA lack coords. Not published: Electra, CH Duero, and INEGA Galicia plant registries omit coordinates, and 34/876 MITECO WFS plant points have corrupted latitude=0 coordinates. |
Generation capacity capacity_mw | Partially covered |
| MITECO WFS gives kW in only 106/876 rows; Electra omits >50 MW Fases; JRC gives 342/342 plants (16,084.5 MW); basins/regions cover local plants. Not published: No single un-gated official open dataset provides MW capacity for both >50 MW (REPROv2 CAPTCHA) and <=50 MW (PRETOR CAPTCHA) hydro plants nationwide. |
Reservoir volume reservoir_volume | Partially covered |
| MITECO UP_Presas_y_embalses gives NMN_CAPAC (hm3) for 2,672/3,170 reservoirs and Embalses_Mapa covers 375 >5 hm3 weekly; JRC links volume to 62/342 plants. Not published: 498/3,170 minor reservoirs in MITECO Layer 1 lack NMN_CAPAC, and no official national dataset provides a join key linking reservoir volume to hydro plants. |
Operator operator | Partially covered |
| MITECO ArcGIS gives TITULAR for 3,185/3,208 dams; MITECO WFS/Electra omit plant operator (PRETOR/REPROv2 CAPTCHA); WRI covers 124 plants; INEGA covers Galicia. Not published: MITECO omits Titular from Electra bulk dumps and WFS; CH Cantabrico redacts natural-person owners under LO 3/2018; PRETOR/REPROv2 public queries use CAPTCHA. |
Annual generation annual_generation | Partially covered |
| Not published per plant nationwide (REE/MITECO/CNMC give totals); CH Duero (169/435) and CH Jucar (33/60) publish basin MWh; ENTSO-E covers >=100 MW units. Not published: MITECO, REE (REData), and CNMC publish generation only aggregated nationally, regionally, or by technology; only CH Duero, CH Jucar, and ENTSO-E (>=100 MW) publish unit/plant MWh. |
Main caveats
- MITECO UP_Presas_y_embalses USO mislabels major hydro dams (ALDEADAVILA, ALCANTARA, ALMENDRA, CORTES II) as Abastecimiento; never filter USO to find hydro dams.
- In UP_Presas_y_embalses Layer 0, multi-dike dams repeat rows (ALMENDRA x4) each repeating full NMN_CAPAC; sum volume from Layer 1 (Embalses) and filter FASE='Explotación'.
- MITECO WFS agua:aprov_hidro_central (876 plants) has potencia_t=0 in 770/876 rows, lat=0 in 34/876, and no operator; Electra dump lacks tech, >50 MW phases, and froze 2026-01-27.
- Observed annual generation per plant is not published nationwide; MITECO, REE REData, and CNMC publish only aggregates, leaving CH Duero, CH Jucar, and ENTSO-E (>=100 MW).
- MITECO static dam Shapefiles use an Altcha anti-bot gate and RAIPRE queries (PRETOR/REPROv2) use image CAPTCHAs; use MITECO ArcGIS REST UP_Presas_y_embalses instead.
Sources
MITECO DGA — Inventario de Presas y Embalses (UP_Presas_y_embalses ArcGIS REST)
- Source id
- s001
- Publisher
- Ministerio para la Transición Ecológica y el Reto Demográfico (Dirección General del Agua)
- Official
- Yes
- Landing url
- https://www.miteco.gob.es/es/cartografia-y-sig/ide/descargas/agua/inventario-presas-embalses.html
- Data url
- https://services-eu1.arcgis.com/RvnYk1PBUJ9rrAuT/ArcGIS/rest/services/UP_Presas_y_embalses/FeatureServer
- Access
- api
- Format
- GeoJSON / ArcGIS JSON
- License
- Free to use and redistribute with attribution: 'Fuente: © Ministerio para la Transición Ecológica y el Reto Demográfico'.
- Language
- es
- Has coordinates
- Yes
- Location precision
- exact
- Summary
- MITECO DGA — Inventario de Presas y Embalses (UP_Presas_y_embalses ArcGIS REST)
- Coverage note
- Spain (national, all inter-community and intra-community basins including islands)
- Date of data
- 2021-12-31 (source inventory snapshot dated 2021-12-30/31; hosted FeatureServer last edited 2023-04-25)
- Caveats
- Consult the main caveats and the complete reading traps and access evidence in the detail.
- Test
- Tested on
- 2026-11-16
- Method
- api_query
- Http status
- 200
- Problems
- Static ZIP links on landing_url are gated by an Altcha proof-of-work challenge; ArcGIS REST UP_Presas_y_embalses serves the same inventory openly.
- Example
- Example request
https://services-eu1.arcgis.com/RvnYk1PBUJ9rrAuT/ArcGIS/rest/services/UP_Presas_y_embalses/FeatureServer/0/query?where=1%3D1&outFields=*&outSR=4326&resultOffset=0&resultRecordCount=2000&f=json
- Example result
{"attributes": {"FID": 1, "ID_INFRAES": 2999, "CODIGO": "12350074", "NOMBRE": "SATAUTEJO", "FASE": "Explotación", "TITULAR": "AYUNTAMIENTO DE LAS PALMAS", "CAUCE": "BARRANCO DEL COLEGIO", "DEMARC": "GRAN CANARIA", "PROVINCIA": "Las Palmas", "TIPO": "Presa de fábrica de mampostería", "USO": "Abastecimiento", "NMN_CAPAC": "0.107", "ALT_CIMIEN": "32"}, "geometry": {"x": -15.49, "y": 28.05}}
- Members summary
MITECO DGA — Aprovechamientos Hidroeléctricos (agua:aprov_hidro_central GeoServer WFS)
- Source id
- s002
- Publisher
- Ministerio para la Transición Ecológica y el Reto Demográfico (Dirección General del Agua)
- Official
- Yes
- Landing url
- https://www.miteco.gob.es/es/cartografia-y-sig/ide/directorio_datos_servicios/agua/wms-inspire-agua.html
- Data url
- https://gis.miteco.gob.es/geoserver/agua/ows?service=WFS&version=2.0.0&request=GetFeature&typeNames=agua:aprov_hidro_central&outputFormat=application/json
- Access
- api
- Format
- GeoJSON / GML (WFS 2.0.0)
- License
- MITECO open attribution terms (© Ministerio para la Transición Ecológica y el Reto Demográfico)
- Language
- es
- Has coordinates
- Yes
- Location precision
- exact
- Summary
- MITECO DGA — Aprovechamientos Hidroeléctricos (agua:aprov_hidro_central GeoServer WFS)
- Coverage note
- Spain (national)
- Date of data
- Caveats
- Consult the main caveats and the complete reading traps and access evidence in the detail.
- Test
- Tested on
- 2026-11-16
- Method
- api_query
- Http status
- 200
- Problems
- None recorded
- Example
- Example request
https://gis.miteco.gob.es/geoserver/agua/ows?service=WFS&version=2.0.0&request=GetFeature&typeNames=agua:aprov_hidro_central&outputFormat=application/json&count=3
- Example result
{"type":"Feature","id":"aprov_hidro_central.1","geometry":{"type":"Point","coordinates":[-2.6549,42.9575]},"properties":{"id":1122,"nombrecent":"Urrúnaga","corriente":"Trasvase","sbruto_m":23.6,"potencia_t":0,"tipocent":"Con regulación propia (embalse)"}}
- Members summary
Spanish River Basin Authorities & Regional Energy/Water Portals (Hydro Plants & Basin Dams)
- Source id
- s003
- Publisher
- Confederaciones Hidrográficas (CH Duero, CH Júcar, CH Cantábrico, CH Ebro, CH Tajo, CH Segura, CH Guadalquivir, CH Guadiana, CH Miño-Sil) & Regional Agencies (INEGA Galicia, IECA Andalucía, ACA Cataluña, JCyL, URA Euskadi, IDENA Navarra, Augas de Galicia)
- Official
- Yes
- Landing url
- https://datos.gob.es/es/catalogo/ea0043420-centrales-hidroelectricas
- Data url
- Access
- direct_download
- Format
- JSON / XLSX / PDF / GeoPackage / CSV
- License
- Various Spanish public sector open reuse licenses (e.g., CC-BY / Avisos Legales of each basin or regional portal)
- Language
- es, ca, gl, eu
- Has coordinates
- Yes
- Location precision
- exact
- Summary
- Spanish River Basin Authorities & Regional Energy/Water Portals (Hydro Plants & Basin Dams)
- Coverage note
- Partial Spain (grouped across 9 Confederaciones Hidrográficas and autonomous-community agencies; richest open plant data in Duero, Júcar, Cantábrico, Galicia, and Andalucía)
- Date of data
- 2026-06 (INEGA Galicia); 2026-08-17 (CH Duero); 1987/88-2022/23 series (CH Júcar).
- Caveats
- Consult the main caveats and the complete reading traps and access evidence in the detail.
- Test
- Tested on
- 2026-11-16
- Method
- download
- Http status
- 200
- Problems
- None recorded
- Example
- Example request
https://datos.chduero.es/data-integration/Centrales%20hidroel%C3%A9ctricas/Centrales%20Hidroelectricas.json
- Example result
{"Código": 1100001, "Nombre": "La Villa o Salto de la Villa ( TF-0012/1987)", "Potencia instalada (kW)": 429, "Producción declarada (MWh/año)": 711.6, "Modo operación": "Fluyente"}
- Members summary
- Total
- Listed
- 16
- Tested
- 8
- Data found
- 0
- Scope note
- Inherited members; data findings were not reclassified during this structural migration. Consult each member note.
- Pattern
Additional sources in the detail: 9. Read the full detail; locate each source by its source_id.
Document access
- Summary
Local search terms
- Term
- central hidroeléctrica / aprovechamiento hidroeléctrico
- Language
- es
- Meaning
- Hydropower plant / hydroelectric water-use concession
- Term
- central hidráulica reversible / bombeo
- Language
- es
- Meaning
- Pumped-storage hydropower plant
- Term
- minicentral hidráulica / minihidráulica
- Language
- es
- Meaning
- Small hydropower plant (typically <= 10 MW)
- Term
- presa / azud / balsa
- Language
- es
- Meaning
- Dam / weir / off-stream retention basin
- Term
- embalse / capacidad de embalse (hm3)
- Language
- es
- Meaning
- Reservoir / reservoir volume in cubic hectometres (1 hm3 = 1 million m3)
- Term
- potencia instalada / potencia neta / salto bruto
- Language
- es
- Meaning
- Installed capacity / net capacity / gross hydraulic head
- Term
- titular / concesionario
- Language
- es
- Meaning
- Plant or dam owner / concession holder (operator)
- Term
- RAIPRE / PRETOR / REPROv2
- Language
- es
- Meaning
- Administrative Registry of Electricity Production Facilities (Sección 2ª <=50 MW; Sección 1ª >50 MW)
Confidence
- Confidence
- high
- Confidence reason
- Directly queried MITECO ArcGIS REST, GeoServer WFS, Electra, REData, CNMC, 9 basins, 5 regional portals, JRC, WRI, ENTSO-E, GeoDAR, GEM, SEPREM, ohsome, and BOE.
Research provenance
- Pass count
- 1
- Models
- Gemini 4 Hydrogen (Extra High)
- Minutes estimate
- 37
- Pages opened
- 136
- Passes
- Pass
- 1
- Date
- 2026-11-16
- Model
- Gemini 4 Hydrogen (Extra High)
- Note
- Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed.
Record metadata
- Schema version
- 1.0
- Country
- es
- Country name
- Spain
- Topic
- hydropower-plants
- Territory
- es
- Territory level
- country
- Parent url
- Html url
- https://georutter.org/es/hydropower-plants/