Spain wind farms data sources
Where can I get a list of wind farms in operation in Spain, with location, capacity (MW), number of turbines, operator and commissioning date?
Answer
There is no tested single public source supplying all requested fields for every operating Spanish wind farm. Regional government datasets cover several major regions; Navarra includes turbine count and commissioning year. AEE publishes individual park records for all 17 communities, but its operating labels can be stale and its developer field is not necessarily the operator.
- Official data
- Partial coverage
- Non official data
- Partial coverage
- Published
- 2026-11-19
- Research reviewed
- 2026-11-15
- Access checked
Requested attributes
| Attribute | Coverage | Sources | Scope and limitations |
|---|---|---|---|
Wind-farm location location | Partially covered |
| Navarra and Andalucía provide geometries; AEE positions can be shared. Not checked: Confirm coordinates and data for remaining regions. |
Capacity capacity_mw | Partially covered |
| Power appears in regional datasets and the AEE map. Not checked: Check current coverage and inconsistent source values. |
Number of turbines turbine_count | Partially covered |
| Navarra, Castilla y León and Cataluña publish counts; AEE provides counts by park. Not checked: Review remaining regions and post-repowering counts. |
Operator operator | Partially covered |
| Aragón identifies the titular; other records give promoter or applicant. Not checked: Current operator is not established nationally. |
Commissioning date commissioning_date | Partially covered |
| Navarra supplies year, Castilla y León date; ELECTRA phase dates lack wind classification. Not checked: Check other regions and record joins. |
Main caveats
- The AEE map labels Es Milà as operating although a 2026 report says dismantling is complete and generation ceased in 2023.
- Promoter or applicant is not necessarily the current operator.
- 229 of 305 tested Castilla y León AEE records share a location with another record; do not assume exact sites.
- Regional records use different definitions; some have multiple rows per park or municipality.
- Castilla y León CABEZA MESA reports 29,600 kW although 15 turbines × 1,800 kW gives 27,000 kW.
Sources
Autonomous community operating wind-farm datasets
- Source id
- s001
- Publisher
- Junta de Castilla y León
- Official
- Yes
- Landing url
- https://analisis.datosabiertos.jcyl.es/explore/dataset/parques-eolicos/api/?flg=es
- Data url
- https://analisis.datosabiertos.jcyl.es/api/explore/v2.1/catalog/datasets/parques-eolicos/records?limit=2
- Access
- api
- Format
- JSON, CSV, SHP
- License
- CC BY 4.0 (Castilla y León and Navarra); verify other members
- Language
- Spanish
- Has coordinates
- Yes
- Location precision
- municipality
- Summary
- Autonomous community operating wind-farm datasets
- Coverage note
- Five autonomous communities tested: Andalucía, Aragón, Castilla y León, Cataluña, Navarra; Galicia document opened via web reader.
- Date of data
- Caveats
- Consult the main caveats and the complete reading traps and access evidence in the detail.
- Test
- Tested on
- 2026-11-15
- Method
- api_query
- Http status
- 200
- Problems
- None recorded
- Example
- Example request
https://analisis.datosabiertos.jcyl.es/api/explore/v2.1/catalog/datasets/parques-eolicos/records?limit=2
- Example result
CABEZA MESA, AVILA, potencia_total_kw 29600, no_aerogene_radores 15, pot_unit_kw 1800, fecha_puesta_en_marcha 2011-06-21.
- Members summary
- Total
- Listed
- 6
- Tested
- 5
- Data found
- 0
- Scope note
- Inherited members; data findings were not reclassified during this structural migration. Consult each member note.
- Pattern
ELECTRA — electricity producer register export
- Source id
- s002
- Publisher
- Ministerio para la Transición Ecológica y el Reto Demográfico
- Official
- Yes
- Landing url
- https://energia.serviciosmin.gob.es/Electra/BuscarDatos.aspx
- Data url
- https://energia.serviciosmin.gob.es/Electra/descargarExcelProduccion.aspx
- Access
- direct_download
- Format
- XLSX
- License
- unknown
- Language
- Spanish
- Has coordinates
- No
- Location precision
- none
- Summary
- ELECTRA — electricity producer register export
- Coverage note
- Spain
- Date of data
- Caveats
- Consult the main caveats and the complete reading traps and access evidence in the detail.
- Test
- Tested on
- 2026-11-15
- Method
- download
- Http status
- 200
- Problems
- None recorded
- Example
- Example request
https://energia.serviciosmin.gob.es/Electra/descargarExcelProduccion.aspx
- Example result
Fases row 2: DOMIKO, POTENCIANETA 337,000, POTENCIABRUTA 337,000, Autonomia Navarra; commissioning date blank.
- Members summary
AEE Mapa eólico interactivo — regional dataset
- Source id
- s003
- Publisher
- Asociación Empresarial Eólica
- Official
- No
- Landing url
- https://aeeolica.org/sobre-la-eolica/mapa-de-parques-eolicos/castilla-leon/
- Data url
- https://aeeolica.org/wp-content/litespeed/js/26d3281eeea125589c56a4ed8e633bf2.js?ver=0545f
- Access
- direct_download
- Format
- JSON embedded in JavaScript
- License
- unknown
- Language
- Spanish
- Has coordinates
- Yes
- Location precision
- municipality
- Summary
- AEE Mapa eólico interactivo — regional dataset
- Coverage note
- All 17 autonomous communities; Madrid returned zero parks.
- Date of data
- Caveats
- Consult the main caveats and the complete reading traps and access evidence in the detail.
- Test
- Tested on
- 2026-11-15
- Method
- download
- Http status
- 200
- Problems
- None recorded
- Example
- Example request
https://aeeolica.org/wp-content/litespeed/js/26d3281eeea125589c56a4ed8e633bf2.js?ver=0545f
- Example result
Aciberos: FUNCIONAMIENTO; 35 MW; 7 turbines; Ibereólica Aciberos, S.L. as developer; Lubián, Zamora; [42.03614673,-6.90801065].
- Members summary
- Total
- Listed
- 17
- Tested
- 17
- Data found
- 0
- Scope note
- Inherited members; data findings were not reclassified during this structural migration. Consult each member note.
- Pattern
Additional sources in the detail: 1. Read the full detail; locate each source by its source_id.
Document access
- Summary
Local search terms
- Term
- parque eólico
- Language
- Spanish
- Meaning
- wind farm
- Term
- aerogenerador
- Language
- Spanish
- Meaning
- wind turbine
- Term
- puesta en servicio
- Language
- Spanish
- Meaning
- commissioning
- Term
- repotenciación
- Language
- Spanish
- Meaning
- repowering
- Term
- sociedad promotora
- Language
- Spanish
- Meaning
- developer or promoter, not necessarily operator
Confidence
- Confidence
- medium
- Confidence reason
- Several official downloads and all 17 AEE regional data objects were tested, but current national completeness and source-date semantics remain unverified.
Research provenance
- Pass count
- 1
- Models
- Terra 6.1 (High)
- Minutes estimate
- 12
- Pages opened
- 87
- Passes
- Pass
- 1
- Date
- 2026-11-15
- Model
- Terra 6.1 (High)
- Note
- Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed.
Record metadata
- Schema version
- 1.0
- Country
- es
- Country name
- Spain
- Topic
- wind-farms
- Territory
- es
- Territory level
- country
- Parent url
- Html url
- https://georutter.org/es/wind-farms/