de / solar-pv-plantsGermany solar pv plants data sources
Where can I get a list of solar PV plants in operation in Germany, with location, capacity (MW), operator and commissioning date?
- Research reviewed
- 2026-11-27
- Sources tested
- 2026-11-27
- Access checked
- 2026-11-27
- Published
- 2026-11-27
- Sources
- 5 on this page · 1 in the detail
Answer
- Official data
- Structured data
- Non official data
- Partial coverage
- Confidence
- High
The Bundesnetzagentur’s Marktstammdatenregister (MaStR) lists registered PV units with status, commissioning date, gross and net capacity in kW and operator identifiers. Filtering for solar energy and operating status yields 6,534,010 units on 2026-11-27, including 20,213 ground-mounted units. Use the extended overview or the daily XML export. Coordinates were found for 262,196 operating units over 30 kW net in the sample. Natural-person operator names are withheld. A park can span several registered units.
Requested attributes
| Attribute | Coverage | Sources | Scope and limitations |
|---|---|---|---|
Plant location location | Partially covered | mastr-units-api mastr-full-export laender-energy-atlases osm-solar-plants | The export checked reported WGS84 points for 262,196 operating units above 30 kW net. The smaller units are located by postcode and municipality. Not published: § 15(1) Nr. 1a MaStRV withholds street, parcel and coordinates of units ≤30 kW; checked in the MaStR overview, the XML export, the TSO EEG files and the regulation. |
Capacity capacity_mw | Covered | mastr-units-api mastr-full-export tso-eeg-master-data | Per unit in kW: Bruttoleistung (module kWp, DC) and Nettonennleistung (lower of module and inverter rating); divide by 1,000 for MW. |
Operator operator | Partially covered | mastr-units-api mastr-full-export gem-gspt | Operator name for organisations; natural persons shown as 'natürliche Person (ABR…)' (19.5% of a sampled page of parks, 86% of all units). Not published: § 15(1) Nr. 2 MaStRV withholds data of natural-person operators; confirmed in MaStR JSON (AnlagenbetreiberPersonenArt 518) and the Marktakteure export; TSO files carry no operator. |
Commissioning date commissioning_date | Covered | mastr-units-api mastr-full-export tso-eeg-master-data | Inbetriebnahmedatum (first commissioning) present for every unit 'In Betrieb' in all samples checked. |
Main caveats
- In the export checked, precise coordinates were unavailable for operating PV units of up to 30 kW net. About 96% of registered operating PV units fell in this range.
- Operator names are published only for organisations; natural persons appear as 'natürliche Person (ABR…)' – 86% of all operating units and about one in five ground-mounted units in the pages sampled.
- The counting unit is the MaStR 'Einheit': one park can be several units (phases, operators); group with LokationMastrNr. Without filters the list also holds 1.56 million balcony units and planned or shut-down units.
- Capacity is in kW on two bases: Bruttoleistung = module peak (DC, kWp), Nettonennleistung = lower of module and inverter rating. Divide by 1,000 for MW and do not mix with GEM's MWac.
- Operators have one month to register after commissioning, so the latest month is incomplete; the web CSV export stops at 25,000 rows.
Sources
mastr-units-apiMarktstammdatenregister (MaStR) – Erweiterte Einheitenübersicht, Stromerzeugungseinheiten (JSON behind the viewer, CSV export)
Bundesnetzagentur · Official · JSON (Kendo grid endpoint used by the web viewer); CSV export button on the same page · API · License: Datenlizenz Deutschland – Namensnennung – Version 2.0 (BNetzA: applies to MaStR .xml/.csv data and the Webdienst unless marked otherwise)
Official register of every PV unit; filter Energieträger 2495 + Betriebs-Status 35 for units in operation, with commissioning date, kW capacities, operator and coordinates above 30 kW.
- Landing url
- https://www.marktstammdatenregister.de/MaStR/Einheit/Einheiten/ErweiterteOeffentlicheEinheitenuebersicht
- Data url
- https://www.marktstammdatenregister.de/MaStR/Einheit/EinheitJson/GetErweiterteOeffentlicheEinheitStromerzeugung
- Coverage note
- 6,534,010 solar units in operation on 2026-11-27: 20,213 ground-mounted, 4,953,666 on buildings, 1,559,990 balcony units, 141 other; 262,196 carry coordinates.
- Date of data
- 2026-11-26 (previous-day state)
- Language
de- Location precision
- Exact
- Has coordinates
- Yes
- Test
- 2026-11-27 · API query · HTTP 200
Caveats
- Unit ≠ plant: group by LokationMastrNr.
- Coordinates only above 30 kW net; natural-person operators masked.
Example request
curl -s -G 'https://www.marktstammdatenregister.de/MaStR/Einheit/EinheitJson/GetErweiterteOeffentlicheEinheitStromerzeugung' --data-urlencode 'sort=Nettonennleistung-desc' --data-urlencode 'page=1' --data-urlencode 'pageSize=3' --data-urlencode 'group=' --data-urlencode "filter=Energieträger~eq~'2495'~and~Betriebs-Status~eq~'35'~and~Art der Solaranlage~eq~'852'"
Example result
{"Total":20213,"Data":[{"MaStRNummer":"SEE936162158023","EinheitName":"Solarpark Gottesgabe","BetriebsStatusName":"In Betrieb","InbetriebnahmeDatum":"/Date(1644451200000)/","Bruttoleistung":153131.42,"Nettonennleistung":144000.0,"AnlagenbetreiberName":"EnBW Solarpark Gottesgabe GmbH","Breitengrad":52.639405,"Laengengrad":14.189378,"Gemeinde":"Neuhardenberg"},…]}mastr-full-exportMaStR Gesamtdatenauszug (Gesamtdatenexport) – EinheitenSolar_*.xml, Lokationen_*.xml, Marktakteure_*.xml
Bundesnetzagentur · Official · ZIP of XML files (UTF-16), 453 files; documentation with XSD · Direct download · License: Datenlizenz Deutschland – Namensnennung – Version 2.0
Daily 3.3 GB XML dump of the whole MaStR (solar units in EinheitenSolar_*.xml), with site and operator tables and quarterly snapshots.
- Landing url
- https://www.marktstammdatenregister.de/MaStR/Datendownload
- Data url
- https://download.marktstammdatenregister.de/Gesamtdatenexport_20261127_26.2.zip
- Coverage note
- All public MaStR records; same 30 kW coordinate and natural-person limits as the web overview.
- Date of data
- 2026-11-26 (Vortag)
- Language
de- Location precision
- Exact
- Has coordinates
- Yes
- Test
- 2026-11-27 · Headers only · HTTP 200
- Full ZIP is 3.3 GB; tested by headers and Range reads of the central directory and of EinheitenSolar_68.xml, Katalogwerte.xml, Lokationen_71.xml and the start of EinheitenSolar_1.xml and Marktakteure_1.xml.
Caveats
- Codes need Katalogwerte.xml; operator names need a join to Marktakteure.
tso-eeg-master-dataEEG-Anlagenstammdaten (EEG system master data) for the annual statement – files of the four transmission system operators
50Hertz, Amprion, TenneT TSO, TransnetBW (published on netztransparenz.de) · Official · ZIP with one CSV per TSO (semicolon, cp1252, decimal comma) + legend XLSX · Direct download · License: unknown
Annual EEG settlement master data from the four TSOs: per EEG installation commissioning date, installed kW, postcode/place (street above 30 kW) and decommissioning date.
- Landing url
- https://www.netztransparenz.de/en/Renewable-energies-and-levies/EEG/EEG-billing/EEG-annual-statements/EEG-system-master-data
- Coverage note
- All EEG installations reported for 2025 (status 31.12.2025); TransnetBW file alone: 711,131 solar rows.
- Date of data
- 2025-12-31
- Language
de- Location precision
- Address
- Has coordinates
- No
- Example access test
- 2026-11-27 · Download · HTTP 200
- The file server answers HEAD requests with 405 Method Not Allowed; GET works.
- Range requests are ignored (full file returned).
- Members summary
- Total: 4 · Listed: 4 · Tested: 1 · Data found: 1
One file per German transmission system operator (control area); TransnetBW downloaded and parsed, the other three checked by GET headers only.
netztransparenz.de › EEG › EEG-Abrechnungen › EEG-Jahresabrechnungen › EEG-Anlagenstammdaten, one ZIP per TSO and year.See member links and checks in the detail (
tso-eeg-master-data)
Caveats
- No operator and no coordinates.
- 50Hertz area reports only installations missing from MaStR.
gem-gsptGlobal Solar Power Tracker (GSPT), February 2026 release
Global Energy Monitor · Non-official · GeoJSON (map data file); summary tables as Google Sheets · Direct download · License: CC BY 4.0 (records with a TZ ID: CC BY-NC 4.0)
Non-official park/phase list ≥1 MW with owner, operator, start year and MWac; Germany: 7,825 operating phases.
- Landing url
- https://globalenergymonitor.org/projects/global-solar-power-tracker
- Data url
- https://publicgemdata.nyc3.cdn.digitaloceanspaces.com/interim_maps/gspt_map_2026-02.geojson
- Coverage note
- Worldwide, utility-scale only; February 2026 release.
- Date of data
- 2026-02
- Language
en- Location precision
- Exact
- Has coordinates
- Yes
- Test
- 2026-11-27 · Headers only · HTTP 200
Caveats
- Start year only; MWac vs MaStR DC kWp.
osm-solar-plantsOpenStreetMap – power=plant + plant:source=solar
OpenStreetMap contributors · Non-official · OSM JSON/XML via Overpass API · API · License: ODbL 1.0
Volunteer-mapped park polygons (7,021 objects) with sparse operator/start_date/capacity tags; 478 carry a ref:mastr link.
- Landing url
- https://taginfo.geofabrik.de/europe:germany
- Data url
- https://overpass-api.de/api/interpreter
- Coverage note
- Germany-wide, ground-mounted parks; rooftop units are separate generator objects.
- Date of data
- 2026-11-24
- Language
de- Location precision
- Exact
- Has coordinates
- Yes
- Test
- 2026-11-27 · API query · HTTP 200
- overpass-api.de and overpass.private.coffee answered 406 Not Acceptable to curl with its default client identification; the same query through another HTTP client returned data.
Caveats
- Tags sparse and free-text.
Additional sources in the detail: 1. Read the full detail; locate each source by its source_id.
Document access
No document route is needed for the published attributes: MaStR is structured. The two gaps – exact location of units ≤30 kW and names of natural-person operators – are withheld under § 15 MaStRV; no official document source publishing them was found, and the TSO EEG files apply the same 30 kW address cut.
Research provenance
- Pass count
- 1
- Minutes estimate
- 38
- Pages opened
- 52
| Pass | Date |
|---|---|
| 1 | 2026-11-27 |