France battery storage in permitting data sources
Where can I get a list of stand-alone battery storage (BESS) projects currently in permitting in France, with location, power (MW), developer, permitting stage and date?
Answer
No unified French registry tracks all stand-alone BESS currently in permitting. Nationally, the Ministry portal NOVAE exposes an open API and Excel export for R.122-2 environmental screening (cas par cas) and opinions, including open cases, though MW and developer appear only inside attached PDFs and smaller sites below thresholds are omitted. Major full-EIA consultations appear on projets-environnement.gouv.fr. Most BESS (>600 kW Li-ion) file an ICPE 2925-2 Déclaration whose receipts are scattered across 101 departmental Préfectures, while pending building permits are excluded from Sitadel (CRPA L.311-2).
- Official data
- Partial coverage
- Non official data
- Partial coverage
- Published
- 2026-11-19
- Research reviewed
- 2026-11-15
- Access checked
Requested attributes
| Attribute | Coverage | Sources | Scope and limitations |
|---|---|---|---|
Project location location | Partially covered |
| NOVAE API/XLSX gives commune/dept/region (Cerfa PDFs may give DMS/Lambert coords); Préfecture 2925-2 PDFs give lieu-dit and Lambert-93 X/Y; source 2 has GeoJSON points. Not published: NOVAE JSON/Excel omits coordinates; municipal pending building permit locations are not published in open structured datasets. |
Power power_mw | Partially covered |
| Absent from NOVAE JSON/Excel and Sitadel; available inside NOVAE Cerfa/decision PDFs (MW/MWh) and Préfecture 2925-2 PDFs (max charging kW, often MWh). Not published: Neither NOVAE metadata nor Sitadel nor Géorisques exposes structured MW for permitting-stage BESS; requires reading PDFs or paid commercial trackers. |
Developer developer | Partially covered |
| Omitted from NOVAE API/XLSX; stated inside NOVAE Cerfa/decision PDFs, Préfecture 2925-2 PDFs (Raison sociale + SIRET), and full-EIA inquiry files. Not published: Structured national open datasets do not expose developer/applicant names for pending PC or R.122-2 dossiers without downloading PDFs. |
Permitting stage permitting_stage | Partially covered |
| NOVAE tracks R.122-2 stage (En cours d'instruction, À COMPLÉTER, Dossier Clos); source 2 tracks EIA consultations; source 3 shows ICPE 2925-2 filing (15-day rule). Not published: There is no cross-procedure tracker linking R.122-2 screening, ICPE 2925-2 declaration, grid queue, and pending DDT/Préfet building-permit stage. |
Stage date stage_date | Partially covered |
| NOVAE provides publishedDate, updatedDate and submission date; Préfecture 2925-2 PDFs carry exact filing timestamp; source 2 provides consultation start/end dates. Not published: Pending urbanism application filing/instruction dates remain unpublished in Sitadel and offline at town halls/DDTs. |
Main caveats
- NOVAE inProgress=true omits 'À COMPLÉTER' dossiers (missing open standalone BESS 005778/KK P in Œuilly, 5 MW); query without inProgress or filter documentStatus manually.
- Most 1-20+ MW standalone BESS require only ICPE 2925-2 Déclaration (>600 kW) plus Permis de construire/DP, so projects below R.122-2 thresholds never appear in NOVAE unless filed voluntarily.
- Sitadel excludes all pending building permits ('en cours d'instruction') under CRPA art. L.311-2, omits permits without floor area, and strips project descriptions.
- Géorisques ICPE covers only active/ended Autorisation and Enregistrement facilities, excluding 2925-2 Déclaration-only BESS and pending applications.
- Grid queue datasets (ODRÉ, Enedis data-fair, EDF Corse-Outremer, RTE Cartostock, Caparéseau) publish substation MW headroom or regional totals, never named permitting projects.
Sources
NOVAE — Portail de l'évaluation environnementale (Cas par cas et avis Ae)
- Source id
- s001
- Publisher
- Ministère de la Transition écologique (CGDD / DREAL / IGEDD)
- Official
- Yes
- Landing url
- https://evaluation-environnementale.ecologie.gouv.fr/
- Data url
- https://gatew-evaluation-environnementale.developpement-durable.gouv.fr/api/PublishedDocument/Get
- Access
- api
- Format
- JSON, XLSX, PDF
- License
- Licence Ouverte Etalab 2.0
- Language
- fr
- Has coordinates
- No
- Location precision
- municipality
- Summary
- NOVAE — Portail de l'évaluation environnementale (Cas par cas et avis Ae)
- Coverage note
- France (métropole et DROM — 13 regions observed in standalone BESS subset including Martinique)
- Date of data
- Continuous live portal since 2025-09-03; API snapshot tested 2026-11-15 (latest publishedDate 2026-11-12)
- Caveats
- Consult the main caveats and the complete reading traps and access evidence in the detail.
- Test
- Tested on
- 2026-11-15
- Method
- api_query
- Http status
- 200
- Problems
- HEAD returns 405 Method Not Allowed; ExportToExcel fails silently or returns subsets if start/filters vary; inProgress=true excludes 'À COMPLÉTER'; MW and developer missing from structured fields.
- Example
- Members summary
projets-environnement.gouv.fr — Projets soumis à étude d'impact (diffusion)
- Source id
- s002
- Publisher
- Ministère de la Transition écologique (CGDD / GarAnce)
- Official
- Yes
- Landing url
- https://www.projets-environnement.gouv.fr/pages/home/
- Data url
- https://www.projets-environnement.gouv.fr/api/explore/v2.1/catalog/datasets/projets-environnement-diffusion/records
- Access
- api
- Format
- JSON, CSV (Opendatasoft v2.1)
- License
- Licence Ouverte (Etalab)
- Language
- fr
- Has coordinates
- Yes
- Location precision
- exact
- Summary
- projets-environnement.gouv.fr — Projets soumis à étude d'impact (diffusion)
- Coverage note
- France (national)
- Date of data
- Caveats
- Consult the main caveats and the complete reading traps and access evidence in the detail.
- Test
- Tested on
- 2026-11-15
- Method
- api_query
- Http status
- 200
- Problems
- Excludes projects not subject to full EIA; developer and MW are mostly missing from structured columns; stale dataset metadata modified date (2018-03-22).
- Example
- Example request
https://www.projets-environnement.gouv.fr/api/explore/v2.1/catalog/datasets/projets-environnement-diffusion/records?limit=5&order_by=dc_date%20desc&where=dc_title%20like%20%22%25batterie%25%22
- Example result
{"total_count":3,"results":[{"dc_title":"Centrale solaire et stockage par batterie","descriptif_du_projet":"Parc photovoltaïque et stockage par batteries à Neulliac (56)","vp_status":null,"dc_type":["Permis de construire"],"dc_date":"2026-08-31T10:40:23+00:00","localisation":{"type":"Feature","geometry":{"coordinates":[-3.001184,48.131144],"type":"Point"}}}]}
- Members summary
Déclarations ICPE 2925-2 (Preuves de dépôt) — Préfectures départementales
- Source id
- s003
- Publisher
- Préfectures de département (101 préfectures)
- Official
- Yes
- Landing url
- https://entreprendre.service-public.gouv.fr/vosdroits/F33414
- Data url
- Access
- Format
- PDF, HTML
- License
- Licence Ouverte Etalab 2.0 (gouv.fr default)
- Language
- fr
- Has coordinates
- Yes
- Location precision
- exact
- Summary
- Déclarations ICPE 2925-2 (Preuves de dépôt) — Préfectures départementales
- Coverage note
- Decentralized across all 101 French departments (4 preuves/index + 1 guide sampled)
- Date of data
- Caveats
- Consult the main caveats and the complete reading traps and access evidence in the detail.
- Test
- Tested on
- 2026-11-15
- Method
- download
- Http status
- 200
- Problems
- Decentralized across 101 Préfectures with inconsistent navigation and occasional scanned PDFs; Python urllib TLS failed on some gouv.fr hosts whereas curl -4 succeeded.
- Example
- Example request
curl -4sSL -o preuve_verrieres.pdf https://www.vienne.gouv.fr/contenu/telechargement/51156/314801/file/fichierAccuseReception_stockage_d_energie_par_batteries_lithium_verrieres.pdf && pdftotext preuve_verrieres.pdf -
- Example result
Vous venez de déposer un dossier de demande de déclaration ICPE concernant le projet Stockage d'énergie par batterie lithium sur la commune principale de l'AIOT LD LA BARRIERE 86410 VERRIERES... transmise le 06/11/2026... Raison sociale PHOTOSOL DEVELOPPEMENT... X : 514667 Y : 6590260 Projection : Lambert 93... 2925-2 Puissance maximale 20000 kW D 50 MWh
- Members summary
- Total
- Listed
- 5
- Tested
- 5
- Data found
- 0
- Scope note
- Inherited members; data findings were not reclassified during this structural migration. Consult each member note.
- Pattern
Additional sources in the detail: 2. Read the full detail; locate each source by its source_id.
Document access
- Summary
Local search terms
- Term
- stockage d'électricité par batteries / BESS
- Language
- fr
- Meaning
- Battery energy storage system (stand-alone = autonome)
- Term
- atelier de charge d'accumulateurs (rubrique 2925-2)
- Language
- fr
- Meaning
- ICPE rubric for non-H2 (Li-ion) battery systems >600 kW, subject to Déclaration (D)
- Term
- preuve de dépôt
- Language
- fr
- Meaning
- Official ICPE Declaration filing receipt published on departmental Préfecture websites for 3 years (R.512-49)
- Term
- examen au cas par cas
- Language
- fr
- Meaning
- Environmental screening (R.122-2) handled via NOVAE to decide if a full EIA is required
- Term
- autorisation environnementale (AENV)
- Language
- fr
- Meaning
- Unified environmental permit required for major projects crossing AENV/EIA/IOTA/species thresholds
- Term
- permis de construire (PC) / déclaration préalable (DP)
- Language
- fr
- Meaning
- Urban planning permits (>20 m² footprint triggers PC; instructed by DDT for Préfet under L.422-2/R.422-2)
- Term
- enquête publique / PPVE
- Language
- fr
- Meaning
- Public inquiry or electronic public participation required before EIA-subject project decisions
- Term
- poste source / capacité d'accueil
- Language
- fr
- Meaning
- HTB/HTA substation and grid hosting capacity mapped on RTE Cartostock and Caparéseau
Confidence
- Confidence
- high
- Confidence reason
- Verified across Ministry portals, live NOVAE/projets-environnement/ODRÉ/Enedis/EDF APIs, Géorisques/Sitadel docs and files, DDT77 BESS guide, 4 Préfecture 2925-2 pages/PDFs and commercial pages.
Research provenance
- Pass count
- 1
- Models
- Gemini 4 Hydrogen
- Minutes estimate
- 23
- Pages opened
- 78
- Passes
- Pass
- 1
- Date
- 2026-11-15
- Model
- Gemini 4 Hydrogen
- Note
- Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed.
Record metadata
- Schema version
- 1.0
- Country
- fr
- Country name
- France
- Topic
- battery-storage-in-permitting
- Territory
- fr
- Territory level
- country
- Parent url
- Html url
- https://georutter.org/fr/battery-storage-in-permitting/