fr / battery-storageFrance battery storage data sources
Where can I get a list of battery storage (BESS) installations in operation in France, with location, power (MW), energy (MWh), operator and commissioning date?
- Research reviewed
- 2026-11-26
- Sources tested
- 2026-11-26
- Access checked
- 2026-11-26
- Published
- 2026-11-27
- Sources
- 5 on this page · 2 in the detail
Answer
- Official data
- Structured data
- Non official data
- Partial coverage
- Confidence
- Medium
The official answer is the Registre national des installations de production et de stockage d'électricité on ODRÉ (RTE with Enedis, EDF SEI and local DSOs). Filtering codeFiliere STOCK gives 938 in-service storage rows (including 10 flywheel and 7 'Autre') at 30/09/2026 (2,453 MW, ≈3,347 MWh) with commune, charge/discharge kW, storable kWh, connection and commissioning dates. It does not publish the battery operator (only the grid operator), gives no coordinates, has no MWh for the 7 ZNI rows and no Mayotte row. Operators come from CRE ZNI deliberations, owner releases and OSM (23 large plants, joinable by EIC code).
Requested attributes
| Attribute | Coverage | Sources | Scope and limitations |
|---|---|---|---|
Installation location location | Covered | odre-registre-national cre-zni-storage-deliberations edf-sei-ponant-park osm-openinframap | Register: commune and INSEE code for all 938 rows (IRIS for 40), no coordinates; OSM gives exact geometry for 23 large plants; CRE names the commune for Mayotte. |
Power power_mw | Covered | odre-registre-national cre-zni-storage-deliberations | Register kW: puisMaxInstallee (max output), puisMaxCharge (charging), puisMaxInstalleeDisCharge and connection kW; charge empty in 89 rows, discharge in 104. |
Stored energy energy_mwh | Partially covered | odre-registre-national cre-zni-storage-deliberations operator-publications osm-openinframap | energieStockable (kWh) >0 in 912 of 938 rows; CRE gives usable MWh for contracted ZNI sites; owner pages (Corse row: 10 MWh) and OSM (12 plants) fill some gaps. Not published: No energy for the 7 EDF SEI rows (Corse, DOM), empty in 19 rows and 1-2 kWh placeholders in 14 rows of the register at 30/09/2026; not derivable from MW. |
Operator operator | Partially covered | cre-zni-storage-deliberations operator-publications osm-openinframap | Register shows only the grid operator and an installation name (706 'NWJ…', 164 'Confidentiel'); operators from CRE ZNI deliberations, owner releases and OSM (17 plants). Restricted: The register collects 'nom de l'exploitant' (item 1A) but the arrêté du 7 juillet 2016, art. 4, leaves it out of the public data; no public operator list found at RTE, Enedis, CRE or NW. |
Commissioning date commissioning_date | Covered | odre-registre-national cre-zni-storage-deliberations operator-publications | dateMiseEnService (grid-side 'mise en service industrielle') in 933 rows, dateRaccordement in the rest; commercial operation can be months later. |
Main caveats
- gestionnaire is the network operator (RTE, Enedis, EDF-SEI, ELD), not the battery operator; the exploitant is collected but not public.
- dateMiseEnService is the grid operator's view: Cernay-lès-Reims shows 12/01/2026, the owner reports commercial operation since May 2026.
- Hybrid batteries sit inside PV, wind, hydro or thermal rows (39 individual rows with typeStockage BATTE outside STOCK; small PV only as aggregates).
- ZNI: only 7 EDF SEI rows without MWh or names; Mayotte absent (CRE deliberations fill part); EDF island batteries on Sein/Ouessant absent.
- Row counts are not site or company counts: 706 rows are distributed 'NWJ' units of ≈1.25 MW; some sites have several rows.
- Totals differ by source: register 31/12/2025 mainland 741 rows/1,531 MW/1,762 MWh vs CRE 758 projects/1,512 MW/1,720 MWh.
Sources
odre-registre-nationalRegistre national des installations de production et de stockage d'électricité (au 30/09/2026)
RTE (compiler, art. L142-9-1 Code de l'énergie) with data from Enedis, EDF SEI and local DSOs (ELD); published on Open Data Réseaux Énergies (ODRÉ) · Official · CSV, JSON, XLSX exports and Opendatasoft Explore API v2.1 (JSON) · API · License: Licence Ouverte v2.0 (Etalab)
Official per-installation register (RTE/Enedis/EDF SEI/ELD) on ODRÉ; filter codeFiliere STOCK: 938 rows in service at 30/09/2026 (incl. 10 flywheel, 7 'Autre'), 2,453 MW puisMaxInstallee, ≈3,347 MWh.
- Landing url
- https://odre.opendatasoft.com/explore/dataset/registre-national-installation-production-stockage-electricite-agrege/information/
- Data url
- https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/registre-national-installation-production-stockage-electricite-agrege/exports/csv?where=codefiliere%3D%22STOCK%22&delimiter=%3B
- Coverage note
- All networks of mainland France plus 7 EDF SEI rows (Corse 1, Guadeloupe 1, Martinique 1, Guyane 2, Réunion 2); Mayotte absent. Location = commune/INSEE, no coordinates. Operator not published.
- Date of data
- 2026-09-30
- Language
fr- Location precision
- Municipality
- Has coordinates
- No
- Test
- 2026-11-26 · Download · HTTP 200
Caveats
- gestionnaire is the grid operator, not the battery operator; 164 names are 'Confidentiel'.
- dateMiseEnService is grid-side commissioning, not commercial operation.
- EDF SEI rows carry no MWh; 14 rows have 1-2 kWh placeholders.
- Batteries in hybrid plants sit in PV/wind rows (typeStockage BATTE).
Example request
curl -sG 'https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/registre-national-installation-production-stockage-electricite-agrege/exports/csv' --data-urlencode 'where=codefiliere="STOCK"' --data-urlencode 'delimiter=;'
Example result
938 rows, e.g. SSLAIS01-STOCKAGE N0 01 DE SAINT-LAID;17W000002385265P;511050000;51105;Cernay-lès-Reims;…;12/01/2026;;12/01/2026;12/01/2026;SSLAI;225 kV;DIRECT;STOCK;Stockage non hydraulique;;;;;BATTE;Batterie;BATTE;240000.0;240000.0;;240000.0;;;1;En service;480000.0;;;;;10XFR-RTE------Q;RTE;…
cre-zni-storage-deliberationsCRE deliberations on centralised storage in non-interconnected zones (compensation decisions, guichets, contract amendments)
Commission de régulation de l'énergie (CRE) · Official · PDF deliberations · PDF · License: unknown
CRE deliberations (PDF) on contracted ZNI storage give operator, commune, MW, usable MWh and real commissioning date; they fill the Mayotte gap of the register.
- Landing url
- https://www.cre.fr/documents/deliberations.html
- Data url
- https://www.cre.fr/fileadmin/Documents/Deliberations/2025/250724_2025-203_CDS_Batterie_TE_Mayotte.pdf
- Coverage note
- Only storage contracted with ZNI system operators; tested on Mayotte (TotalEnergies Renewables ESS Mayotte, 4 MW/2 MWh, in service 24/01/2024).
- Date of data
- 2025-07-24
- Language
fr- Location precision
- Municipality
- Has coordinates
- No
- Test
- 2026-11-26 · Page only · HTTP 200
Caveats
- Documents, not a dataset: one PDF per decision.
- Guichet decisions list projects, not operating sites.
Example request
https://www.cre.fr/fileadmin/Documents/Deliberations/2025/250724_2025-203_CDS_Batterie_TE_Mayotte.pdf, pages 1-2, §1.2 'Objet du projet d’avenant au contrat d’achat'.
Example result
TotalEnergies Renewables ESS Mayotte; Koungou (Longoni); 4 MW; capacité utile 2 MWh; batteries lithium-ion; mise en service le 24 janvier 2024; contrat EDM 15 ans.
operator-publicationsBattery owners' and operators' press releases and site pages
Battery owners/operators (TagEnergy with Banque des Territoires, Harmony Energy, NW Groupe, others) · Official · PDF press releases and HTML pages · PDF · License: unknown
Owner/operator releases identify who runs large sites and when commercial operation began; tested for Cernay-lès-Reims, Cheviré, and ZNI sites in Corse (Corsica Sole, 10 MWh) and Martinique (Akuo); NW publishes only totals.
- Coverage note
- Ad hoc, large sites only; no list.
- Date of data
- 2026-10-01
- Language
fr, en- Location precision
- Municipality
- Has coordinates
- No
- Example access test
- 2026-11-26 · Page only · HTTP 200
- Members summary
- Listed: 5 · Tested: 5 · Data found: 4
Universe of battery operators unknown; the ATEE/CRE observatory identified 45 organisations for HTA/HTB storage in mainland France (31 responded). Tested: 2 mainland RTE sites, NW, and 2 of the 7 EDF SEI ZNI rows (Corse, Martinique).
Search '<commune> stockage batteries MW MWh mise en service' or the operator named in OSM; owner press releases and the Banque des Territoires 'réalisations' pages carry dates.See member links and checks in the detail (
operator-publications)
Caveats
- Commercial operation date ≠ register dateMiseEnService.
- Owners change (Cheviré sold to Alpiq).
edf-sei-ponant-parkParc de production et de stockage - Sein Ouessant Molene
EDF (Systèmes Énergétiques Insulaires) on the EDF open data portals (data-fair) · Official · data-fair API (JSON, CSV export) · API · License: Licence Ouverte / Open Licence version 2.0
EDF open data list of Sein/Ouessant/Molène plants: two EDF batteries (200 kW and 1 MW, 2017) with coordinates, absent from the national register.
- Landing url
- https://opendata-corse.edf.fr/
- Data url
- https://opendata-corse.edf.fr/data-fair/api/v1/datasets/fgg0oqqf65k32g7q3fu4l1q2/lines
- Coverage note
- Three Breton islands only; end-2018 snapshot; no MWh.
- Date of data
- 2018-12-31
- Language
fr- Location precision
- Exact
- Has coordinates
- Yes
- Test
- 2026-11-26 · API query · HTTP 200
Caveats
- The same EDF portals also host copies of the national register per ZNI (Corse, DOM, SPM); those copies add nothing for storage.
Example request
curl -sG 'https://opendata-corse.edf.fr/data-fair/api/v1/datasets/fgg0oqqf65k32g7q3fu4l1q2/lines' --data-urlencode 'size=20'
Example result
Ouessant | EDF | Centrale thermique de Ouessant | Stockage centralisé à base de batteries lithium-ion | 2017 | 1000 kW | 48.459791934476335, -5.099139511585236
osm-openinframapOpenStreetMap battery plants in France (Open Infrastructure Map statistics and OSM API)
OpenStreetMap contributors; statistics page by Open Infrastructure Map · Non-official · HTML table (Open Infrastructure Map); OSM API 0.6 JSON per object · API · License: ODbL (OpenStreetMap); Open Infrastructure Map analysis CC-BY
OSM (via Open Infrastructure Map) maps 23 battery plants with exact geometry; 17 name an operator, 12 give MWh, 18 carry the register EIC code for joining.
- Landing url
- https://openinframap.org/stats/area/France/plants
- Data url
- https://api.openstreetmap.org/api/0.6/way/1375030122.json
- Coverage note
- Large sites only; distributed 1 MW units are missing; includes some projects.
- Date of data
- 2026-11-26
- Language
fr, en- Location precision
- Exact
- Has coordinates
- Yes
- Test
- 2026-11-26 · API query · HTTP 200
- overpass-api.de answers 406 to the default curl client; two other Overpass instances did not answer within 110-180 s.
Caveats
- Not official; values sometimes differ from the register.
- Start dates often copied from the register.
Example request
curl -s 'https://api.openstreetmap.org/api/0.6/way/1223498422.json'
Example result
…"name":"Claudia","old_ref:EU:ENTSOE_EIC":"17W000001600745Y","operator":"Amarenco","plant:output:electricity":"105 MW","plant:source":"battery","plant:storage":"99.58 MWh","power":"plant","ref:EU:ENTSOE_EIC":"17W000001637626Q","source":"Registre national des installations de production d'électricité et de stockage 2025","start_date":"2023-04-10"…
Additional sources in the detail: 2. Read the full detail; locate each source by its source_id.
Document access
The register lacks the operator, ZNI energy and Mayotte; CRE deliberations on ZNI storage and owner press releases give these site by site, and OSM links large sites to register EIC codes.
Research provenance
- Pass count
- 1
- Minutes estimate
- 32
- Pages opened
- 44
| Pass | Date |
|---|---|
| 1 | 2026-11-26 |