us / biomethane-plants-in-permitting

United States biomethane plants in permitting data sources

Where can I get a list of biogas and biomethane projects currently in permitting in the United States, with location, capacity, developer, permitting stage and date?

Research reviewed
2026-11-24
Sources tested
2026-11-24
Access checked
2026-11-24
Published
2026-11-24
Sources
5 on this page · 0 in the detail

Answer

Official data
Partial coverage
Non official data
None found in the documented search
Confidence
Medium

No national list of biogas/RNG projects in permitting was found. Stage and date are documented only in local records: CEQAnet (California) follows projects through dated filings, e.g. Orland Power Solutions, Manteca (MND 2026-06-02, county approval 2026-07-16, air district 2026-09-09) and Couco Creek, Turlock (approval 2025-08-21). EPA LMOP (102 landfill RNG projects) and AgSTAR (73 farm digesters) give construction status without permit dates; CDFA lists California grants. Capacity is not published.

Confidence reason: Two projects were followed to dated approval documents and counts come from downloaded files; coverage outside California and Wisconsin, and permit texts with capacity, were not checked.

Local search terms

  • CEQAnet / Notice of Determination (NOD) — California portal and the notice filed after a project is approved; open the SCH number's documents 1, 2, 3.
  • Conditional Use Permit (CUP) / Use Permit Application — County zoning permit for a digester or injection site; appears as the CEQAnet title.
  • Authority to Construct (ATC) project number — Air-district permit key such as N-1261215 in San Joaquin Valley APCD records.
  • Mitigated Negative Declaration (MND) — CEQA document type posted for state review before county approval.
  • LMOP under-construction or planned projects — EPA file of landfill-gas projects not yet operating.
  • DDRDP — CDFA Dairy Digester Research and Development Program; project-level grant list.
  • WARP permit tracking / construction permit (MIN, BAP) — Wisconsin DNR air permit pages with numbers such as 24-MIN-280.
  • Biogas pipeline injection site — Facility that off-loads trucked biogas into a utility pipeline, as at Couco Creek.

Requested attributes

AttributeCoverageSourcesScope and limitations
Project location locationPartially coveredceqanet epa-lmop-planned epa-agstar-construction cdfa-ddrdpCEQAnet gives address, parcel and some coordinates (California); LMOP gives landfill coordinates via a join; AgSTAR and CDFA give city and county.

Not checked: County and state permit records outside California and Wisconsin, and Oregon, were not checked.

Capacity capacityPartially coveredepa-lmop-planned epa-agstar-constructionNo project RNG capacity found. LMOP gives landfill-gas input (19 of 102 rows); AgSTAR raw biogas cu ft/day (16 of 73); CEQA records give truck trips and buildings only.

Not checked: Full mitigated negative declarations, air-district evaluations and Wisconsin permit documents, which may state capacity, were not read.

Developer developerPartially coveredceqanet epa-lmop-planned epa-agstar-construction cdfa-ddrdpCEQAnet names the applicant (Orland Power Solutions, Couco Creek Dairy Biogas); LMOP developer on 79 of 102 RNG rows; AgSTAR and CDFA name developer companies.

Not checked: Projects outside California and landfills in other states' permit portals were not matched to developers.

Permitting stage permitting_stagePartially coveredceqanet wi-dnr-warpCEQAnet document types give stage (consultation, negative declaration, approval); Wisconsin WARP gives permit milestones. LMOP, AgSTAR, CDFA: construction or funding status only.

Not checked: No national stage field exists; only two California projects and one Wisconsin facility were followed to stage documents.

Stage date stage_datePartially coveredceqanet wi-dnr-warpCEQAnet Received and Approved On dates and WARP milestone dates; LMOP anticipated start and CDFA grant dates are not stage dates.

Not checked: Dates exist only for records opened; there is no national list of stage dates.

Main caveats

  • Approval is not construction: CEQA notices of determination show decisions (Manteca 2026-07-16 and 2026-09-09); no start-of-construction or operation document was found.
  • LMOP (September 2024) and AgSTAR (June 2024) status fields are stale: 8 planned LMOP rows and 49 of 73 AgSTAR construction rows have expected years already past.
  • LMOP 'Planned', AgSTAR 'Construction' and CDFA funding data are not permitting stages; their dates are anticipated starts or grant dates.
  • No project capacity is published in the records opened; LMOP and AgSTAR give landfill-gas or raw-biogas volumes, not RNG output.
  • Wisconsin WARP documents are behind page postbacks and were not read; Oregon and county portals outside California were not checked.

Sources

ceqanetCEQAnet: California CEQA database of project records and filed documents

California Governor's Office of Land Use and Climate Innovation (LCI), State Clearinghouse · Official · HTML record pages, per-document CSV export and PDF attachments · Direct download · License: Unknown

Dated CEQA documents with applicant and site: for example Orland Power Solutions (Manteca) MND 2026-06-02, county approval 2026-07-16, air-district approval 2026-09-09.

Landing url
https://ceqanet.lci.ca.gov/
Data url
https://ceqanet.lci.ca.gov/Search?Sch=2026060079&DocumentId=3&OutputFormat=CSV
Coverage note
California only; approval stages, no capacity; keyword search not scriptable.
Date of data
2026-11-23
Language
en
Location precision
Address
Has coordinates
Yes
Test
2026-11-24 · Download · HTTP 200
  • Free-text search is a Google Custom Search widget; the /Search 'q' parameter returned unrelated documents (18,765 for 2026).

Caveats

  • Notice of determination = approved, not built.
  • No capacity field.

Example request

curl -sL https://ceqanet.lci.ca.gov/2026060079/1 (and /2, /3) ; per-document CSV: curl -sL -o doc3.csv 'https://ceqanet.lci.ca.gov/Search?Sch=2026060079&DocumentId=3&OutputFormat=CSV' ; attachment link pattern /2026060079/3/Attachment/<id> is on each record page.

Example result

SCH 2026060079, Lead Agency San Joaquin County: document 1 MND received 6/2/2026; document 2 NOD received 7/22/2026, approved 7/16/2026 by the County Planning Commission; document 3 NOD received 9/11/2026, approved 9/9/2026 by the San Joaquin Valley APCD; applicant Orland Power Solutions, LLC; 8350 E Brady Road, Manteca; APN 257-220-04, -05; 37°43'44"N 121°11'52"W.

epa-lmop-plannedLMOP under-construction or planned landfill gas energy projects (September 2024)

U.S. EPA, Landfill Methane Outreach Program (LMOP) · Official · XLSX (sheets Summary, LMOP Database, Field Descriptions) · Direct download · License: Unknown

102 landfill RNG projects not yet operating (26 under construction, 76 planned) with developer, delivery method and anticipated start; September 2024.

Landing url
https://www.epa.gov/lmop/landfill-gas-energy-project-data
Data url
https://www.epa.gov/system/files/documents/2024-09/underconsplannedlmopdata.xlsx
Coverage note
Landfills only; LMOP status, not permit stage; coordinates via landfill file join.
Date of data
2024-09
Language
en
Location precision
Municipality
Has coordinates
No
Test
2026-11-24 · Download · HTTP 200

Caveats

  • Planned is not a permitting stage; 8 planned rows have start dates already past in 2024.
  • No RNG capacity.

Complete procedure available in the full detail

epa-agstar-constructionAgSTAR Livestock Anaerobic Digester Database: rows with Status = Construction

U.S. EPA, AgSTAR · Official · XLSX (sheet 'Operational and Construction') · Direct download · License: Unknown

73 livestock digesters listed under construction (35 with pipeline gas), with developer and expected year; labelled June 2024.

Landing url
https://www.epa.gov/agstar/livestock-anaerobic-digester-database
Data url
https://www.epa.gov/sites/default/files/2020-10/agstar-livestock-ad-database.xlsx
Coverage note
Farm digesters only; expected years often already past; no permit stage.
Date of data
2024-06
Language
en
Location precision
Municipality
Has coordinates
No
Test
2026-11-24 · Download · HTTP 200

Caveats

  • 49 of 73 expected years are 2024 or earlier.
  • No permit information.

Complete procedure available in the full detail

cdfa-ddrdpDDRDP Project-Level Data of Executed and Funded Grant Projects (updated 2026-10-15)

California Department of Food and Agriculture (CDFA), Dairy Digester Research and Development Program · Official · PDF table (text extractable with pdftotext -layout) · PDF · License: Unknown

142 funded California dairy-digester grants (16 below 100% disbursed, 13 of them RNG) with developer, city, county and grant dates; updated 2026-10-15.

Landing url
https://www.cdfa.ca.gov/oars/ddrdp/
Data url
https://www.cdfa.ca.gov/oefi/DDRDP/docs/DDRDP_Project_Level_Data.pdf
Coverage note
California grants only; funding stage, not permitting.
Date of data
2026-10-15
Language
en
Location precision
Municipality
Has coordinates
No
Test
2026-11-24 · Download · HTTP 200

Caveats

  • Grant dates are not permit dates.
  • Cancelled projects are mixed in the table.

Complete procedure available in the full detail

wi-dnr-warpWisconsin DNR Air Management Permit Tracking (WARP) facility pages

Wisconsin Department of Natural Resources, Air Management Program · Official · HTML pages (ASP.NET) with permit tables and PDF documents behind page postbacks · Web viewer only · License: Unknown

Wisconsin DNR air-permit milestones per facility (application, public notice, decision), e.g. Chevron C-Dairy RNG LLC, Mondovi: construction permit 24-MIN-280 decided 2025-08-19.

Landing url
https://apps.dnr.wi.gov/warp_ext/am_permittracking2.aspx?id=32501
Coverage note
Wisconsin air permits only; three facility pages opened; documents not read.
Date of data
2025-08-19
Language
en
Location precision
Address
Has coordinates
No
Test
2026-11-24 · Page only · HTTP 200
  • Permit documents are served through ASP.NET postbacks; a scripted postback for a document returned HTML again.

Caveats

  • Facility must be found first; documents sit behind postbacks.
  • Permit scope (new project vs expansion) not verified.

Complete procedure available in the full detail

Additional sources in the detail: 0. Read the full detail; locate each source by its source_id.

Document access

Stage, date, applicant and site are in permit documents, not in a list: county use permits and CEQA filings, air-district notices and state air permits.

Research provenance

Pass count
1
Minutes estimate
Not stated
Pages opened
20
PassDate
12026-11-24

Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed.

Record metadata: Schema version: 1.0 · Country: us · Country name: United States · Topic: biomethane-plants-in-permitting · Territory: us · Territory level: Country · Parent url: No parent territory · Html url: https://georutter.org/us/biomethane-plants-in-permitting/