us / gas-injection-capacity

United States gas injection capacity data sources

Where can I get the capacity of the gas grid to receive biomethane injection in the United States, by zone or connection point?

Research reviewed
2026-11-27
Sources tested
2026-11-27
Access checked
2026-11-27
Published
2026-11-27
Sources
2 on this page · 1 in the detail

Answer

Official data
Partial coverage
Non official data
Partial coverage
Confidence
Medium

No US source publishing grid hosting capacity for new biomethane injection by zone or point was found (federal, CPUC and 5 utilities checked). The closest official data are interstate pipeline informational postings (FERC 18 CFR 284.13): daily design, operating and operationally available capacity in MMBtu for existing RNG/biogas receipt points, e.g. Northern Natural Gas (15 points) and Florida Gas Transmission (5). Gas utilities (PG&E, SoCalGas, Con Edison, NW Natural) give takeaway capacity only in per-project screening or feasibility studies (non-binding under the California tariff); seasonal limits are noted but not published.

Confidence reason: Absence of published LDC capacity checked on 5 utilities in 4 states and in the CPUC tariff; interstate data tested on 2 pipelines with queries; SoCalGas/National Grid sites blocked and 176 pipelines unsampled.

Local search terms

  • operationally available capacity (OAC) — Posted capacity still schedulable at a pipeline point for a gas day and cycle; the field to read at RNG receipt points.
  • informational postings — Public section of an interstate pipeline website where FERC-required capacity and location data are posted.
  • receipt point — Point where gas, including RNG, enters a pipeline (Flow Ind R).
  • takeaway capacity — Utility network capability to move gas away from an interconnection point; reported per project in screening studies.
  • Interconnection Screening Study — First, non-binding utility study for a proposed RNG interconnection under California tariffs.
  • Standard Renewable Gas Interconnection Tariff — CPUC-adopted tariff (D.20-08-035): SoCalGas/SDG&E Rule 45, PG&E Gas Rule 29.
  • design capacity — Nameplate daily capacity of a pipeline point, posted with OAC.
  • MMBtu — Million British thermal units; unit of interstate capacity postings, per gas day.

Requested attributes

AttributeCoverageSourcesScope and limitations
Biomethane injection capacity injection_capacityPartially coveredinterstate-oac-postings ldc-interconnection-studiesPublished only for existing interstate RNG receipt points: design/operating/available capacity, MMBtu per gas day (NNG, FGT). LDC capacity only in per-project studies.

Not published: No hosting-capacity map or table for new injection found: PG&E, SoCalGas (via CARB/AQMD copies), Con Edison, NW Natural pages, CPUC D.20-08-035 and PG&E Gas Rule 29 opened.

Zone or connection point zone_or_connection_pointPartially coveredinterstate-oac-postingsPer receipt point (Loc number, name, pipeline zone) with county/state from the Locations list; no coordinates. No zone-level LDC data.

Not published: No utility publishes capacity by distribution zone or candidate point; checked PG&E, SoCalGas, Con Edison, National Grid (blocked), NW Natural.

Latest available data latest_dataPartially coveredinterstate-oac-postingsLatest: gas day 2026-11-27, Timely cycle posted 2026-11-26 16:48 (NNG); FGT posted 11/26/2026 8:45PM for the Evening cycle.

Not published: LDC study results carry their own dates but are not released; CPUC annual biomethane reports (2026-04-30) give injected therms, not capacity.

Historical coverage historical_seriesPartially coveredinterstate-oac-postingsDaily history by gasDay query: NNG back to at least 2020-11-27, FGT to at least 2024-11-27; NNG screen grid lists 90 days. Point lists grow over time.

Not checked: Earliest gas day served by each pipeline's API/CSV not determined; other 176 pipelines not checked.

Update frequency update_frequencyPartially coveredinterstate-oac-postingsDaily by nomination cycle (NNG 7 cycles, FGT Timely/Evening); FERC-551: postings at least daily.

Not published: LDC capacity is not published, so there is no schedule; studies are on request (15 business days in California).

Main caveats

  • Interstate OAC describes existing receipt points only; it is not available capacity for a new plant and must not be read as hosting capacity.
  • The distribution utilities checked provide takeaway capacity through project-specific studies.
  • The public sources checked lack firm and seasonal capacity figures for new connections. Existing point postings vary by gas day and nomination cycle.
  • Do not infer capacity from plant output (EPA LMOP flows, CPUC injected therms) or from pipeline maps (NPMS, utility maps).
  • Seven interstate pipeline postings were checked. Two yielded capacity figures for existing biomethane receipt points.

Sources

interstate-oac-postingsInterstate pipeline informational postings: operationally available capacity and location lists per receipt point

FERC-regulated interstate natural gas pipelines, each on its own informational postings site · Official · JSON and CSV (Northern Natural Gas API); CSV/Excel/ODS/PDF/XML downloads (Energy Transfer ipost) · API · License: unknown

Daily point-level design, operating, scheduled and available capacity (MMBtu) for existing biogas/RNG receipt points on interstate pipelines.

Coverage note
Only interstate pipelines and only points already built; NNG (15 biogas receipt points, Midwest) and FGT (5 RNG receipt points, Florida) confirmed; other pipelines sampled.
Date of data
2026-11-27
Language
en
Location precision
Municipality
Has coordinates
No
Example access test
2026-11-27 · API query · HTTP 200
  • Williams 1Line (Transco) and Enbridge infopost (Texas Eastern) return 403 to automated clients.
  • Kinder Morgan and TC Energy postings load data through ASP.NET postbacks or a JavaScript application; no plain URL to the point table was found.
Members summary
Total: 178 · Listed: 7 · Tested: 7 · Data found: 2

FERC estimated 178 interstate pipelines under FERC-551. Seven operators' postings were opened and biomethane receipt-point capacity was confirmed in two (NNG and FGT).

Informational Postings > Capacity > Operationally Available, filtered by location type (NNG 'BIO', FGT 'RNG') or by names containing RNG, BIOGAS or DAIRY; county/state in Informational Postings > Locations.

See member links and checks in the detail (interstate-oac-postings)

Caveats

  • Capacity of an existing RNG meter point, not hosting capacity for new plants.
  • OAC is an estimate per gas day and cycle; delivery (D) rows at the same site are not injection.

Example request

curl -s -X POST -H 'Content-Type: application/json' --data '{"gasDay":"2026-11-27","cycle":10,"searchType":"Location names containing the following string","searchString":"BIOGAS","locationType":"All location types","locationZone":"","pagination":{"pageNumber":1,"pageSize":500},"download":false}' "https://www.northernnaturalgas.com/wp-json/api/capacity/oac/report"

Example result

postDateTime 2026-11-26T16:48:03, gasDateTime 2026-11-27T09:00, totalCount 24; {location:79509, locationZone:'MID 17', locationName:'BRIGHTMARK ATHENA BALTIC BIOGAS REC', flowInd:'R', designCapacity:2832, operatingCapacity:2832, scheduledQuantity:500, availableCapacity:2332, interruptInd:'N'}

ldc-interconnection-studiesGas utility (LDC) renewable gas interconnection screening and feasibility studies

Local gas distribution utilities under state commission tariffs (sample: PG&E, SoCalGas, Con Edison, National Grid, NW Natural) · Official · Study report delivered to the applicant (PDF); procedures as web pages and tariff PDFs · Request form · License: unknown

On distribution and utility networks, capacity at a proposed location is given only in a per-project screening/feasibility study requested by the developer.

Coverage note
PG&E and SoCalGas follow the CPUC standard tariff (free screening, 15 business days); Con Edison, National Grid and NW Natural run similar request-based reviews.
Date of data
Not stated
Language
en
Location precision
Not stated
Has coordinates
Not stated
Example access test
2026-11-27 · Page only · HTTP 200
  • socalgas.com and nationalgrid.com reject automated clients (403 challenge page).
  • Study reports are delivered to applicants only; no public copy found.
Members summary
Listed: 5 · Tested: 5 · Data found: 0

Gas distribution utilities number in the hundreds; 5 utilities serving CA, NY, MA, OR and WA opened, chosen for RNG activity and the brief's PG&E/SoCalGas comparison. None publishes injection capacity by zone or point.

See member links and checks in the detail (ldc-interconnection-studies)

Caveats

  • Study results are non-binding, project-specific and not public.
  • Summer low-demand hours limit distribution takeaway (SoCalGas).

Complete procedure available in the full detail

Additional sources in the detail: 1. Read the full detail; locate each source by its source_id.

Document access

Utility-network capacity is not published; public documents (CPUC biomethane reports, project cost cases) describe injected volumes or receipt-capacity upgrades without capacity values. The tested recipe compiles existing interstate RNG receipt-point capacity from postings.

Research provenance

Pass count
1
Minutes estimate
23
Pages opened
58
PassDate
12026-11-27

Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed.

Record metadata: Schema version: 1.0 · Country: us · Country name: United States · Topic: gas-injection-capacity · Territory: us · Territory level: Country · Parent url: No parent territory · Html url: https://georutter.org/us/gas-injection-capacity/