us / gas-injection-capacityUnited States gas injection capacity data sources
Where can I get the capacity of the gas grid to receive biomethane injection in the United States, by zone or connection point?
- Research reviewed
- 2026-11-27
- Sources tested
- 2026-11-27
- Access checked
- 2026-11-27
- Published
- 2026-11-27
- Sources
- 2 on this page · 1 in the detail
Answer
- Official data
- Partial coverage
- Non official data
- Partial coverage
- Confidence
- Medium
No US source publishing grid hosting capacity for new biomethane injection by zone or point was found (federal, CPUC and 5 utilities checked). The closest official data are interstate pipeline informational postings (FERC 18 CFR 284.13): daily design, operating and operationally available capacity in MMBtu for existing RNG/biogas receipt points, e.g. Northern Natural Gas (15 points) and Florida Gas Transmission (5). Gas utilities (PG&E, SoCalGas, Con Edison, NW Natural) give takeaway capacity only in per-project screening or feasibility studies (non-binding under the California tariff); seasonal limits are noted but not published.
Local search terms
- operationally available capacity (OAC) — Posted capacity still schedulable at a pipeline point for a gas day and cycle; the field to read at RNG receipt points.
- informational postings — Public section of an interstate pipeline website where FERC-required capacity and location data are posted.
- receipt point — Point where gas, including RNG, enters a pipeline (Flow Ind R).
- takeaway capacity — Utility network capability to move gas away from an interconnection point; reported per project in screening studies.
- Interconnection Screening Study — First, non-binding utility study for a proposed RNG interconnection under California tariffs.
- Standard Renewable Gas Interconnection Tariff — CPUC-adopted tariff (D.20-08-035): SoCalGas/SDG&E Rule 45, PG&E Gas Rule 29.
- design capacity — Nameplate daily capacity of a pipeline point, posted with OAC.
- MMBtu — Million British thermal units; unit of interstate capacity postings, per gas day.
Requested attributes
| Attribute | Coverage | Sources | Scope and limitations |
|---|---|---|---|
Biomethane injection capacity injection_capacity | Partially covered | interstate-oac-postings ldc-interconnection-studies | Published only for existing interstate RNG receipt points: design/operating/available capacity, MMBtu per gas day (NNG, FGT). LDC capacity only in per-project studies. Not published: No hosting-capacity map or table for new injection found: PG&E, SoCalGas (via CARB/AQMD copies), Con Edison, NW Natural pages, CPUC D.20-08-035 and PG&E Gas Rule 29 opened. |
Zone or connection point zone_or_connection_point | Partially covered | interstate-oac-postings | Per receipt point (Loc number, name, pipeline zone) with county/state from the Locations list; no coordinates. No zone-level LDC data. Not published: No utility publishes capacity by distribution zone or candidate point; checked PG&E, SoCalGas, Con Edison, National Grid (blocked), NW Natural. |
Latest available data latest_data | Partially covered | interstate-oac-postings | Latest: gas day 2026-11-27, Timely cycle posted 2026-11-26 16:48 (NNG); FGT posted 11/26/2026 8:45PM for the Evening cycle. Not published: LDC study results carry their own dates but are not released; CPUC annual biomethane reports (2026-04-30) give injected therms, not capacity. |
Historical coverage historical_series | Partially covered | interstate-oac-postings | Daily history by gasDay query: NNG back to at least 2020-11-27, FGT to at least 2024-11-27; NNG screen grid lists 90 days. Point lists grow over time. Not checked: Earliest gas day served by each pipeline's API/CSV not determined; other 176 pipelines not checked. |
Update frequency update_frequency | Partially covered | interstate-oac-postings | Daily by nomination cycle (NNG 7 cycles, FGT Timely/Evening); FERC-551: postings at least daily. Not published: LDC capacity is not published, so there is no schedule; studies are on request (15 business days in California). |
Main caveats
- Interstate OAC describes existing receipt points only; it is not available capacity for a new plant and must not be read as hosting capacity.
- The distribution utilities checked provide takeaway capacity through project-specific studies.
- The public sources checked lack firm and seasonal capacity figures for new connections. Existing point postings vary by gas day and nomination cycle.
- Do not infer capacity from plant output (EPA LMOP flows, CPUC injected therms) or from pipeline maps (NPMS, utility maps).
- Seven interstate pipeline postings were checked. Two yielded capacity figures for existing biomethane receipt points.
Sources
interstate-oac-postingsInterstate pipeline informational postings: operationally available capacity and location lists per receipt point
FERC-regulated interstate natural gas pipelines, each on its own informational postings site · Official · JSON and CSV (Northern Natural Gas API); CSV/Excel/ODS/PDF/XML downloads (Energy Transfer ipost) · API · License: unknown
Daily point-level design, operating, scheduled and available capacity (MMBtu) for existing biogas/RNG receipt points on interstate pipelines.
- Coverage note
- Only interstate pipelines and only points already built; NNG (15 biogas receipt points, Midwest) and FGT (5 RNG receipt points, Florida) confirmed; other pipelines sampled.
- Date of data
- 2026-11-27
- Language
en- Location precision
- Municipality
- Has coordinates
- No
- Example access test
- 2026-11-27 · API query · HTTP 200
- Williams 1Line (Transco) and Enbridge infopost (Texas Eastern) return 403 to automated clients.
- Kinder Morgan and TC Energy postings load data through ASP.NET postbacks or a JavaScript application; no plain URL to the point table was found.
- Members summary
- Total: 178 · Listed: 7 · Tested: 7 · Data found: 2
FERC estimated 178 interstate pipelines under FERC-551. Seven operators' postings were opened and biomethane receipt-point capacity was confirmed in two (NNG and FGT).
Informational Postings > Capacity > Operationally Available, filtered by location type (NNG 'BIO', FGT 'RNG') or by names containing RNG, BIOGAS or DAIRY; county/state in Informational Postings > Locations.See member links and checks in the detail (
interstate-oac-postings)
Caveats
- Capacity of an existing RNG meter point, not hosting capacity for new plants.
- OAC is an estimate per gas day and cycle; delivery (D) rows at the same site are not injection.
Example request
curl -s -X POST -H 'Content-Type: application/json' --data '{"gasDay":"2026-11-27","cycle":10,"searchType":"Location names containing the following string","searchString":"BIOGAS","locationType":"All location types","locationZone":"","pagination":{"pageNumber":1,"pageSize":500},"download":false}' "https://www.northernnaturalgas.com/wp-json/api/capacity/oac/report"Example result
postDateTime 2026-11-26T16:48:03, gasDateTime 2026-11-27T09:00, totalCount 24; {location:79509, locationZone:'MID 17', locationName:'BRIGHTMARK ATHENA BALTIC BIOGAS REC', flowInd:'R', designCapacity:2832, operatingCapacity:2832, scheduledQuantity:500, availableCapacity:2332, interruptInd:'N'}ldc-interconnection-studiesGas utility (LDC) renewable gas interconnection screening and feasibility studies
Local gas distribution utilities under state commission tariffs (sample: PG&E, SoCalGas, Con Edison, National Grid, NW Natural) · Official · Study report delivered to the applicant (PDF); procedures as web pages and tariff PDFs · Request form · License: unknown
On distribution and utility networks, capacity at a proposed location is given only in a per-project screening/feasibility study requested by the developer.
- Coverage note
- PG&E and SoCalGas follow the CPUC standard tariff (free screening, 15 business days); Con Edison, National Grid and NW Natural run similar request-based reviews.
- Date of data
- Language
en- Location precision
- Has coordinates
- Example access test
- 2026-11-27 · Page only · HTTP 200
- socalgas.com and nationalgrid.com reject automated clients (403 challenge page).
- Study reports are delivered to applicants only; no public copy found.
- Members summary
- Listed: 5 · Tested: 5 · Data found: 0
Gas distribution utilities number in the hundreds; 5 utilities serving CA, NY, MA, OR and WA opened, chosen for RNG activity and the brief's PG&E/SoCalGas comparison. None publishes injection capacity by zone or point.
See member links and checks in the detail (
ldc-interconnection-studies)
Caveats
- Study results are non-binding, project-specific and not public.
- Summer low-demand hours limit distribution takeaway (SoCalGas).
Additional sources in the detail: 1. Read the full detail; locate each source by its source_id.
Document access
Utility-network capacity is not published; public documents (CPUC biomethane reports, project cost cases) describe injected volumes or receipt-capacity upgrades without capacity values. The tested recipe compiles existing interstate RNG receipt-point capacity from postings.
Research provenance
- Pass count
- 1
- Minutes estimate
- 23
- Pages opened
- 58
| Pass | Date |
|---|---|