us / hydrogen-plantsUnited States hydrogen plants data sources
Where can I get a list of hydrogen production plants (electrolysers) in operation in the United States, with location, capacity (MW), operator and commissioning date?
- Research reviewed
- 2026-11-24
- Sources tested
- 2026-11-24
- Access checked
- 2026-11-24
- Published
- 2026-11-24
- Sources
- 4 on this page · 0 in the detail
Answer
- Official data
- Partial coverage
- Non official data
- Not checked
- Confidence
- Medium
Best source is DOE Hydrogen Program Record 24001 (May 2024): 113 existing and planned US electrolyzer rows, 70 installed rows totalling about 116 MW (largest Woodbine GA, 40 MW), with city, kW and status only. It names no operator and gives no commissioning date; those came from company documents for two sites (Plug Power Woodbine, FPL Okeechobee). IEA's June 2026 project database needs an account and was not opened. Newer plants are missing from DOE's edition.
Local search terms
- Electrolyzer Installations in the United States (DOE Hydrogen Program Record) — DOE record series 20009, 22001, 23003, 24001; Table 1 is the site list.
- Hydrogen Production and Infrastructure Projects Database (IEA) — IEA global project file; download needs a free IEA account.
- Installed/Operational vs Installed/Commissioning — Status values in DOE Table 1; plain 'Installed' has no qualifier.
- Hydrogen Projects in the US (Clean Energy Group) — Tableau map of production projects by status and hydrogen colour.
- PEM / alkaline / SOEC electrolyzer — Electrolyzer technologies named in DOE Table 1; most capacity is PEM.
- Green hydrogen / electrolytic hydrogen — Terms used by operators such as Plug Power and FPL for electrolyzer output.
- Kilowatts (kW) vs tons per day — DOE lists kW; operators quote MW or tons per day; do not convert one into the other.
- NextGen Hydrogen Hub (FPL Cavendish) — Name of FPL's Okeechobee electrolyzer pilot.
Requested attributes
| Attribute | Coverage | Sources | Scope and limitations |
|---|---|---|---|
Plant location location | Partially covered | doe-record-24001 operator-site-documents | DOE Table 1 gives city and state per installation (28 of 70 installed rows state only); no coordinates. Operator releases name the site for two plants. Not checked: Coordinates and street addresses were not found; IEA's file (location fields unknown) needs an account. |
Capacity capacity_mw | Partially covered | doe-record-24001 operator-site-documents | DOE gives kW per row (70 installed rows, 115,980 kW; basis not stated); releases give 8 x 5 MW (Plug) and 25 MW (FPL). Tons per day is a separate measure. Not checked: The electrical or output basis of DOE's kW is not stated and was not verified against operator documents beyond two sites. |
Operator operator | Partially covered | operator-site-documents | DOE Table 1 omits operators by design; only two per-site documents (Plug Power, Florida Power & Light) name one. No list with operators was found. Not checked: Operators for the other 11 installed sites of 1 MW or more and for the small units were not checked; IEA's database may list developers but needs an account. |
Commissioning date commissioning_date | Partially covered | operator-site-documents doe-record-24001 | DOE labels status (Installed/Operational, Installed/Commissioning) without dates. Releases give Jan 2024 (Plug) and Oct 2023 first hydrogen / Feb 2024 completion (FPL). Not checked: Dates for all other installations were not found; no source states the date of continuous operation. |
Main caveats
- DOE Record 24001 is dated May 2024 and is still the newest electrolyzer-installations record on DOE's program page; later plants and status changes are missing.
- Table 1 gives kW per installation row without stating the electrical or output basis; hydrogen output (for example 15 tons per day at Woodbine) is a different measure.
- No operator or commissioning date in the DOE table; 'Installed' rows include 46 units of 120-180 kW and 4 'Commissioning' rows, so installed is not proof of operation.
- Woodbine GA appears three times (40 MW and 5 MW operational, 40 MW planned); rows are installations, not unique plants.
- IEA's June 2026 database and Clean Energy Group's April 2025 map were not inspected beyond their pages; Plug Power's own release page blocks automated clients.
Sources
doe-record-24001DOE Hydrogen Program Record 24001, Electrolyzer Installations in the United States (Table 1)
U.S. Department of Energy, Hydrogen Program (HFTO) · Official · PDF (Table 1 extractable with pdftotext -layout; map as figure) · PDF · License: Unknown
Table of 113 existing and planned US electrolyzer rows (May 2024): 70 installed rows with 115,980 kW, 13 of them 1 MW or more (largest Woodbine GA 40 MW); location, kW and status only.
- Landing url
- https://www.hydrogen.energy.gov/library/program-records
- Data url
- https://www.hydrogen.energy.gov/docs/hydrogenprogramlibraries/pdfs/24001-electrolyzer-installations-united-states.pdf
- Coverage note
- No operator or commissioning date; city sometimes missing; 18 months old; sites repeat across rows.
- Date of data
- 2024-05
- Language
en- Location precision
- Municipality
- Has coordinates
- No
- Test
- 2026-11-24 · Download · HTTP 200
Caveats
- No operator and no commissioning date.
- Installed is not proof of operation; edition is May 2024.
Example request
curl -sL -o rec24001.pdf https://www.hydrogen.energy.gov/docs/hydrogenprogramlibraries/pdfs/24001-electrolyzer-installations-united-states.pdf ; pdftotext -layout rec24001.pdf rec24001.txt ; keep lines of Table 1 matching '<location> <kW> <status>' (three columns separated by two or more spaces).
Example result
113 rows, 4,523,985 kW in total. Installed: 70 rows, 115,980 kW. Example rows: 'Woodbine, GA 40,000 Installed/Operational'; 'Okeechobee, FL 25,000 Installed/Commissioning'; 'Donaldsonville, LA 20,000 Installed/Commissioning'.
iea-hydrogen-projectsIEA Hydrogen Production and Infrastructure Projects Database (hydrogen production projects file)
International Energy Agency (IEA) · Non-official · XLSX per its page (also .Stat Data Explorer) · Registration required · License: CC BY 4.0
IEA's worldwide hydrogen production projects file (XLSX, June 2026, CC BY 4.0, free with an IEA account); contents and US rows not inspected.
- Landing url
- https://www.iea.org/data-and-statistics/data-product/hydrogen-production-and-infrastructure-projects-database
- Coverage note
- Registration required; fields and status wording unverified.
- Date of data
- 2026-06-18
- Language
en- Location precision
- Has coordinates
- Test
- 2026-11-24 · Page only · HTTP 200
- Download requires an IEA account: 'You are either not logged in or your login session has expired, please login again or create an IEA account to download data.'
Caveats
- Not tested: nothing about fields is verified.
- Global file; filter to the US yourself.
operator-site-documentsOperator and utility documents for individual electrolyzer sites (press releases and supplier announcements)
Plug Power Inc.; Florida Power & Light Company (NextEra Energy); Cummins Inc. · Official · HTML press releases and one PDF fact sheet · Web viewer only · License: Unknown
Operator documents: Plug Power Woodbine GA (eight 5 MW PEM units, operations announced Jan 2024) and FPL Okeechobee FL (25 MW, first hydrogen Oct 2023, completion announced 2024-02-08).
- Coverage note
- Two of 13 installed sites of 1 MW or more checked; company claims; MW and tons per day kept apart.
- Date of data
- 2024-02-08
- Language
en- Location precision
- Municipality
- Has coordinates
- No
- Example access test
- 2026-11-24 · Page only · HTTP 200
- Plug Power investor-relations page returns 403 with a Cloudflare challenge ('Just a moment...') to automated clients.
- Members summary
- Total: 13 · Listed: 2 · Tested: 2 · Data found: 2
Universe: the 13 installed rows of 1 MW or more in DOE Record 24001 (May 2024). Two sites were opened (Woodbine GA, Okeechobee FL); Donaldsonville LA (20 MW) and the California, Colorado, New York, Washington and Illinois sites were not.
Search '<operator> <city> electrolyzer commissioning' on the operator newsroom; utilities and gas suppliers announce start-ups.See member links and checks in the detail (
operator-site-documents)
Caveats
- Plug's own page blocked (403); text via a reprint.
- Milestone wording differs across releases.
cleg-hydrogen-projects-mapClean Energy Group, Hydrogen Projects in the US mapping tool (Tableau Public)
Clean Energy Group (non-profit) · Non-official · Tableau Public embedded dashboard · Web viewer only · License: Unknown
Clean Energy Group's map of US hydrogen production projects of every type by status and colour (updated April 2025); the data could not be extracted.
- Landing url
- https://www.cleanegroup.org/initiatives/alternative-fuels/projects-in-the-us/
- Coverage note
- All production routes; viewer only; not tested.
- Date of data
- 2025-04
- Language
en- Location precision
- Has coordinates
- Test
- 2026-11-24 · Page only · HTTP 200
- A Tableau Public CSV request for the workbook (USHydrogenProjects) returned 404 with an AWS WAF captcha script; the dashboard data was not retrieved.
Caveats
- Not tested beyond the page text.
- Mixes electrolysis with fossil routes.
Additional sources in the detail: 0. Read the full detail; locate each source by its source_id.
Document access
Operator, start milestone and exact MW are not in DOE's table; they sit in operator and supplier press releases for each site.