us / network-tariffs

United States network tariffs data sources

Where can I get the current electricity network access tariffs and charges in the United States, by voltage level and period, with their history?

Research reviewed
2026-11-26
Sources tested
2026-11-26
Access checked
2026-11-26
Published
2026-11-26
Sources
4 on this page · 0 in the detail

Answer

Official data
Partial coverage
Non official data
Partial coverage
Confidence
Medium

There is no single national table. Transmission access rates are FERC-filed tariffs (eTariff, XML export, versions since 2010) and RTOs post computed rates: PJM zonal NITS in $/MW-year (XLSX), CAISO high/low-voltage access charges in $/MWh (PDF). Distribution charges are in each utility's state-approved tariff, e.g. Oncor (TX) by secondary/primary/transmission service and PG&E (CA) with distribution and transmission components by voltage and TOU period. OpenEI URDB compiles rates nationally but is mostly bundled retail rates.

Confidence reason: Sources tested with downloads, but distribution tariffs and RTO postings were sampled (3 utilities, 2 RTOs); PUCT summary blocked to automated clients.

Local search terms

  • Open Access Transmission Tariff (OATT) — FERC-filed tariff with transmission service terms and rates; searchable in eTariff.
  • Tariff for Retail Delivery Service — Texas TDU tariff containing distribution delivery charges by service voltage.
  • Unbundling of total rates — PG&E tariff section splitting each charge into generation, distribution and transmission components.
  • Network Integration Transmission Service (NITS) rate — PJM zonal transmission rate in $/MW-year posted by PJM settlements.
  • Transmission Access Charge (TAC) — CAISO high-voltage and low-voltage transmission charge in $/MWh.
  • TCRF / DCRF — Texas transmission and distribution cost recovery factor riders adjusting delivery charges.
  • TDU / TDSP — Transmission and distribution utility / service provider in Texas retail choice areas.
  • Secondary / Primary / Transmission voltage — Service voltage classes used in US retail tariffs; definitions vary by utility.

Requested attributes

AttributeCoverageSourcesScope and limitations
Network access tariffs network_tariffsPartially coveredferc-etariff rto-transmission-rate-postings state-utility-delivery-tariffs openei-urdbTransmission: eTariff and RTO postings (PJM, CAISO tested). Distribution: per-utility tariffs, sampled Oncor, PG&E, Con Edison.

Not checked: No national official compilation found (FERC, PUCT, OpenEI checked). Distribution tariffs tested for 3 utilities only; MISO, SPP, ISO-NE, NYISO postings and other states not opened.

Access charges network_chargesPartially coveredrto-transmission-rate-postings state-utility-delivery-tariffsComponents separated in sample: PG&E unbundles distribution/transmission; Oncor delivery charges plus TCRF/DCRF riders; CAISO HV/LV TAC.

Not checked: Separation of network charges was checked only in the sampled tariffs; bundled-rate utilities were not examined individually.

Voltage level voltage_levelPartially coveredrto-transmission-rate-postings state-utility-delivery-tariffs openei-urdbCAISO HV (>=200 kV) vs LV; PG&E and Oncor secondary/primary/transmission service; PJM NITS has no voltage split.

Not checked: Voltage classes verified in 3 utility tariffs and CAISO only; URDB voltagecategory is empty in 44,320 of 58,920 rows and can contradict the rate name.

Time period time_bandPartially coveredstate-utility-delivery-tariffs rto-transmission-rate-postings openei-urdbPG&E B-19 peak 4-9 p.m., part-peak, off-peak, summer Jun-Sep; Oncor distribution and PJM/CAISO transmission rates have no time bands.

Not checked: Time-of-use definitions read in PG&E B-19 only; other utilities' calendars not checked (URDB holds 12x24 schedules but unverified).

Latest available data latest_dataPartially coveredferc-etariff rto-transmission-rate-postings state-utility-delivery-tariffs openei-urdbPJM as of 2026-10-01; CAISO rates eff. 2026-06-01 rev. 2026-09-09; Oncor 2026-06-01; PG&E 2026-03-01; URDB update 2026-08-17.

Not checked: Latest versions identified only for the tested sources; each other utility or RTO must be checked separately.

Historical coverage historical_seriesPartially coveredferc-etariff rto-transmission-rate-postings state-utility-delivery-tariffs openei-urdbeTariff since 2010-10-01; CAISO archive from 2008; PJM files 2021-2026; PG&E B rates from 2019-11-01; URDB rate versions with start dates.

Not checked: History depth differs by publisher and was only checked for the sampled sources; pre-2010 FERC tariffs (paper era) not checked.

Update frequency update_frequencyPartially coveredstate-utility-delivery-tariffs openei-urdb rto-transmission-rate-postingsTexas TDU tariffs twice a year (March/September TCRF); URDB annual for ~150 utilities; PJM/CAISO observed several dated postings in 2026.

Not checked: Stated schedules found only for Texas TDUs (archived PUCT page) and URDB; RTO and other utility schedules only observed, not stated.

Main caveats

  • Transmission (FERC, wholesale) and distribution (state commissions, retail) are regulated separately; no source covers both nationally.
  • In vertically integrated states retail tariffs are bundled; a network-only charge may not exist as a published value.
  • Units differ: PJM $/MW-year, CAISO $/MWh, utility tariffs $/kW, $/kWh and $/customer; do not compare without conversion rules.
  • URDB is a convenience compilation; its voltage tags and start dates can differ from the official tariff.

Sources

ferc-etariffeTariff Viewer (tariffs filed with FERC, including Open Access Transmission Tariffs)

Federal Energy Regulatory Commission (FERC) · Official · HTML viewer; XML export per tariff (eTariff export schema); RTF/PDF print · Web viewer only · License: Unknown

FERC's official register of filed tariffs: every FERC-jurisdictional OATT and transmission rate schedule, with section versions and effective dates; XML export per tariff.

Landing url
https://etariff.ferc.gov/TariffList.aspx
Data url
https://etariff.ferc.gov/TariffExport.aspx?tid=1763
Coverage note
Wholesale/interstate transmission service. Not retail distribution tariffs (state PUCs) and not ERCOT-internal utilities.
Date of data
Export of 2026-11-26; records since 2010-10-01
Language
en
Location precision
No location
Has coordinates
No
Test
2026-11-26 · Download · HTTP 200
  • www.ferc.gov and ferc.gov return a Cloudflare 'Just a moment...' 403 page to non-browser clients; the etariff.ferc.gov application itself answered normally.
  • Queries require ASP.NET form posts (view state); there is no documented public API.

Caveats

  • Rates are inside tariff text, not typed fields; formula rates need the RTO's posted results.
  • ferc.gov pages refuse automated clients; etariff.ferc.gov works.

Example request

curl -s -c cj -b cj https://etariff.ferc.gov/TariffExport.aspx?tid=1763 > page.html; then POST the page's hidden ASP.NET fields plus __EVENTTARGET=ctl00$Content1$btnExport, ctl00$Content1$lstStatus$0=9 (Effective), ctl00$Content1$lstBinaryText$1=2 (plain text) to the same URL with the same cookies

Example result

200 application/octet-stream, Content-Disposition: attachment;filename=Tariff_1763.xml, 1,260,358 bytes; <tariff_title>Interregional Agreements</tariff_title>; 292 record_data elements, first: record_content_desc 19.1, record_version_num 0.0.0

rto-transmission-rate-postingsRTO/ISO posted transmission service rates (zonal NITS rates, Transmission Access Charge rates)

Regional transmission organizations / independent system operators (PJM, CAISO tested) · Official · XLSX and PDF (PJM); PDF (CAISO) · Direct download · License: Unknown

Computed transmission access rates: PJM zonal NITS rates ($/MW-Year, XLSX per period) and CAISO Transmission Access Charge (high-voltage >=200 kV and low-voltage $/MWh, PDF per effective date).

Coverage note
Tested PJM and CAISO; MISO, SPP, ISO-NE, NYISO not opened. Transmission level only.
Date of data
PJM as of 2026-10-01; CAISO effective 2026-06-01 (rev. 2026-09-09)
Language
en
Location precision
No location
Has coordinates
No
Example access test
2026-11-26 · Download · HTTP 200
Members summary
Listed: 2 · Tested: 2 · Data found: 2

RTO/ISO markets and transmission providers posting OATT rates; universe not counted in this pass. Tested PJM and CAISO; MISO, SPP, ISO-NE, NYISO and ERCOT were not opened. Utilities outside RTOs post their own OATT rates.

Look on each RTO's billing/settlements or tariff pages for 'transmission service rates', 'zonal rates' or 'revenue requirements'.

See member links and checks in the detail (rto-transmission-rate-postings)

Caveats

  • CAISO revises sheets for the same effective date; take the latest revision.
  • PJM NITS rates have no voltage or time-of-day split.

Example request

curl -sLO https://www.pjm.com/-/media/DotCom/markets-ops/settlements/network-integration-trans-service-october-2026-xls.xlsx (sheet 'October 2026', header row 2)

Example result

['AECO', 'Atlantic City Electric Company', '231657800', '231657800', '85511']  -> zone AECO, NITS rate 85,511 $/MW-Year; CAISO June 01, 2026 R7: PG&E HV 9.3333, LV 17.9118 $/MWh, ISO HV TAC 15.8508 $/MWh

state-utility-delivery-tariffsUtility retail delivery (distribution) tariffs approved by state public utility commissions

Distribution utilities under state commission approval (Oncor/PUCT, PG&E/CPUC, Con Edison/NYPSC tested) · Official · PDF tariff books; some utilities add XLSX rate summaries (PG&E) · PDF · License: Unknown

Distribution network charges are in each utility's commission-approved tariff: e.g. Oncor (TX) delivery charges by secondary/primary/transmission service; PG&E (CA) B-19 with distribution and transmission components by voltage and TOU period.

Coverage note
Sample of 3 utilities (TX, CA, NY); every other utility publishes its own tariff book.
Date of data
Oncor sheets effective 2026-06-01; PG&E B-19 effective 2026-03-01; Con Edison MAC 2026-11-01
Language
en
Location precision
No location
Has coordinates
No
Example access test
2026-11-26 · Download · HTTP 200
  • The Texas PUCT site (puc.texas.gov, ftp.puc.texas.gov) returned a Cloudflare block (403) to non-browser requests; the summary of TDU charges was read only through an archived copy of 2024-10-27.
Members summary
Listed: 3 · Tested: 3 · Data found: 3

One tariff book per regulated distribution utility (investor-owned utilities regulated by each state commission; many cooperatives and municipal utilities set their own rates). Tested one large utility in each of Texas, California and New York; other states and utilities not checked.

Search the utility site for 'tariff', 'rate schedules' or 'Tariff for Retail Delivery Service'; check the state commission's tariff filings for official leaves.

See member links and checks in the detail (state-utility-delivery-tariffs)

Caveats

  • Vertically integrated utilities publish bundled retail rates; network components may not be separated.
  • Formats and voltage-class definitions differ by utility.

Example request

PG&E: https://www.pge.com/tariffs/assets/pdf/tariffbook/ELEC_SCHEDS_B-19.pdf, sheet Cal. P.U.C. 61072-E (UNBUNDLING OF TOTAL RATES), pdftotext -layout

Example result

Distribution**: Maximum Demand Summer $28.24 (R) $19.98 (R) $7.81 (R) [Secondary, Primary, Transmission voltage, $ per kW]; Transmission Maximum Demand* $9.10 $9.10 $9.10; Advice 7846-E, Effective March 1, 2026

openei-urdbU.S. Utility Rate Database (URDB)

OpenEI / National Laboratory of the Rockies (NLR, U.S. Department of Energy laboratory) · Non-official · CSV (gzip) and JSON (gzip); REST API with key · Direct download · License: Creative Commons Zero (CC0) unless otherwise noted

National CC0 compilation of utility rate structures (energy, demand, fixed, TOU calendars, voltage category, start/end dates); bulk CSV of 58,920 rate versions downloaded 2026-11-26.

Landing url
https://openei.org/wiki/Utility_Rate_Database
Data url
https://openei.org/apps/USURDB/download/usurdb.csv.gz
Coverage note
Mostly total retail rates; only 3,252 rows marked Delivery; voltagecategory empty in 75% of rows.
Date of data
Latest record update 2026-08-17; file of 2026-11-25
Language
en
Location precision
No location
Has coordinates
No
Test
2026-11-26 · Download · HTTP 200

Caveats

  • Not an official register; verify against the source tariff.
  • Voltage tags and start dates can differ from the tariff.

Example request

curl -sLO https://openei.org/apps/USURDB/download/usurdb.csv.gz ; python: csv.DictReader over gzip, filter eiaid=='14328' and 'B-19' in name, sort by startdate

Example result

label 69de92556d1ebb0263094f0e | B-19 Medium General Demand TOU Option R (Transmission) Mandatory | startdate 2026-03-27 | voltagecategory Secondary | servicetype Bundled | energyratestructure/period0/tier0rate 0.08878

Additional sources in the detail: 0. Read the full detail; locate each source by its source_id.

Document access

Outside the PJM and PG&E spreadsheets, rate values are inside PDF tariff sheets; extract the schedule table per utility.

Research provenance

Pass count
1
Minutes estimate
Not stated
Pages opened
36
PassDate
12026-11-26

Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed.

Record metadata: Schema version: 1.0 · Country: us · Country name: United States · Topic: network-tariffs · Territory: us · Territory level: Country · Parent url: No parent territory · Html url: https://georutter.org/us/network-tariffs/