us / permitting-rulesUnited States permitting rules data sources
Where can I find, in consolidated form, the current legal texts that set the permitting procedure for energy projects in the United States, by technology and size?
- Research reviewed
- 2026-11-26
- Sources tested
- 2026-11-26
- Access checked
- 2026-11-26
- Published
- 2026-11-26
- Sources
- 5 on this page · 1 in the detail
Answer
- Official data
- Partial coverage
- Non official data
- Partial coverage
- Confidence
- Medium
Federal law is consolidated officially: eCFR (regulations, current to 2026-11-24, versions since 2017, API) and the U.S. Code (statutes through Public Law 119-142, XML). They hold e.g. FERC hydro licensing and exemptions for eligible projects up to 10 MW, QF 80 MW limit, offshore renewables, BLM rights-of-way and NEPA deadlines; CEQ's NEPA rules were removed in 2025. State authorization is in each state's code (e.g. MN 216I, NY PSL Art. 8 at 25 MW); local zoning is only compiled non-officially (NLR wind ordinances). Interconnection rules sit in FERC tariffs.
Local search terms
- Electronic Code of Federal Regulations (eCFR) — Continuously updated consolidated federal regulations; query by title and part.
- Release point — Dated update of the United States Code downloads, named by the last Public Law included.
- Certificate of public convenience and necessity (CCN) — State commission authorization for utility facilities such as transmission lines (e.g. Texas).
- Siting permit / site permit — State authorization for large generation or transmission facilities (e.g. NY PSL Art. 8, MN 216I).
- NEPA, EIS, EA — National Environmental Policy Act; environmental impact statement; environmental assessment.
- FAST-41 — Title 41 of the FAST Act, federal coordination for covered infrastructure projects (42 U.S.C. 4370m).
- LWECS — Large wind energy conversion system, Minnesota category of 5,000 kW or more.
- Qualifying facility (QF) — PURPA small power production facility up to 80 MW under 18 CFR 292.204.
Requested attributes
| Attribute | Coverage | Sources | Scope and limitations |
|---|---|---|---|
Consolidated current legal text consolidated_legal_text | Partially covered | ecfr us-code-olrc state-codes govinfo-cfr-annual | Federal regulations and statutes are officially consolidated (eCFR, U.S. Code); state codes checked for MN, NY, TX. Not checked: 46 states and DC not checked; no official consolidation of local (county/municipal) ordinances found beyond the non-official NLR compilation. |
Permitting procedure permitting_procedure | Partially covered | ecfr us-code-olrc state-codes ferc-oatt-interconnection nlr-siting-ordinances | Federal review (NEPA, FERC, BOEM, BLM, DOE), state authorization (MN, NY, TX), local rules (NLR wind), interconnection (OATT) identified. Not checked: Agency procedures read only for sampled parts; other states, local codes and state distribution interconnection rules not opened. |
Technology technology | Partially covered | ecfr state-codes nlr-siting-ordinances | Law categories found: hydro, conduit hydro, QF small power production, OCS renewables, solar/wind on BLM land, LWECS, solar generating systems, major renewable facility. Not checked: Nuclear (10 CFR 50/52), gas pipelines (18 CFR 157) and storage-specific rules listed by part only, text not read; other states not checked. |
Project size size_threshold | Partially covered | ecfr us-code-olrc state-codes ferc-oatt-interconnection | Hydro <=1.5 MW minor, <=10 MW exemption, <=40 MW conduit; QF <=80 MW; FAST-41 >$200M; MN 5,000/50,000 kW; NY 25,000 kW, 125 kV; PJM 20 MW tiers. Not checked: Thresholds verified only in the sampled sections and 3 states; California thresholds seen only in a CEC fact sheet because leginfo was blocked. |
Latest available data latest_data | Partially covered | ecfr us-code-olrc state-codes | eCFR up to date as of 2026-11-24; U.S. Code through P.L. 119-142 (2026-11-10); Minnesota 2026 edition. Not checked: Currency dates read for federal sources and Minnesota; New York and Texas pages give no as-of date in the text read; other states not checked. |
Historical coverage historical_series | Partially covered | ecfr govinfo-cfr-annual us-code-olrc state-codes | eCFR point-in-time from 2017-01-03; CFR annual editions 1996-2026; U.S. Code prior release points; MN yearly editions; NY revision dates. Not checked: State history checked for MN and NY only; local ordinance history limited to 2022 and 2025 NLR editions. |
Update frequency update_frequency | Partially covered | us-code-olrc ecfr state-codes | U.S. Code updated by release points per new law; eCFR observed current to 2 days before test; MN annual editions observed. Not checked: No publisher statement of eCFR frequency read (web pages blocked); state schedules not stated on the pages read. |
Main caveats
- Permitting is split by level: federal review applies only with a federal nexus (federal land, funding, licence); states and localities authorize most onshore wind and solar.
- CEQ NEPA regulations (40 CFR 1500-1508) were removed effective 2025-04-11; older guidance citing them is outdated.
- Generator interconnection procedures are in each transmission provider's FERC tariff, not in the CFR.
- Local zoning rules have no official national consolidation; the NLR compilation is AI-assisted and non-official.
Sources
ecfrElectronic Code of Federal Regulations (eCFR) and its Versioner API
Office of the Federal Register (National Archives) / Government Publishing Office · Official · JSON (structure, versions) and XML (full text) via REST API · API · License: Unknown
Official consolidated federal regulations, current to 2026-11-24, with point-in-time versions since 2017; REST API for structure, versions and full text (e.g. 18 CFR Part 4 hydro, Part 292 QF 80 MW, 30 CFR 585 offshore wind, 43 CFR 2800 BLM rights-of-way).
- Landing url
- https://www.ecfr.gov/
- Data url
- https://www.ecfr.gov/api/versioner/v1/titles.json
- Coverage note
- Federal regulations only; statutes are in the U.S. Code and state/local rules elsewhere.
- Date of data
- Up to date as of 2026-11-24
- Language
en- Location precision
- No location
- Has coordinates
- No
- Test
- 2026-11-26 · API query · HTTP 200
- www.ecfr.gov web pages redirect non-browser clients to unblock.federalregister.gov ('Request Access'); the /api/ endpoints answer normally.
Caveats
- CEQ NEPA regulations (40 CFR 1500-1508) removed 2025-04-11.
- Web pages block automated clients; use the API with compression.
Example request
curl --compressed 'https://www.ecfr.gov/api/versioner/v1/full/2026-11-24/title-18.xml?part=292§ion=292.204'
Example result
§ 292.204 Criteria for qualifying small power production facilities. (a) Size of the facility—(1) Maximum size. ... may not exceed 80 megawatts.
us-code-olrcUnited States Code Online (release points, XML/USLM downloads)
Office of the Law Revision Counsel, U.S. House of Representatives · Official · XML (USLM), XHTML, PCC, PDF per title (zip) · Direct download · License: Unknown
Official consolidated federal statutes, current through Public Law 119-142 (2026-11-10), downloadable as XML per title: NEPA (42 U.S.C. 4321 et seq.), FAST-41 (42 U.S.C. 4370m), Federal Power Act (16 U.S.C. 791a et seq.).
- Landing url
- https://uscode.house.gov/download.html
- Data url
- https://uscode.house.gov/download/releasepoints/us/pl/119/142/xml_usc42@119-142.zip
- Coverage note
- Federal statutes; procedures are detailed in regulations (eCFR) and state law.
- Date of data
- Release point 119-142 (2026-11-10)
- Language
en- Location precision
- No location
- Has coordinates
- No
- Test
- 2026-11-26 · Download · HTTP 200
- The site states it is operating in a temporary format; section view pages (view.xhtml) returned 404 on the test date.
Caveats
- Section view pages were unavailable (temporary format); use the downloads.
Example request
curl -sLO https://uscode.house.gov/download/releasepoints/us/pl/119/142/xml_usc42@119-142.zip ; search usc42.xml for identifier="/us/usc/t42/s4336a"
Example result
(e) Page limits (1) Environmental impact statements (A) In general ... an environmental impact statement shall not exceed 150 pages ... (B) Extraordinary complexity ... shall not exceed 300 pages
state-codesState statutes and regulations on energy facility siting (official state legislative code sites)
State legislatures and revisor offices (Minnesota, New York, Texas, California tested) · Official · HTML (Minnesota, New York, Texas); bulk ZIP database dumps (California) · Web viewer only · License: Unknown
State authorization law is on each state's legislative code site: e.g. Minnesota ch. 216I (wind >=5,000 kW, solar and plants >=50,000 kW; 2026 edition), New York PSL Art. 8 (renewables >=25,000 kW, lines >=125 kV), Texas Util. Code ch. 37.
- Coverage note
- 4 of 50 states checked; California site blocked to automated clients.
- Date of data
- MN 2026 edition; NY revision 2024-06-21
- Language
en- Location precision
- No location
- Has coordinates
- No
- Example access test
- 2026-11-26 · Page only · HTTP 200
- leginfo.legislature.ca.gov returns a Cloudflare 403 challenge to non-browser clients.
- New York Open Legislation API requires an API key (401).
- Members summary
- Total: 50 · Listed: 4 · Tested: 4 · Data found: 3
50 states (plus DC and territories). Four states tested: Minnesota and New York (state siting acts with thresholds), Texas (certificate of convenience and necessity for utilities and transmission), California (site blocked; bulk files checked by headers). Other states not checked.
Search the legislature or revisor site for 'siting', 'certificate of public convenience and necessity', 'energy facility', 'power plant siting'; regulations are in the state administrative code.See member links and checks in the detail (
state-codes)
Caveats
- Each state uses its own categories and units.
- Regulations implementing the statutes are in separate state administrative codes.
Example request
curl -s https://www.revisor.mn.gov/statutes/cite/216I/full
Example result
2026 Minnesota Statutes ... "Solar energy generating system" means a set of devices ... with a combined nameplate capacity of 50,000 kilowatts alternating current or more.
ferc-oatt-interconnectionGenerator interconnection procedures in FERC-filed Open Access Transmission Tariffs (eTariff)
Federal Energy Regulatory Commission (eTariff viewer); tariffs filed by transmission providers and RTOs · Official · HTML viewer; XML export per tariff · Web viewer only · License: Unknown
Transmission interconnection procedures are binding tariff text in each OATT on FERC eTariff (e.g. PJM Part VIII cycle process and small generation procedures with 20 MW tiers), not in the CFR.
- Landing url
- https://etariff.ferc.gov/TariffList.aspx
- Data url
- https://etariff.ferc.gov/TariffBrowser.aspx?tid=1731
- Coverage note
- Tested PJM OATT tree; other providers and state distribution interconnection rules not checked.
- Date of data
- Language
en- Location precision
- No location
- Has coordinates
- No
- Test
- 2026-11-26 · Page only · HTTP 200
Caveats
- Not a consolidated national text; one tariff per provider.
nlr-siting-ordinancesU.S. Wind Siting Regulation and Zoning Ordinances (2025)
National Laboratory of the Rockies (NLR, formerly NREL) via OpenEI / data.gov · Non-official · XLSX; GeoPackage of jurisdiction shapes · Direct download · License: CC BY 4.0
Non-official national compilation of state and local wind siting rules (setbacks, noise, decommissioning) with ordinance year and source URL; 12,297 rule rows in the 2025 edition.
- Landing url
- https://catalog.data.gov/dataset/u-s-wind-siting-regulation-and-zoning-ordinances-2025
- Data url
- https://data.openei.org/files/8519/Wind%20Ordinances%202025%20%281%29.xlsx
- Coverage note
- Wind only; local rules are compiled, not consolidated law.
- Date of data
- 2025 edition (GeoPackage 2025-09-12)
- Language
en- Location precision
- Municipality
- Has coordinates
- No
- Test
- 2026-11-26 · Download · HTTP 200
Caveats
- Compiled with LLM tooling; verify each value at the source URL.
Example request
curl -sLO 'https://data.openei.org/files/8519/Wind%20Ordinances%202025%20%281%29.xlsx' ; sheet 'County-Level', header on row 2
Example result
['Alabama', 'Baldwin', '1003', 'Structures (Non-Participating)', '5', 'tip-height-multiplier', ..., 'Section 7(n)(1)', '2014', 'https://alison.legislature.state.al.us/files/pdf/SearchableInstruments/2014RS/PrintFiles/SB12-Eng.pdf']
Additional sources in the detail: 1. Read the full detail; locate each source by its source_id.
Document access
Official consolidation exists for federal law; state and local texts must be gathered per jurisdiction from legislative sites and municipal codes.
Research provenance
- Pass count
- 2
- Minutes estimate
- Pages opened
| Pass | Date |
|---|---|
| 1 | 2026-11-26 |
| 2 | 2026-11-26 |