Where can I get a list of solar PV projects currently in permitting in the United States, with location, capacity (MW), developer, permitting stage and date?
Answer
No national list of solar PV projects in permitting exists in the sources examined; permitting is split across federal (BLM) and state or local bodies. Best entry points: state registers (NY ORES, CEC Opt-In) and BLM ePlanning for federal land, plus EIA-860M as a national lead (1,100 planned PV generators with coordinates and approval-status codes, not a permit file).
- Official data
- Partial coverage
- Non official data
- Not checked
Local search terms
- Major Renewable Energy Facility Siting Permit — New York Article VIII permit issued by ORES.
- Opt-In Certification — California route where the CEC certifies a project instead of local permits.
- NEPA / EIS / EA / ROD / FONSI / DNA — Federal environmental review documents and decisions.
- Right-of-way (ROW) — BLM authorisation to use public land for a project.
- Notice of Intent (NOI) — Start of an EIS process.
- Published
- 2026-11-19
- Research reviewed
- 2026-11-19
- Access checked
- 2026-11-19
Requested attributes
| Attribute | Coverage | Sources | Scope and limitations |
|---|---|---|---|
Project location location | Partially covered |
| EIA gives coordinates for all 1,100 planned PV rows; NY and CA give town/county only; BLM site geometry not reached. Not published: No tested permit register exposes site coordinates in text; BLM and CEC map layers were not opened. |
Capacity capacity_mw | Partially covered |
| EIA nameplate MW; NY MW inside description text; CEC 300 MW PV plus separate storage MW. Not checked: Capacity bases differ (and NY list/docket disagree for Addison Solar); BLM pages read gave no MW. |
Developer developer | Partially covered |
| NY and CEC name the applicant LLC; EIA gives the reporting entity, not always the developer. Not checked: BLM pages read name no applicant; sponsor parent companies are usually absent. |
Permitting stage permitting_stage | Partially covered |
| NY stage by list section; CEC status and milestones; EIA codes L/T/U; BLM EIS/decision pages. Not checked: Only NY, CA opt-in and a few BLM projects examined; other states, counties and the federal dashboard not read. |
Stage date stage_date | Partially covered |
| CEC dated milestones (filed 2024-08-01, Final Order 2026-04-27); NY dates only withdrawals; BLM Libra 2025-12-15. Not published: EIA status has no date; NY list has no date column; BLM register dates were not readable as text. |
Main caveats
- No single federal body lists all projects; BLM covers only projects needing BLM action and state or county permits sit elsewhere.
- EIA-860M status is survey-reported and undated, and the entity is not always the developer; the same applies to interconnection queues.
- NY list and docket can disagree (Addison Solar 120 vs 105 MW); read the docket for the authoritative figures.
- Only NY, California opt-in and two BLM pages were examined; Texas, Midwest, Southeast, Arizona and counties are pending.
- BLM register records and the federal permitting dashboard could not be read from this environment.
Sources
EIA-860M Monthly Update, 'Planned' sheet (solar PV generators with status codes)
- Source id
- eia-860m-planned-generators
- Publisher
- U.S. Energy Information Administration (EIA)
- Official
- Yes
- Landing url
- https://www.eia.gov/electricity/data/eia860m/
- Data url
- https://www.eia.gov/electricity/data/eia860m/xls/september_generator2026.xlsx
- Access
- direct_download
- Format
- XLSX (sheets Operating, Planned, Retired, Canceled or Postponed, plus Puerto Rico)
- License
- Unknown
- Language
- en
- Has coordinates
- Yes
- Location precision
- exact
- Summary
- Monthly national workbook: 1,100 planned PV generators with coordinates, MW, owner entity and status (approvals pending/received, construction).
- Coverage note
- Nationwide but survey-based and not a permitting register.
- Date of data
- As of September 2026 (released 2026-10-23)
- Caveats
- Status has no date; owner is not always the developer.
- Does not prove permits; use it to find the project, then the agency file.
- Test
- Tested on
- 2026-11-19
- Method
- download
- Http status
- 200
- Problems
- Download works without account.
- Records_total counts solar PV rows in the Planned sheet.
- Example
- Example request
curl -sL 'https://www.eia.gov/electricity/data/eia860m/xls/september_generator2026.xlsx' -o eia860m.xlsx # sheet 'Planned', header on row 3; filter Technology == 'Solar Photovoltaic'
- Example result
Entity 'Nautilus Solar Solutions' | Plant 'Sandoval 2' | IL, Clinton | 2 MW | Solar Photovoltaic | Planned operation 9/2026 | (L) Regulatory approvals pending. Not under construction | 38.5894, -89.1467
- Members summary
NY Office of Renewable Energy Siting (ORES) permit application lists and DPS case pages
- Source id
- ny-ores-permit-applications
- Publisher
- New York State Department of Public Service, Office of Renewable Energy Siting and Electric Transmission
- Official
- Yes
- Landing url
- https://dps.ny.gov/ores-permit-applications
- Data url
- https://documents.dps.ny.gov/public/MatterManagement/CaseMaster.aspx?MatterSeq=85427&MNO=23-03015
- Access
- web_viewer_only
- Format
- HTML list with links to CaseMaster docket pages
- License
- Unknown
- Language
- en
- Has coordinates
- No
- Location precision
- municipality
- Summary
- NY siting permits by stage with docket links; solar mixed with wind; capacity and location only in description text.
- Coverage note
- New York ORES permits only.
- Date of data
- 2026-11-19 (latest dated entry 2026-10-06)
- Caveats
- No date column; list and docket MW differ for Addison Solar.
- Wind projects share the lists.
- Test
- Tested on
- 2026-11-19
- Method
- page_only
- Http status
- 200
- Problems
- No export on the page; the data must be scraped from the HTML tables.
- Docket page capture shows no status field and zero calendar entries; the filings tab lists 297 documents but rows were not captured.
- Example
- Example request
Open https://dps.ny.gov/ores-permit-applications and follow the docket link of 'Addison Solar' (23-03015) to https://documents.dps.ny.gov/public/MatterManagement/CaseMaster.aspx?MatterSeq=85427&MNO=23-03015
- Example result
List: 23-03015 Addison Solar, section Incomplete, 'ADDISON SOLAR, LLC', 120 MW, Steuben. Docket page: 'WEB Addison Solar, LLC', 105-megawatt, Towns of Addison, Campbell and Erwin; 297 filed documents; no status or key dates shown.
- Members summary
California Energy Commission Opt-In Certification projects and project pages
- Source id
- ca-cec-opt-in-certification
- Publisher
- California Energy Commission (CEC)
- Official
- Yes
- Landing url
- https://www.energy.ca.gov/programs-and-topics/topics/power-plants/opt-certification-program
- Data url
- https://www.energy.ca.gov/powerplant/solar-photovoltaic-pv-battery-energy-storage/soda-mountain-solar-project
- Access
- web_viewer_only
- Format
- HTML project pages and e-filing docket logs
- License
- Unknown
- Language
- en
- Has coordinates
- No
- Location precision
- municipality
- Summary
- CEC opt-in project pages: applicant, docket, MW, county, status and dated milestones.
- Coverage note
- California opt-in projects only (11).
- Date of data
- 2026-04-29 (latest dated milestone seen)
- Caveats
- Opt-In projects only.
- No download; page-by-page reading.
- Test
- Tested on
- 2026-11-19
- Method
- page_only
- Http status
- 200
- Problems
- No data download or last-updated date found; program page lists names only.
- e-filing docket documents were not opened.
- Example
- Example request
Open https://www.energy.ca.gov/powerplant/solar-photovoltaic-pv-battery-energy-storage/soda-mountain-solar-project
- Example result
Soda Mountain Solar Project | Applicant Soda Mountain Solar, LLC | 24-OPT-03C | 300 MW solar PV + 300 MW/1,200 MWh storage | San Bernardino | Status 'Compliance - Pre-Construction' | filed 2024-08-01, complete 2025-07-31, Final Order 2026-04-27.
- Members summary
BLM ePlanning National NEPA Register and BLM project announcements
- Source id
- blm-eplanning-national-nepa-register
- Publisher
- U.S. Bureau of Land Management (BLM)
- Official
- Yes
- Landing url
- https://eplanning.blm.gov/
- Data url
- Access
- web_viewer_only
- Format
- Script-driven web register; PDFs; BLM HTML pages
- License
- Unknown
- Language
- en
- Has coordinates
- Location precision
- Summary
- BLM NEPA register for federal-land solar (filters by applicant, county, status, decision date) plus BLM pages with decision dates.
- Coverage note
- Projects needing BLM action only; record contents not readable here.
- Date of data
- 2026-08-28 (latest BLM page seen)
- Caveats
- Register is a script-driven viewer.
- News pages lack applicant and MW.
- Test
- Tested on
- 2026-11-19
- Method
- page_only
- Http status
- 200
- Problems
- Project records are not retrievable as text without a browser session; document links under /public_projects/ returned HTML.
- No CSV or API found; export is PDF only (and showed an error).
- Example
- Members summary
- Total
- Listed
- 2
- Tested
- 2
- Data found
- 2
- Scope note
- Two BLM project pages read; the register holds many more renewable projects whose count could not be read.
- Pattern
- Search the register by Program = Renewable Energy and look for BLM state office news pages.
Additional sources in the detail: 1. Read the full detail; locate each source by its source_id.
Document access
- Summary
- Project records are mostly in docket and document pages: read the docket for applicant, MW and filing dates, and the NEPA documents for site and capacity.
Confidence
- Confidence
- low
- Confidence reason
- Two state registers and a national lead were read; BLM records and the federal dashboard were not retrievable and most states were not examined.
Research provenance
- Pass count
- 1
- Models
- claude-sonnet-5-5 (Claude Sonnet 5.5) via Claude Code in the VS Code extension (Claude Agent SDK)
- Minutes estimate
- Pages opened
- 16
- Passes
- Pass
- 1
- Date
- 2026-11-19
- Model
- claude-sonnet-5-5 (Claude Sonnet 5.5) via Claude Code in the VS Code extension (Claude Agent SDK)
- Note
- Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed.
Record metadata
- Schema version
- 1.0
- Country
- us
- Country name
- United States
- Topic
- solar-pv-plants-in-permitting
- Territory
- us
- Territory level
- country
- Parent url
- Html url
- https://georutter.org/us/solar-pv-plants-in-permitting/