de / data-centers-in-permittingGermany data centers in permitting data sources
Where can I get a list of data center projects currently in permitting in Germany, with location, power (MW), developer, permitting stage and date?
- Research reviewed
- 2026-11-27
- Sources tested
- 2026-11-27
- Access checked
- 2026-11-27
- Published
- 2026-11-27
- Sources
- 4 on this page · 0 in the detail
Answer
- Official data
- Documents only
- Non official data
- Partial coverage
- Confidence
- Medium
The Länder UVP portal and regional participation sites provide selected dated files, especially for data-centre emergency power. Municipal planning and building approvals are separate and no complete current national list was verified. A party-hosted municipal reply gives an example electrical connection capacity; generator thermal MW must not be mistaken for data-centre demand.
Requested attributes
| Attribute | Coverage | Sources | Scope and limitations |
|---|---|---|---|
Project location location | Partially covered | uvp_laender nrw_participation | Some files name an address or municipality. Not checked: Nationwide project coverage not checked. |
Project power power_mw | Partially covered | maintal_reply | A historical reply gives one maximum electrical connection; other files report generator thermal input. Not checked: IT load, grid request and total demand are missing or unverified for most cases. |
Developer developer | Partially covered | uvp_laender nrw_participation | Some notices identify the applicant; it need not be the eventual operator. Not checked: Applicant-to-developer identity and all regions not verified. |
Permitting stage permitting_stage | Partially covered | uvp_laender nrw_participation hessen_decisions | Individual consultations and decisions are dated; current pending status requires further checks. Not checked: Files and subsequent decisions not checked nationally. |
Stage date stage_date | Partially covered | uvp_laender nrw_participation hessen_decisions | Notices provide display and decision dates when recorded. Not checked: Timeliness and coverage across Länder and municipalities not established. |
Main caveats
- A public-display period ending does not establish that the permit was granted or remains pending.
- Environmental notices frequently cover emergency generators; building permits may be separate.
- Generator thermal input, data-centre IT load and electrical grid connection are different quantities.
- The Maintal capacity and status example dates from February 2026 and needs current verification.
- Coverage and bulk extraction beyond the opened examples remain unchecked.
Sources
uvp_laenderUVP-Portal der Länder
Landesbetrieb Geoinformation und Vermessung · Official · HTML · Web viewer only · License: unknown
Finds selected UVP-linked permitting files and dated procedural milestones.
- Landing url
- https://www.uvp-verbund.de/
- Coverage note
- Federal Länder portal; selected UVP procedures, not all building applications.
- Date of data
- Language
de- Location precision
- Address
- Has coordinates
- No
- Test
- 2026-11-27 · Page only · HTTP 200
Caveats
- The project is a backup-generator application, not necessarily an application for the building.
- Redtec already has a decision; do not count it as currently pending. Its 230 MW is thermal fuel input.
nrw_participationBeteiligung NRW Bezirksregierung Köln
Bezirksregierung Köln · Official · HTML and PDF · Web viewer only · License: unknown
A detailed NRW consultation record and notice for a Bedburg data-centre campus backup system.
- Landing url
- https://beteiligung.nrw.de/portal/brk/beteiligung/themen/1030062
- Data url
- https://beteiligung.nrw.de/portal/download/resources/beteiligung/1030062/information/1086830/datei/2327008_1/%C3%96ffentliche%2BBekanntmachung%2BNEA%2BNRW08_09.pdf
- Coverage note
- Cologne government district, North Rhine-Westphalia.
- Date of data
- Language
de- Location precision
- Address
- Has coordinates
- No
- Test
- 2026-11-27 · Page only · HTTP 200
Caveats
- Kürzlich beendet labels the participation period, not the overall permit decision.
- 545,3 MW is the thermal input of emergency generators, not IT load or the electricity connection.
hessen_decisionsIndustrieemissionen
Regierungspräsidium Darmstadt · Official · HTML and PDF · Web viewer only · License: unknown
Checks later decisions for Hessian industrial-emissions cases.
- Landing url
- https://rp-darmstadt.hessen.de/veroeffentlichungen-und-digitales/oeffentliche-bekanntmachungen/industrieemissionen
- Coverage note
- Darmstadt administrative district, Hessen.
- Date of data
- Language
de- Location precision
- Municipality
- Has coordinates
- No
- Test
- 2026-11-27 · Page only · HTTP 200
Caveats
- This is a decision list, not a live list of pending applications.
- Publication date differs from decision date; a generator approval may differ from the building permit.
maintal_replyAnfrage Nr. 260/2026 – Rechenzentren
FDP-Fraktion Maintal (copy of municipal response) · Non-official · PDF · PDF · License: unknown
A dated municipal response, available in a party-hosted copy, states a project electrical connection capacity.
- Landing url
- https://fdp-maintal.de/wp-content/uploads/sites/52/2026/02/260209_Grosse_Anfrage_Rechenzentren.pdf
- Coverage note
- Maintal, Hessen; one response dated 09.02.2026.
- Date of data
- Language
de- Location precision
- Municipality
- Has coordinates
- No
- Test
- 2026-11-27 · Page only · HTTP 200
Caveats
- A party-hosted copy is not the live municipal permit register.
- The February reply does not establish that either application remains pending in November; 168 MW is not IT load.
Additional sources in the detail: 0. Read the full detail; locate each source by its source_id.
Document access
Public notices and decisions are project-specific and need manual reconciliation; missing data cannot necessarily be recovered from them.
Research provenance
- Pass count
- 1
- Minutes estimate
- 8
- Pages opened
- 41
| Pass | Date |
|---|---|
| 1 | 2026-11-27 |