GeoRutter

Geospatial data sources by country, with access methods and caveats.

Spain battery storage in permitting data sources

Where can I get a list of stand-alone battery storage (BESS) projects currently in permitting in Spain, with location, power (MW), developer, permitting stage and date?

Answer

No complete current national list was established. Vitreous Labs publishes a downloadable gazette-derived inventory with a stand-alone filter, but it omits some regional gazettes and a checked promoter is wrong. BOE and regional notices provide official project details and dated milestones; Catalonia describes a project viewer. A notice or old milestone alone does not prove today’s stage.

Official data
Partial coverage
Non official data
Partial coverage
Published
2026-11-19
Research reviewed
2026-11-15
Access checked
No complete access check recorded

Requested attributes

AttributeCoverageSourcesScope and limitations
Project location locationPartially covered
  • s001
  • s002
  • s003
Municipality in CSV and official notices; Catalan viewer described but not sampled.

Not checked: Full national coverage and current status have not been checked in every jurisdiction.

Power power_mwPartially covered
  • s001
  • s002
Battery MW appears in CSV and some official project texts.

Not checked: Full national coverage and current status have not been checked in every jurisdiction.

Developer developerPartially covered
  • s001
  • s002
Applicant field in CSV and official notices, with at least one demonstrated error.

Not checked: Full national coverage and current status have not been checked in every jurisdiction.

Permitting stage permitting_stagePartially covered
  • s001
  • s002
  • s003
CSV classifies milestones, BOE provides underlying historical official decisions.

Not checked: Full national coverage and current status have not been checked in every jurisdiction.

Stage date stage_datePartially covered
  • s001
  • s002
CSV dates individual acts; exact present state needs later checks.

Not checked: Full national coverage and current status have not been checked in every jurisdiction.

Main caveats

Sources

Vitreous Labs battery installation inventory

Source id
s001
Publisher
Vitreous Labs
Official
No
Landing url
https://vitreouslabs.com/es/project/
Data url
https://vitreouslabs.com/es/project/installations.csv
Access
direct_download
Format
CSV
License
unknown
Language
en
Has coordinates
No
Location precision
municipality
Summary
Vitreous Labs battery installation inventory
Coverage note
Spain, state and selected regional gazettes
Date of data
Downloaded 2026-11-15; source describes regional and state read-through dates separately.
Caveats
  • The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply.
Test
Tested on
2026-11-15
Method
download
Http status
200
Problems
None recorded
Example
Example request
curl -sSL --max-time 40 'https://vitreouslabs.com/es/project/installations.csv'
Example result
PB Babor 7, Arena Power Ren 29 SL, stand-alone, 66 MW, First authorisation; official BOE-A-2026-14321 confirms these fields.
Members summary
Not a grouped source

Boletín Oficial del Estado (BOE) - Datos Abiertos API (Sumario)

Source id
s002
Publisher
Agencia Estatal Boletín Oficial del Estado (AEBOE)
Official
Yes
Landing url
https://www.boe.es/datosabiertos/
Data url
https://boe.es/datosabiertos/api/boe/sumario/20261113
Access
api
Format
JSON / XML
License
Open data (BOE)
Language
es
Has coordinates
No
Location precision
municipality
Summary
Boletín Oficial del Estado (BOE) - Datos Abiertos API (Sumario)
Coverage note
Spain, BOE notices from state and some regional authorities
Date of data
Daily (YYYYMMDD)
Caveats
  • The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply.
Test
Tested on
2026-11-15
Method
api_query
Http status
200
Problems
None recorded
Example
Example request
curl -sSL --max-time 30 -H 'Accept: application/json' 'https://boe.es/datosabiertos/api/boe/sumario/20261113'
Example result
BOE issue 283, metadata fecha_publicacion 20261113; linked individual notices give project details.
Members summary
Not a grouped source

Catalan environmental renewable energy project viewer

Source id
s003
Publisher
Generalitat de Catalunya
Official
Yes
Landing url
https://mediambient.gencat.cat/ca/detalls/Articles/visor
Data url
https://sig.gencat.cat/visorHipermapa/?ID=2305
Access
web_viewer_only
Format
web map
License
unknown
Language
ca
Has coordinates
Not stated
Location precision
Not stated
Summary
Catalan environmental renewable energy project viewer
Coverage note
Catalonia
Date of data
Not stated
Caveats
  • The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply.
Test
Tested on
2026-11-15
Method
page_only
Http status
200
Problems
None recorded
Example
Example request
https://sig.gencat.cat/visorHipermapa/?ID=2305
Example result
The map description identifies stand-alone battery projects in prior administrative authorisation.
Members summary
Not a grouped source

Additional sources in the detail: 0. Read the full detail; locate each source by its source_id.

Document access

Summary
Not stated

Local search terms

Confidence

Confidence
medium
Confidence reason
The CSV, a stand-alone BOE case and several regional documents were checked; complete regional and present-status coverage was not established.

Research provenance

Pass count
2
Models
  • Gemini 4 Hydrogen (Low)
  • Terra 6.1 (High)
Minutes estimate
30
Pages opened
48
Passes
  • Pass
    1
    Date
    2026-11-15
    Model
    Gemini 4 Hydrogen (Low)
  • Pass
    2
    Date
    2026-11-15
    Model
    Terra 6.1 (High)
Note
Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed.

Record metadata

Schema version
1.0
Country
es
Country name
Spain
Topic
battery-storage-in-permitting
Territory
es
Territory level
country
Parent url
No parent territory
Html url
https://georutter.org/es/battery-storage-in-permitting/