Spain conventional power plants data sources
Where can I get a list of thermal and nuclear power plants in Spain, with location, fuel or technology, capacity (MW), operator, status and annual generation?
Answer
No single open Spanish dataset lists all thermal and nuclear power plants with electrical capacity (MW), operator, status, coordinates, and annual generation. MITECO's statutory registry (RAIPEE: REPROv2 and PRETOR) is gated by CAPTCHA/login, while REE's e-sios unit list requires an API token and hits WAF blocks. Best open options: combine EEA Industrial Reporting v16 (thermal >=50 MWth through 2024, coords, thermal MWth and fuel TJ, not GWh), MITECO/IAEA PRIS plus Foro Nuclear 2025 PDF (nuclear MW, operator, status, 2025 GWh), and ENTSO-E (>=100 MW, free registration) for thermal MWe and annual MWh, or GEM GIPT (request form, Sept 2026) for current >=20-30 MW plant lists.
- Official data
- Partial coverage
- Non official data
- Partial coverage
- Published
- 2026-11-19
- Research reviewed
- 2026-11-16
- Access checked
Requested attributes
| Attribute | Coverage | Sources | Scope and limitations |
|---|---|---|---|
Plant location location | Partially covered |
| Coords: EEA (1), WFS (8), GEM (9), WRI (10, 2 errors), JRC (11, 119/648), OSM (12, 182 sites). Site/municipality only: ENTSO-E (2), IAEA (5), MITECO/CSN (6), ForoNuc (7). Not published: REE e-sios (4) omits location; MITECO/IAEA/ENTSO-E lack coords; JRC lacks coords on 529/648 ES thermal/nuclear rows; thermal units <50 MWth lack open official coordinates. |
Fuel or technology fuel_or_technology | Partially covered |
| EEA (1) & WFS (8) give fuel TJ/burner (>=50MWth); ENTSO-E (2) & e-sios (4) give production type (reg/WAF); nuclear (5-7); GEM (9), WRI (10), JRC (11), OSM (12) classify fuel. Not published: No open official bulk table classifies fuel/technology for Spanish thermal plants <50 MWth (RAIPEE 3 is CAPTCHA/login-gated, REE e-sios 4 is token/WAF-blocked, Electra omits technology). |
Capacity capacity_mw | Partially covered |
| MWe open for nuclear (5-7) & stale WRI/JRC/OSM (10-12); ENTSO-E >=100MW reg (2); RAIPEE/e-sios blocked (3,4); GEM form (9). EEA (1) & WFS (8) give thermal MWth, not MWe. Not published: Open official bulk downloads do not publish current electrical capacity (MWe) for Spanish thermal plants <100 MW (RAIPEE 3 is CAPTCHA-gated, REE e-sios 4 is token/WAF-blocked). |
Operator operator | Partially covered |
| Nuclear operator/owners: IAEA (5), MITECO/CSN (6), ForoNuc (7). Thermal: RAIPEE holder CAPTCHA (3), e-sios SM/BRP WAF (4), GEM form (9), WRI 2021 owner (10), OSM 69/182 (12). Not published: Open official thermal bulk downloads (EEA F5_2/F1_4/F6_1, MITECO WFS, JRC) and ENTSO-E 14.1.b omit operator; Electra CSV lists installation names without fuel or MW. |
Status status | Partially covered |
| Nuclear: IAEA/CSN/ForoNuc (5-7). Thermal: EEA F6_1 (1), RAIPEE previa/def CAPTCHA (3), WFS 2018-19 (8), GEM form (9), JRC 117/648 (11). REE e-sios (4) & WRI (10) omit status. Not published: Unified current administrative status for all thermal plants is gated inside MITECO REPROv2/PRETOR (3) and BOE closure resolutions; JRC is blank on 531/648 ES thermal/nuclear rows. |
Annual generation annual_generation | Partially covered |
| ENTSO-E 16.1.a >=100MW reg (2); Foro Nuclear 2025 GWh for 7 nuclear units (7); WRI modeled 2017 est. only, 0 reported (10); JRC 2015-2018 MWh (11). OSM (12) has none. Not published: No open bulk dataset publishes current plant-level annual electricity generation (MWh/GWh) for Spanish thermal plants; EEA (1) gives fuel TJ and IAEA API (5) gives lifetime TWh only. |
Main caveats
- MITECO RAIPEE (REPROv2/PRETOR) is CAPTCHA/login-gated, REE e-sios requires a token and hits Incapsula WAF, and Electra CSV drops technical fields.
- EEA Industrial Reporting v16 (F5_2) and MITECO WFS report rated thermal input (MWth) and fuel input (TJ), NOT electrical MW or GWh, and mix industrial boilers with power plants.
- Official MITECO/EEA reporting completeness gaps for Spain are explicitly flagged in EEA v16 metadata; MITECO WFS ei_gp_combustion is frozen at 2018-2019 (still marks closed coal plants functional).
- ENTSO-E Transparency Platform (14.1.b, 16.1.a) covers electrical MW and actual generation per unit, but requires registration and excludes units below 100 MW.
- Non-official WRI GPPD (2021, 2 coord errors in Spain, 0 reported ES generation) and JRC-PPDB-OPEN (2019, coords on 119/648 thermal/nuclear rows) are outdated.
Sources
Industrial Reporting under the Industrial Emissions Directive (IED 2010/75/EU) and E-PRTR (v16.0, Feb 2026)
- Source id
- s001
- Publisher
- European Environment Agency (EEA)
- Official
- Yes
- Landing url
- https://industry.eea.europa.eu/industrial-emissions/dataset
- Data url
- https://sdi.eea.europa.eu/datashare/public.php/webdav/User%20friendly%20.csv%20files.zip
- Access
- direct_download
- Format
- ZIP (CSV, XLSX, ACCDB, GPKG, GDB)
- License
- EEA standard re-use policy (free open access with attribution)
- Language
- en
- Has coordinates
- Yes
- Location precision
- exact
- Summary
- Industrial Reporting under the Industrial Emissions Directive (IED 2010/75/EU) and E-PRTR (v16.0, Feb 2026)
- Coverage note
- EU-27 plus EEA/cooperating countries (31 countries, including Spain)
- Date of data
- 2016-2024 for LCPs (2007-2024 for E-PRTR); database status as of 2026-02-20 (v16.0)
- Caveats
- The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply.
- Test
- Tested on
- 2026-11-16
- Method
- headers_only
- Http status
- 200
- Problems
- Full CSV ZIP exceeds 100 MB (147.6 MB); F5_2_LCP_Energy_Emissions.csv (31,356 ES rows, 356 unique LCPs, 0/356 outside Spain), F1_4_Air_Releases_Facilities.csv (159 ES 1(c) facilities, 0/159 outside Spain), and F6_1_IED_Installations.csv header/schema were verified via HTTP Range slices.
- Example
- Example request
curl -sL -u AnfiqFkZYBSq36B: -r 82906843-100332245 -o f5_2_slice.bin "https://sdi.eea.europa.eu/datashare/public.php/webdav/User%20friendly%20.csv%20files.zip"
- Example result
{"PublicationDate": "2026/02/13", "countryName": "Spain", "reportingYear": "2019", "LCPInspireId": "ES.CAED/000136007.PART", "installationPartName": "CT SON REUS TG3-END", "City_Of_Facility": "PALMA", "Longitude": "2.681304", "Latitude": "39.650492", "featureType": "LCPCharacteristics", "unit": "MW", "featureValue": "175"}
- Members summary
ENTSO-E Transparency Platform (Art. 14.1.b Production/Generation Units & Art. 16.1.a Actual Generation per Unit)
- Source id
- s002
- Publisher
- ENTSO-E (data submitted by REE / Redeia)
- Official
- Yes
- Landing url
- https://transparency.entsoe.eu/
- Data url
- https://web-api.tp.entsoe.eu/api
- Access
- registration_required
- Format
- XML (REST API), CSV/XLSX (Web UI & File Library FMS)
- License
- ENTSO-E Transparency Platform free open access upon registration (Regulation EU 543/2013)
- Language
- en
- Has coordinates
- No
- Location precision
- municipality
- Summary
- ENTSO-E Transparency Platform (Art. 14.1.b Production/Generation Units & Art. 16.1.a Actual Generation per Unit)
- Coverage note
- Pan-European bidding zones / control areas, including Spain (10YES-REE------0)
- Date of data
- Continuous (14.1.b published annually for 3 following years; 16.1.a published D+5)
- Caveats
- The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply.
- Test
- Tested on
- 2026-11-16
- Method
- page_only
- Http status
- 200
- Problems
- Web export, File Library (FMS), and REST API require free user registration and token; Zendesk Help Center pages returned 403 to curl.
- Example
- Members summary
MITECO Registro Administrativo de Instalaciones de Producción de Energía Eléctrica (RAIPEE: REPROv2 y PRETOR)
- Source id
- s003
- Publisher
- Ministerio para la Transición Ecológica y el Reto Demográfico (MITECO)
- Official
- Yes
- Landing url
- https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/regimen-ordinario/registro-instalaciones.html
- Data url
- https://energia.serviciosmin.gob.es/reprov2/RegistroPublico.aspx
- Access
- web_viewer_only
- Format
- Web query interface (ASP.NET) behind CAPTCHA; PRETOR offers Excel export inside CAPTCHA-gated viewer
- License
- Spanish public sector information (MITECO legal notice)
- Language
- es
- Has coordinates
- No
- Location precision
- municipality
- Summary
- MITECO Registro Administrativo de Instalaciones de Producción de Energía Eléctrica (RAIPEE: REPROv2 y PRETOR)
- Coverage note
- Spain (national)
- Date of data
- Continuously updated
- Caveats
- The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply.
- Test
- Tested on
- 2026-11-16
- Method
- blocked
- Http status
- 200
- Problems
- Public lookup pages in both REPROv2 and PRETOR are gated behind image CAPTCHAs; full portal access requires digital certificate or Cl@ve; REPROv2 citizen manual PDF returns 404.
- Example
- Members summary
- Total
- Listed
- 2
- Tested
- 2
- Data found
- 0
- Scope note
- The inherited list is a sample or documented publisher list; successful retrieval has not been separately reclassified in this structural migration. See individual notes.
- Pattern
Additional sources in the detail: 9. Read the full detail; locate each source by its source_id.
Document access
- Summary
Local search terms
- Term
- central térmica convencional
- Language
- es
- Meaning
- Conventional thermal power plant (coal, fuel-oil, natural gas)
- Term
- central de ciclo combinado (CTCC)
- Language
- es
- Meaning
- Combined cycle gas turbine (CCGT) power plant
- Term
- central nuclear
- Language
- es
- Meaning
- Nuclear power plant
- Term
- cogeneración
- Language
- es
- Meaning
- Combined heat and power (CHP) thermal plant
- Term
- régimen ordinario / régimen especial
- Language
- es
- Meaning
- Historical Spanish regulatory split between large conventional plants (>50 MW, Sección 1ª REPROv2) and renewables/cogeneration/waste (Sección 2ª PRETOR)
- Term
- RAIPEE (Registro Administrativo de Instalaciones de Producción de Energía Eléctrica)
- Language
- es
- Meaning
- Official national registry of electricity production facilities at MITECO
- Term
- potencia instalada / potencia neta / potencia bruta
- Language
- es
- Meaning
- Installed electrical capacity (gross vs net MWe)
- Term
- grandes instalaciones de combustión (GIC / LCP)
- Language
- es
- Meaning
- Large combustion plants (>=50 MWth thermal input) under EU IED / RD 815/2013
Confidence
- Confidence
- high
- Confidence reason
- Verified directly across MITECO (REPROv2, PRETOR, Electra, WFS, stats), REE/e-sios, CNMC, CSN, BOE, EEA v16, ENTSO-E, IAEA PRIS, Foro Nuclear, GEM, WRI, JRC, and OSM.
Research provenance
- Pass count
- 1
- Models
- Gemini 4 Hydrogen (Extra High)
- Minutes estimate
- 35
- Pages opened
- 113
- Passes
- Pass
- 1
- Date
- 2026-11-16
- Model
- Gemini 4 Hydrogen (Extra High)
- Note
- Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed.
Record metadata
- Schema version
- 1.0
- Country
- es
- Country name
- Spain
- Topic
- conventional-power-plants
- Territory
- es
- Territory level
- country
- Parent url
- Html url
- https://georutter.org/es/conventional-power-plants/