REE (the TSO) publishes monthly renewable curtailment from day-ahead technical constraints by grid node (ERNI, GWh, PDF on ESIOS; Peninsula plus Baleares/Canarias in MWh). Redispatch volumes (technical-constraint energy up/down, PDBF phase I and real time) are open as national monthly/yearly series via the REData API, not by node. Per-unit data is restricted to market subjects; economic curtailment and daily series were not found public.
- Official data
- Partial coverage
- Non official data
- Partial coverage
- Published
- 2026-11-19
- Research reviewed
- 2026-11-16
- Access checked
Requested attributes
| Attribute | Coverage | Sources | Scope and limitations |
|---|---|---|---|
Renewable curtailment volume renewable_curtailment | Partially covered |
| ERNI = renewable energy not integrable due to day-ahead (D-1) grid constraints only; real-time and economic curtailment not published as such. Not published: Economic curtailment and real-time curtailment: no public series found in ESIOS PDFs, REData, REE reports, CNMC (see audit.search_log). |
Redispatch volume redispatch_volume | Covered |
| Technical-constraint energy up/down (PDBF phase I and real time), MWh, month/year; REData and REE annual report agree for 2024-2025. |
Zone or node spatial_breakdown | Partially covered |
| Curtailment by grid node (name+kV) and by RTT/RTD cause; no zone/province split. Redispatch by node or zone not published. Not published: Redispatch per node: not in REData, ESIOS PDFs or REE reports; per-unit data exists only for market subjects (PO 9.1, 90 days). |
Reference period reference_period | Partially covered |
| ERNI: monthly (Jun 2025 to Oct 2026 found). Redispatch: month/year in REData; day returned HTTP 400; hourly only via ESIOS token (untested). Not checked: Daily/hourly redispatch via ESIOS API needs a token (request to [email protected]); not obtained. ERNI before Jun 2025 not located. |
Latest available data latest_data | Not covered | None recorded | Separate coverage of this canonical requirement was not established in the inherited research; see the complete source evidence. Not checked: The previous attributes did not separately establish this requirement. The original answer and all source evidence have been retained; no new research was performed. |
Historical coverage historical_series | Not covered | None recorded | Separate coverage of this canonical requirement was not established in the inherited research; see the complete source evidence. Not checked: The previous attributes did not separately establish this requirement. The original answer and all source evidence have been retained; no new research was performed. |
Update frequency update_frequency | Not covered | None recorded | Separate coverage of this canonical requirement was not established in the inherited research; see the complete source evidence. Not checked: The previous attributes did not separately establish this requirement. The original answer and all source evidence have been retained; no new research was performed. |
Main caveats
- ERNI by node is a monthly Power BI PDF export (no CSV): the table lists only the Top 30 nodes (Oct 2026: 355 of 578 GWh); the chart shows more nodes but its values need image/chart reading.
- ERNI counts only D-1 phase I technical constraints vs PDBF, renewable units with specific electrical location; the report itself says node values may not match the aggregate monthly value on ESIOS.
- Colours in the PDF legend decide RTT vs RTD: text extraction loses the mapping (Oct 2026: RTT 569.4 GWh, RTD 8.7 GWh read from the rendered chart).
- REData energia-restricciones has no unit field; values match REE report GWh x1000 (MWh). Down values are negative. Wider period/geo options (day, baleares, ccaa) returned HTTP 400.
- Redispatch (restricciones tecnicas) is not renewable-only: it includes gas/other units scheduled for voltage control and stability; do not equate it with renewable curtailment.
Sources
ESIOS monthly publication per node of Renewable Energy Not Integrable (ERNI) due to D-1 technical constraints
- Source id
- s001
- Publisher
- Red Electrica de Espana (ESIOS)
- Official
- Yes
- Landing url
- https://www.esios.ree.es/es
- Data url
- https://api.esios.ree.es/documents/3386/download?locale=es
- Access
- direct_download
- Format
- PDF (Power BI export, 4-5 pages; chart plus Top 30 table)
- License
- unknown
- Language
- es
- Has coordinates
- No
- Location precision
- none
- Summary
- ESIOS monthly publication per node of Renewable Energy Not Integrable (ERNI) due to D-1 technical constraints
- Coverage note
- Peninsular system by transmission/distribution-connected grid node (e.g. ACECA 220); Baleares and Canarias islands in separate TNP files. Months found: 2025-06 to 2026-10 (scan of document ids; earlier months not located).
- Date of data
- Calendar month (Oct 2026: 01/10/2026 to 31/10/2026)
- Caveats
- The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply.
- Test
- Tested on
- 2026-11-16
- Method
- download
- Http status
- 200
- Problems
- HEAD request returns 403 (GET returns 200)
- No machine-readable table; PDF only
- Example
- Example request
curl -sL --max-time 60 -o erni_202610.pdf 'https://api.esios.ree.es/documents/3386/download?locale=es' && pdftotext -f 3 -l 3 -layout erni_202610.pdf -
- Example result
ACECA 220 Programa PDBF 77,28 GWh ERNI 36,23 GWh 46,88 % nudo 0,30 % peninsular ; ALARCOS 220 20,68 9,63 46,55 % 0,08 %. Page 2 pie: RTT 569,4 GWh (98%), RTD 8,7 GWh (2%).
- Members summary
- Total
- Listed
- 2
- Tested
- 2
- Data found
- 0
- Scope note
- The inherited list is a sample or documented publisher list; successful retrieval has not been separately reclassified in this structural migration. See individual notes.
- Pattern
REData API widget energia-restricciones (energy by technical constraints at PDBF and in real time)
- Source id
- s002
- Publisher
- Red Electrica de Espana (REData)
- Official
- Yes
- Landing url
- https://www.ree.es/es/apidatos
- Data url
- https://apidatos.ree.es/es/datos/mercados/energia-restricciones?start_date=2026-09-01T00:00&end_date=2026-10-31T23:59&time_trunc=month
- Access
- api
- Format
- JSON
- License
- unknown
- Language
- es
- Has coordinates
- No
- Location precision
- none
- Summary
- REData API widget energia-restricciones (energy by technical constraints at PDBF and in real time)
- Coverage note
- Peninsular system (default geo gave the same values as geo_limit=peninsular&geo_ids=8741); baleares and ccaa requests returned HTTP 400
- Date of data
- Series start dates per month/year (e.g. 2026-10-01); last-update fields 2026-11-01 (PDBF) and 2026-11-11 (real time)
- Caveats
- The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply.
- Test
- Tested on
- 2026-11-16
- Method
- api_query
- Http status
- 200
- Problems
- No day granularity or non-peninsular geography accepted
- No unit in the payload
- Example
- Example request
curl -sL --max-time 60 'https://apidatos.ree.es/es/datos/mercados/energia-restricciones?start_date=2026-09-01T00:00&end_date=2026-10-31T23:59&time_trunc=month'
- Example result
id 701 Energía a subir restricciones técnicas al PDBF (fase I): 2026-09-01 2505899.7 ; 2026-10-01 2203504.6. id 702 a bajar: -991163 ; -600357.9. id 720 TR a subir: 262934.6 ; 224801.8.
- Members summary
REE Informe del Sistema Electrico 2025: Servicios de ajuste e intercambios internacionales
- Source id
- s003
- Publisher
- Red Electrica de Espana (sistemaelectrico-ree.es)
- Official
- Yes
- Landing url
- https://www.sistemaelectrico-ree.es/es/informe-del-sistema-electrico
- Data url
- https://www.sistemaelectrico-ree.es/sites/default/files/informes/2026/servicio-ajuste-2025.pdf
- Access
- Format
- PDF (14 pages)
- License
- unknown
- Language
- es
- Has coordinates
- No
- Location precision
- none
- Summary
- REE Informe del Sistema Electrico 2025: Servicios de ajuste e intercambios internacionales
- Coverage note
- Peninsular system, national totals; years 2024-2025 (edition March 2026)
- Date of data
- Calendar year 2025 (footer: March 2026)
- Caveats
- The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply.
- Test
- Tested on
- 2026-11-16
- Method
- download
- Http status
- 200
- Problems
- Landing page links to a www.ree.es path that returns 404; same path on sistemaelectrico-ree.es works
- Example
- Example request
curl -sL --max-time 120 -o ajuste2025.pdf 'https://www.sistemaelectrico-ree.es/sites/default/files/informes/2026/servicio-ajuste-2025.pdf' && pdftotext -layout ajuste2025.pdf - | grep 'Restricciones técnicas'
- Example result
Restricciones técnicas PDBF 13.588 1.717 21.340 3.611 57,0 110,3 ; Restricciones técnicas en tiempo real 5.429 701 5.091 1.487 -6,2 112,1 (GWh, 2024 up/down, 2025 up/down, % up, % down).
- Members summary
Additional sources in the detail: 4. Read the full detail; locate each source by its source_id.
Document access
- Summary
Local search terms
- Term
- restricciones técnicas
- Language
- es
- Meaning
- Technical constraints; the process (PO 3.2) that redispatches units to solve grid problems
- Term
- ERNI (energía renovable no integrable)
- Language
- es
- Meaning
- Renewable energy that cannot be integrated; REE's curtailment measure by node
- Term
- vertidos / curtailment
- Language
- es/en
- Meaning
- Press terms for non-integrated renewable energy
- Term
- RTT / RTD
- Language
- es
- Meaning
- Restricción técnica de red de transporte / de distribución
- Term
- PDBF / PDVP
- Language
- es
- Meaning
- Programa Diario Base de Funcionamiento / Programa Diario Viable Provisional
- Term
- nudo
- Language
- es
- Meaning
- Grid node (substation busbar by name and kV)
- Term
- TNP / SNP
- Language
- es
- Meaning
- Territorios / sistemas no peninsulares (islands)
- Term
- unidad de programación (UP)
- Language
- es
- Meaning
- Scheduling unit used for per-unit constraint results
Confidence
- Confidence
- medium
- Confidence reason
- Core sources opened and tested (PDF, API, report) with cross-check; ESIOS API, per-unit files and ENTSO-E could not be tested without credentials, and the full ERNI archive was only sampled by document id.
Research provenance
- Pass count
- 1
- Models
- Claude Sonnet 5.5 (High)
- Minutes estimate
- 12
- Pages opened
- 38
- Passes
- Pass
- 1
- Date
- 2026-11-16
- Model
- Claude Sonnet 5.5 (High)
- Note
- Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed.
Record metadata
- Schema version
- 1.0
- Country
- es
- Country name
- Spain
- Topic
- curtailment-and-redispatch
- Territory
- es
- Territory level
- country
- Parent url
- Html url
- https://georutter.org/es/curtailment-and-redispatch/