Spain energy auctions data sources
Where can I get the results of renewable and storage auctions in Spain, with awarded projects, capacity (MW), price, technology and location?
Answer
Spain has held four REER (renewable) price auctions: 26-01-2021, 19-10-2021, 25-10-2022 and 22-11-2022 (none since). Each is resolved in a BOE resolution (PDF annex: awardee, CIF, technology, offer-unit code, EUR/MWh, kW), mirrored on MITECO. No storage auction has been held yet; no project location is published.
- Official data
- Partial coverage
- Non official data
- None found in the documented search
- Published
- 2026-11-19
- Research reviewed
- 2026-11-16
- Access checked
Requested attributes
| Attribute | Coverage | Sources | Scope and limitations |
|---|---|---|---|
Awarded project awarded_project | Partially covered |
| Rows are awardee offer units, not named plants; per-awardee strategic-plan PDFs exist but name no site. Installation identification goes to DGPEM unpublished. Not published: Orden TED/1161/2020 art.14 sends installation name/location to DGPEM electronically; no public list found in BOE, MITECO auction pages, CNMC, OMIE (403) or REPRO/ERIDE (login). |
Awarded capacity capacity_mw | Covered |
| Annex column is in kW with dot thousands separator (50.800 = 50.8 MW; 10 = 10 kW). |
Award price price | Covered |
| EUR/MWh per offer unit in BOE annex (pay-as-bid); CNMC gives weighted averages. 2016-17 auctions have no price column. |
Technology technology | Covered |
| Technology + RD 413/2014 subgroup (b.1.1 PV, b.2.1 onshore wind, b.6 biomass) per row. |
Project location location | Not covered | None recorded | No REER result or registry resolution carries province, municipality or coordinates (checked 9 BOE resolutions, 3 awardee plans). Not published: Looked in BOE results and preassignment annexes, MITECO auction pages, plans PDFs, CNMC reports; only Canary-wind 2015 call lists island per project (source 5). |
Latest available data latest_data | Not covered | None recorded | This specific requirement was not separately established in the inherited research. Not checked: Review the original answer and source evidence; no new research was performed during this adaptation. |
Historical coverage historical_series | Not covered | None recorded | This specific requirement was not separately established in the inherited research. Not checked: Review the original answer and source evidence; no new research was performed during this adaptation. |
Update frequency update_frequency | Not covered | None recorded | This specific requirement was not separately established in the inherited research. Not checked: Review the original answer and source evidence; no new research was performed during this adaptation. |
Main caveats
- Latest REER auction is 22-11-2022; MITECO's REER page lists none after it. A new auction or the first capacity-market auction (storage eligible) would add a BOE resolution not yet in this card.
- Annex units: kW, dot as thousands separator (10 = 10 kW, not 10 MW). Sum of Jan 2021 annex = 3,034.178 MW; Oct 2021 = 3,123.77 MW; Oct 2022 = 177 MW; Nov 2022 = 45.5 MW.
- Awarded capacity is not installed capacity: awardees later register installations; the BOE rows are bids per awardee (CIF + UA code), so no plant name or site can be read from them.
- Storage: not auctioned in REER; MITECO/IDAE storage awards are grants (PINALM, 126 projects, 818.3 M EUR) and access-capacity tenders, which are not price auctions.
- CNMC supervision reports black out bidder volumes ([CONFIDENCIAL]); only awarded totals and weighted prices are readable.
Sources
REER auction results: DGPEM resolutions resolving each auction (BOE annex I)
- Source id
- s001
- Publisher
- Ministerio para la Transicion Ecologica (Direccion General de Politica Energetica y Minas), published in BOE and mirrored on miteco.gob.es
- Official
- Yes
- Landing url
- https://www.miteco.gob.es/es/energia/renovables/regimen-economico.html
- Data url
- https://www.boe.es/boe/dias/2021/01/28/pdfs/BOE-A-2021-1251.pdf
- Access
- Format
- PDF (text layer, table in annex I)
- License
- unknown (BOE/MITECO public documents; no licence statement read)
- Language
- es
- Has coordinates
- No
- Location precision
- none
- Summary
- REER auction results: DGPEM resolutions resolving each auction (BOE annex I)
- Coverage note
- Spain (national auctions); no territorial breakdown in the annex
- Date of data
- Auction date (26-01-2021, 19-10-2021, 25-10-2022, 22-11-2022); BOE publication days to 2 weeks later
- Caveats
- Consult the main caveats and the complete reading traps and access evidence in the detail.
- Test
- Tested on
- 2026-11-16
- Method
- download
- Http status
- 200
- Problems
- None recorded
- Example
- Example request
curl -sL --max-time 60 -o r1.pdf https://www.boe.es/boe/dias/2021/01/28/pdfs/BOE-A-2021-1251.pdf && pdftotext -layout r1.pdf r1.txt && python3 -I -c "import re; rows=[re.search(r'^\s*(.+?)\s{2,}([A-Z]\d{8})\s+(Fotovoltaica|Eólica terrestre)\.\s+(\S+)\s+(UA_\d+_\d+_\d+)\s+([\d,]+)\s+([\d.]+)\s*$',l) for l in open('r1.txt',encoding='utf-8')]; rows=[m.groups() for m in rows if m]; print(len(rows), sum(int(r[6].replace('.',''))/1000 for r in rows)); print(rows[0])"- Example result
109 3034.178 ; ('AKUO RENOVABLES, S.L.', 'B67430298', 'Fotovoltaica', 'b.1.1', 'UA_21_01_00017', '23,5', '50.800')
- Members summary
- Total
- Listed
- 4
- Tested
- 4
- Data found
- 0
- Scope note
- Inherited members; data findings were not reclassified during this structural migration. Consult each member note.
- Pattern
REER preassignment registry resolutions (BOE annex I with registered power and PER code)
- Source id
- s002
- Publisher
- Ministerio para la Transicion Ecologica (DGPEM), BOE
- Official
- Yes
- Landing url
- https://www.miteco.gob.es/es/energia/renovables/regimen-economico.html
- Data url
- https://www.boe.es/boe/dias/2023/03/29/pdfs/BOE-A-2023-8031.pdf
- Access
- Format
- PDF (text layer)
- License
- unknown (BOE/MITECO public documents; no licence statement read)
- Language
- es
- Has coordinates
- No
- Location precision
- none
- Summary
- REER preassignment registry resolutions (BOE annex I with registered power and PER code)
- Coverage note
- Spain; no territorial breakdown
- Date of data
- Resolution date (17-06-2021, 16-02-2022, 10-03-2022, 09-03-2023, 16-03-2023); BOE publication later
- Caveats
- Consult the main caveats and the complete reading traps and access evidence in the detail.
- Test
- Tested on
- 2026-11-16
- Method
- download
- Http status
- 200
- Problems
- None recorded
- Example
- Example request
curl -sL --max-time 60 -o 8031.pdf https://www.boe.es/boe/dias/2023/03/29/pdfs/BOE-A-2023-8031.pdf && pdftotext -layout 8031.pdf 8031.txt && grep -n 'PER-0' 8031.txt
- Example result
ELAWAN ENERGY, S.L. B85146215 Eólica terrestre. b.2.1 UA_22_11_00001 39,88 20.000,00 20.000,00 528.000,00 840.000,00 PER-000002-2023-E
- Members summary
- Total
- Listed
- 5
- Tested
- 5
- Data found
- 0
- Scope note
- Inherited members; data findings were not reclassified during this structural migration. Consult each member note.
- Pattern
CNMC supervision reports on REER auction results
- Source id
- s003
- Publisher
- Comision Nacional de los Mercados y la Competencia
- Official
- Yes
- Landing url
- https://www.cnmc.es/sectores-que-regulamos/energia/informes-de-subastas-de-contratacion-a-plazo
- Data url
- https://www.cnmc.es/sites/default/files/3408659_14.pdf
- Access
- Format
- PDF with some text blacked out as [CONFIDENCIAL]
- License
- unknown
- Language
- es
- Has coordinates
- No
- Location precision
- none
- Summary
- CNMC supervision reports on REER auction results
- Coverage note
- Spain (national auctions)
- Date of data
- Report dates 2021-03-04, 2022-01-20 and 2023-07-27 (cover pages and CNMC listing)
- Caveats
- Consult the main caveats and the complete reading traps and access evidence in the detail.
- Test
- Tested on
- 2026-11-16
- Method
- download
- Http status
- 200
- Problems
- None recorded
- Example
- Example request
curl -sL --max-time 90 -o 3408659_14.pdf https://www.cnmc.es/sites/default/files/3408659_14.pdf && pdftotext 3408659_14.pdf r.txt && grep -n 'precio medio ponderado' r.txt
- Example result
Al cierre de la subasta, 109 tramos resultaron adjudicados a 32 participantes por un total de 3.034.178 kW de potencia, a un precio medio ponderado de 24,75 €/MWh
- Members summary
- Total
- Listed
- 3
- Tested
- 3
- Data found
- 0
- Scope note
- Inherited members; data findings were not reclassified during this structural migration. Consult each member note.
- Pattern
Additional sources in the detail: 2. Read the full detail; locate each source by its source_id.
Document access
- Summary
Local search terms
- Term
- subasta REER
- Language
- es
- Meaning
- Auction for the Régimen Económico de Energías Renovables (RD 960/2020): long-term price per MWh
- Term
- unidad de adjudicación (UA_yy_mm_nnnnn)
- Language
- es
- Meaning
- Awarded bid block; the row unit in the result annex
- Term
- estado de preasignación / explotación
- Language
- es
- Meaning
- Two states of the REER electronic registry
- Term
- régimen retributivo específico
- Language
- es
- Meaning
- Earlier support scheme (RD 413/2014) used in the 2016-2017 auctions and cogeneration
- Term
- mercado de capacidad / potencia firme
- Language
- es
- Meaning
- Capacity market created by Orden TED/966/2026; storage may bid
- Term
- concurso de capacidad de acceso
- Language
- es
- Meaning
- Competitive tender for grid access at a node; not a price auction
- Term
- cupo
- Language
- es
- Meaning
- MW quota offered in an auction
- Term
- Resolución ... por la que se resuelve la subasta
- Language
- es
- Meaning
- Title to search in BOE section III for each result
Confidence
- Confidence
- medium
- Confidence reason
- Results and prices verified in downloaded BOE PDFs and CNMC reports; location/storage negatives rest on opened pages, but ERIDE/REPRO and OMIE could not be read (login, 403).
Research provenance
- Pass count
- 1
- Models
- Claude Sonnet 5.5
- Minutes estimate
- 13
- Pages opened
- 60
- Passes
- Pass
- 1
- Date
- 2026-11-16
- Model
- Claude Sonnet 5.5
- Note
- Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed.
Record metadata
- Schema version
- 1.0
- Country
- es
- Country name
- Spain
- Topic
- energy-auctions
- Territory
- es
- Territory level
- country
- Parent url
- Html url
- https://georutter.org/es/energy-auctions/