Where can I get the planned new power lines and substations in Spain, with location, voltage, planned date and status?

Answer

No structured national file of planned lines and substations was found. The official lists are PDF tables with voltage and planned year: the approved Plan 2021-2026 (consolidated July 2026) and the initial 2025-2030 proposal (Annex I). Coordinates and a 3-state status exist only in Red Eléctrica's project map (385 substations, 77 lines, updated September 2024). Distribution-grid plans were not obtained.

Official data
Partial coverage
Non official data
None found in the documented search
Published
2026-11-19
Research reviewed
2026-11-16
Access checked
No complete access check recorded

Requested attributes

AttributeCoverageSourcesScope and limitations
Planned line or substation location locationPartially covered
  • s003
  • s004
Exact points only in REE map (lines as straight endpoint pairs) and TYNDP (12 features); plan PDFs give names only

Not published: No coordinates table in the plan PDFs or on planificacionelectrica.es, MITECO, datos.gob.es, REE pages opened

Voltage level voltageCovered
  • s001
  • s002
  • s003
kV in the name of each asset in plan tables and in map line titles
Planned date planned_dateCovered
  • s001
  • s002
  • s004
Prev. = best-estimate year in plan tables; TYNDP gives month-year for 12 projects; REE map has no date
Project status statusPartially covered
  • s003
  • s004
  • s005
  • s001
REE map in process/partial/in service (2024-09); TYNDP status; plan only separates starting grid from new actions

Not checked: Per-project authorisation status sits in BOE notices; no consolidated list found; REE status page returned 404

Latest available data latest_dataNot coveredNone recordedThis specific requirement was not separately established in the inherited research.

Not checked: Review the original answer and source evidence; no new research was performed during this adaptation.

Historical coverage historical_seriesNot coveredNone recordedThis specific requirement was not separately established in the inherited research.

Not checked: Review the original answer and source evidence; no new research was performed during this adaptation.

Update frequency update_frequencyNot coveredNone recordedThis specific requirement was not separately established in the inherited research.

Not checked: Review the original answer and source evidence; no new research was performed during this adaptation.

Main caveats

Sources

Plan de desarrollo de la red de transporte de energía eléctrica 2021-2026, documento completo consolidado (con las tres modificaciones de aspectos puntuales)

Source id
s001
Publisher
Ministerio para la Transición Ecológica y el Reto Demográfico (MITECO), documento elaborado por Red Eléctrica; publicado en planificacionelectrica.es
Official
Yes
Landing url
https://www.planificacionelectrica.es/planificacion-vigente
Data url
https://www.planificacionelectrica.es/sites/default/files/2026-08/planificacion-doc-completo-map26-jul26.pdf
Access
pdf
Format
PDF, 554 pages, A4 landscape, tables in the text layer (Annex I 'Red de partida', Annex II 'Nuevas actuaciones'); maps are vector drawings
License
unknown
Language
es
Has coordinates
No
Location precision
none
Summary
Plan de desarrollo de la red de transporte de energía eléctrica 2021-2026, documento completo consolidado (con las tres modificaciones de aspectos puntuales)
Coverage note
Spain: peninsula, Balearic Islands, Canary Islands (transmission network, 66 kV to 400 kV)
Date of data
Consolidated after the third modification approved by the Council of Ministers in July 2026 (PDF metadata creation date 2026-09-08)
Caveats
  • Consult the main caveats and the complete reading traps and access evidence in the detail.
Test
Tested on
2026-11-16
Method
download
Http status
200
Problems
  • HEAD requests return 403 (Incapsula) while GET works; the portal answers GET to the default curl client
  • No structured file (CSV/GIS) of the plan on the portal; planificacionelectrica.es 'Accede a la Planificación' links to a PDF only
Example
Complete procedure available in the full detail
Members summary
Not a grouped source

Propuesta inicial de desarrollo de la red de transporte de energía eléctrica 2025-2030, Anexo I 'Actuaciones propuestas' (audiencia pública)

Source id
s002
Publisher
MITECO (proposal prepared by Red Eléctrica de España as system operator)
Official
Yes
Landing url
https://www.miteco.gob.es/es/energia/participacion/2025/detalle-participacion-publica-k-779.html
Data url
https://www.miteco.gob.es/content/dam/miteco/es/energia/files-1/es-ES/Participacion/Documents/anexos/aeip-planificacion-h2030/2_Planficacion_ANEXO_I_-_ACTUACIONES_PROPUESTAS.pdf
Access
pdf
Format
PDF, 380 pages (annex I fact sheets 'Red de partida' pages 3-197 and 'Nuevas actuaciones' H2030_* pages 198-380); companion PDFs: executive summary, plan, technical annexes, maps (vector), environmental study
License
unknown
Language
es
Has coordinates
No
Location precision
none
Summary
Propuesta inicial de desarrollo de la red de transporte de energía eléctrica 2025-2030, Anexo I 'Actuaciones propuestas' (audiencia pública)
Coverage note
Spain: peninsula, Balearic Islands, Canary Islands (transmission network)
Date of data
Initial proposal put to public hearing in October 2025; a revised proposal was announced on 2026-09-21 but its documents were not found published
Caveats
  • Consult the main caveats and the complete reading traps and access evidence in the detail.
Test
Tested on
2026-11-16
Method
download
Http status
200
Problems
  • Companion XLSX on a different host (ssweb.seap.minhap.es) returned 503 Service Unavailable on every attempt
Example
Example request
curl -sL --max-time 400 --max-filesize 100000000 -o h2030_anexoI.pdf "https://www.miteco.gob.es/content/dam/miteco/es/energia/files-1/es-ES/Participacion/Documents/anexos/aeip-planificacion-h2030/2_Planficacion_ANEXO_I_-_ACTUACIONES_PROPUESTAS.pdf"; pdftotext -f 205 -l 205 -layout h2030_anexoI.pdf -
Example result
Page 205, actuación H2030_ApD_CONSUM-ARA (Aragón): 'Ampliación de subestaciones | uds. | Tipo | Motiv. | Prev.: Entrerríos 220 kV | 3 | Blind. | RdT | 2028'; 'Nuevas líneas/cables: Los Leones - Los Leones 220 kV, cto 1 | 1 | Cable | RdT | 2027'; unit table 220 kV: 11 positions; 400 kV: 3 positions
Members summary
Not a grouped source

Mapa de proyectos de la red de transporte (Red Eléctrica), datos embebidos en la página

Source id
s003
Publisher
Red Eléctrica de España (transmission system operator and sole transmitter)
Official
Yes
Landing url
https://www.ree.es/es/transporte-electricidad/proyectos-transporte/mapa-proyectos
Data url
https://www.ree.es/es/transporte-electricidad/proyectos-transporte/mapa-proyectos
Access
web_viewer_only
Format
HTML page carrying a JSON object (drupalSettings.projects_map: lines, substations, projects, filters)
License
unknown
Language
es
Has coordinates
Yes
Location precision
exact
Summary
Mapa de proyectos de la red de transporte (Red Eléctrica), datos embebidos en la página
Coverage note
Spain: peninsula, Balearic Islands, Canary Islands (Canarias have their own inset)
Date of data
Data updated to September 2024 (older than the plans by two years)
Caveats
  • Consult the main caveats and the complete reading traps and access evidence in the detail.
Test
Tested on
2026-11-16
Method
download
Http status
200
Problems
  • No documented API or file; data exist only as page-embedded JSON consumed by the Leaflet map
  • HEAD not tested; GET with default client works
  • All 385 substation points and 77 line endpoint pairs fall inside Spain bounding box (lat 27-44, lon -19 to 5)
Example
Complete procedure available in the full detail
Members summary
Not a grouped source

Additional sources in the detail: 2. Read the full detail; locate each source by its source_id.

Document access

Summary
Not stated

Local search terms

Confidence

Confidence
medium
Confidence reason
PDFs, JSON and API opened and tested; distribution and OSM left unchecked (portal 503, Overpass unreachable) and the 2030 XLSX could not be downloaded.

Research provenance

Pass count
1
Models
  • Claude Sonnet 5.5 (High)
Minutes estimate
18
Pages opened
41
Passes
  • Pass
    1
    Date
    2026-11-16
    Model
    Claude Sonnet 5.5 (High)
Note
Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed.

Record metadata

Schema version
1.0
Country
es
Country name
Spain
Topic
grid-expansion-plans
Territory
es
Territory level
country
Parent url
No parent territory
Html url
https://georutter.org/es/grid-expansion-plans/