Spain hydrogen plants in permitting data sources
Where can I get a list of hydrogen production projects currently in permitting in Spain, with location, capacity (MW), developer, permitting stage and date?
Answer
Aragón publishes cases in current public participation, and Castilla y León published a project list in 2025. Sondeva reports a commercial national hydrogen permitting index, with limited free results. Current status, electrolyser technology, capacity and national completeness need further checking.
- Official data
- Partial coverage
- Non official data
- Partial coverage
- Published
- 2026-11-19
- Research reviewed
- 2026-11-16
- Access checked
Requested attributes
| Attribute | Coverage | Sources | Scope and limitations |
|---|---|---|---|
Project location location | Partially covered |
| Catalina example in the 2024 regional gazette; current status is unverified. Not checked: Current status and national and regional coverage remain to be checked. |
Capacity capacity_mw | Partially covered |
| Catalina example in the 2024 regional gazette; current status is unverified. Not checked: Current status and national and regional coverage remain to be checked. |
Developer developer | Partially covered |
| Catalina example in the 2024 regional gazette; current status is unverified. Not checked: Current status and national and regional coverage remain to be checked. |
Permitting stage permitting_stage | Partially covered |
| Dated Aragón decision and Andalusian consultation; subsequent status unverified. Not checked: Current status and national and regional coverage remain to be checked. |
Stage date stage_date | Partially covered |
| Dated Aragón decision and Andalusian consultation; subsequent status unverified. Not checked: The inherited row combines multiple concepts or coverage; this specific requirement requires separate review. |
Main caveats
- An old administrative act does not establish current permitting status.
- The national environmental search covers environmental procedures, not necessarily all permit types.
- Hysencia capacity differs: 20 MW in the January 2026 Aragón act versus 35 MW on the developer page; verify the applicable configuration.
- Castilla y León’s 2025 list includes projects later authorized; electrolysis is not specified for every entry.
- Commercial project-level results were not checked; the stated national total is the provider’s count.
Sources
INAGA files in public participation
- Source id
- s001
- Publisher
- Instituto Aragonés de Gestión Ambiental
- Official
- Yes
- Landing url
- https://opendata.aragon.es/datos/catalogo/dataset/expedientes-inaga-en-periodo-de-informacion-publica
- Data url
- https://opendata.aragon.es/GA_OD_Core/download?filters=%7B%22tipo_publicacion%22%3A%22Informacion+p%C3%BAblica%22%7D&formato=json&resource_id=240
- Access
- direct_download
- Format
- JSON
- License
- CC BY 4.0
- Language
- Spanish
- Has coordinates
- No
- Location precision
- municipality
- Summary
- INAGA files in public participation
- Coverage note
- Aragón
- Date of data
- Caveats
- Consult the main caveats and the complete reading traps and access evidence in the detail.
- Test
- Tested on
- 2026-11-16
- Method
- download
- Http status
- 200
- Problems
- None recorded
- Example
- Example request
curl -sSL --max-time 60 --max-filesize 100000000 -o inaga.json 'https://opendata.aragon.es/GA_OD_Core/download?filters=%7B%22tipo_publicacion%22%3A%22Informacion+p%C3%BAblica%22%7D&formato=json&resource_id=240'
- Example result
30 public-display records; none contains HIDRÓGENO or HIDROGENO in asunto. One record has expediente 50030502202511104 and tipo_resolucion EN TRAMITACIÓN.
- Members summary
Boletín Oficial de Aragón: Catalina regional interest decision
- Source id
- s002
- Publisher
- Gobierno de Aragón
- Official
- Yes
- Landing url
- https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1348260490101
- Data url
- https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1348260490101
- Access
- Format
- License
- unknown
- Language
- Spanish
- Has coordinates
- No
- Location precision
- municipality
- Summary
- Boletín Oficial de Aragón: Catalina regional interest decision
- Coverage note
- Aragón; one example decision
- Date of data
- Caveats
- Consult the main caveats and the complete reading traps and access evidence in the detail.
- Test
- Tested on
- 2026-11-16
- Method
- page_only
- Http status
- 200
- Problems
- None recorded
- Example
- Example request
https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1348260490101 pages 25540–25541, Annex I
- Example result
Catalina: Andorra (Teruel, Aragón); Copenhagen Infrastructure Energy Transition Fund I K/S; 500 MW; decision dated 23 August 2024.
- Members summary
Andalucía public environmental consultation: La Joya H2
- Source id
- s003
- Publisher
- Junta de Andalucía
- Official
- Yes
- Landing url
- https://www.juntadeandalucia.es/servicios/participacion/todos-documentos/detalle/637861.html
- Data url
- Access
- web_viewer_only
- Format
- HTML
- License
- unknown
- Language
- Spanish
- Has coordinates
- No
- Location precision
- none
- Summary
- Andalucía public environmental consultation: La Joya H2
- Coverage note
- Andalucía: one consultation record
- Date of data
- Caveats
- Consult the main caveats and the complete reading traps and access evidence in the detail.
- Test
- Tested on
- 2026-11-16
- Method
- page_only
- Http status
- 200
- Problems
- The linked supporting-document address returned HTTP 404.
- Example
- Example request
https://www.juntadeandalucia.es/servicios/participacion/todos-documentos/detalle/637861.html
- Example result
AAI/MA/05/25; SIROCCO HYDROGEN 2, S.L.; LA JOYA H2; 27/01/2026–09/03/2026.
- Members summary
Additional sources in the detail: 2. Read the full detail; locate each source by its source_id.
Document access
- Summary
Local search terms
- Term
- información pública
- Language
- es
- Meaning
- public consultation
- Term
- electrolizador
- Language
- es
- Meaning
- electrolyser
Confidence
- Confidence
- low
- Confidence reason
- Research is in progress; current status and national coverage remain unverified.
Research provenance
- Pass count
- 1
- Models
- Terra 6.1 (High)
- Minutes estimate
- 15
- Pages opened
- 46
- Passes
- Pass
- 1
- Date
- 2026-11-16
- Model
- Terra 6.1 (High)
- Note
- Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed.
Record metadata
- Schema version
- 1.0
- Country
- es
- Country name
- Spain
- Topic
- hydrogen-plants-in-permitting
- Territory
- es
- Territory level
- country
- Parent url
- Html url
- https://georutter.org/es/hydrogen-plants-in-permitting/