Spain network tariffs data sources
Where can I get the current electricity network access tariffs and charges in Spain, by voltage level and period, with their history?
Answer
Peajes (network access tariffs) are set yearly by CNMC resolution and cargos (system charges) by MITERD order, both in BOE, with 2.0TD to 6.4TD by period P1-P6. Current 2026 values: MITECO peajes page (both) and BOE-A-2025-26348 (peajes), BOE-A-2025-26705 (cargos). History since 2021-06 is the chain of BOE resolutions/orders; 2014-2021 frozen old-structure orders. No CSV/API of the series was found.
- Official data
- Structured data
- Non official data
- None found in the documented search
- Published
- 2026-11-19
- Research reviewed
- 2026-11-16
- Access checked
Requested attributes
| Attribute | Coverage | Sources | Scope and limitations |
|---|---|---|---|
Network access tariffs network_tariffs | Covered |
| 2.0TD (BT<=15kW), 3.0TD (BT>15kW), 6.1TD-6.4TD (1-30, 30-72.5, 72.5-145, >145 kV), TDVE for EV charging; 2026 values. |
Access charges network_charges | Covered |
| Segments 1-6 plus 2VE/3VE, P1-P6, 2026 Orden TED/1524/2025. One cell differs between MITECO page and BOE (segment 3 power P3-P5). |
Voltage level voltage_level | Covered |
| 2.0TD (BT<=15kW), 3.0TD (BT>15kW), 6.1TD-6.4TD (1-30, 30-72.5, 72.5-145, >145 kV), TDVE for EV charging; 2026 values. |
Time period time_band | Covered |
| Power EUR/kW year, energy EUR/kWh, split transport/distribution in the BOE; hour definition of periods is in Circular 3/2020 art. 7. |
Latest available data latest_data | Not covered | None recorded | This specific requirement was not separately established in the inherited research. Not checked: Review the original answer and source evidence; no new research was performed during this adaptation. |
Historical coverage historical_series | Partially covered |
| Coverage combines distinct components of the question; see the original detailed evidence and its geographic and technical limits. Not checked: The original rows have different scopes. Their combination has not been established as complete; original rows are retained in internal curation. |
Update frequency update_frequency | Not covered | None recorded | This specific requirement was not separately established in the inherited research. Not checked: Review the original answer and source evidence; no new research was performed during this adaptation. |
Main caveats
- Peajes (CNMC, networks) and cargos (Ministry, other system costs) are separate documents; a full regulated price needs both. Do not add transport and distribution parts on top of the T&D line.
- No official CSV, API or time series exists in what was found: values sit in BOE text tables and an HTML page. History needs one BOE document per year; BOE legal status flags do not show supersession.
- MITECO page shows 2,051434 for cargos segment 3 power P3-P5; the BOE order text says 2,054134. Take the BOE as the legal text.
- Periods P1-P6 depend on season, day type and territory (Peninsula, Balearics, Canary Islands, Ceuta, Melilla); 2.0TD has 3 energy periods and 2 power periods. Hours are in Circular 3/2020 art. 7, not in the price resolutions.
- 2025 has two peajes documents: Res. 4-12-2024 (from 2025-01-01) and Res. 6-3-2025 replacing only Annex II (excess power) from 2025-04-01. Cargos 2024 order was published 2024-02-14.
Sources
CNMC annual resolutions setting the values of peajes de acceso a las redes de transporte y distribucion (BOE series 2021-2026)
- Source id
- s001
- Publisher
- CNMC, published in Boletin Oficial del Estado
- Official
- Yes
- Landing url
- https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-26348
- Data url
- https://www.boe.es/diario_boe/xml.php?id=BOE-A-2025-26348
- Access
- direct_download
- Format
- BOE XML (also HTML and PDF); prices are tables flattened into text
- License
- unknown
- Language
- es
- Has coordinates
- No
- Location precision
- none
- Summary
- CNMC annual resolutions setting the values of peajes de acceso a las redes de transporte y distribucion (BOE series 2021-2026)
- Coverage note
- Spain (all territories); period hours differ by territory in Circular 3/2020
- Date of data
- Prices apply from 2026-01-01; BOE publication 2025-12-22
- Caveats
- Consult the main caveats and the complete reading traps and access evidence in the detail.
- Test
- Tested on
- 2026-11-16
- Method
- download
- Http status
- 200
- Problems
- None recorded
- Example
- Example request
curl -sL "https://www.boe.es/diario_boe/xml.php?id=BOE-A-2025-26348" -o res2026.xml ; then strip tags, find ANEXO I, 1. Precios ... a) Términos de potencia contratada. For other years the same URL with the BOE id above; to find an id: curl -sL -H "Accept: application/xml" "https://www.boe.es/datosabiertos/api/boe/sumario/20241216" and look for the item title 'valores de los peajes de acceso'.
- Example result
Annex I, T&D block, EUR/kW year: 2.0 TD P1 23,324952 P2 0,443770; 6.1 TD P1 23,946498 P2 12,687713 P3 4,747747 P4 3,339695 P5 0,070979 P6 0,062703. Same series 2.0TD T&D power P1: 2021-06 23,469833; 2022 22,988256; 2023 22,393140; 2024 22,401746; 2025 22,958932; 2026 23,324952.
- Members summary
- Total
- Listed
- 7
- Tested
- 7
- Data found
- 0
- Scope note
- Inherited members; data findings were not reclassified during this structural migration. Consult each member note.
- Pattern
MITERD orders setting the prices of the cargos del sistema electrico (BOE series 2021-2026)
- Source id
- s002
- Publisher
- Ministerio para la Transicion Ecologica y el Reto Demografico, published in Boletin Oficial del Estado
- Official
- Yes
- Landing url
- https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-26705
- Data url
- https://www.boe.es/diario_boe/xml.php?id=BOE-A-2025-26705
- Access
- direct_download
- Format
- BOE XML (also HTML and PDF); tables flattened into text
- License
- unknown
- Language
- es
- Has coordinates
- No
- Location precision
- none
- Summary
- MITERD orders setting the prices of the cargos del sistema electrico (BOE series 2021-2026)
- Coverage note
- Spain (all territories)
- Date of data
- Prices apply from 2026-01-01; BOE publication 2025-12-27
- Caveats
- Consult the main caveats and the complete reading traps and access evidence in the detail.
- Test
- Tested on
- 2026-11-16
- Method
- download
- Http status
- 200
- Problems
- None recorded
- Example
- Example request
curl -sL "https://www.boe.es/diario_boe/xml.php?id=BOE-A-2025-26705" -o cargos2026.xml ; strip tags and read Primero a) Precios de los términos de potencia and b) Precios de los términos de energía
- Example result
Segment 1: power P1 4,379461 P2 0,281653 EUR/kW year; energy P1 0,064292 P2 0,012858 P3 0,003215 EUR/kWh. Segment 3 power P1 5,648870 P2 2,826996 P3-P5 2,054134 P6 0,941478. 2024 order: segment 1 power P1 2,989915.
- Members summary
- Total
- Listed
- 6
- Tested
- 6
- Data found
- 0
- Scope note
- Inherited members; data findings were not reclassified during this structural migration. Consult each member note.
- Pattern
MITECO page: Peajes de acceso a las redes de transporte y distribucion y cargos asociados a los costes del sistema
- Source id
- s003
- Publisher
- Ministerio para la Transicion Ecologica y el Reto Demografico
- Official
- Yes
- Landing url
- https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/peajes.html
- Data url
- Access
- web_viewer_only
- Format
- HTML page with tables (also embedded as escaped HTML in the page source)
- License
- unknown
- Language
- es
- Has coordinates
- No
- Location precision
- none
- Summary
- MITECO page: Peajes de acceso a las redes de transporte y distribucion y cargos asociados a los costes del sistema
- Coverage note
- Spain
- Date of data
- 2026-01-01 values; page read 2026-11-16
- Caveats
- Consult the main caveats and the complete reading traps and access evidence in the detail.
- Test
- Tested on
- 2026-11-16
- Method
- download
- Http status
- 200
- Problems
- None recorded
- Example
- Example request
curl -sL "https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/peajes.html" -o peajes.html ; the text is also in the page body table elements
- Example result
Peajes power EUR/kW year 2.0 TD: P1 23,324952, P2 0,443770; energy EUR/kWh 2.0 TD: P1 0,033261, P2 0,016409, P3 0,000077. Cargos segment 1 power P1 4,379461 P2 0,281653.
- Members summary
Additional sources in the detail: 3. Read the full detail; locate each source by its source_id.
Document access
- Summary
Local search terms
- Term
- peajes de acceso (a las redes de transporte y distribucion)
- Language
- es
- Meaning
- Network access tariffs set by CNMC
- Term
- cargos del sistema electrico
- Language
- es
- Meaning
- Charges for other system costs (renewable support, deficit, capacity) set by the Ministry
- Term
- peajes T&D, TD
- Language
- es
- Meaning
- Transport and distribution tariff groups 2.0TD to 6.4TD
- Term
- segmento tarifario de cargos
- Language
- es
- Meaning
- Cargo segments 1-6 matching the peaje groups
- Term
- termino de potencia / termino de energia
- Language
- es
- Meaning
- Fixed power term (EUR/kW year) and energy term (EUR/kWh)
- Term
- periodo P1-P6 (punta, llano, valle)
- Language
- es
- Meaning
- Tariff periods by season, day type and hour
- Term
- TDVE
- Language
- es
- Meaning
- Peajes for public electric vehicle charging points
- Term
- exceso de potencia
- Language
- es
- Meaning
- Excess over contracted power, billed with its own price
Confidence
- Confidence
- high
- Confidence reason
- Official BOE texts and CNMC files opened and values cross-checked (BOE, MITECO page, CNMC Excel and memoria agree except one cell); older years read from the BOE text.
Research provenance
- Pass count
- 1
- Models
- Claude Sonnet 5.5
- Minutes estimate
- 13
- Pages opened
- 40
- Passes
- Pass
- 1
- Date
- 2026-11-16
- Model
- Claude Sonnet 5.5
- Note
- Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed.
Record metadata
- Schema version
- 1.0
- Country
- es
- Country name
- Spain
- Topic
- network-tariffs
- Territory
- es
- Territory level
- country
- Parent url
- Html url
- https://georutter.org/es/network-tariffs/