Spain solar pv plants in permitting data sources
Where can I get a list of solar PV projects currently in permitting in Spain, with location, capacity (MW), developer, permitting stage and date?
Answer
Spain publishes regional project information and official notices, but the sources checked do not establish a complete current national list. Catalonia, Aragon, Valencia and Navarre provide regional project data. The ministry describes a state map as under construction; BOE notices provide dated milestones. National coverage and current-stage dates remain unverified.
- Official data
- Partial coverage
- Non official data
- Partial coverage
- Published
- 2026-11-19
- Research reviewed
- 2026-11-15
- Access checked
Requested attributes
| Attribute | Coverage | Sources | Scope and limitations |
|---|---|---|---|
Project location location | Partially covered |
| Some polygons and municipalities are available; exact locations vary by member. Not checked: National completeness and current project-level coverage remain to be verified. |
Capacity capacity_mw | Partially covered |
| Nominal MW and panel MWp are separate measures. Not checked: National completeness and current project-level coverage remain to be verified. |
Developer developer | Partially covered |
| Named applicants are available for tested regional and BOE examples. Not checked: National completeness and current project-level coverage remain to be verified. |
Permitting stage permitting_stage | Partially covered |
| Some regional layers report stages; a notice records a historic milestone. Not checked: National completeness and current project-level coverage remain to be verified. |
Stage date stage_date | Partially covered |
| BOE dates individual events; dates of current stage are not consistently established. Not checked: The inherited row combines multiple concepts or coverage; this specific requirement requires separate review. |
Main caveats
- State and autonomous authorities process different projects; the 50 MW threshold has territorial exceptions.
- A public notice records an event, not necessarily the present status; check subsequent decisions.
- Navarre includes projects with AAP and/or AAC; its BEGINLIFE field is a database insertion date.
- Panel MWp and nominal installed MW are different; regional sources use different fields.
- GEM has coarse project statuses, size thresholds and a download request form; individual Spanish records were not tested.
Sources
Autonomous community solar PV project datasets
- Source id
- s001
- Publisher
- Generalitat de Catalunya; Gobierno de Aragón
- Official
- Yes
- Landing url
- https://analisi.transparenciacatalunya.cat/Medi-Ambient/Plantes-solars-fotovoltaiques-a-Catalunya/ggx8-jkp4/about_data
- Data url
- https://analisi.transparenciacatalunya.cat/resource/ggx8-jkp4.json?%24where=estat%3D%27En%20tramitaci%C3%B3%27&%24limit=2
- Access
- api
- Format
- JSON, CSV, GML, SHP
- License
- Different by member; Navarre CC BY 4.0
- Language
- ca, es
- Has coordinates
- Yes
- Location precision
- exact
- Summary
- Autonomous community solar PV project datasets
- Coverage note
- Catalonia, Aragon, Valencia and Navarre
- Date of data
- Caveats
- Consult the main caveats and the complete reading traps and access evidence in the detail.
- Test
- Tested on
- 2026-11-15
- Method
- api_query
- Http status
- 200
- Problems
- None recorded
- Example
- Example request
curl -sSL --max-time 40 'https://analisi.transparenciacatalunya.cat/resource/ggx8-jkp4.json?%24where=estat%3D%27En%20tramitaci%C3%B3%27&%24limit=2'
- Example result
PSFV Galera Solar; 47.16 MW; Castelldans; Galera Solar, SL; En tramitació; Informació Pública (DOGC).
- Members summary
- Total
- Listed
- 4
- Tested
- 4
- Data found
- 0
- Scope note
- Inherited members; data findings were not reclassified during this structural migration. Consult each member note.
- Pattern
BOE daily summary API
- Source id
- s002
- Publisher
- Agencia Estatal Boletín Oficial del Estado
- Official
- Yes
- Landing url
- https://www.boe.es/datosabiertos/api/boe/sumario/20261113
- Data url
- https://www.boe.es/datosabiertos/api/boe/sumario/20261113
- Access
- api
- Format
- JSON
- License
- unknown
- Language
- es
- Has coordinates
- No
- Location precision
- municipality
- Summary
- BOE daily summary API
- Coverage note
- Spain, partial
- Date of data
- Caveats
- Consult the main caveats and the complete reading traps and access evidence in the detail.
- Test
- Tested on
- 2026-11-15
- Method
- api_query
- Http status
- 200
- Problems
- None recorded
- Example
- Example request
curl -sSL --max-time 30 -H 'Accept: application/json' 'https://www.boe.es/datosabiertos/api/boe/sumario/20261015'
- Example result
BOE-B-2026-33542: PSFV Solana, Constantí, 5.000 MW, public consultation on AAP/AAC and environmental assessment.
- Members summary
SABIA environmental assessment project search
- Source id
- s003
- Publisher
- MITECO
- Official
- Yes
- Landing url
- https://sede.miteco.gob.es/portal/site/seMITECO/navServicioContenido
- Data url
- Access
- web_viewer_only
- Format
- HTML
- License
- unknown
- Language
- es
- Has coordinates
- No
- Location precision
- municipality
- Summary
- SABIA environmental assessment project search
- Coverage note
- Spain, partial
- Date of data
- Caveats
- Consult the main caveats and the complete reading traps and access evidence in the detail.
- Test
- Tested on
- 2026-11-15
- Method
- page_only
- Http status
- 200
- Problems
- None recorded
- Example
- Example request
https://sede.miteco.gob.es/portal/site/seMITECO/navServicioContenido
- Example result
Search fields include project title, status, project type and promoter.
- Members summary
Additional sources in the detail: 1. Read the full detail; locate each source by its source_id.
Document access
- Summary
Local search terms
- Term
- planta solar fotovoltaica
- Language
- es
- Meaning
- solar PV plant
- Term
- información pública
- Language
- es
- Meaning
- public consultation
- Term
- autorización administrativa previa
- Language
- es
- Meaning
- prior administrative authorisation
- Term
- autorización administrativa de construcción
- Language
- es
- Meaning
- construction authorisation
- Term
- declaración de impacto ambiental
- Language
- es
- Meaning
- environmental impact statement
Confidence
- Confidence
- medium
- Confidence reason
- Regional files and a BOE notice were tested; the state map service and national coverage remain unchecked.
Research provenance
- Pass count
- 2
- Models
- Gemini 4 Hydrogen (Low)
- Terra 6.1 (High)
- Minutes estimate
- 34
- Pages opened
- 48
- Passes
- Pass
- 1
- Date
- 2026-11-15
- Model
- Gemini 4 Hydrogen (Low)
- Pass
- 2
- Date
- 2026-11-15
- Model
- Terra 6.1 (High)
- Note
- Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed.
Record metadata
- Schema version
- 1.0
- Country
- es
- Country name
- Spain
- Topic
- solar-pv-plants-in-permitting
- Territory
- es
- Territory level
- country
- Parent url
- Html url
- https://georutter.org/es/solar-pv-plants-in-permitting/