Sources
2 on this page · 0 in the detail

Answer

Official data
Partial coverage
Non official data
Not checked
Confidence
Medium

The UK REPD publishes a quarterly list with battery and stand-alone storage filters, planning milestones and project details for all four nations. It is a snapshot above 150 kW, not a complete live register. Check each application with its planning authority; the Northern Ireland portal excludes some records online.

Confidence reason: The extract was downloaded and Scottish, Welsh and Northern Irish case documents checked; completeness and several sources remain unverified.

Requested attributes

AttributeCoverageSourcesScope and limitations
Project location locationPartially coveredrepdREPD has address and coordinates; Netherton coordinate checked.

Not checked: Coverage, completeness and freshness across responsible authorities have not been fully checked.

Power power_mwPartially coveredrepdREPD Installed Capacity (MWelec); Netherton is 400.

Not checked: Coverage, completeness and freshness across responsible authorities have not been fully checked.

Developer developerPartially coveredrepdREPD names operator or applicant; actual legal applicant can differ.

Not checked: Coverage, completeness and freshness across responsible authorities have not been fully checked.

Permitting stage permitting_stagePartially coveredrepdREPD has Development Status and planning reference.

Not checked: Coverage, completeness and freshness across responsible authorities have not been fully checked.

Stage date stage_datePartially coveredrepdUse the date for each milestone. The REPD date and the later Netherton letter do not establish the current consent stage.

Not checked: Coverage, completeness and freshness across responsible authorities have not been fully checked.

Main caveats

  • REPD can lag: Belfast LA04/2020/1724/F is listed as submitted despite a 2023 council report marking it invalid.
  • The ECU screening outcome is not planning consent; the Netherton application dates require reconciliation.
  • The Northern Ireland register is not fully online, and Mid Ulster has a separate portal.
  • Connection and planning permission are separate milestones.
  • In October 2026, 32 of 271 rows tagged stand-alone and Application Submitted lacked MW. This is a snapshot count, and the stand-alone classification needs checking.

Sources

repdRenewable Energy Planning Database quarterly extract

Department for Energy Security and Net Zero · Official · CSV · Direct download · License: UK Open Government Licence

Quarterly downloadable project records, filterable by battery, storage type and planning status.

Landing url
https://www.gov.uk/government/publications/renewable-energy-planning-database-quarterly-extract
Data url
https://assets.publishing.service.gov.uk/media/6af42ff0a4004bdbe54e54a5/REPD_Publication_Q3_2026.csv
Coverage note
UK records across all four nations; not a complete current register and subject to a 150 kW threshold.
Date of data
October 2026
Language
en
Location precision
Address
Has coordinates
Yes
Test
2026-11-27 · Download · HTTP 200
  • UTF-8 decoding failed; Windows-1252 worked.

Caveats

  • Check current status with the competent planning authority.

Complete procedure available in the full detail

authority_documentsPlanning authority case documents: sample

Planning authorities · Official · PDF · PDF · License: unknown

Original planning case documents can confirm project details and expose stale snapshot statuses.

Coverage note
Four case examples across the nations; find the relevant planning authority for other projects.
Date of data
Not stated
Language
en
Location precision
Address
Has coordinates
No
Example access test
2026-11-27 · Page only · HTTP 200
Members summary
Listed: 4 · Tested: 4 · Data found: 4

Four documents chosen to compare one REPD case in each UK nation; the number of competent planning authorities is not established.

See member links and checks in the detail (authority_documents)

Caveats

  • Examples are historical and do not establish current decisions.

Complete procedure available in the full detail

Additional sources in the detail: 0. Read the full detail; locate each source by its source_id.

Document access

Planning case documents can resolve omissions and confirm a current decision; the sample below was read, but no systematic UK-wide compilation was tested.

Research provenance

Pass count
1
Minutes estimate
7
Pages opened
Not stated
PassDate
12026-11-27

Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed.

Record metadata: Schema version: 1.0 · Country: gb · Country name: United Kingdom · Topic: battery-storage-in-permitting · Territory: gb · Territory level: Country · Parent url: No parent territory · Html url: https://georutter.org/gb/battery-storage-in-permitting/