gb / battery-storage-in-permittingUnited Kingdom battery storage in permitting data sources
Where can I get a list of stand-alone battery storage (BESS) projects currently in permitting in the United Kingdom, with location, power (MW), developer, permitting stage and date?
- Research reviewed
- 2026-11-27
- Sources tested
- 2026-11-27
- Access checked
- 2026-11-27
- Published
- 2026-11-27
- Sources
- 2 on this page · 0 in the detail
Answer
- Official data
- Partial coverage
- Non official data
- Not checked
- Confidence
- Medium
The UK REPD publishes a quarterly list with battery and stand-alone storage filters, planning milestones and project details for all four nations. It is a snapshot above 150 kW, not a complete live register. Check each application with its planning authority; the Northern Ireland portal excludes some records online.
Requested attributes
| Attribute | Coverage | Sources | Scope and limitations |
|---|---|---|---|
Project location location | Partially covered | repd | REPD has address and coordinates; Netherton coordinate checked. Not checked: Coverage, completeness and freshness across responsible authorities have not been fully checked. |
Power power_mw | Partially covered | repd | REPD Installed Capacity (MWelec); Netherton is 400. Not checked: Coverage, completeness and freshness across responsible authorities have not been fully checked. |
Developer developer | Partially covered | repd | REPD names operator or applicant; actual legal applicant can differ. Not checked: Coverage, completeness and freshness across responsible authorities have not been fully checked. |
Permitting stage permitting_stage | Partially covered | repd | REPD has Development Status and planning reference. Not checked: Coverage, completeness and freshness across responsible authorities have not been fully checked. |
Stage date stage_date | Partially covered | repd | Use the date for each milestone. The REPD date and the later Netherton letter do not establish the current consent stage. Not checked: Coverage, completeness and freshness across responsible authorities have not been fully checked. |
Main caveats
- REPD can lag: Belfast LA04/2020/1724/F is listed as submitted despite a 2023 council report marking it invalid.
- The ECU screening outcome is not planning consent; the Netherton application dates require reconciliation.
- The Northern Ireland register is not fully online, and Mid Ulster has a separate portal.
- Connection and planning permission are separate milestones.
- In October 2026, 32 of 271 rows tagged stand-alone and Application Submitted lacked MW. This is a snapshot count, and the stand-alone classification needs checking.
Sources
repdRenewable Energy Planning Database quarterly extract
Department for Energy Security and Net Zero · Official · CSV · Direct download · License: UK Open Government Licence
Quarterly downloadable project records, filterable by battery, storage type and planning status.
- Landing url
- https://www.gov.uk/government/publications/renewable-energy-planning-database-quarterly-extract
- Data url
- https://assets.publishing.service.gov.uk/media/6af42ff0a4004bdbe54e54a5/REPD_Publication_Q3_2026.csv
- Coverage note
- UK records across all four nations; not a complete current register and subject to a 150 kW threshold.
- Date of data
- October 2026
- Language
en- Location precision
- Address
- Has coordinates
- Yes
- Test
- 2026-11-27 · Download · HTTP 200
- UTF-8 decoding failed; Windows-1252 worked.
Caveats
- Check current status with the competent planning authority.
authority_documentsPlanning authority case documents: sample
Planning authorities · Official · PDF · PDF · License: unknown
Original planning case documents can confirm project details and expose stale snapshot statuses.
- Coverage note
- Four case examples across the nations; find the relevant planning authority for other projects.
- Date of data
- Language
en- Location precision
- Address
- Has coordinates
- No
- Example access test
- 2026-11-27 · Page only · HTTP 200
- Members summary
- Listed: 4 · Tested: 4 · Data found: 4
Four documents chosen to compare one REPD case in each UK nation; the number of competent planning authorities is not established.
See member links and checks in the detail (
authority_documents)
Caveats
- Examples are historical and do not establish current decisions.
Additional sources in the detail: 0. Read the full detail; locate each source by its source_id.
Document access
Planning case documents can resolve omissions and confirm a current decision; the sample below was read, but no systematic UK-wide compilation was tested.
Research provenance
- Pass count
- 1
- Minutes estimate
- 7
- Pages opened
| Pass | Date |
|---|---|
| 1 | 2026-11-27 |