gb / grid-connection-queueUnited Kingdom grid connection queue data sources
Where can I get the list of grid connection requests in the United Kingdom, with project, technology, capacity (MW), connection node, status and date?
- Research reviewed
- 2026-11-27
- Sources tested
- 2026-11-27
- Access checked
- 2026-11-27
- Published
- 2026-11-27
- Sources
- 4 on this page · 0 in the detail
Answer
- Official data
- Partial coverage
- Non official data
- Not checked
- Confidence
- Medium
NESO publishes GB TEC contracts and a separate Scottish embedded register; SONI publishes Northern Ireland connection agreements and effective applications. Distribution operators publish their own registers. These datasets mix connected and future projects and do not provide a complete list of all UK applications.
Local search terms
- Transmission Entry Capacity — Contracted TEC, not all applications.
- Gate 2 — Prioritised connection agreement after applicable assessment and countersignature.
- Embedded Capacity Register — Distribution operator register; distinct from NESO Scottish Embedded register.
Requested attributes
| Attribute | Coverage | Sources | Scope and limitations |
|---|---|---|---|
Project project | Partially covered | tec embedded soni distribution | Names and project IDs are available in tested NESO and SONI records. Not checked: UK-wide coverage and missing distribution, request-date or history details remain to be checked. |
Technology technology | Partially covered | tec embedded soni distribution | NESO has Plant Type; SONI groups rows in technology sections. Not checked: UK-wide coverage and missing distribution, request-date or history details remain to be checked. |
Requested capacity capacity_mw | Partially covered | tec embedded soni distribution | NESO connected and cumulative TEC; SONI export/import differ. Not checked: UK-wide coverage and missing distribution, request-date or history details remain to be checked. |
Connection node connection_node | Partially covered | tec embedded soni distribution | NESO connection site and SONI point coordinates are available. Not checked: UK-wide coverage and missing distribution, request-date or history details remain to be checked. |
Request status status | Partially covered | tec embedded soni distribution | Status and agreement stage exist; Gate blank is unspecified. Not checked: UK-wide coverage and missing distribution, request-date or history details remain to be checked. |
Request or event date event_date | Partially covered | tec embedded soni distribution | NESO MW Effective From is not the request date; SONI has connection dates. Not checked: The tested NESO files give capacity-effective dates, SONI reports connection dates or status, and Northern Powergrid reports offer acceptance. Application submission dates were not established across these registers. |
Latest available data latest_data | Partially covered | tec embedded soni | NESO files dated 26 November 2026; SONI latest linked 17 August 2026. Not checked: UK-wide coverage and missing distribution, request-date or history details remain to be checked. |
Historical coverage historical_series | Partially covered | tec embedded soni | NESO cites FOI archives for 2014–2025; SONI links previous editions. Not checked: UK-wide coverage and missing distribution, request-date or history details remain to be checked. |
Update frequency update_frequency | Partially covered | tec embedded soni distribution | NESO states twice weekly, SSEN monthly; SONI schedule not established. Not checked: UK-wide coverage and missing distribution, request-date or history details remain to be checked. |
Main caveats
- TEC is a contract register, not all requests; NESO reports no public demand connection register.
- An empty Gate field is not Gate 1 or Gate 2: NESO populates it after an agreement is countersigned.
- Effective capacity dates are not application dates; connected MW and cumulative stage MW are different.
- NESO warns repeated capacity across stages or technologies can cause duplicates.
- Distribution coverage varies: Northern Powergrid ECR omits unaccepted enquiries; SONI omits cluster agreements.
Sources
tecNESO Transmission Entry Capacity register
National Energy System Operator · Official · CSV · Direct download · License: NESO Open Data Licence
TEC agreements, including existing and future projects.
- Landing url
- https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register
- Data url
- https://api.neso.energy/dataset/cbd45e54-e6e2-4a38-99f1-8de6fd96d7c1/resource/17becbab-e3e8-473f-b303-3806f43a6a10/download/tec-register-26-november-2026.csv
- Coverage note
- Great Britain; projects holding TEC agreements for existing or future connections, including embedded projects.
- Date of data
- 26 November 2026
- Language
en- Location precision
- No location
- Has coordinates
- No
- Test
- 2026-11-27 · Download · HTTP 200
Caveats
- Not a complete UK-wide list of all applications.
embeddedNESO Embedded Register
National Energy System Operator · Official · CSV · Direct download · License: NESO Open Data Licence
NESO Scottish embedded generation.
- Landing url
- https://www.neso.energy/data-portal/embedded-register
- Data url
- https://api.neso.energy/dataset/4b0e109c-aa23-45ac-86c1-0bda557d1aab/resource/68b6f3a1-e1bf-403b-9062-0269fc758d77/download/embedded-register-26-november-2026.csv
- Coverage note
- Scotland: embedded generation connected or contracted to connect.
- Date of data
- 26 November 2026
- Language
en- Location precision
- No location
- Has coordinates
- No
- Test
- 2026-11-27 · Download · HTTP 200
Caveats
- Not a complete UK-wide list of all applications.
soniConnections Register
SONI · Official · XLSX · Direct download · License: unknown
Northern Ireland applications and agreements.
- Landing url
- https://www.soni.ltd.uk/industry/connections-and-applications
- Data url
- https://cms.soni.ltd.uk//sites/default/files/2026-08/20260817%20Connections%20Register%2017%20Aug%202026%20%28Excel%29.xlsx
- Coverage note
- Northern Ireland transmission and selected distribution TUoS cases. SONI excludes connections below 5 MW and cluster substation agreements.
- Date of data
- 17 August 2026
- Language
en- Location precision
- Exact
- Has coordinates
- Yes
- Test
- 2026-11-27 · Download · HTTP 200
Caveats
- Not a complete UK-wide list of all applications.
distributionDistribution operators’ embedded capacity registers: sample
Distribution network operators · Official · JSON, CSV or web · API · License: varies by operator
Operator registers cover distribution-connected and accepted projects; Northern Powergrid data are queryable.
- Coverage note
- Northern Powergrid tested in northeast England and Yorkshire; SSEN and NGED data downloads were blocked.
- Date of data
- 13 November 2026 for Northern Powergrid
- Language
en- Location precision
- Exact
- Has coordinates
- Yes
- Example access test
- 2026-11-27 · API query · HTTP 200
- Members summary
- Listed: 4 · Tested: 4 · Data found: 2
Three DNO group examples reviewed, chosen for accessible dataset leads; not all GB operators are covered.
See member links and checks in the detail (
distribution)
Caveats
- Coverage and access differ by operator; ECRs omit many unaccepted enquiries.
Additional sources in the detail: 0. Read the full detail; locate each source by its source_id.
Document access
Where published information is in workbooks or case documents, extract only their stated status; the example does not fill all missing requests.
Research provenance
- Pass count
- 1
- Minutes estimate
- 12
- Pages opened
| Pass | Date |
|---|---|
| 1 | 2026-11-27 |