Where can I get a list of stand-alone battery storage (BESS) projects currently in permitting in the United States, with location, power (MW), developer, permitting stage and date?

Answer

US stand-alone BESS permitting is split across state and local authorities; no complete national list was found in the inherited research. EIA-860M September 2026 (released October) gives a planned-generator proxy with 34 filtered stand-alone cases >=1 MW, coordinates and Entity Name, but lacks permit stages/dates and misses early or local applications. Sampled state portals provide actual stages and dates in CA, WA and MA; linked dockets and PDFs supply further details. Paid trackers have different coverage.

Official data
Partial coverage
Non official data
Partial coverage
Published
2026-11-19
Research reviewed
2026-11-15
Access checked
No complete access check recorded

Requested attributes

AttributeCoverageSourcesScope and limitations
Project location locationPartially covered
  • s001
  • s002
EIA and CA have coordinates; WA/MA use towns, counties or docket maps. Early local projects and a consolidated national permitting inventory are missing.

Not published: Inherited location and stand-alone-project-list rows document gaps in early county/municipal cases and variable site precision.

Power power_mwPartially covered
  • s001
  • s002
MW is available in EIA, CA and some state pages; small or early projects outside reporting thresholds lack consolidated coverage.

Not published: The original power and project-list rows document projects below 1 MW and early/local cases outside the EIA proxy.

Developer developerPartially covered
  • s001
  • s002
EIA Entity Name and state applicant LLCs give partial developer information; CA REST requires linked project pages for the applicant.

Not published: The original developer row distinguishes project SPVs, parent developers and fields omitted from the CA REST attributes.

Permitting stage permitting_stagePartially covered
  • s002
  • s001
State dockets give review stages; EIA Status (L) is a coarse approvals-pending proxy. Interconnection study status is not a siting permit stage.

Not published: The original stage and project-list rows document absent national tracking of local zoning, environmental and other siting sub-stages.

Stage date stage_datePartially covered
  • s002
State dockets give some filing/completeness/scoping dates. EIA planned-operation dates do not satisfy a permitting-stage date.

Not published: EIA does not publish permit application/hearing/approval dates. The inherited evidence locates real stage dates in scattered state/county dockets.

Main caveats

Sources

Preliminary Monthly Electric Generator Inventory (Form EIA-860M) — supplemented by Form EIA-860

Source id
s001
Publisher
U.S. Energy Information Administration (EIA)
Official
Yes
Landing url
https://www.eia.gov/electricity/data/eia860m/
Data url
https://www.eia.gov/electricity/data/eia860m/xls/september_generator2026.xlsx
Access
direct_download
Format
xlsx (plus annual zip of xlsx files for EIA-860)
License
Public domain (U.S. Federal Government publication; attribution requested)
Language
en
Has coordinates
Yes
Location precision
exact
Summary
A nationwide planned-generator proxy with MW and coordinates; it is not a complete permitting register.
Coverage note
Reported batteries at least 1 MW; the inherited stand-alone Status (L) filter yields 34 cases and misses early/local applications.
Date of data
September 2026 inventory, released October 2026.
Caveats
  • Planned or interconnection status is not the same as siting/environmental permit stage. EIA lacks permit filing and decision dates.
  • The annual Independent field is unreliable for this purpose; the detail gives the tested cross-Plant-ID filter.
  • The inherited shell example only lists workbook sheets; the 34-project result also requires the filtering steps in the detail.
Test
Tested on
2026-11-15
Method
download
Http status
200
Problems
  • Lacks permitting sub-stages and permitting/filing dates; misses early state-permitting BESS (4/5 CA CEC Opt-In, WA Goldeneye, MA EFSB 26-01/26-02).
Example
Complete procedure available in the full detail
Members summary
Not a grouped source

U.S. State Energy Facility Siting Boards & State BESS Permitting Portals (sampled across 9 states)

Source id
s002
Publisher
State Energy Commissions & Utility Siting Councils (CA CEC, WA EFSEC, MA EFSB, OR EFSC, NY ORES, CT CSC, VA DEQ, MN PUC, MI MPSC)
Official
Yes
Landing url
https://www.energy.ca.gov/programs-and-topics/topics/power-plants/opt-certification-program
Data url
https://services3.arcgis.com/bWPjFyq029ChCGur/arcgis/rest/services/OptIn_Dashboard_Data/FeatureServer/0
Access
api
Format
ArcGIS REST GeoJSON/JSON (CA CEC Opt-In) + HTML docket tables & PDFs (WA, MA, OR, NY, CT)
License
Public state government records (varies by state)
Language
en
Has coordinates
Yes
Location precision
exact
Summary
Start here for actual state permitting stages and dates; follow linked dockets and PDFs for missing fields.
Coverage note
Nine state portals sampled. Matching stand-alone cases are documented in CA, WA and MA; local approvals remain fragmented.
Date of data
Rolling dockets; inherited tests dated 2026-11-15.
Caveats
  • CA REST field Projec_Name is misspelled and omits the developer; use the linked project page.
  • OR/NY mainly show hybrids and CT had no pending matching cases. VA/MN/MI access failures do not establish absence.
  • County/municipal permits are not comprehensively covered. WA/MA location and document access vary.
Test
Tested on
2026-11-15
Method
api_query
Http status
200
Problems
  • Patchwork coverage across only selected states/thresholds; Developer omitted in CA REST attributes; VA/MN/MI blocked to curl.
Example
Example request
curl -sS "https://services3.arcgis.com/bWPjFyq029ChCGur/arcgis/rest/services/OptIn_Dashboard_Data/FeatureServer/0/query?where=Technology%3D%27Energy%20Storage%20System%27%20AND%20Status%3D%27Under%20Review%27&outFields=Projec_Name,Docket_Number,Technology,Status,BatteryPower,County,Latitude_DD,Longitude_DD,Application_Review_Status,Application_Completeness,Scoping_Date,Webpage&outSR=4326&f=json"
Example result
5 features returned: Corby (24-OPT-05, 300 MW, Solano, Application Approved, completeness 2025-10-17), Prairie Song (25-OPT-02, 1150 MW, LA, completeness 2026-01-30), Viracocha Hill (25-OPT-01, 90.7 MW, Alameda, Incomplete), Vaca Dixon (26-OPT-01, 157 MW, Solano, Incomplete), Seahawk (26-OPT-02, 200 MW, Santa Cruz, Under completeness review, 36.951874, -121.758846).
Members summary
Total
50
Listed
9
Tested
9
Data found
3
Scope note
50 state-level jurisdictions, with nine portals sampled. This group does not enumerate DC, territories or county/municipal authorities.
Pattern
Not stated

Additional sources in the detail: 2. Read the full detail; locate each source by its source_id.

Document access

Summary
Use state siting docket logs to locate applications, completeness worksheets and assessments. The inherited CA and WA PDF examples supply dates, project context and location references; broader coordinate/ortho joins remain unverified.

Local search terms

Confidence

Confidence
high
Confidence reason
Verified directly against Sep 2026 EIA-860M/2025 EIA-860 spreadsheets, federal NEPA/FAST-41 portals, 9 state siting portals, NYISO queue workbook, OSM Taginfo, Sandia GESDB, GEM, and commercial trackers.

Research provenance

Pass count
1
Models
  • Gemini 4 Hydrogen
Minutes estimate
23
Pages opened
73
Passes
  • Pass
    1
    Date
    2026-11-15
    Model
    Gemini 4 Hydrogen
Note
Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed.

Record metadata

Schema version
1.0
Country
us
Country name
United States
Topic
battery-storage-in-permitting
Territory
us
Territory level
country
Parent url
No parent territory
Html url
https://georutter.org/us/battery-storage-in-permitting/