United States battery storage in permitting data sources
Where can I get a list of stand-alone battery storage (BESS) projects currently in permitting in the United States, with location, power (MW), developer, permitting stage and date?
Answer
US stand-alone BESS permitting is split across state and local authorities; no complete national list was found in the inherited research. EIA-860M September 2026 (released October) gives a planned-generator proxy with 34 filtered stand-alone cases >=1 MW, coordinates and Entity Name, but lacks permit stages/dates and misses early or local applications. Sampled state portals provide actual stages and dates in CA, WA and MA; linked dockets and PDFs supply further details. Paid trackers have different coverage.
- Official data
- Partial coverage
- Non official data
- Partial coverage
- Published
- 2026-11-19
- Research reviewed
- 2026-11-15
- Access checked
Requested attributes
| Attribute | Coverage | Sources | Scope and limitations |
|---|---|---|---|
Project location location | Partially covered |
| EIA and CA have coordinates; WA/MA use towns, counties or docket maps. Early local projects and a consolidated national permitting inventory are missing. Not published: Inherited location and stand-alone-project-list rows document gaps in early county/municipal cases and variable site precision. |
Power power_mw | Partially covered |
| MW is available in EIA, CA and some state pages; small or early projects outside reporting thresholds lack consolidated coverage. Not published: The original power and project-list rows document projects below 1 MW and early/local cases outside the EIA proxy. |
Developer developer | Partially covered |
| EIA Entity Name and state applicant LLCs give partial developer information; CA REST requires linked project pages for the applicant. Not published: The original developer row distinguishes project SPVs, parent developers and fields omitted from the CA REST attributes. |
Permitting stage permitting_stage | Partially covered |
| State dockets give review stages; EIA Status (L) is a coarse approvals-pending proxy. Interconnection study status is not a siting permit stage. Not published: The original stage and project-list rows document absent national tracking of local zoning, environmental and other siting sub-stages. |
Stage date stage_date | Partially covered |
| State dockets give some filing/completeness/scoping dates. EIA planned-operation dates do not satisfy a permitting-stage date. Not published: EIA does not publish permit application/hearing/approval dates. The inherited evidence locates real stage dates in scattered state/county dockets. |
Main caveats
- Cross-checking Sep 2026 EIA-860M (L) proves it misses active state siting cases: 4/5 CA CEC Opt-In BESS under review, WA Goldeneye (200 MW), and MA EFSB 26-01/26-02 do not appear in EIA-860M (L).
- EIA-860 annual 3_4_Energy_Storage 'Independent' column is blank in 89/90 Status='L' rows and labels hybrid Plant 65043 ('Dulles Solar and Storage') as 'Y'; stand-alone BESS must be derived across Plant IDs.
- Grid interconnection queues (NYISO, ERCOT GIS, CAISO, LBNL Queued Up, Interconnection.fyi) track transmission study status and target COD, NOT siting or environmental permitting.
- Texas leads EIA-860M stand-alone (L) with 16 of 34 plants nationwide despite having no state BESS siting board, underscoring that most BESS permit locally at county/municipal level.
- Open non-official portals freeze in Jan 2022 (Sandia GESDB), lack a BESS tracker (GEM), have ~0 proposed BESS (OSM Taginfo), or mirror EIA-860M (US Energy Map); PUC+EIA trackers (Halcyon) are paid.
Sources
Preliminary Monthly Electric Generator Inventory (Form EIA-860M) — supplemented by Form EIA-860
- Source id
- s001
- Publisher
- U.S. Energy Information Administration (EIA)
- Official
- Yes
- Landing url
- https://www.eia.gov/electricity/data/eia860m/
- Data url
- https://www.eia.gov/electricity/data/eia860m/xls/september_generator2026.xlsx
- Access
- direct_download
- Format
- xlsx (plus annual zip of xlsx files for EIA-860)
- License
- Public domain (U.S. Federal Government publication; attribution requested)
- Language
- en
- Has coordinates
- Yes
- Location precision
- exact
- Summary
- A nationwide planned-generator proxy with MW and coordinates; it is not a complete permitting register.
- Coverage note
- Reported batteries at least 1 MW; the inherited stand-alone Status (L) filter yields 34 cases and misses early/local applications.
- Date of data
- September 2026 inventory, released October 2026.
- Caveats
- Planned or interconnection status is not the same as siting/environmental permit stage. EIA lacks permit filing and decision dates.
- The annual Independent field is unreliable for this purpose; the detail gives the tested cross-Plant-ID filter.
- The inherited shell example only lists workbook sheets; the 34-project result also requires the filtering steps in the detail.
- Test
- Tested on
- 2026-11-15
- Method
- download
- Http status
- 200
- Problems
- Lacks permitting sub-stages and permitting/filing dates; misses early state-permitting BESS (4/5 CA CEC Opt-In, WA Goldeneye, MA EFSB 26-01/26-02).
- Example
- Members summary
U.S. State Energy Facility Siting Boards & State BESS Permitting Portals (sampled across 9 states)
- Source id
- s002
- Publisher
- State Energy Commissions & Utility Siting Councils (CA CEC, WA EFSEC, MA EFSB, OR EFSC, NY ORES, CT CSC, VA DEQ, MN PUC, MI MPSC)
- Official
- Yes
- Landing url
- https://www.energy.ca.gov/programs-and-topics/topics/power-plants/opt-certification-program
- Data url
- https://services3.arcgis.com/bWPjFyq029ChCGur/arcgis/rest/services/OptIn_Dashboard_Data/FeatureServer/0
- Access
- api
- Format
- ArcGIS REST GeoJSON/JSON (CA CEC Opt-In) + HTML docket tables & PDFs (WA, MA, OR, NY, CT)
- License
- Public state government records (varies by state)
- Language
- en
- Has coordinates
- Yes
- Location precision
- exact
- Summary
- Start here for actual state permitting stages and dates; follow linked dockets and PDFs for missing fields.
- Coverage note
- Nine state portals sampled. Matching stand-alone cases are documented in CA, WA and MA; local approvals remain fragmented.
- Date of data
- Rolling dockets; inherited tests dated 2026-11-15.
- Caveats
- CA REST field Projec_Name is misspelled and omits the developer; use the linked project page.
- OR/NY mainly show hybrids and CT had no pending matching cases. VA/MN/MI access failures do not establish absence.
- County/municipal permits are not comprehensively covered. WA/MA location and document access vary.
- Test
- Tested on
- 2026-11-15
- Method
- api_query
- Http status
- 200
- Problems
- Patchwork coverage across only selected states/thresholds; Developer omitted in CA REST attributes; VA/MN/MI blocked to curl.
- Example
- Example request
curl -sS "https://services3.arcgis.com/bWPjFyq029ChCGur/arcgis/rest/services/OptIn_Dashboard_Data/FeatureServer/0/query?where=Technology%3D%27Energy%20Storage%20System%27%20AND%20Status%3D%27Under%20Review%27&outFields=Projec_Name,Docket_Number,Technology,Status,BatteryPower,County,Latitude_DD,Longitude_DD,Application_Review_Status,Application_Completeness,Scoping_Date,Webpage&outSR=4326&f=json"
- Example result
5 features returned: Corby (24-OPT-05, 300 MW, Solano, Application Approved, completeness 2025-10-17), Prairie Song (25-OPT-02, 1150 MW, LA, completeness 2026-01-30), Viracocha Hill (25-OPT-01, 90.7 MW, Alameda, Incomplete), Vaca Dixon (26-OPT-01, 157 MW, Solano, Incomplete), Seahawk (26-OPT-02, 200 MW, Santa Cruz, Under completeness review, 36.951874, -121.758846).
- Members summary
- Total
- 50
- Listed
- 9
- Tested
- 9
- Data found
- 3
- Scope note
- 50 state-level jurisdictions, with nine portals sampled. This group does not enumerate DC, territories or county/municipal authorities.
- Pattern
Additional sources in the detail: 2. Read the full detail; locate each source by its source_id.
Document access
- Summary
- Use state siting docket logs to locate applications, completeness worksheets and assessments. The inherited CA and WA PDF examples supply dates, project context and location references; broader coordinate/ortho joins remain unverified.
Local search terms
- Term
- Stand-alone BESS / Front-of-the-Meter (FTM) Energy Storage System
- Language
- en
- Meaning
- Battery facility not co-located with generation; isolated in EIA-860M by checking that all units sharing Plant ID across Operating + Planned have Technology='Batteries'.
- Term
- Status (L) — Regulatory approvals pending. Not under construction
- Language
- en
- Meaning
- Form EIA-860/860M planned generator status code indicating approvals/permits are pending prior to construction.
- Term
- Opt-In Certification (CA AB 205 / Pub. Resources Code § 25545)
- Language
- en
- Meaning
- California Energy Commission optional statewide CEQA/siting certification pathway for >=200 MWh energy storage systems, alternative to county conditional use permits.
- Term
- Site Certification / CPCN / Certificate of Environmental Impact and Public Interest
- Language
- en
- Meaning
- State siting permit terms used by WA EFSEC, CT CSC, and MA EFSB for state-jurisdiction projects.
- Term
- Conditional Use Permit (CUP) / Special Use Permit (SUP)
- Language
- en
- Meaning
- County or municipal land-use zoning permit required in states without a state BESS siting board (e.g. Texas) or below state capacity thresholds.
- Term
- NFPA 855 / IFC Chapter 1207
- Language
- en
- Meaning
- Model U.S. fire safety codes governing stationary BESS fire permitting, hazard mitigation analysis, and UL 9540A testing.
Confidence
- Confidence
- high
- Confidence reason
- Verified directly against Sep 2026 EIA-860M/2025 EIA-860 spreadsheets, federal NEPA/FAST-41 portals, 9 state siting portals, NYISO queue workbook, OSM Taginfo, Sandia GESDB, GEM, and commercial trackers.
Research provenance
- Pass count
- 1
- Models
- Gemini 4 Hydrogen
- Minutes estimate
- 23
- Pages opened
- 73
- Passes
- Pass
- 1
- Date
- 2026-11-15
- Model
- Gemini 4 Hydrogen
- Note
- Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed.
Record metadata
- Schema version
- 1.0
- Country
- us
- Country name
- United States
- Topic
- battery-storage-in-permitting
- Territory
- us
- Territory level
- country
- Parent url
- Html url
- https://georutter.org/us/battery-storage-in-permitting/