United States grid connection queue data sources
Where can I get the list of grid connection requests in the United States, with project, technology, capacity (MW), connection node, status and date?
Answer
There is no single official national list: each ISO/RTO publishes its own. MISO (JSON), CAISO and NYISO (Excel) were downloaded and give technology, MW, POI, status and dates; only NYISO names developers. PJM has a web viewer with export links not tested; SPP, ISO-NE, ERCOT not retrieved. Berkeley Lab's Queued Up compilation (7 ISOs plus ~50 non-ISO areas) was blocked here.
- Official data
- Partial coverage
- Non official data
- Partial coverage
Local search terms
- Interconnection queue — Ordered list of generator requests to connect to the transmission grid.
- POI (point of interconnection) — Requested substation or line where the project would connect.
- ERIS / NRIS — Energy Resource / Network Resource Interconnection Service (MISO svcType values).
- DPP (Definitive Planning Phase) — MISO study cycle label such as DPP-2023.
- Cluster study — Requests studied in batches (CAISO clusters, PJM Transition Cycles, NYISO cluster projects).
- ISO/RTO — Independent System Operator or Regional Transmission Organization.
- Published
- 2026-11-19
- Research reviewed
- 2026-11-19
- Access checked
- 2026-11-19
Requested attributes
| Attribute | Coverage | Sources | Scope and limitations |
|---|---|---|---|
Project project | Partially covered |
| NYISO names developer and project; CAISO gives project names; MISO only a request number. Not published: MISO and CAISO files tested do not publish developer; PJM rows not read; non-ISO utilities not examined. |
Technology technology | Partially covered |
| MISO fuelType/facilityType, CAISO up to three fuels with MW, NYISO fuel code. Not checked: PJM, SPP, ISO-NE, ERCOT and non-ISO utilities not read; LBNL compilation blocked. |
Requested capacity capacity_mw | Partially covered |
| Summer/winter or POI MW; bases differ (MISO net summer/winter, CAISO per fuel and POI, NYISO SP/WP). Not checked: Other operators not read; MW bases are not harmonised and are undocumented. |
Connection node connection_node | Partially covered |
| Single POI field: MISO poiName (3,746 of 4,101 filled), CAISO POI, NYISO Points of Interconnection. Not published: Tested files do not separate requested from assigned node; MISO leaves POI empty on about 355 records. |
Request status status | Partially covered |
| MISO applicationStatus; CAISO active vs Withdrawn sheets; NYISO numeric Project Status # without legend. Not published: No queue position in MISO or CAISO; NYISO and MISO status codes undefined; suspended not isolated. |
Request or event date event_date | Partially covered |
| Queue, application, withdrawal and requested in-service dates; NYISO Date of IR and Last Updated. Not checked: Meaning of each date differs by operator; PJM dates not visible in capture; other operators not read. |
Latest available data latest_data | Partially covered |
| MISO live on 2026-11-19 (latest queueDate 2026-11-03); CAISO C16 posted 2026-10-16; NYISO 2026-10-31; LBNL through 2025. Not checked: No national file is current to the month; lag differs per operator. |
Historical coverage historical_series | Partially covered |
| NYISO withdrawn back to 1999; MISO records from 2015; LBNL annual editions (not opened). Not checked: No dated snapshots from operators were found; CAISO holds one file per cluster; LBNL content not verified. |
Update frequency update_frequency | Partially covered |
| MISO cache about 5 minutes (observed); CAISO per cluster; PJM statistics PDFs semiannual; none states record cadence. Not published: No tested operator states how often request records are updated. |
Main caveats
- Operator lists are regional and use different fields, MW bases and status codes; do not add them up as a national total.
- A connection request does not prove permits, financing or construction.
- MISO and CAISO omit developer names; NYISO status is a numeric code without legend.
- Withdrawn and done requests sit in the same files as active ones; filter by status before counting.
- The MISO JSON endpoint is undocumented and no licence was found for any operator file.
Sources
MISO generator interconnection queue (JSON endpoint behind the Project Status tool)
- Source id
- miso-gi-queue-api
- Publisher
- Midcontinent Independent System Operator (MISO)
- Official
- Yes
- Landing url
- https://www.misoenergy.org/planning/resource-utilization/GI_Queue/
- Data url
- https://www.misoenergy.org/api/giqueue/getprojects
- Access
- api
- Format
- JSON array (one object per request)
- License
- Unknown
- Language
- en
- Has coordinates
- No
- Location precision
- municipality
- Summary
- Full MISO queue as JSON: 4,101 requests with status, fuel, MW, POI, TO, state and dates; no developer names.
- Coverage note
- MISO footprint only (one of seven ISO/RTOs); not a national list.
- Date of data
- 2026-11-19 (live endpoint; latest queueDate 2026-11-03)
- Caveats
- Undocumented endpoint, no licence stated.
- No developer or project name; Done and LEGACY statuses undefined.
- Test
- Tested on
- 2026-11-19
- Method
- api_query
- Http status
- 200
- Problems
- Endpoint is not documented on the landing page; found by testing the Project Status tool's data path. HEAD returns 405 while GET returns 200.
- No licence or terms of use found for the data.
- Example
- Example request
curl -sL --max-time 120 'https://www.misoenergy.org/api/giqueue/getprojects' -o miso_gi.json
- Example result
{"projectNumber":"J3464","queueDate":"2024-04-16T04:00:00+00:00","transmissionOwner":"ITC MIDWEST","county":"Story","state":"IA","studyCycle":"DPP-2023","studyPhase":"Phase 2","svcType":"NRIS","poiName":"Fernald","summerNetMW":200.0,"fuelType":"Solar","facilityType":"Photovoltaic","applicationStatus":"Active"}
- Members summary
CAISO generator interconnection queue reports (Cluster 16 and Cluster 15 Excel files)
- Source id
- caiso-cluster-queue-reports
- Publisher
- California Independent System Operator (CAISO)
- Official
- Yes
- Landing url
- https://www.caiso.com/planning/Pages/GeneratorInterconnection/Default.aspx
- Data url
- https://www.caiso.com/documents/cluster-16-queue-report.xlsx
- Access
- direct_download
- Format
- XLSX (one workbook per cluster; Cluster 15 has Active and Withdrawn sheets)
- License
- Unknown
- Language
- en
- Has coordinates
- No
- Location precision
- municipality
- Summary
- Per-cluster Excel files with project name, fuels and MW, POI, county, requested COD and queue/application dates.
- Coverage note
- CAISO only; the two latest clusters (15 and 16) were tested, older ones sit in RIMS.
- Date of data
- 2026-10-16 (Cluster 16 posting)
- Caveats
- No developer name and no status column in Cluster 16.
- Cluster files are not cumulative; Excel serial dates.
- Test
- Tested on
- 2026-11-19
- Method
- download
- Http status
- 200
- Problems
- Each cluster is a separate file; no cumulative queue file was found in the page text.
- No licence or terms found for the files.
- Example
- Example request
curl -sL 'https://www.caiso.com/documents/cluster-16-queue-report.xlsx' -o c16.xlsx # sheet 'Cluster 16 Queue Report', header in row 1
- Example result
55357 | Airchair 1 | Photovoltaic/Solar 250 MW + Storage/Battery 250 MW | NET MW POI 250 | Kern, CA | PG&E FRESNO | PTO PGAE | POI GATES-MIDWAY 500kV | Requested COD 48335 (2032-05-01) | Queue Date 46296 (2026-10-01) | Application Date 46303.49 | Energy Only Requested
- Members summary
NYISO Interconnection Queue workbook (active, cluster, withdrawn, in-service)
- Source id
- nyiso-interconnection-queue
- Publisher
- New York Independent System Operator (NYISO)
- Official
- Yes
- Landing url
- https://www.nyiso.com/interconnections
- Data url
- https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-10312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1794581737933
- Access
- direct_download
- Format
- XLSX with several sheets
- License
- Unknown
- Language
- en
- Has coordinates
- No
- Location precision
- municipality
- Summary
- NYISO workbook with developer, project, MW, fuel, POI, status code and dates; active, cluster, withdrawn and in-service sheets.
- Coverage note
- New York only; file dated 2026-10-31.
- Date of data
- 2026-10-31 (file name); posted by 2026-11-13
- Caveats
- Status # codes undefined in the file.
- Mixed sheet layouts and some placeholder dates.
- Test
- Tested on
- 2026-11-19
- Method
- download
- Http status
- 200
- Problems
- Status codes are not defined in the workbook or on the page read.
- No licence or terms found.
- Example
- Example request
curl -sL 'https://www.nyiso.com/documents/20142/1407078/NYISO-Interconnection-Queue-10312026.xlsx/ff0e2005-e8d3-e75d-3e81-fa7027a52685?t=1794581737933' -o nyiso.xlsx # sheet 'Interconnection Queue', header row 1
- Example result
0571 | Heritage Wind, LLC | Heritage Wind | Date of IR 42614 (2016-09-12) | SP 126 / WP 126 MW | Large Facility | W | Genesee, NY | Zone B | Lockport - Mortimer 115kV | NM-NG | Status # 11 | Last Updated 46326
- Members summary
PJM Cycle and Serial Service Request Status pages
- Source id
- pjm-service-request-status
- Publisher
- PJM Interconnection
- Official
- Yes
- Landing url
- https://www.pjm.com/planning/service-requests
- Data url
- Access
- web_viewer_only
- Format
- HTML table with XLS/XML export links (export untested); PDFs
- License
- Unknown
- Language
- en
- Has coordinates
- Location precision
- Summary
- PJM publishes request lists in a web viewer (cycle and serial pages) with XLS/XML export links; the viewer rows and exports were not read.
- Coverage note
- PJM footprint only.
- Date of data
- Caveats
- Export and sign-in requirement not verified.
- TC2 moved from the serial to the cycle page.
- Test
- Tested on
- 2026-11-19
- Method
- page_only
- Http status
- 200
- Problems
- Request rows and exports were not retrieved: the pages are a script-driven viewer.
- Whether the exports need a PJM account was not verified.
- Example
- Members summary
Berkeley Lab Queued Up: interconnection queue data file (through 2025)
- Source id
- lbnl-queued-up-dataset
- Publisher
- Lawrence Berkeley National Laboratory with GridTracker
- Official
- No
- Landing url
- https://eta-publications.lbl.gov/publications/us-interconnection-queue-data-0
- Data url
- https://eta-publications.lbl.gov/sites/default/files/2026-05/lbnl_ix_queue_data_file_thru2025.xlsx
- Access
- direct_download
- Format
- XLSX (project-level dataset, codebook and 36 summary tabs per the publication page)
- License
- CC BY 4.0
- Language
- en
- Has coordinates
- Location precision
- Summary
- Annual multi-operator compilation of US generation queues through end-2025 (CC BY 4.0), covering ISO/RTOs and about 50 non-ISO areas.
- Coverage note
- Per publisher; fields and records not verified because the file was blocked here.
- Date of data
- Requests through end of 2025; published 2026-05
- Caveats
- File could not be downloaded from this environment (403).
- Lags operator data by months; generation only.
- Test
- Tested on
- 2026-11-19
- Method
- blocked
- Http status
- 403
- Problems
- Automated requests to emp.lbl.gov and to the data-file URL on eta-publications.lbl.gov get a 403 challenge page; the landing page emp.lbl.gov/queues also returned 403 to curl.
- Contents of the workbook not verified; description relies on the publication page.
- Example
- Members summary
Additional sources in the detail: 1. Read the full detail; locate each source by its source_id.
Document access
- Summary
- Operator files and viewers are structured; no document-extraction recipe needed for the tested operators.
Confidence
- Confidence
- medium
- Confidence reason
- Three operators in different regions were downloaded and inspected; PJM, SPP, ISO-NE, ERCOT, non-ISO utilities and the compilation were not read.
Research provenance
- Pass count
- 1
- Models
- claude-sonnet-5-5 (Claude Sonnet 5.5) via Claude Code in the VS Code extension (Claude Agent SDK)
- Minutes estimate
- Pages opened
- 20
- Passes
- Pass
- 1
- Date
- 2026-11-19
- Model
- claude-sonnet-5-5 (Claude Sonnet 5.5) via Claude Code in the VS Code extension (Claude Agent SDK)
- Note
- Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed.
Record metadata
- Schema version
- 1.0
- Country
- us
- Country name
- United States
- Topic
- grid-connection-queue
- Territory
- us
- Territory level
- country
- Parent url
- Html url
- https://georutter.org/us/grid-connection-queue/